SlideShare a Scribd company logo
CIS Implementation RFP
Structure of an RFP –
 Statement of Purpose…………………………………………………………2
 Organization details………………………………………………………
 Background Information……………………………………………….
 Project Scope…………………………………………….....................
 Current Scenario………………………………………………….
 Contract Terms and requirements………………………….
 Financial Terms…………………………………………...
 Timeline and approach………………………………..
 Proposer minimum requirement…………………
 Proposal evaluation criteria……………………
 Proposal Requirements and Instructions……...........
 Confidentiality Terms…………………………….
 Other Conditions and Legal Terms………………….
CIS Implementation RFP
1. Statement of Purpose -
This Document constitutes a Request for Proposal (hereinafter “RFP”). It is the intent of ABC Power &
Light Company (hereinafter “ABC”) to investigate <the purchase of the requested customer information
system as specified within this document.>
2. Organization details –
ABC Power & Light Company (fictitious name) the principal subsidiary of XYZ Inc. is a Florida - based
power utility – and the largest electric utility in the united states – serving roughly 4.7 million customers
and 9 million people in Florida. It generates, transmits, distributes and sells electric energy.
ABC Company was founded in 1925 by merging a number of smaller companies providing power and
other services to local communities in northeastern Florida, and grew with the growth in population the
state has experienced.
3. Background Information -
ABC is planning to expand its retail energy sector by providing efficient and up to date customer
services. To meet the growing customers demand and enhance its retail operations ABC requires to
implement customer information system for its day to day retail activities.
The main objective behind this CIS implementation is to improve retail utility performance and enhance
customer service levels along with improving billing accuracy, reduce service order backlog, minimize
overtime, and cut abandoned calls.
4. Project Scope
The ABC wishes to acquire anABC’s Retail Customer System (“ARCS”) product configured to provide
the full range of CIS capabilities using proven state-of-the-art technology and best practices for planning,
controlling and accounting for the ABC's retail operations. Proposals for cloud based (SaaS) and/or
internally hosted solution(s) for all or part of the CIS software components are acceptable.
ABC expects each Offeror to present its best price and documented pricing methodology based on the
requirements documented within this RFP. ABC expects the project to have multiple phases,which are
being generically referred to as Planning, Analysis & Functional Design, Configuration & Development,
Testing, Transition, and Production Support.
5. Current Scenario –
ABC Currently performs its Customer related manually which introduces lots of errors in the customer
handling process due to human touch points. It is a time consuming process and also substantial cost is
involved in terms of time and paper.
CIS Implementation RFP
The ABC desires to acquire a replacement CIS to support multiple purposes within the ABC's retail
operations, focused primarily on the needs of Customer Management. Proposals must include integration
with current and anticipated retail operations as detailed in this RFP.
Proposals on any product offerings for a municipal Financial Information System (“FIS”) incorporating
functions such as procurement, budgeting, general ledger and financial reporting that integrates with
the proposed CIS shall be accepted. Proposals for FIS products shall be considered as optional and will be
evaluated as the ABC considers final award; however, the primary purpose of this RFP is procurement of
an integrated fully functioning CIS.
6. Contract Termsand requirements –
The ABC is soliciting proposals from qualified Proposers for a comprehensive Customer Information
System (CIS) solution to replace the ABC’s current CIS application. The proposed solutions are required
to meet multiple business needs, accommodate multiple requirements in the retail utility sector, and
provide a wide array of customer-facing opportunities that provide the ABC, and its customers, greatly
enhanced capabilities and functionality.
This will be a competitive negotiation process. Qualified individuals, firms, contractors, consultants or
entities (hereinafter “Proposers”), who meet the requirements set forth in this RFP, and are capable of
providing the services requested are encouraged to participate.
Product/ applications requirements are as follows –
1. Compatible with current CIS
2. User friendly and easy to adapt by staff
3. Should requires minimum efforts in training staff for its use
4. Should be with minimum maintenance cost
5. Should have efficient customer information tracking functions
6. Should provide advanced customer self-service portal
7. Capable of generating timely and accurate billings
8. Facilitate multiple bill pay modes
9. Capable to integrate with Big- data/Business Intelligence Dashboards and reports that
immediately promote critical thinking and fact-based decision making.
ABC requests details on
 Development methodology (agile/waterfall);
 Delivery schedule
 Post implementation support approach and tenure
***The Proposer System Integrator must provide a single point of contact throughout the project and
post implementation.
7. Financial Terms
CIS Implementation RFP
Please refer <project scope section 4> for details on budget. ABC requests detail pricing break down,
expected payment structure and payment cycle from the proposers.
***Product failing to perform per expectations won’t get paid and proposers are bound to compensate
for the losses of efforts and time.
***Proposers are liable to pay penalty amount in case of missing deadlines of each phases as specified in
the contract.
8. Timeline and approach –
The ABC expects the implementation project to be started from May 5, 2016,with duration of 18 months.
ABC also requires post implementation support of 18 months after the deployment which makes the total
contract duration of 3 years.
During the contract Proposer are expected to deploy the system in phases.The ABC has identified, but is
not held to, the following roll-out schedule:
Phase I -
 Customer Information System - including information tracking, bill generating systems
 Automating fund transfer technology
Phase II -
 Web Customer Self-Service
 Mobile Lite
 Remote payment Kiosk
Phase III –
 Application Support
9. Proposer minimum requirement –
Requirements will be stated within the RFP for potential Proposers to meet, if they are to be considered
for evaluation. These include but are not limited to the following:
 The solution must provide for the automation of many currently manual processes and back-
office functional requirements.
 The solution will function based on the following technology components, Preference for the
following –
 Operating platforms:
o MVC Architecture
o Cloud Based
o Support for all OS environment
 Database Platform
o Any RDBMS with scalability.
 The Proposer should demonstrate a long-term commitment to the utility CIS marketplace.
 The Proposer should be free from legal entanglements related to CIS implementation failure.
 Solution should have a proven record of on-going and current upgrades.
CIS Implementation RFP
 The Proposer should demonstrate an understanding of and commitment to supporting the
Florida legislative and municipal utility environment. This includes but is not limited to: Energy
Efficiency (Energy Budget billing) programs and Energy Reuse.
 The solution will optionally contain a series of Business Intelligence Dashboards and reports that
immediately promote critical thinking and fact-based decision making.
 The Proposer System Integrator must provide a single point of contact throughout the project
and post implementation.
 All solution costs including travel fees must be fixed price.
 All documents and attachments related to the RFP must be included at the time of submittal.
10. Proposal evaluation criteria –
The scope of this project includes the evaluation of the areas described below:
I] Functional components –
1. Track Customer Information
2. Help to provide web customer self-service, and reduce demands on service staff
3. Generate Bills, Improve billing accuracy
4. Reduce payment defaults by enabling automatic funds transfer, credit card, phone pay, web pay
5. Issue Service Requests
6. Manage Customer Relationships
o Decrease Customer Response Times
o Automate communication with customers about utility programs and activities such as
electricity quality, electricity conservation and maintenance activities;
o Remote payment kiosk
II] Technical Components –
1. Preferred platform/operating system
2. Compatibility with current system
3. Solution support
4. Disaster recovery
11. Proposal Requirements and Terms
NOTICE IS HEREBY GIVEN that proposals for the CIS Implementation project will be received by the
ABC on following address –
Submittals: ABC Power & Light Company
Attn: Mr. XYZ (Project Manager)
300 N Coast Highway
Oceanside, FL 92054
Any responses submitted after 4 PM PT on March 19, 2016 will not be considered and will be returned
unopened.
CIS Implementation RFP
The Proposer is also directed to include the RFP title “CIS IMPLEMENTAION/REPLACEMENT
PROJECT” on the outside
Requested proposal should be submitted in the word format with pricing sheet and the attached formed
filled.
Proposers may send additional questions and queries till February 7, 2016 on the above address,
information requested after the mentioned date would not be answered.
ABC plans to conduct pre-proposal conference on Feb 15, 2016,all interested proposers are requested to
register themselves on the given link: https://xyz.prepraposalconferenceregistration
12. Outcome and Performance Standards
This CIS replacement should facilitate ABC’s retail utility performance and enhance customer service
levels along with improving billing accuracy, reduce service order backlog, minimize overtime, and cut
abandoned calls.
It should give low maintenance cost and should be standardized per utility industry norms.
The system must be adaptable to integrate with upcoming technologies and trends.
13. Confidentiality Terms -
The information contained in this Request for Proposal (RFP) is confidential. In accepting this RFP,
vendors should agree that the Confidential Information has been compiled, created and maintained by
special effort and expense of the other party.
14. Other Conditions and Legal Terms–
1. Proposals Property of the ABC: All documents or materials submitted with or in conjunction with
any Proposal, including but not limited to electronic files, shall become the property of the ABC
after the Proposal submission deadline. No submission documents will be returned.
2. During negotiations, the scope of services may be amended by the ABC and negotiated based
upon ideas provided by other Proposers or any other source.
3. Rejection as Non-Responsive: Proposals may be rejected as non-responsive at the ABC’s sole
discretion if there are alterations of form, the Proposal is conditional or the Proposal is
incomplete.
4. Modifying RFP: The ABC reserves the right to modify any portion of, or to postpone or cancel
this RFP at any time, and/or reject any and all Proposals without indicating any reason.
5. No Proposal is accepted: The ABC may elect to have the services performed in some other
manner.
6. Rejecting Team Members, Proposers or Sub-contractors. The ABC reserves the right to reject
individual team members, Proposers, sub-consultants, business partners or sub-contractors and
request substitution prior to contract award.
7. Business License Required. Any entity doing business in the ABC of Oceanside is required to
obtain a business license prior to beginning work.
CIS Implementation RFP

More Related Content

PDF
Rnd-point-case-collection
PDF
Ps business blueprint
PDF
PMs Role supporting Cloud Acquisition and associated Challenges
PDF
204560 sellwood bridge replacement project case study
PPT
Rohit demo sap ps_module_training
PDF
Sap solutions presentation
PDF
sap-ps-project-systems
PDF
286648705 sap-bos
Rnd-point-case-collection
Ps business blueprint
PMs Role supporting Cloud Acquisition and associated Challenges
204560 sellwood bridge replacement project case study
Rohit demo sap ps_module_training
Sap solutions presentation
sap-ps-project-systems
286648705 sap-bos

What's hot (20)

PPT
SAP mm module
PDF
2007_HOW_TO_USE_SAP_PROJECT_SYSTEM_FOR_REVENUE_RECOGNITION_IN_PROFESSIONAL_SE...
DOCX
Jim richardson oom cs377 phase 5 ip (2)
PPTX
PS Module Overview
PDF
SAP PS overview
DOC
CRM Consulting Services RFP
PPT
Software for Project Planning - Nfra professional
DOCX
PDF
CV_Gaurav Mohite
PDF
SAP Project Management
PDF
Ceo product categories_reference_customer_edition
DOC
Jagadeesh_Bangalore_5.01_yrs
PDF
Ps training mannual ( configuration )
PDF
UN CEFACT Business Requirements Specification Cross Industry Invoicing Process
PPT
SAP PS Intro
PDF
Presentation rate&bill
PDF
Balco ps configuration manual
PPTX
RFP execution a practical guideline to improve selection process
PDF
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
SAP mm module
2007_HOW_TO_USE_SAP_PROJECT_SYSTEM_FOR_REVENUE_RECOGNITION_IN_PROFESSIONAL_SE...
Jim richardson oom cs377 phase 5 ip (2)
PS Module Overview
SAP PS overview
CRM Consulting Services RFP
Software for Project Planning - Nfra professional
CV_Gaurav Mohite
SAP Project Management
Ceo product categories_reference_customer_edition
Jagadeesh_Bangalore_5.01_yrs
Ps training mannual ( configuration )
UN CEFACT Business Requirements Specification Cross Industry Invoicing Process
SAP PS Intro
Presentation rate&bill
Balco ps configuration manual
RFP execution a practical guideline to improve selection process
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
Ad

Viewers also liked (19)

PDF
Guía sofía
PDF
Guía de etica
PDF
AVR FM Brochure
PDF
Guía redes sociales
PDF
Estudio de seguridad y salud
PDF
Guía entorno socioeconómico
PDF
Short Profile - AVR Bangladesh - Official Presentation
PDF
Guía formación por proyectos
PDF
Ipoclorito di sodio Usi e Proprietà in molte applicazioni
PPTX
T5genomaysabelmarcano
PPTX
Tarea2sistemanervioso
PDF
La Seguridad en el proyecto - 5. Análisis de Estudios de Seguridad y Salud
DOCX
La domotica
DOCX
PPTX
Ysabelmarcanoaparatoreproductor
PDF
La Seguridad en el proyecto - 3. Protecciones colectivas e individuales
PDF
Actividad de seguridad - Identificación de riesgos, medidas preventivas y pro...
PDF
Planos seguridad y salud
DOCX
ADMIRE T Mpofu Detailed Inclusive CV
Guía sofía
Guía de etica
AVR FM Brochure
Guía redes sociales
Estudio de seguridad y salud
Guía entorno socioeconómico
Short Profile - AVR Bangladesh - Official Presentation
Guía formación por proyectos
Ipoclorito di sodio Usi e Proprietà in molte applicazioni
T5genomaysabelmarcano
Tarea2sistemanervioso
La Seguridad en el proyecto - 5. Análisis de Estudios de Seguridad y Salud
La domotica
Ysabelmarcanoaparatoreproductor
La Seguridad en el proyecto - 3. Protecciones colectivas e individuales
Actividad de seguridad - Identificación de riesgos, medidas preventivas y pro...
Planos seguridad y salud
ADMIRE T Mpofu Detailed Inclusive CV
Ad

Similar to Rfp cis implementation v3 (20)

PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
DOC
Website Design RFP Template
DOC
Annx i ,ii 1
PPTX
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...
PDF
Sourcing Functional Requirements for a Services Division. Transforming Digitally
DOCX
RFP1. Project Initiation Phase The purpose of the RFP document.docx
PDF
State of Nevada RFP Legacy Modernization
PPTX
Agile Development with Agile Contract
PDF
Rfp is audit-201300000000-0000-0
DOCX
Website Request for Proposals (RFP)1. DESCRIPTION, PURPOSE AND O.docx
DOC
Rohan_Purekar
PPTX
Project Plan And Estimation
DOCX
Course project scenario the course project scenario in this c
PDF
Webinar consulting services rfp
DOC
Guruprasad_Srinivasamurthy - CV
PPTX
A guide to business analysis
PPTX
Vendor Selection Process
PPT
4. Chapter3_How to Scope a Project (2).ppt
DOCX
Sample Assessment SOW Scope
PPTX
Telecom SaaS Billing Solutions Case Study
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Website Design RFP Template
Annx i ,ii 1
Kanban India 2023 | Jayalatha Ramachandran and Sanjay Adasul | Embracing sim...
Sourcing Functional Requirements for a Services Division. Transforming Digitally
RFP1. Project Initiation Phase The purpose of the RFP document.docx
State of Nevada RFP Legacy Modernization
Agile Development with Agile Contract
Rfp is audit-201300000000-0000-0
Website Request for Proposals (RFP)1. DESCRIPTION, PURPOSE AND O.docx
Rohan_Purekar
Project Plan And Estimation
Course project scenario the course project scenario in this c
Webinar consulting services rfp
Guruprasad_Srinivasamurthy - CV
A guide to business analysis
Vendor Selection Process
4. Chapter3_How to Scope a Project (2).ppt
Sample Assessment SOW Scope
Telecom SaaS Billing Solutions Case Study

Recently uploaded (20)

PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PPTX
A Presentation on Touch Screen Technology
PDF
Enhancing emotion recognition model for a student engagement use case through...
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
project resource management chapter-09.pdf
PDF
Hybrid model detection and classification of lung cancer
PPTX
Tartificialntelligence_presentation.pptx
PDF
DP Operators-handbook-extract for the Mautical Institute
PPTX
OMC Textile Division Presentation 2021.pptx
PDF
Getting Started with Data Integration: FME Form 101
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PDF
Approach and Philosophy of On baking technology
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
1. Introduction to Computer Programming.pptx
PDF
Heart disease approach using modified random forest and particle swarm optimi...
NewMind AI Weekly Chronicles - August'25-Week II
Univ-Connecticut-ChatGPT-Presentaion.pdf
Agricultural_Statistics_at_a_Glance_2022_0.pdf
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
1 - Historical Antecedents, Social Consideration.pdf
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
A Presentation on Touch Screen Technology
Enhancing emotion recognition model for a student engagement use case through...
Programs and apps: productivity, graphics, security and other tools
project resource management chapter-09.pdf
Hybrid model detection and classification of lung cancer
Tartificialntelligence_presentation.pptx
DP Operators-handbook-extract for the Mautical Institute
OMC Textile Division Presentation 2021.pptx
Getting Started with Data Integration: FME Form 101
MIND Revenue Release Quarter 2 2025 Press Release
Approach and Philosophy of On baking technology
Unlocking AI with Model Context Protocol (MCP)
1. Introduction to Computer Programming.pptx
Heart disease approach using modified random forest and particle swarm optimi...

Rfp cis implementation v3

  • 1. CIS Implementation RFP Structure of an RFP –  Statement of Purpose…………………………………………………………2  Organization details………………………………………………………  Background Information……………………………………………….  Project Scope…………………………………………….....................  Current Scenario………………………………………………….  Contract Terms and requirements………………………….  Financial Terms…………………………………………...  Timeline and approach………………………………..  Proposer minimum requirement…………………  Proposal evaluation criteria……………………  Proposal Requirements and Instructions……...........  Confidentiality Terms…………………………….  Other Conditions and Legal Terms………………….
  • 2. CIS Implementation RFP 1. Statement of Purpose - This Document constitutes a Request for Proposal (hereinafter “RFP”). It is the intent of ABC Power & Light Company (hereinafter “ABC”) to investigate <the purchase of the requested customer information system as specified within this document.> 2. Organization details – ABC Power & Light Company (fictitious name) the principal subsidiary of XYZ Inc. is a Florida - based power utility – and the largest electric utility in the united states – serving roughly 4.7 million customers and 9 million people in Florida. It generates, transmits, distributes and sells electric energy. ABC Company was founded in 1925 by merging a number of smaller companies providing power and other services to local communities in northeastern Florida, and grew with the growth in population the state has experienced. 3. Background Information - ABC is planning to expand its retail energy sector by providing efficient and up to date customer services. To meet the growing customers demand and enhance its retail operations ABC requires to implement customer information system for its day to day retail activities. The main objective behind this CIS implementation is to improve retail utility performance and enhance customer service levels along with improving billing accuracy, reduce service order backlog, minimize overtime, and cut abandoned calls. 4. Project Scope The ABC wishes to acquire anABC’s Retail Customer System (“ARCS”) product configured to provide the full range of CIS capabilities using proven state-of-the-art technology and best practices for planning, controlling and accounting for the ABC's retail operations. Proposals for cloud based (SaaS) and/or internally hosted solution(s) for all or part of the CIS software components are acceptable. ABC expects each Offeror to present its best price and documented pricing methodology based on the requirements documented within this RFP. ABC expects the project to have multiple phases,which are being generically referred to as Planning, Analysis & Functional Design, Configuration & Development, Testing, Transition, and Production Support. 5. Current Scenario – ABC Currently performs its Customer related manually which introduces lots of errors in the customer handling process due to human touch points. It is a time consuming process and also substantial cost is involved in terms of time and paper.
  • 3. CIS Implementation RFP The ABC desires to acquire a replacement CIS to support multiple purposes within the ABC's retail operations, focused primarily on the needs of Customer Management. Proposals must include integration with current and anticipated retail operations as detailed in this RFP. Proposals on any product offerings for a municipal Financial Information System (“FIS”) incorporating functions such as procurement, budgeting, general ledger and financial reporting that integrates with the proposed CIS shall be accepted. Proposals for FIS products shall be considered as optional and will be evaluated as the ABC considers final award; however, the primary purpose of this RFP is procurement of an integrated fully functioning CIS. 6. Contract Termsand requirements – The ABC is soliciting proposals from qualified Proposers for a comprehensive Customer Information System (CIS) solution to replace the ABC’s current CIS application. The proposed solutions are required to meet multiple business needs, accommodate multiple requirements in the retail utility sector, and provide a wide array of customer-facing opportunities that provide the ABC, and its customers, greatly enhanced capabilities and functionality. This will be a competitive negotiation process. Qualified individuals, firms, contractors, consultants or entities (hereinafter “Proposers”), who meet the requirements set forth in this RFP, and are capable of providing the services requested are encouraged to participate. Product/ applications requirements are as follows – 1. Compatible with current CIS 2. User friendly and easy to adapt by staff 3. Should requires minimum efforts in training staff for its use 4. Should be with minimum maintenance cost 5. Should have efficient customer information tracking functions 6. Should provide advanced customer self-service portal 7. Capable of generating timely and accurate billings 8. Facilitate multiple bill pay modes 9. Capable to integrate with Big- data/Business Intelligence Dashboards and reports that immediately promote critical thinking and fact-based decision making. ABC requests details on  Development methodology (agile/waterfall);  Delivery schedule  Post implementation support approach and tenure ***The Proposer System Integrator must provide a single point of contact throughout the project and post implementation. 7. Financial Terms
  • 4. CIS Implementation RFP Please refer <project scope section 4> for details on budget. ABC requests detail pricing break down, expected payment structure and payment cycle from the proposers. ***Product failing to perform per expectations won’t get paid and proposers are bound to compensate for the losses of efforts and time. ***Proposers are liable to pay penalty amount in case of missing deadlines of each phases as specified in the contract. 8. Timeline and approach – The ABC expects the implementation project to be started from May 5, 2016,with duration of 18 months. ABC also requires post implementation support of 18 months after the deployment which makes the total contract duration of 3 years. During the contract Proposer are expected to deploy the system in phases.The ABC has identified, but is not held to, the following roll-out schedule: Phase I -  Customer Information System - including information tracking, bill generating systems  Automating fund transfer technology Phase II -  Web Customer Self-Service  Mobile Lite  Remote payment Kiosk Phase III –  Application Support 9. Proposer minimum requirement – Requirements will be stated within the RFP for potential Proposers to meet, if they are to be considered for evaluation. These include but are not limited to the following:  The solution must provide for the automation of many currently manual processes and back- office functional requirements.  The solution will function based on the following technology components, Preference for the following –  Operating platforms: o MVC Architecture o Cloud Based o Support for all OS environment  Database Platform o Any RDBMS with scalability.  The Proposer should demonstrate a long-term commitment to the utility CIS marketplace.  The Proposer should be free from legal entanglements related to CIS implementation failure.  Solution should have a proven record of on-going and current upgrades.
  • 5. CIS Implementation RFP  The Proposer should demonstrate an understanding of and commitment to supporting the Florida legislative and municipal utility environment. This includes but is not limited to: Energy Efficiency (Energy Budget billing) programs and Energy Reuse.  The solution will optionally contain a series of Business Intelligence Dashboards and reports that immediately promote critical thinking and fact-based decision making.  The Proposer System Integrator must provide a single point of contact throughout the project and post implementation.  All solution costs including travel fees must be fixed price.  All documents and attachments related to the RFP must be included at the time of submittal. 10. Proposal evaluation criteria – The scope of this project includes the evaluation of the areas described below: I] Functional components – 1. Track Customer Information 2. Help to provide web customer self-service, and reduce demands on service staff 3. Generate Bills, Improve billing accuracy 4. Reduce payment defaults by enabling automatic funds transfer, credit card, phone pay, web pay 5. Issue Service Requests 6. Manage Customer Relationships o Decrease Customer Response Times o Automate communication with customers about utility programs and activities such as electricity quality, electricity conservation and maintenance activities; o Remote payment kiosk II] Technical Components – 1. Preferred platform/operating system 2. Compatibility with current system 3. Solution support 4. Disaster recovery 11. Proposal Requirements and Terms NOTICE IS HEREBY GIVEN that proposals for the CIS Implementation project will be received by the ABC on following address – Submittals: ABC Power & Light Company Attn: Mr. XYZ (Project Manager) 300 N Coast Highway Oceanside, FL 92054 Any responses submitted after 4 PM PT on March 19, 2016 will not be considered and will be returned unopened.
  • 6. CIS Implementation RFP The Proposer is also directed to include the RFP title “CIS IMPLEMENTAION/REPLACEMENT PROJECT” on the outside Requested proposal should be submitted in the word format with pricing sheet and the attached formed filled. Proposers may send additional questions and queries till February 7, 2016 on the above address, information requested after the mentioned date would not be answered. ABC plans to conduct pre-proposal conference on Feb 15, 2016,all interested proposers are requested to register themselves on the given link: https://xyz.prepraposalconferenceregistration 12. Outcome and Performance Standards This CIS replacement should facilitate ABC’s retail utility performance and enhance customer service levels along with improving billing accuracy, reduce service order backlog, minimize overtime, and cut abandoned calls. It should give low maintenance cost and should be standardized per utility industry norms. The system must be adaptable to integrate with upcoming technologies and trends. 13. Confidentiality Terms - The information contained in this Request for Proposal (RFP) is confidential. In accepting this RFP, vendors should agree that the Confidential Information has been compiled, created and maintained by special effort and expense of the other party. 14. Other Conditions and Legal Terms– 1. Proposals Property of the ABC: All documents or materials submitted with or in conjunction with any Proposal, including but not limited to electronic files, shall become the property of the ABC after the Proposal submission deadline. No submission documents will be returned. 2. During negotiations, the scope of services may be amended by the ABC and negotiated based upon ideas provided by other Proposers or any other source. 3. Rejection as Non-Responsive: Proposals may be rejected as non-responsive at the ABC’s sole discretion if there are alterations of form, the Proposal is conditional or the Proposal is incomplete. 4. Modifying RFP: The ABC reserves the right to modify any portion of, or to postpone or cancel this RFP at any time, and/or reject any and all Proposals without indicating any reason. 5. No Proposal is accepted: The ABC may elect to have the services performed in some other manner. 6. Rejecting Team Members, Proposers or Sub-contractors. The ABC reserves the right to reject individual team members, Proposers, sub-consultants, business partners or sub-contractors and request substitution prior to contract award. 7. Business License Required. Any entity doing business in the ABC of Oceanside is required to obtain a business license prior to beginning work.