Logical roadmap of evolving PMO
with Organizational Maturity
Introduction
• Nowadays lots of Organization are going for CMMi
assessment to manage their capabilities. The PMO
setup should also colloberate with Organization
maturity level
• This paper will help in driving PMO level as per
Organization maturity level
• Project management as well as process management
will drive Organization maturity level
• Establishing a project management office (PMO) today
is considered one step forward in the maturity level of
an organization,
Overview PMO
• A project management office (PMO) is a unit or
department that specializes in project
management concepts and uses those concepts
to improve the overall project capability of an
organization. Typically, the primary goal of a PMO
is to improve project performance through
standardization and process. Additionally, a PMO
can also provide project support, information,
guidance, and oversight to an organization.
The Levels of a PMO.
CMMi Overview
• CMMI currently addresses three areas of interest:
– Product and service development — CMMI for
Development (CMMI-DEV),
– Service establishment, management, — CMMI for Services
(CMMI-SVC), and
– Product and service acquisition — CMMI for Acquisition
(CMMI-ACQ).
• CMMI models provide guidance for developing or
improving processes that meet the business goals of an
organization. A CMMI model may also be used as a
framework for appraising the process maturity of the
organization
Logical roadmap of creating pmo with cm mi prospective
CMMI Level VS PMO Level (adhoc
Processes)
Maturity Level 1 - Initial
• At maturity level 1, processes are
usually ad hoc and chaotic. The
organization usually does not provide
a stable environment. Success in
these organizations depends on the
competence and heroics of the
people in the organization and not on
the use of proven processes.
• Maturity level 1 organizations often
produce products and services that
work; however, they frequently
exceed the budget and schedule of
their projects.
• Maturity level 1 organizations are
characterized by a tendency to over
commit, abandon processes in the
time of crisis, and not be able to
repeat their past successes.
Level 1: The Functional Project Office
Level 1 is the simplest Project Office
possible, in which project managers are
simply present in the organization and
available for projects.
• The Functional Project Office is a
functional unit responsible for
staffing the organization with capable
project managers to manage projects
within the functional units of the
organization. In addition to staffing
project managers, the Functional
Project Office is also responsible for
resource management activities for
project managers.
• The Functional Project Office does
not provide an approved set of
project management processes,
organizational management, or
oversight of projects
CMMi Level Vs PMO Level (Project
Process)Maturity Level 2 - Managed
• the projects of the organization have ensured
that requirements are managed and that
processes are planned, performed, measured,
and controlled.
• The process discipline reflected by maturity
level 2 helps to ensure that existing practices
are retained during times of stress. When these
practices are in place, projects are performed
and managed according to their documented
plans.
• At maturity level 2, requirements, processes,
work products, and services are managed. The
status of the work products and the delivery of
services are visible to management at defined
points.
• Commitments are established among relevant
stakeholders and are revised as needed. Work
products are reviewed with stakeholders and
are controlled.
• The work products and services satisfy their
specified requirements, standards, and
objectives
Level 1: The Functional Project Office
• project managers typically work in various
parts of the organization and often use
different project management processes; in
addition, project managers may use different
project documentation templates and may
even have different project documentation
criteria, which range from ad-hoc to highly
structured criteria.
CMMi Level Vs PMO level
(Organization Process)
Maturity Level 3 – Defined
• At maturity level 3, processes are well
characterized and understood, and
are described in standards,
procedures, tools, and methods
• the standards, process descriptions,
and procedures for a project are
tailored from the organization's set of
standard processes to suit a
particular project or organizational
unit.
• the processes that are performed
across the organization are consistent
except for the differences allowed by
the tailoring guidelines
• processes are managed more
proactively using an understanding of
the interrelationships of the process
activities and detailed measures of
the process, its work products, and
its services.
Level 2: The Support Project Office
• The components of the Support Project
Office add to the components of the
Functional Project Office. The Support
Project Office provides the organization
with a standardized set of project
processes; however, similar to the
Functional Project Office, the Support
Project Office does not provide any
organizational management, oversight, or
communication about projects.
• A standardized set of project processes
includes project tools, a project
methodology, and project templates.
• The Support Project Office also works to
gain acceptance and adoption of the
project processes throughout the
organization
CMMi Level Vs PMO level
(Information management)
Maturity Level 4 - Quantitatively Managed
• At maturity level 4 Subprocesses are selected
that significantly contribute to overall process
performance. These selected subprocesses are
controlled using statistical and other
quantitative techniques.
• Quantitative objectives for quality and process
performance are established and used as
criteria in managing processes. Quantitative
objectives are based on the needs of the
customer, end users, organization, and process
implementers. Quality and process performance
are understood in statistical terms and are
managed throughout the life of the processes.
• For these processes, detailed measures of
process performance are collected and
statistically analyzed. Special causes of process
variation are identified and, where appropriate,
the sources of special causes are corrected to
prevent future occurrences.
• Quality and process performance measures are
incorporated into the organization.s
measurement repository to support fact-based
decision making in the future.
Level 3: The Information Project Office
• The Information Project Office begins to
expand the role of the Project Office to
provide project information and status to the
organization. In addition to the roles of the
Functional and Support Project Offices, the
role of the Information Project Office is to
compile a complete project list for the
organization, collect project information,
consolidate and summarize the project
information, and then distribute the
information throughout the organization.
• The Information Project Office works with
the organization to identify a standardized
set of project information needed by the
organization. The project information
collected and provided by projects could
include project status, project life cycle
stages, project approval gates, total hours,
project documents, timelines, milestones,
estimated start and finish dates, actual start
and finish dates, and so forth.
Optimization
Maturity Level 5 - Optimizing
• Processes are continually improved based on a
quantitative understanding of the common
causes of variation inherent in processes.
• Maturity level 5 focuses on continually
improving process performance through both
incremental and innovative technological
improvements.
• Quantitative process-improvement objectives
for the organization are established, continually
revised to reflect changing business objectives,
and used as criteria in managing process
improvement.
• The effects of deployed process improvements
are measured and evaluated against the
quantitative process-improvement objectives.
Both the defined processes and the
organization's set of standard processes are
targets of measurable improvement activities
Level 5: The Enterprise Project
Management Office
• The Enterprise Project Management
Office is the culmination of all or most
of the previous levels, along with the
addition of any combination of the
components listed below. At level 5,
the Enterprise PMO brings greater
awareness to resource utilization and
conflicts, facilitates conversations
about effective resource management,
and uses resource time reporting
information to guide organizational
decisions.
• The Enterprise PMO focuses on
project success, continuous
improvement, and better project
resource management.
Conclusion
• By relating each level we can evolve PMO
components and it will help in driving PMO
setup as per Organization capabilities .
• PMO also should be evolve as per
Organizational maturity
• This paper will help to draw linkage between
Organizational maturity and PMO level and
will help to evolve right PMO model

More Related Content

PDF
Project Management Office (PMO) Maturity Assessment
PPTX
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
PPTX
Project Management Framework
PDF
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PPT
PMI Project Management Framework
PDF
Undestand PMBok 5th, Section 3
PPTX
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
PPTX
Lecture 05:Advanced Project Management PM Processes and Framework
Project Management Office (PMO) Maturity Assessment
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Framework
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMI Project Management Framework
Undestand PMBok 5th, Section 3
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Lecture 05:Advanced Project Management PM Processes and Framework

What's hot (20)

PPT
Project Management Methodology
PPTX
1.3 project management process groups & knowledge areas 1
PDF
PMP PMBOK 6th
PPT
Common Sense Project Management Methodology
PPT
Introduction to PMP Brief Presentation
PDF
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
PDF
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
PDF
PMP PMbok 5th CH1 - CH2
PDF
Project Management Methodology
PPTX
Project management process
PDF
PMP PMBOK5 Ch4 integration management
PPT
PMP Certification Chapter one Summary of PMBOK
PPT
Project management professional (pmi) study guide
PDF
Inter national standards for project management - fitsilis
PPTX
7.0 Project Cost Management Overview
PPTX
Project management
PDF
Project Management Plan
PDF
PMI Project Management Model Overview (PMBOK 4th Edition)
PDF
The Project Management Plan in 20 steps
PPT
Project management methodologies
Project Management Methodology
1.3 project management process groups & knowledge areas 1
PMP PMBOK 6th
Common Sense Project Management Methodology
Introduction to PMP Brief Presentation
PMP Chapter 5 of 6 M & C Process Group (12- Processes) (Based on PMBOK 6th e...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
PMP PMbok 5th CH1 - CH2
Project Management Methodology
Project management process
PMP PMBOK5 Ch4 integration management
PMP Certification Chapter one Summary of PMBOK
Project management professional (pmi) study guide
Inter national standards for project management - fitsilis
7.0 Project Cost Management Overview
Project management
Project Management Plan
PMI Project Management Model Overview (PMBOK 4th Edition)
The Project Management Plan in 20 steps
Project management methodologies
Ad

Similar to Logical roadmap of creating pmo with cm mi prospective (20)

PPTX
Integrated roadmap for Developing PMO with CMMi Prospective
PDF
Maksym Vyshnivetskyi: PMO Maturity and Continuous Improvement (UA)
PPTX
Capability Maturity Model Integration (CMMI)
PPTX
PPTX
Capability Maturity Model Integartion
PPTX
Capability Maturity Model Integration
PDF
project management maturity models
PDF
PMO 2.0 - Building PMO Capabilities
PDF
Achieve cmmi level 5 maturity
PDF
Rostyslav Chayka: Assessing Organizational Readiness (UA)
PPTX
PMO Kick-Off Presentation
PDF
PPTX
CMMI Certification (Level 1-5)
PDF
Program Office Background
PPT
Program & project management (pmo)
PPSX
CMMI for Development Workshop
DOCX
Benchmarking of Project Management Office EstablishmentExtr.docx
PDF
How to deploy PPM methodologies with an agile approach
PDF
Project management best practices ispi-fritsch
PPTX
CMMi journey at small Organizations
Integrated roadmap for Developing PMO with CMMi Prospective
Maksym Vyshnivetskyi: PMO Maturity and Continuous Improvement (UA)
Capability Maturity Model Integration (CMMI)
Capability Maturity Model Integartion
Capability Maturity Model Integration
project management maturity models
PMO 2.0 - Building PMO Capabilities
Achieve cmmi level 5 maturity
Rostyslav Chayka: Assessing Organizational Readiness (UA)
PMO Kick-Off Presentation
CMMI Certification (Level 1-5)
Program Office Background
Program & project management (pmo)
CMMI for Development Workshop
Benchmarking of Project Management Office EstablishmentExtr.docx
How to deploy PPM methodologies with an agile approach
Project management best practices ispi-fritsch
CMMi journey at small Organizations
Ad

Recently uploaded (20)

PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Unlocking AI with Model Context Protocol (MCP)
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPT
Teaching material agriculture food technology
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Encapsulation theory and applications.pdf
PDF
cuic standard and advanced reporting.pdf
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PDF
Approach and Philosophy of On baking technology
PDF
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
Network Security Unit 5.pdf for BCA BBA.
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Unlocking AI with Model Context Protocol (MCP)
“AI and Expert System Decision Support & Business Intelligence Systems”
Chapter 3 Spatial Domain Image Processing.pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Advanced methodologies resolving dimensionality complications for autism neur...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
NewMind AI Weekly Chronicles - August'25 Week I
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Teaching material agriculture food technology
Understanding_Digital_Forensics_Presentation.pptx
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
Digital-Transformation-Roadmap-for-Companies.pptx
Encapsulation theory and applications.pdf
cuic standard and advanced reporting.pdf
20250228 LYD VKU AI Blended-Learning.pptx
Approach and Philosophy of On baking technology
Bridging biosciences and deep learning for revolutionary discoveries: a compr...

Logical roadmap of creating pmo with cm mi prospective

  • 1. Logical roadmap of evolving PMO with Organizational Maturity
  • 2. Introduction • Nowadays lots of Organization are going for CMMi assessment to manage their capabilities. The PMO setup should also colloberate with Organization maturity level • This paper will help in driving PMO level as per Organization maturity level • Project management as well as process management will drive Organization maturity level • Establishing a project management office (PMO) today is considered one step forward in the maturity level of an organization,
  • 3. Overview PMO • A project management office (PMO) is a unit or department that specializes in project management concepts and uses those concepts to improve the overall project capability of an organization. Typically, the primary goal of a PMO is to improve project performance through standardization and process. Additionally, a PMO can also provide project support, information, guidance, and oversight to an organization.
  • 4. The Levels of a PMO.
  • 5. CMMi Overview • CMMI currently addresses three areas of interest: – Product and service development — CMMI for Development (CMMI-DEV), – Service establishment, management, — CMMI for Services (CMMI-SVC), and – Product and service acquisition — CMMI for Acquisition (CMMI-ACQ). • CMMI models provide guidance for developing or improving processes that meet the business goals of an organization. A CMMI model may also be used as a framework for appraising the process maturity of the organization
  • 7. CMMI Level VS PMO Level (adhoc Processes) Maturity Level 1 - Initial • At maturity level 1, processes are usually ad hoc and chaotic. The organization usually does not provide a stable environment. Success in these organizations depends on the competence and heroics of the people in the organization and not on the use of proven processes. • Maturity level 1 organizations often produce products and services that work; however, they frequently exceed the budget and schedule of their projects. • Maturity level 1 organizations are characterized by a tendency to over commit, abandon processes in the time of crisis, and not be able to repeat their past successes. Level 1: The Functional Project Office Level 1 is the simplest Project Office possible, in which project managers are simply present in the organization and available for projects. • The Functional Project Office is a functional unit responsible for staffing the organization with capable project managers to manage projects within the functional units of the organization. In addition to staffing project managers, the Functional Project Office is also responsible for resource management activities for project managers. • The Functional Project Office does not provide an approved set of project management processes, organizational management, or oversight of projects
  • 8. CMMi Level Vs PMO Level (Project Process)Maturity Level 2 - Managed • the projects of the organization have ensured that requirements are managed and that processes are planned, performed, measured, and controlled. • The process discipline reflected by maturity level 2 helps to ensure that existing practices are retained during times of stress. When these practices are in place, projects are performed and managed according to their documented plans. • At maturity level 2, requirements, processes, work products, and services are managed. The status of the work products and the delivery of services are visible to management at defined points. • Commitments are established among relevant stakeholders and are revised as needed. Work products are reviewed with stakeholders and are controlled. • The work products and services satisfy their specified requirements, standards, and objectives Level 1: The Functional Project Office • project managers typically work in various parts of the organization and often use different project management processes; in addition, project managers may use different project documentation templates and may even have different project documentation criteria, which range from ad-hoc to highly structured criteria.
  • 9. CMMi Level Vs PMO level (Organization Process) Maturity Level 3 – Defined • At maturity level 3, processes are well characterized and understood, and are described in standards, procedures, tools, and methods • the standards, process descriptions, and procedures for a project are tailored from the organization's set of standard processes to suit a particular project or organizational unit. • the processes that are performed across the organization are consistent except for the differences allowed by the tailoring guidelines • processes are managed more proactively using an understanding of the interrelationships of the process activities and detailed measures of the process, its work products, and its services. Level 2: The Support Project Office • The components of the Support Project Office add to the components of the Functional Project Office. The Support Project Office provides the organization with a standardized set of project processes; however, similar to the Functional Project Office, the Support Project Office does not provide any organizational management, oversight, or communication about projects. • A standardized set of project processes includes project tools, a project methodology, and project templates. • The Support Project Office also works to gain acceptance and adoption of the project processes throughout the organization
  • 10. CMMi Level Vs PMO level (Information management) Maturity Level 4 - Quantitatively Managed • At maturity level 4 Subprocesses are selected that significantly contribute to overall process performance. These selected subprocesses are controlled using statistical and other quantitative techniques. • Quantitative objectives for quality and process performance are established and used as criteria in managing processes. Quantitative objectives are based on the needs of the customer, end users, organization, and process implementers. Quality and process performance are understood in statistical terms and are managed throughout the life of the processes. • For these processes, detailed measures of process performance are collected and statistically analyzed. Special causes of process variation are identified and, where appropriate, the sources of special causes are corrected to prevent future occurrences. • Quality and process performance measures are incorporated into the organization.s measurement repository to support fact-based decision making in the future. Level 3: The Information Project Office • The Information Project Office begins to expand the role of the Project Office to provide project information and status to the organization. In addition to the roles of the Functional and Support Project Offices, the role of the Information Project Office is to compile a complete project list for the organization, collect project information, consolidate and summarize the project information, and then distribute the information throughout the organization. • The Information Project Office works with the organization to identify a standardized set of project information needed by the organization. The project information collected and provided by projects could include project status, project life cycle stages, project approval gates, total hours, project documents, timelines, milestones, estimated start and finish dates, actual start and finish dates, and so forth.
  • 11. Optimization Maturity Level 5 - Optimizing • Processes are continually improved based on a quantitative understanding of the common causes of variation inherent in processes. • Maturity level 5 focuses on continually improving process performance through both incremental and innovative technological improvements. • Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives, and used as criteria in managing process improvement. • The effects of deployed process improvements are measured and evaluated against the quantitative process-improvement objectives. Both the defined processes and the organization's set of standard processes are targets of measurable improvement activities Level 5: The Enterprise Project Management Office • The Enterprise Project Management Office is the culmination of all or most of the previous levels, along with the addition of any combination of the components listed below. At level 5, the Enterprise PMO brings greater awareness to resource utilization and conflicts, facilitates conversations about effective resource management, and uses resource time reporting information to guide organizational decisions. • The Enterprise PMO focuses on project success, continuous improvement, and better project resource management.
  • 12. Conclusion • By relating each level we can evolve PMO components and it will help in driving PMO setup as per Organization capabilities . • PMO also should be evolve as per Organizational maturity • This paper will help to draw linkage between Organizational maturity and PMO level and will help to evolve right PMO model