Insights into
Project Management Body of Knowledge
(PMBOK® Guide) - Sixth Edition
TAREQ A. AL BEHEIRI, PMP,PMI-ACP
#kuwaitpmc
2017
1
2
3
What is the PMBOK©
4
The PMBOK
©
A global standard and guide for Project
Management profession
WWW.PMI.ORG
one of the world largest non-profit association for PM profession
5
What is the Purpose?
PROVIDEIDENTIFY
Common
6
The PMBOK History
109999
Knowledge
Areas
4742443937Processes
7
(PMBOK® Guide) - Sixth Edition
10Knowledge Areas
49Processes
8
9
Why Update the 5th Edition
Progress in Profession
Change in World
Compliance
10
11
PMBOK Components
a. Guide
b. Standard
c. Supplements
PMBOK comprises three parts:
PMBOK
Guide
72%
PMBOK
Standered
7%
PMBOK
Supplements
21%
PMBOK 5th
Edition Components
Guide
444 Pgs
Standard 46 Pgs
Supplements
128 Pgs
618PAGES
12
13
A. The Guide
A guide to project management body of
knowledge
A.1
Front- End
A.2
Knowledge
Area
Chapter (1-3) Chapter (4-13)
Not ANSI Standard ANSI Standard
14
B. The Standard
A standard for project management
Section (i)Section (ii)
According to
the American National Standards Institute (ANSI)
ANNEX 1
15
C. Supplements
Things that complete and enhance the guide
C.1
Appendices
C.2
References
C.3
Glossary
C.4
Index
16
17
What is the standard?
According to ISO
A document approved by a
recognized body that provide for
common and repeated use
rules,guidelines,or characteristics
for products,processes,or services
with which compliance are not
mandatory ISO 9453
18
Standard means…
A set of principles and rules considered by
an authority or general consent
as a basis of comparison and
judgment in approved model
The Standard Components
Section (i)
Introduces
The Role of Project
Management
Includes
Abbreviated
Key Concepts
Describes
Project Management
Process Groups
(IPECC)
Describes processes, grouped
into Process Groups
Key Benefit
Inputs
Outputs
Section (ii)
19
20
Standardization
of the PMI
In 1998,PMI was accredited as a
standards developers by ANSI?
This process was outlined in the
ANNEX Part
and described in
the PMBOK Guide 5th edition part
Approved
AMERICAN NATIONAL
STANDARD
ANSI/PMI 99-001-2013
21
22
What is the standard
for
PROJECT MANAGEMENT?
ANSI requires an update at least every Fiveyears
23
Requirements for COMPLIANCE
ANSI Formal Review Process
requires
BMBOK Guide
Exposure Draft
All comments reviewed formally
Decisions can be appealed and adjudicated
Member Advisory Group Review (MAG (
Consensus body vote
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth Edition
25
B.in the Guide
26
Front – End
(Chapter (1-3
Chapter 1
Chapter 2
Chapter 3
Introduction
Organizational Influence And Project Life Cycle
Project Management Processes
Cover key principles and broad concepts
Not an ANSI Standard
Formal Exposure Draft processNot REQUIRED
Reviewed along with Knowledge Area
chapters 4-1327
What’s new for the Front – End
(Chapter (1-3
Restructure
3=2
+1
Chapter 3 :The Role
of28
In the presence of a comprehensive knowledge
Area about the STAKEHOLDERS, Do you see good
importance to specially add a new chapter on the
PROJECT MANAGER role at the PMBOK® Guide
In your perspective, What is the most important
role(s) required from the Project Manager
orchestra
The New chapter Focus
Will discuss the PMI Talent Triangle™
and the skill sets organizations
demand that make project managers
more competitive and relevant
Link the New chapter with the
PMI Talent Triangle™
knowledge Areas
(Chapter (4-13
Chapter 4
Chapter 5
Chapter 6
Integration
Scope
Time
Chapter 7 Cost
Chapter 8 Quality
Chapter 9 Human Resources
Chapter 10 Communication
Chapter 11 Risk
Chapter 12 Procurement
Chapter 13 Stakeholders
Cover project management knowledge areas
Introductory
section / each
Processes with
inputs, tools & techniques, outputs
An ANSI Standard
Formal Exposure Draft process
1 2
33
Introductory Section
1
Common structure for
each knowledge area
Definition
Key Benefits
List of Processes
Overview Diagram
Data Flow Diagram
Key Concepts
Number of processes
with
inputs, tools &
techniques, outputs
2
34
What’s new for knowledge Areas
Chapter (4-13) Introductory Section
Improve
Trends and Emerging Practices
Approach for Iterative, Adaptive and
Agile environment
Tailoring Considerations
Consistency across knowledge areas
35
What’s new for knowledge Areas
Chapter (4-13) Processes with ITTO Section
ITTO Bundling
Inputs outputsT&T
36
What’s new for knowledge Areas
Chapter (4-13) Processes with ITTO Section
Grouping (T&T)
under Heading of AFFINITIES
DataGathering
DG
DataAnalysis
DA DecisionMakingDM
Interpersonal
andteamskills
ITS
Communication
skills
CS
Communication
COM
1 2 3 4 5 637
1
2
3
4
5
6
Grouping (T&T)
under heading of affinities
38
The process of COLLECT REQUIREMENTS
Fifth Edition Sixth Editionin
39
1. Project management
plan
2. Project documents
1. Project management
plan update
2. Project documents updates
What’s new for knowledge Areas
Chapter (4-13) Processes with ITTO Section
Simplify (IO)- Not Listed Individually
Individual project management PLAN components and
project DOCUMENTS are listed beneath table:
Schedule management plan, Scope baseline, Cost estimates, Risk register
Inputs outputs
1 …..
2….
3…..
T&T
40
Detailed Changes
41
Detailed Changes in the Knowledge Areas
Rearrange
+Processes
3
*Processes
6
-Processes
1
ADD Rename Remove
*Knowledge
Area
2
Rename
42
Manage Project Knowledge
Control Resources
Implement Risk Responses
4.Integration
3.Excuting
+
4.Control
9.Resources
+
3.Excuting
11.Risk
+
43
Adding Processes
Rename Processes
• SIX processes have different names.
• In order to :
 Be aligned the process name with the intent of it
 To align with RESEARCH showing that project
management is more about FACILITATING and
MANAGING than CONTROLLING,
 THREE of them have shifted from a Control
function to a Monitor function.
Fifth Edition Sixth Edition
KA8
KA9
KA10
KA11
KA13
KA13
45
Rename Processes
6
Close Procurement
12 Procurement
5Closing
-
46
Remove Processes
Fifth Edition
Sixth Edition
KA6
KA9
Human Resource Management
Time Management
Project Schedule Management
Project Resource Management
47
Rename KAs
4. Integration Management
48
5. Scope Management
49
6. Schedule Management
50
• emphasizing the importance of
scheduling in project management.
• aligns with PMI’s Practice Standard
for Scheduling.
51
8. Quality Management
52
9. Resources Management
53
• discuss both TEAM resources
and PHYSICAL resources
10. Communication Management
54
11. Risk Management
55
12. Procurement Management
56
57
The function of the
Close Procurement process
Control Procurements Close Project or Phase
- Research shows that few project managers have the
authority to formally and legally close a contract.
- Project managers are responsible to determine that
work is complete, records indexed and archived, and
responsibilities transferred appropriately.
- Project managers have no included work associated
with Close Procurements within the aforementioned
processes.
13. Stakeholders Management
58
7. Cost Management
59
A.in the Standard
60
The main change in the Standard
Simplification of IO table
- Not Listed Individually
1. Project management plan
2. Project documents
……….
1. Project management plan
update
2. Project documents
updates ……….
Individual project management plan components and project
documents are listed beneath table:
Schedule management plan, Scope baseline, Cost estimates, Risk register
Inputs outputs
61
Example of IO Simplification
62
63
Why use simplified IO structure?
David Hillson
6th Ed.Core committee
Vice Chair
1. Provides a stable foundation
for future updates
Project management plan and Project documents
will always be inputs and outputs in IO table,
although specific components and documents may change
in future updates
64
Why use simplified IO structure?
David Hillson
6th Ed.Core committee
Vice Chair
2.Non-prescriptive, emphasizing
need for tailoring
- Specific Project management plan components and
Project documents are likely to be different for different
projects
- PM is responsible for identifying what is needed for
their project65
C. Supplements
66
What’s new for Supplements
Index- References – Glossary – Appendices
68
Guidelines for Updating
69
70
when will the new edition be
released?
(Sept)2017
6.Final version will be
released
7.Printed version will
become available
Beginof2018
1.Development work
completed
December2015
2.Exposure Draft period
June-July2016
3.All comments reviewed
(July)2016
4. Integration, QC and final edit
(Aug)2016
5. CEO approval
(Sept)2016new PMP® Exam update to be based on PMBOK® Guide 6th edition
is in the first quarter of 2018
2017
2017
2017
2017
My Biography
in 4 snapshots
Instructor Construction manager
volunteer Civil engineer
72
• Name | (TAREQ A. AL BEHEIRI)
• Email | (tareq742@yahoo.com)
• Mobil | + 965 97818174
73

More Related Content

PDF
PMP PMBOK 6th
PPT
10. Project Quality Management
PDF
Project Management Concepts
PPTX
Project Management Framework
PPTX
2. project initiation
PPTX
Project scope management 1
PDF
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PDF
Project Charter Guide
PMP PMBOK 6th
10. Project Quality Management
Project Management Concepts
Project Management Framework
2. project initiation
Project scope management 1
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
Project Charter Guide

What's hot (20)

DOC
PDF
Project management
PPT
072 Method Statement
PPTX
Implementing a Project Office Management
PDF
Construction Safety Training
PPTX
Project management process and Project Management Knowledge areas
PPTX
Guide for RAID Management
PDF
Project initiation
PDF
PMP PMbok 5th CH1 - CH2
PPT
Final Project Closing
PPT
010 Permit To Work.ppt
PPTX
Printed circuit board
PDF
NEBOSH HSE PSM Element 1 v1.pdf
DOCX
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PPT
PMP Exam Notes
PPT
Electrical Safety
PPTX
Project Resource Management - PMBOK6
PDF
PMO Performance Measurement and Metrics - Kendrick
PPT
Pmi - Project Management Professional (Pmp) Certification Study Guide
Project management
072 Method Statement
Implementing a Project Office Management
Construction Safety Training
Project management process and Project Management Knowledge areas
Guide for RAID Management
Project initiation
PMP PMbok 5th CH1 - CH2
Final Project Closing
010 Permit To Work.ppt
Printed circuit board
NEBOSH HSE PSM Element 1 v1.pdf
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PMP Exam Notes
Electrical Safety
Project Resource Management - PMBOK6
PMO Performance Measurement and Metrics - Kendrick
Pmi - Project Management Professional (Pmp) Certification Study Guide
Ad

Similar to Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth Edition (20)

PPTX
PMI PMP Course-Workshop Master Presentation (6th Edition).pptx
PPTX
Fundamentals of Project Management - Basics
PDF
14 key changes in pmbok ® guide sixth edition
PDF
PMBoK V5 changes
PPTX
Section 1: introduction
PPTX
Section 1: introduction
PPTX
PMP as per PMBOK 6
PDF
PMBOK 6th vs 5th Edition
PPTX
Pmbok6 changes
PPTX
2) PMT & PIM.pptx
PPTX
PMBOK® Guide Sixth Edition Update
PPTX
PM FrameWork: Module 1
PPTX
Pmi chapter 29.11.2017
PDF
PMBoK6Ed.lect1.introduction
PDF
A New Approach to PMBOK® Guide 2000
PDF
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
PDF
Understand PMBOK 6TH GUIDE
PPTX
What's new in pmbok guide 6th edition
PDF
Understand PMBoK 5th edition
PPT
Project Management V1
PMI PMP Course-Workshop Master Presentation (6th Edition).pptx
Fundamentals of Project Management - Basics
14 key changes in pmbok ® guide sixth edition
PMBoK V5 changes
Section 1: introduction
Section 1: introduction
PMP as per PMBOK 6
PMBOK 6th vs 5th Edition
Pmbok6 changes
2) PMT & PIM.pptx
PMBOK® Guide Sixth Edition Update
PM FrameWork: Module 1
Pmi chapter 29.11.2017
PMBoK6Ed.lect1.introduction
A New Approach to PMBOK® Guide 2000
Change in PMP Exam PMBOK 6th Edition, Presentation by Ahmad Al-Musallami
Understand PMBOK 6TH GUIDE
What's new in pmbok guide 6th edition
Understand PMBoK 5th edition
Project Management V1
Ad

Recently uploaded (20)

PDF
Features of Effective decision making in Management
PDF
CISSP - Domain 7: Security Operations - InfoSec Institute
PPTX
_ISO_Presentation_ISO 9001 and 45001.pptx
PPTX
Improved_Leadership_in_Total_Quality_Lesson.pptx
PDF
Phillips model training for evaluation pdf
PPTX
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
PPTX
Concluding Session_Wrapup-NA May 5 2024-Oct 10 2025 ZS.pptx
PPTX
Course Overview of the Course Titled.pptx
PDF
The-Power-of-Communication (1).pdf......
PPTX
Strategic Plan 2023-2024 Presentation.pptx
PDF
Case study -Uber strategic plan and management
PDF
MANAGEMENT LESSONS FROM ANCIENT KNOWLEDGE SYSTEM-ARTHASHASTRA AND THIRUKKURAL...
PDF
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
PPTX
Supervisory Styles and When to Use Them!
PPTX
Chapter Three for international political
PPTX
Leadership for Industry 4.0 And Industry 5.0
PDF
Human resources management is a best management
PPTX
Empowering Project Management Through Servant Leadership - PMI UK.pptx
PPTX
Human resources management -job perception concept
PDF
The Cyber SwarmShield by Stéphane Nappo
Features of Effective decision making in Management
CISSP - Domain 7: Security Operations - InfoSec Institute
_ISO_Presentation_ISO 9001 and 45001.pptx
Improved_Leadership_in_Total_Quality_Lesson.pptx
Phillips model training for evaluation pdf
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
Concluding Session_Wrapup-NA May 5 2024-Oct 10 2025 ZS.pptx
Course Overview of the Course Titled.pptx
The-Power-of-Communication (1).pdf......
Strategic Plan 2023-2024 Presentation.pptx
Case study -Uber strategic plan and management
MANAGEMENT LESSONS FROM ANCIENT KNOWLEDGE SYSTEM-ARTHASHASTRA AND THIRUKKURAL...
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
Supervisory Styles and When to Use Them!
Chapter Three for international political
Leadership for Industry 4.0 And Industry 5.0
Human resources management is a best management
Empowering Project Management Through Servant Leadership - PMI UK.pptx
Human resources management -job perception concept
The Cyber SwarmShield by Stéphane Nappo

Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth Edition

  • 1. KUWAIT PROJECT MANAGEMENT CONFERENCE 25-26 April 2017 - Kuwait Insights into Project Management Body of Knowledge (PMBOK® Guide) - Sixth Edition TAREQ A. AL BEHEIRI, PMP,PMI-ACP #kuwaitpmc 2017 1
  • 2. 2
  • 3. 3 What is the PMBOK©
  • 4. 4 The PMBOK © A global standard and guide for Project Management profession WWW.PMI.ORG one of the world largest non-profit association for PM profession
  • 5. 5 What is the Purpose? PROVIDEIDENTIFY Common
  • 7. 7 (PMBOK® Guide) - Sixth Edition 10Knowledge Areas 49Processes
  • 8. 8
  • 9. 9 Why Update the 5th Edition Progress in Profession Change in World Compliance
  • 10. 10
  • 11. 11 PMBOK Components a. Guide b. Standard c. Supplements PMBOK comprises three parts:
  • 13. 13 A. The Guide A guide to project management body of knowledge A.1 Front- End A.2 Knowledge Area Chapter (1-3) Chapter (4-13) Not ANSI Standard ANSI Standard
  • 14. 14 B. The Standard A standard for project management Section (i)Section (ii) According to the American National Standards Institute (ANSI) ANNEX 1
  • 15. 15 C. Supplements Things that complete and enhance the guide C.1 Appendices C.2 References C.3 Glossary C.4 Index
  • 16. 16
  • 17. 17 What is the standard? According to ISO A document approved by a recognized body that provide for common and repeated use rules,guidelines,or characteristics for products,processes,or services with which compliance are not mandatory ISO 9453
  • 18. 18 Standard means… A set of principles and rules considered by an authority or general consent as a basis of comparison and judgment in approved model
  • 19. The Standard Components Section (i) Introduces The Role of Project Management Includes Abbreviated Key Concepts Describes Project Management Process Groups (IPECC) Describes processes, grouped into Process Groups Key Benefit Inputs Outputs Section (ii) 19
  • 20. 20 Standardization of the PMI In 1998,PMI was accredited as a standards developers by ANSI? This process was outlined in the ANNEX Part and described in the PMBOK Guide 5th edition part
  • 22. 22 What is the standard for PROJECT MANAGEMENT? ANSI requires an update at least every Fiveyears
  • 23. 23 Requirements for COMPLIANCE ANSI Formal Review Process requires BMBOK Guide Exposure Draft All comments reviewed formally Decisions can be appealed and adjudicated Member Advisory Group Review (MAG ( Consensus body vote
  • 25. 25
  • 27. Front – End (Chapter (1-3 Chapter 1 Chapter 2 Chapter 3 Introduction Organizational Influence And Project Life Cycle Project Management Processes Cover key principles and broad concepts Not an ANSI Standard Formal Exposure Draft processNot REQUIRED Reviewed along with Knowledge Area chapters 4-1327
  • 28. What’s new for the Front – End (Chapter (1-3 Restructure 3=2 +1 Chapter 3 :The Role of28
  • 29. In the presence of a comprehensive knowledge Area about the STAKEHOLDERS, Do you see good importance to specially add a new chapter on the PROJECT MANAGER role at the PMBOK® Guide
  • 30. In your perspective, What is the most important role(s) required from the Project Manager orchestra
  • 31. The New chapter Focus Will discuss the PMI Talent Triangle™ and the skill sets organizations demand that make project managers more competitive and relevant
  • 32. Link the New chapter with the PMI Talent Triangle™
  • 33. knowledge Areas (Chapter (4-13 Chapter 4 Chapter 5 Chapter 6 Integration Scope Time Chapter 7 Cost Chapter 8 Quality Chapter 9 Human Resources Chapter 10 Communication Chapter 11 Risk Chapter 12 Procurement Chapter 13 Stakeholders Cover project management knowledge areas Introductory section / each Processes with inputs, tools & techniques, outputs An ANSI Standard Formal Exposure Draft process 1 2 33
  • 34. Introductory Section 1 Common structure for each knowledge area Definition Key Benefits List of Processes Overview Diagram Data Flow Diagram Key Concepts Number of processes with inputs, tools & techniques, outputs 2 34
  • 35. What’s new for knowledge Areas Chapter (4-13) Introductory Section Improve Trends and Emerging Practices Approach for Iterative, Adaptive and Agile environment Tailoring Considerations Consistency across knowledge areas 35
  • 36. What’s new for knowledge Areas Chapter (4-13) Processes with ITTO Section ITTO Bundling Inputs outputsT&T 36
  • 37. What’s new for knowledge Areas Chapter (4-13) Processes with ITTO Section Grouping (T&T) under Heading of AFFINITIES DataGathering DG DataAnalysis DA DecisionMakingDM Interpersonal andteamskills ITS Communication skills CS Communication COM 1 2 3 4 5 637
  • 39. The process of COLLECT REQUIREMENTS Fifth Edition Sixth Editionin 39
  • 40. 1. Project management plan 2. Project documents 1. Project management plan update 2. Project documents updates What’s new for knowledge Areas Chapter (4-13) Processes with ITTO Section Simplify (IO)- Not Listed Individually Individual project management PLAN components and project DOCUMENTS are listed beneath table: Schedule management plan, Scope baseline, Cost estimates, Risk register Inputs outputs 1 ….. 2…. 3….. T&T 40
  • 42. Detailed Changes in the Knowledge Areas Rearrange +Processes 3 *Processes 6 -Processes 1 ADD Rename Remove *Knowledge Area 2 Rename 42
  • 43. Manage Project Knowledge Control Resources Implement Risk Responses 4.Integration 3.Excuting + 4.Control 9.Resources + 3.Excuting 11.Risk + 43 Adding Processes
  • 44. Rename Processes • SIX processes have different names. • In order to :  Be aligned the process name with the intent of it  To align with RESEARCH showing that project management is more about FACILITATING and MANAGING than CONTROLLING,  THREE of them have shifted from a Control function to a Monitor function.
  • 45. Fifth Edition Sixth Edition KA8 KA9 KA10 KA11 KA13 KA13 45 Rename Processes 6
  • 47. Fifth Edition Sixth Edition KA6 KA9 Human Resource Management Time Management Project Schedule Management Project Resource Management 47 Rename KAs
  • 50. 6. Schedule Management 50 • emphasizing the importance of scheduling in project management. • aligns with PMI’s Practice Standard for Scheduling.
  • 51. 51
  • 53. 9. Resources Management 53 • discuss both TEAM resources and PHYSICAL resources
  • 57. 57 The function of the Close Procurement process Control Procurements Close Project or Phase - Research shows that few project managers have the authority to formally and legally close a contract. - Project managers are responsible to determine that work is complete, records indexed and archived, and responsibilities transferred appropriately. - Project managers have no included work associated with Close Procurements within the aforementioned processes.
  • 61. The main change in the Standard Simplification of IO table - Not Listed Individually 1. Project management plan 2. Project documents ………. 1. Project management plan update 2. Project documents updates ………. Individual project management plan components and project documents are listed beneath table: Schedule management plan, Scope baseline, Cost estimates, Risk register Inputs outputs 61
  • 62. Example of IO Simplification 62
  • 63. 63
  • 64. Why use simplified IO structure? David Hillson 6th Ed.Core committee Vice Chair 1. Provides a stable foundation for future updates Project management plan and Project documents will always be inputs and outputs in IO table, although specific components and documents may change in future updates 64
  • 65. Why use simplified IO structure? David Hillson 6th Ed.Core committee Vice Chair 2.Non-prescriptive, emphasizing need for tailoring - Specific Project management plan components and Project documents are likely to be different for different projects - PM is responsible for identifying what is needed for their project65
  • 67. What’s new for Supplements Index- References – Glossary – Appendices
  • 68. 68
  • 70. 70 when will the new edition be released?
  • 71. (Sept)2017 6.Final version will be released 7.Printed version will become available Beginof2018 1.Development work completed December2015 2.Exposure Draft period June-July2016 3.All comments reviewed (July)2016 4. Integration, QC and final edit (Aug)2016 5. CEO approval (Sept)2016new PMP® Exam update to be based on PMBOK® Guide 6th edition is in the first quarter of 2018 2017 2017 2017 2017
  • 72. My Biography in 4 snapshots Instructor Construction manager volunteer Civil engineer 72
  • 73. • Name | (TAREQ A. AL BEHEIRI) • Email | (tareq742@yahoo.com) • Mobil | + 965 97818174 73

Editor's Notes

  • #74: Please add your notes here