Agile Project Management and
PRINCE2® In Projects

Agile Project Management and PRINCE2® In Projects

Case Study on Using
AgilePM
in a
PRINCE2 Project
This presentation will be taking a look at a project where
“Agile Project Management” and PRINCE2 methods of
project delivery were successfully employed together. The
project was for the delivery a new bandwidth usage protocol
configuration onto a Bank’s National Network to enable
Application bandwidth prioritization usage as the new
applications, and hence teller system, was being moved to
Java functionality.
Presenter
Antony C. Della Porta
• Over 25 years experience of working in project delivery,
rescue and consultancy roles
• Major verticals such as Finance, Travel, Media and
Pharmaceuticals.

• Established trainer in delivering courses in Project
Management methodologies, and courses relevant to the
delivery and realisation of business strategy.
• Started using PRINCE2®, in earnest, over 14 years ago,
along with Agile Project management
• Successfully managed and implemented a number of
PRINCE2® -AgilePM projects
• APMG accredited and member of Institute of Consultants

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Training ByteSize

Specialists in Project and
Programme Management
Training
•

Training Bytesize Ltd is the largest provider of multi-lingual
online bespoke project management training courses in
English, German, Polish, French, Spanish and Arabic.

•

APMG accredited Courses that offer a really interactive
way to learn, using audio, animation, interactive
exercises and exam simulators.

•

The team is one of the most experienced in the Project
and Programme industry and have been responsible for
developing courses used by over 5,000 companies
worldwide

•

Specialists in developing e-learning for the fastest
growing project management qualifications

•

International presence in the UK, Germany, Poland,
Denmark, Australia, USA

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Agile Project Management and
PRINCE2® In Projects

Introduction to Relationship between
PRINCE2 and AgilePM methodologies

•

The following slide will show a graphic view of
the correlation of processes in PRINCE2 and
the Phases employed by Atern Agile Project
Management

•

AgilePM established with PRINCE2

•

Correlation of the Processes/Stages to
Phases/Increments

•

Relationship of plans and lifecycles

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Process Overview of PRINCE2 and AgilePM

Key: AgilePM; PRINCE2®

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
The Project A Bank Network Upgrade
•
•

•
•
•

•
•

Part of bank teller system replacement programme to employ Java based
applications
Network to introduce QoS (Quality of Service) banding
– Gold for high demand applications (40% b/w)
– Silver for general demand applications (next 30%)
– Bronze – backoffice applications (20% b/w)
QoS was a new concept indicating that the required solution to Prioritize traffic
would have to evolve
Scope was two years old so requirements would have to be reviewed as well as
equipment
Proof of Concept (PoC)facilities no longer available from the incoming Telco
(Optus)so alternative had to be sourced
PoC was allocated one (1) month to complete defining, testing and piloting the
Gold, Silver and, as Could, Bronze.
Estimates for Effort would be broad as new functionality and no known active
solution for this type of network

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
The Project Plan •

Initial Project Start Up employing PRINCE2® as the primary methodology

•

Stage 1- (P2) Initiating a Project used to setup and review Project in detail

•

Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators

•

Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot

•

Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator

•

Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out

•

Stage 6 – (P2) First group of Retail Banks for Live Upgrade

•

Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
SU and Stages 1-2 – PRINCE2 – High Level

•

Initial Project Start Up employing PRINCE2® as the primary methodology

•

Stage 1- (P2) Initiating a Project used to setup and review Project in detail

•

Stage 2 - (P2) Seek Integrators and Hardware requirements

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
SU and Stages 1-2 – PRINCE2 - Detail
•

Starting Up a Project: document and sign-off Project Brief and
Approach - Use a hybrid of methodology using PRINCE2 and Agile

•

Initiating a Project: Usual IP activities and preparing Stage 2 ,

planning the project to engage both delivery approaches: Agile
for the PoC and PRINCE2 for the main rollout and overall
Organisation and governance mapping for Roles and
Responsibilities

•

Stage 2
o

Review current scope (2 years old at this point)

o

Define resource requirements (original Proof of Concept facilities no longer valid)

o

Define Approach for PoC delivery (AgilePM) for Stage 3

o

Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase
(Exploration and Engineering Timeboxes)

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 3 – AgilePM managed Increment (P2 stage) HighLevel

•

Stage 3 – (APM) Define and Develop requirements for technical solution,
deploy 1st and 2nd Pilots to check initial design

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 3 – AgilePM Development Phase

•
•
•
•

Use Feasibility/Foundations to define and prioritize the requirements to be delivered
over how many increments.
Approach was to build the “Gold” application configuration requirements during the
1st increment and deploy into the 1st Pilot
Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further
refinement
2nd Pilot used for checking Telco configurations and hence full “Gold” function

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 4 – Joint AgilePM and PRINCE2
•

Agile: Refine Technical solution (Pilot feedback), 2nd Pilot

•

PRINCE2: Engage Integrator, Preparations for Hardware builds and
configuration

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 4 - PRINCE2 managed stage – AgilePM Develop solution
Agile:
• Refine Technical solution for Gold using Pilot feedback (1st Pilot)
• Commence development of configurations for Silver and Bronze
• Deploy Silver and Bronze solutions and commence 2nd Pilot

PRINCE2
• Engage Integrator
• Start planning the roll-out stages 6 and 7 with Integrator
• Define and order hardware requirements

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution

•

AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot

•

PRINCE2 - Plan National Roll-Out in detail

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM Develop solution
AgilePM
• Timeboxes under this Development Increment used to
• Refine Silver and Bronze applications
• Develop other requirements (including any dropped from earlier Timeboxes)
• Complete Pilot stage and sign-off developed solution now ready for
Deployment and hand back to PRINCE2
PRINCE2
• Finalize plans for 1st Stage roll-out in Stage 6
• Ensure resources in place and hardware (replacement network) preconfigured

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out

•

Stage 6 – (P2) First group of Retail Banks for Live Upgrade

•

Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out
•

Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4
nights

•

Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of
the Roll-out plan and upgrade the remaining 345 Nation-wide branches

•

Post Project – Agile to monitor the success of the Bandwidth Prioritization

Stage
7

Stage
6

Controlling
a Stage

MP

Work
Packag
e1

S
t
a
g
e

B
o
u
n
d
a
r
y

Controlling
a Stage

MP

C
l
o
s
i
n
g

P
r
o
j
e
c
t

Work
Packag
e1

Post Project

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Summary of Presentation
• PRINCE2 and Atern AgilePM can be used to deliver projects of
varying delivery requirements and needs
• Most projects are probably in reality managed this way

• There are some direct correlations between the
processes/phases of both methodologies
• Not necessary to marry these up directly, more important to
know and understand how each can be best employed for
each project

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Contact Details
Antony della Porta - Training Byte Size Ltd
Mobile: +44 7533 240 675
Office: +44 (0)1270 653111
Email: antony@trainingbytesize.com
The Dowery, 22 Barker Street, Nantwich,
Cheshire CW5 5TE

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Any Questions on the implementation
of Agile Project Management or how
to use Agile PM in a PRINCE2
environment please contact us for
further information
+44 (0)1270 653111
learning@trainingbytesize.com

PRINCE2® ® is a Registered Trade Mark of the Cabinet Office
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.

More Related Content

PPTX
PMO Kick-Off Presentation
PDF
PRINCE2 Process Model
PDF
Pm process matrix v 1.1
PDF
PMP PMBOK 6th
PDF
Lessons in Project Management - 7 - Project Performance Management
PDF
The Product Owner Role
PDF
PMP Chap 10 - Project Communication Management Details
PDF
Project Execution Powerpoint Presentation Slides
PMO Kick-Off Presentation
PRINCE2 Process Model
Pm process matrix v 1.1
PMP PMBOK 6th
Lessons in Project Management - 7 - Project Performance Management
The Product Owner Role
PMP Chap 10 - Project Communication Management Details
Project Execution Powerpoint Presentation Slides

What's hot (20)

PDF
Agile Performance Metrics
 
PDF
Introduction To Jira
PDF
Project Management Plan - Group Presentation
PPTX
Creating the project charter
PDF
P3M - Project, Program, Portfolio Management Framework
PPSX
Leadership In Project Management
PDF
Agile transformation 1.3
PPT
What Is Agile Scrum
PPTX
Agile methodology
PDF
12 Agile Principles in Pictures
PDF
Project Quality Management - PMBOK
ODP
Agile Project Management
PDF
PMO 101
PPT
Scrum ppt
PDF
PMP Chap 13 - Project stakeholder management Overview
PPTX
PMP Training - 01 introduction to framework
PPT
Planning Poker
PPT
PRINCE2 - Presentation
ODP
Introduction To Agile
Agile Performance Metrics
 
Introduction To Jira
Project Management Plan - Group Presentation
Creating the project charter
P3M - Project, Program, Portfolio Management Framework
Leadership In Project Management
Agile transformation 1.3
What Is Agile Scrum
Agile methodology
12 Agile Principles in Pictures
Project Quality Management - PMBOK
Agile Project Management
PMO 101
Scrum ppt
PMP Chap 13 - Project stakeholder management Overview
PMP Training - 01 introduction to framework
Planning Poker
PRINCE2 - Presentation
Introduction To Agile
Ad

Viewers also liked (20)

PDF
Discover how agile can enhance your organization’s project delivery
PDF
PRINCE2 + AGILE = SUCCESS
PDF
9 lat pracy zdalnej - czego się nauczyłem?
PDF
Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...
PPT
Agile effort estimation
PPTX
PRINCE2 Agile - Which is the difference between PRINCE2 and other Agile Frame...
PPTX
Proof-Of-Concept
PDF
Similarities and differences between PMBOK® Guide and PRINCE2® method
PDF
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PDF
Mix Agile with Prince 2 for rewarding results
PDF
Scrum under PRINCE 2
PDF
Open Source Cyber Weaponry
PDF
Nordic project zone talk on Agile and PRINCE2
PPTX
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
PPTX
Proof Of Concept Presentation on Concept
PDF
Proof of Concept Workshop
PDF
PPTX
Big Data Proof of Concept
PPTX
Agile vs. waterfall - The fundamentals differences
Discover how agile can enhance your organization’s project delivery
PRINCE2 + AGILE = SUCCESS
9 lat pracy zdalnej - czego się nauczyłem?
Case Study: Intel Corporation - The Benefits of, and Need for Agile Operation...
Agile effort estimation
PRINCE2 Agile - Which is the difference between PRINCE2 and other Agile Frame...
Proof-Of-Concept
Similarities and differences between PMBOK® Guide and PRINCE2® method
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
Mix Agile with Prince 2 for rewarding results
Scrum under PRINCE 2
Open Source Cyber Weaponry
Nordic project zone talk on Agile and PRINCE2
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Proof Of Concept Presentation on Concept
Proof of Concept Workshop
Big Data Proof of Concept
Agile vs. waterfall - The fundamentals differences
Ad

Similar to A real life case study of using Agile and PRINCE2 together - AgilePM (20)

PDF
How "AgilePM" and PRINCE2 were used in the same project
PPT
Apqp la
PPTX
Prince2 Agile Frukostmöte
PPTX
PRINCE2 Executive Briefing
PDF
prince2_practitioner_resource_book _v3.5.pdf
PDF
Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...
PPTX
8 reasons to adopt AgilePM
PDF
ince2pri
PDF
Ralph Jocham, Effective Agile | Agile Turkey Summit 2013
PDF
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
PDF
Prince2 2009 & its benefits potifob stefan ondek
PPTX
Lietuvos paštas. Agile PMO generic
PPTX
Mobile app development project lifecycle
PPTX
Agile Project Delivery Fundamentals by SAP
PPTX
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
PDF
Agile Development Lifecycle and Best Practices with Denodo
PDF
PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil
PPTX
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
PPTX
Project Management in Agile Organizations - Stage Gate and Agile
PPTX
20160512 predictive and adaptive approach
How "AgilePM" and PRINCE2 were used in the same project
Apqp la
Prince2 Agile Frukostmöte
PRINCE2 Executive Briefing
prince2_practitioner_resource_book _v3.5.pdf
Ralph Jocham, effective agile - Scaled Scrum at Swiss Postal Services | Agile...
8 reasons to adopt AgilePM
ince2pri
Ralph Jocham, Effective Agile | Agile Turkey Summit 2013
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Prince2 2009 & its benefits potifob stefan ondek
Lietuvos paštas. Agile PMO generic
Mobile app development project lifecycle
Agile Project Delivery Fundamentals by SAP
Camunda Day Amsterdam 2019: Best Practices for successfully introducing Camun...
Agile Development Lifecycle and Best Practices with Denodo
PPM. Gør det rigtige, rigtigt, - men hurtigt - Thomas Røygaard, Maersk Oil
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
Project Management in Agile Organizations - Stage Gate and Agile
20160512 predictive and adaptive approach

More from Training Bytesize (6)

PPT
Introduction to Agile change agent
PPT
AgileBA introduction and certification options
PDF
Better business cases overview
PPTX
CP3P Public Private Partnerships Training
PPTX
Tbs presentation v3
PDF
Better business cases overview presentation - 5 Case Model
Introduction to Agile change agent
AgileBA introduction and certification options
Better business cases overview
CP3P Public Private Partnerships Training
Tbs presentation v3
Better business cases overview presentation - 5 Case Model

Recently uploaded (20)

PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
Cell Structure & Organelles in detailed.
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
Institutional Correction lecture only . . .
PDF
Insiders guide to clinical Medicine.pdf
PPTX
Lesson notes of climatology university.
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Computing-Curriculum for Schools in Ghana
PDF
Pre independence Education in Inndia.pdf
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
TR - Agricultural Crops Production NC III.pdf
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Microbial diseases, their pathogenesis and prophylaxis
Module 4: Burden of Disease Tutorial Slides S2 2025
Anesthesia in Laparoscopic Surgery in India
Cell Structure & Organelles in detailed.
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Institutional Correction lecture only . . .
Insiders guide to clinical Medicine.pdf
Lesson notes of climatology university.
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Computing-Curriculum for Schools in Ghana
Pre independence Education in Inndia.pdf
O7-L3 Supply Chain Operations - ICLT Program
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
TR - Agricultural Crops Production NC III.pdf

A real life case study of using Agile and PRINCE2 together - AgilePM

  • 1. Project Challenge 2013 Presentation by Antony Della Porta Lead Trainer Training Byte Size Ltd PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 2. Agile Project Management and PRINCE2® In Projects Agile Project Management and PRINCE2® In Projects Case Study on Using AgilePM in a PRINCE2 Project This presentation will be taking a look at a project where “Agile Project Management” and PRINCE2 methods of project delivery were successfully employed together. The project was for the delivery a new bandwidth usage protocol configuration onto a Bank’s National Network to enable Application bandwidth prioritization usage as the new applications, and hence teller system, was being moved to Java functionality.
  • 3. Presenter Antony C. Della Porta • Over 25 years experience of working in project delivery, rescue and consultancy roles • Major verticals such as Finance, Travel, Media and Pharmaceuticals. • Established trainer in delivering courses in Project Management methodologies, and courses relevant to the delivery and realisation of business strategy. • Started using PRINCE2®, in earnest, over 14 years ago, along with Agile Project management • Successfully managed and implemented a number of PRINCE2® -AgilePM projects • APMG accredited and member of Institute of Consultants PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 4. Training ByteSize Specialists in Project and Programme Management Training • Training Bytesize Ltd is the largest provider of multi-lingual online bespoke project management training courses in English, German, Polish, French, Spanish and Arabic. • APMG accredited Courses that offer a really interactive way to learn, using audio, animation, interactive exercises and exam simulators. • The team is one of the most experienced in the Project and Programme industry and have been responsible for developing courses used by over 5,000 companies worldwide • Specialists in developing e-learning for the fastest growing project management qualifications • International presence in the UK, Germany, Poland, Denmark, Australia, USA PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 5. Agile Project Management and PRINCE2® In Projects Introduction to Relationship between PRINCE2 and AgilePM methodologies • The following slide will show a graphic view of the correlation of processes in PRINCE2 and the Phases employed by Atern Agile Project Management • AgilePM established with PRINCE2 • Correlation of the Processes/Stages to Phases/Increments • Relationship of plans and lifecycles PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 6. Process Overview of PRINCE2 and AgilePM Key: AgilePM; PRINCE2® PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 7. The Project A Bank Network Upgrade • • • • • • • Part of bank teller system replacement programme to employ Java based applications Network to introduce QoS (Quality of Service) banding – Gold for high demand applications (40% b/w) – Silver for general demand applications (next 30%) – Bronze – backoffice applications (20% b/w) QoS was a new concept indicating that the required solution to Prioritize traffic would have to evolve Scope was two years old so requirements would have to be reviewed as well as equipment Proof of Concept (PoC)facilities no longer available from the incoming Telco (Optus)so alternative had to be sourced PoC was allocated one (1) month to complete defining, testing and piloting the Gold, Silver and, as Could, Bronze. Estimates for Effort would be broad as new functionality and no known active solution for this type of network PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 8. The Project Plan • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot • Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator • Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 9. SU and Stages 1-2 – PRINCE2 – High Level • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Seek Integrators and Hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 10. SU and Stages 1-2 – PRINCE2 - Detail • Starting Up a Project: document and sign-off Project Brief and Approach - Use a hybrid of methodology using PRINCE2 and Agile • Initiating a Project: Usual IP activities and preparing Stage 2 , planning the project to engage both delivery approaches: Agile for the PoC and PRINCE2 for the main rollout and overall Organisation and governance mapping for Roles and Responsibilities • Stage 2 o Review current scope (2 years old at this point) o Define resource requirements (original Proof of Concept facilities no longer valid) o Define Approach for PoC delivery (AgilePM) for Stage 3 o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase (Exploration and Engineering Timeboxes) PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 11. Stage 3 – AgilePM managed Increment (P2 stage) HighLevel • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st and 2nd Pilots to check initial design PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 12. Stage 3 – AgilePM Development Phase • • • • Use Feasibility/Foundations to define and prioritize the requirements to be delivered over how many increments. Approach was to build the “Gold” application configuration requirements during the 1st increment and deploy into the 1st Pilot Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further refinement 2nd Pilot used for checking Telco configurations and hence full “Gold” function PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 13. Stage 4 – Joint AgilePM and PRINCE2 • Agile: Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2: Engage Integrator, Preparations for Hardware builds and configuration PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 14. Stage 4 - PRINCE2 managed stage – AgilePM Develop solution Agile: • Refine Technical solution for Gold using Pilot feedback (1st Pilot) • Commence development of configurations for Silver and Bronze • Deploy Silver and Bronze solutions and commence 2nd Pilot PRINCE2 • Engage Integrator • Start planning the roll-out stages 6 and 7 with Integrator • Define and order hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 15. Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution • AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2 - Plan National Roll-Out in detail PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 16. Stage 5 - PRINCE2 managed stage – AgilePM Develop solution AgilePM • Timeboxes under this Development Increment used to • Refine Silver and Bronze applications • Develop other requirements (including any dropped from earlier Timeboxes) • Complete Pilot stage and sign-off developed solution now ready for Deployment and hand back to PRINCE2 PRINCE2 • Finalize plans for 1st Stage roll-out in Stage 6 • Ensure resources in place and hardware (replacement network) preconfigured PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 17. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 18. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4 nights • Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of the Roll-out plan and upgrade the remaining 345 Nation-wide branches • Post Project – Agile to monitor the success of the Bandwidth Prioritization Stage 7 Stage 6 Controlling a Stage MP Work Packag e1 S t a g e B o u n d a r y Controlling a Stage MP C l o s i n g P r o j e c t Work Packag e1 Post Project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 19. Summary of Presentation • PRINCE2 and Atern AgilePM can be used to deliver projects of varying delivery requirements and needs • Most projects are probably in reality managed this way • There are some direct correlations between the processes/phases of both methodologies • Not necessary to marry these up directly, more important to know and understand how each can be best employed for each project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 20. Contact Details Antony della Porta - Training Byte Size Ltd Mobile: +44 7533 240 675 Office: +44 (0)1270 653111 Email: antony@trainingbytesize.com The Dowery, 22 Barker Street, Nantwich, Cheshire CW5 5TE PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 21. Any Questions on the implementation of Agile Project Management or how to use Agile PM in a PRINCE2 environment please contact us for further information +44 (0)1270 653111 learning@trainingbytesize.com PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.