SlideShare a Scribd company logo
The PRINCE2
                          Processes
                         the  chronology  of  activities




  projectingIT                                  PRINCE2 Pre-course reading
Friday 8 February 13
in this session...

         The SEVEN processes of PRINCE2
         The anatomy of a process
         The project journey
         An overview of each process




       www.projectingIT.com            2          Processes
Friday 8 February 13
the PRINCE2 processes




                              PRINCE2 is a process-based approach for
                                       project management


       www.projectingIT.com                    3                        Processes
Friday 8 February 13
a process is...



                              a structured set of activities
                                designed to accomplish a
                                   specific objective.



       www.projectingIT.com        4                       Processes
Friday 8 February 13
the PRINCE2 processes


                                        There are SEVEN processes in
                                   PRINCE2, which provide the set of
                                 activities required to direct, manage
                                                 and deliver a project


       www.projectingIT.com                 5                       Processes
Friday 8 February 13
the 7 PRINCE2 processes
                                                     Starting up
                                                      a Project


                                  Closing a                            Directing a
                                   Project                               Project




                              Managing
                                                                             Initiating a
                               a Stage
                                                                               Project
                              Boundary




                                          Managing
                                                               Controlling
                                           Product
                                                                a Stage
                                          Delivery

       www.projectingIT.com                               6                                 Processes
Friday 8 February 13
The process users



                              Project  
                                 oard                        Project  
                               B
                                                             Ma nager


                                                   Team  

                                                  Man ager

       www.projectingIT.com                   7                      Processes
Friday 8 February 13
MANAGE BY STAGES

                                                                 Principles


                                                         t is pl a  n ne d ,
                                  R INCE2      p ro je c
                              AP                                  le d o n a
                                             d and c   o n t ro l
                              m o n i t o re
                                                 y-s t ag   e b asis
                                      s t age -b



       www.projectingIT.com                           8                        Processes
Friday 8 February 13
A Management Stage...

                         - is a partition of the project
                         - provides review and decision points
                         - PM delivers one management stage at a time
                         - supports the Manage by Stages principle




       www.projectingIT.com                         9                   Processes
Friday 8 February 13
there MUST be at least...

              ...TWO management stages.

                        INITIATION
                     [plan the project]

                                                   DELIVERY
                                               [execute the plan]



       www.projectingIT.com               10                        Processes
Friday 8 February 13
Divide the delivery stage...

                                       ....into more number of
                              management stages based on the
                                 project risks and complexity
                INITIATION
                  Stage 1
                                    Delivery
                                    Stage 2
                                                    Delivery
                                                    Stage 3
                                                               Delivery
                                                               Stage 4
       www.projectingIT.com                    11                         Processes
Friday 8 February 13
The project journey

                                             Initiation     Subsequent        Final delivery
                              Pre-Project
                                               Stage      delivery stage(s)       stage


                                 The Processes defines the activities,
                               responsibility and templates for
                                pre-project and each of the management
                                           stage of the project

       www.projectingIT.com                                 12                                 Processes
Friday 8 February 13
Pre-project



              -> Before initiation stage
              -> Determine feasibility
              -> Identify stakeholders     Initiation   Stage 2   Final Stage
              -> Define objectives
              -> Ensure justification




       www.projectingIT.com                        13                           Processes
Friday 8 February 13
the INITIATION stage



                                          -> Prepare strategies
                                          -> Develop plans
                              Pre-Project -> Define controls        Stage 2   Final Stage
                                          -> Obtain funding
                                          -> Refine Business Case




       www.projectingIT.com                                 14                              Processes
Friday 8 February 13
Sub-sequent delivery
                                                    stages



                                                         -> Deliver products
                                                         -> Monitor progress
                              Pre-Project   Initiation                         Final Stage
                                                         -> Control
                                                         -> Check viability




       www.projectingIT.com                                 15                               Processes
Friday 8 February 13
Final stage




                                                                        -> Project acceptance
                                                                        -> Hand-over
                              Pre-Project   Initiation        Stage 2
                                                                        -> Evaluate performance
                                                                        -> Lessons




       www.projectingIT.com                              16                                       Processes
Friday 8 February 13
The project journey
                                            Initiation         Subsequent                   Final delivery
                              Pre-Project
                                              Stage          delivery stage(s)                  stage

       Directing                                                    Directing a Project

                               SU
                                                 SB                            SB                            CP
       Managing
                                               IP         Controlling a Stage             Controlling a Stage



       Delivering                                        Managing Product Delivery    Managing Product Delivery



       www.projectingIT.com                                    17                                            Processes
Friday 8 February 13
The Anatomy of a
                                            process



                          inputs    Activities   outputs




       www.projectingIT.com              18                Processes
Friday 8 February 13
Each Process has a...

                              => a Purpose
                              => an Objective
                              => List of Activities
                              => Inputs
                              => Outputs
                              => Responsibilities

       www.projectingIT.com                         19   Processes
Friday 8 February 13
Inputs




       the ingredients


       www.projectingIT.com   20        Processes
Friday 8 February 13
Activities


                   > Each process has defined set of activities
                   > Activity defines the work to do
                   > Defined set of responsibility for each activity
                   > Activity takes an input and creates an output
                   > Appendix A provides a template for the output



       www.projectingIT.com                21                          Processes
Friday 8 February 13
Outputs are the...
                                                   Project Plan

                                                                                 PID
                                            Risk Register


                                                   End Project Report
                                                 During stage 2, there were
                                                 total 6 risks, 3 were
                                                 external and ......
                                                     the risks related to cost was
                                                    escalated to corporate by the
                                                                  Executive as ....




                       ...the Management Products
       www.projectingIT.com                                                            Processes
Friday 8 February 13                 22
the SEVEN processes...
                  >> St arting up a Proje ct (SU)
                  >> Di re ct ing a Proje ct (DP)
                   >> In iti at ing a Proje ct (IP )
                   >> Co nt ro lli ng a St age (C S)
                   >> M an ag ing Produc t De liver y (M P)
                   >> M an ag ing a St age Bo un da ry (SB)
                    >> Cl os ing a Proje ct (CP)

       www.projectingIT.com                        23         Processes
Friday 8 February 13
Integrating processes...

                                                                    DP                   DP
                                DP        SB                              CS        CP
               SU                                              SB
                                                    CS
                                               DP                              MP
                                     IP
                                                         MP

                              > the output of one process becomes an input to the next process
                                                                > defined sequence of processes

       www.projectingIT.com                               24                               Processes
Friday 8 February 13
Mandate      the Project Journey...
             Starting up a
                                                  Directing a Project
                Project




                              Initiating a          Managing a
                                                  Stage Boundary           Closing a Project
                                Project




                                                         Controlling a Stage




                                                     Managing Product Delivery

       www.projectingIT.com                  25                                        Processes
Friday 8 February 13
Starting up a Project

          This process describes the project
          feasibility work to be done by the
           Project Manager, Project Board
           and Corporate, prior to project
          initiation to ensure the project is   Project
                  justified and viable           Brief




       www.projectingIT.com          26                   Processes
Friday 8 February 13
Directing a Project

          This process describes the
        work to be done by the Project
        Board to provide management
           control, governance and       Decisions.
            direction to the project     Approvals.
                                         Authorizations.



       www.projectingIT.com        27                  Processes
Friday 8 February 13
Initiating a Project
             This process describes the
         detailed planning work to be done
             by the Project Manager to
           prepare project strategies and
           define how the project will be            Pro je
                                                              ct
                                                  Ini t i
              monitored and controlled       Do c u
                                                          at io n
                                                    me n
                                                           t at io
                                                                   n




       www.projectingIT.com        28                                  Processes
Friday 8 February 13
Controlling a Stage

           This process describes the day-
            to-day work to be done by the
          Project Manager to monitor and         Register

           control one management stage
          and deliver the stage within the   Re p orts   Logs

                  agreed tolerances
                                                     Work
                                                    Package




       www.projectingIT.com        29                           Processes
Friday 8 February 13
Managing Product
                                      Delivery
          This process describes the
         work to be done by the Team
          Manager to plan, execute
          and deliver the specialist                Pla
                                                           n
                                       Re p ort
           products of the project
                                             Pro duc t s



       www.projectingIT.com       30                           Processes
Friday 8 February 13
Managing a Stage
                                    Boundary
         This process describes the work to
         be done by the Project Manager at
            the end of each management
          stage, except the final stage, to         Re p ort
                                                  Pla
          review the project progress and               n
                 plan the next stage          Register
                                                            P ID




       www.projectingIT.com        31                              Processes
Friday 8 February 13
Closing a Project

        This process describes the work to
         be done by the Project Manager
           during the final stage of the
          project, to obtain acceptance,     Re p ort
        hand-over products and to evaluate
                                                   Lessons
          how the project was delivered




       www.projectingIT.com      32                          Processes
Friday 8 February 13
Process vs. Themes

       Theme s support the activities within a
       process by providing more information
        about the activity
                              Process > Starting up a Project
                              Activity > Prepare an outline Business Case
                              Theme > Business Case
                                <<the theme provides information about who, what,
                                        why and how of the Business Case>>
       www.projectingIT.com                    33                             Processes
Friday 8 February 13
Process vs. Principles

       Process  es support principles by defining
       activit ies and outputs that implement a
        PRINCE2 principle

                                 Process > Starting up a Project
                                 Activity > prepare an outline Business Case
                                 Principle > Continued Business Justification


       www.projectingIT.com                  34                                Processes
Friday 8 February 13

More Related Content

PPTX
Prince2 explained in 30mins
DOCX
A guide for project managers prince2
PDF
7 Themes of Prince2
PDF
The funkiest PRINCE2 Processes revision guide on the internet
PDF
7 Principles of PRINCE 2
PPTX
PRINCE2 Overview
PDF
An introduction to prince2
PDF
Good governance of the project portfolio
Prince2 explained in 30mins
A guide for project managers prince2
7 Themes of Prince2
The funkiest PRINCE2 Processes revision guide on the internet
7 Principles of PRINCE 2
PRINCE2 Overview
An introduction to prince2
Good governance of the project portfolio

What's hot (20)

PDF
Learn the PRINCE2 Principles ebook
PDF
The Obeya Room - Tool and Mirror for Culture Change
PPT
PRINCE2 - Presentation
PPTX
Project, Program and Portfolio Comparison
PDF
Program Management Office (PMO)
PPTX
Project Management as a Service
PDF
The new PMP, what it is and how to get prepared for it
PDF
PRINCE2 key terms and free revision notes to pass the certification exam
PPTX
What are the Basic Principles of Project Management | AIMS, UK
PDF
7 Processes of Prince2
PDF
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PPT
Presentation project management
PDF
PMO Performance Measurement and Metrics - Kendrick
PPTX
Project Risk Management
PPTX
Evolution of project management
PPSX
PMO - Strategic Model & Concepts Overview
PPTX
Smart project management - Best Practices to Manage Project effectively
PPTX
Comparison and Analysis of Project Management software
PDF
Want to be a (PMP)® with 1250 memorizing notes
Learn the PRINCE2 Principles ebook
The Obeya Room - Tool and Mirror for Culture Change
PRINCE2 - Presentation
Project, Program and Portfolio Comparison
Program Management Office (PMO)
Project Management as a Service
The new PMP, what it is and how to get prepared for it
PRINCE2 key terms and free revision notes to pass the certification exam
What are the Basic Principles of Project Management | AIMS, UK
7 Processes of Prince2
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
Presentation project management
PMO Performance Measurement and Metrics - Kendrick
Project Risk Management
Evolution of project management
PMO - Strategic Model & Concepts Overview
Smart project management - Best Practices to Manage Project effectively
Comparison and Analysis of Project Management software
Want to be a (PMP)® with 1250 memorizing notes
Ad

Viewers also liked (14)

PPT
DMAIC Methodology
PPTX
Understanding Agile Project Management
PDF
Agile Project Management for PMP's
PPTX
Waterfallmodel
PDF
Introduction to Agile Project Management and Scrum
PPTX
Agile Project Management
PPT
Prince2
PPTX
Waterfall model ppt final
PPTX
Introduction to Agile Project Planning and Project Management
PPTX
Waterfall model
PPT
Project Management Methodology
PDF
PRINCE2 Foundation Training Manual by Frank Turley
PDF
Agile Project Management - An introduction to Agile and the new PMI-ACP
DMAIC Methodology
Understanding Agile Project Management
Agile Project Management for PMP's
Waterfallmodel
Introduction to Agile Project Management and Scrum
Agile Project Management
Prince2
Waterfall model ppt final
Introduction to Agile Project Planning and Project Management
Waterfall model
Project Management Methodology
PRINCE2 Foundation Training Manual by Frank Turley
Agile Project Management - An introduction to Agile and the new PMI-ACP
Ad

Similar to PRINCE2 Process Model (20)

PPTX
Project management
PPTX
PRINCE2 - Skillshare @ Betahaus| Sofia 18. March 2013
PDF
Prince2 and agile happy bedfellows
PDF
Visa Prince2 Presentation
PDF
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
PDF
Prince2 Complement Pmbok
PDF
Prince2 Vs PMBOK
PDF
PRINCE2 and Agile
PDF
James dimas it infrastructure approach
PDF
58086 04 directing_a_project
PDF
Romeo.mitchell
PDF
Romeo.mitchell
PDF
Prince2 Gce820 PréSentation
PDF
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
XLS
Excel Project Management
PDF
V3 basic pm training overview thammasat
PDF
Prince 2 + XLPM - Semcon - Bert Hedeman
PDF
Understanding Software Project Management
PDF
57086 03 initiating_a_project
PDF
Prince2 2009 & its benefits potifob stefan ondek
Project management
PRINCE2 - Skillshare @ Betahaus| Sofia 18. March 2013
Prince2 and agile happy bedfellows
Visa Prince2 Presentation
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
Prince2 Complement Pmbok
Prince2 Vs PMBOK
PRINCE2 and Agile
James dimas it infrastructure approach
58086 04 directing_a_project
Romeo.mitchell
Romeo.mitchell
Prince2 Gce820 PréSentation
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Excel Project Management
V3 basic pm training overview thammasat
Prince 2 + XLPM - Semcon - Bert Hedeman
Understanding Software Project Management
57086 03 initiating_a_project
Prince2 2009 & its benefits potifob stefan ondek

More from projectingIT (19)

PDF
ProjectingIT - Introduction to Project Management Training
PDF
Benefits of PRINCE2
PDF
1 what is a project
PDF
The prince2 themes
PDF
The prince2 team
PDF
The prince2 business case
PDF
The structure of prince2
PDF
PRINCE2 Organization Theme - PRINCE2 Project Management Team - ProjectingIT A...
PDF
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PDF
PRINCE2 Themes
PDF
Benefits of PRINCE2
PDF
What is a PRINCE2 Project Management
PDF
What is a Project ? - by Ashish Dhoke (projectingIT)
PDF
Being Agile ! - by Ashish Dhoke (projectingIT)
PPTX
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
PDF
PRINCE2 Practitioner Exam Guide - by Ashish Dhoke (projectingIT)
PDF
Case Study on Business Communication Training - by projectingIT
PPTX
PRINCE2 Cloud - by Ashish Dhoke
PPTX
2 principles
ProjectingIT - Introduction to Project Management Training
Benefits of PRINCE2
1 what is a project
The prince2 themes
The prince2 team
The prince2 business case
The structure of prince2
PRINCE2 Organization Theme - PRINCE2 Project Management Team - ProjectingIT A...
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 Themes
Benefits of PRINCE2
What is a PRINCE2 Project Management
What is a Project ? - by Ashish Dhoke (projectingIT)
Being Agile ! - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
PRINCE2 Practitioner Exam Guide - by Ashish Dhoke (projectingIT)
Case Study on Business Communication Training - by projectingIT
PRINCE2 Cloud - by Ashish Dhoke
2 principles

Recently uploaded (20)

PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
GDM (1) (1).pptx small presentation for students
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Lesson notes of climatology university.
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PDF
Computing-Curriculum for Schools in Ghana
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
01-Introduction-to-Information-Management.pdf
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Sports Quiz easy sports quiz sports quiz
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
STATICS OF THE RIGID BODIES Hibbelers.pdf
GDM (1) (1).pptx small presentation for students
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Final Presentation General Medicine 03-08-2024.pptx
Lesson notes of climatology university.
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Computing-Curriculum for Schools in Ghana
Complications of Minimal Access Surgery at WLH
Pharmacology of Heart Failure /Pharmacotherapy of CHF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
O7-L3 Supply Chain Operations - ICLT Program
01-Introduction-to-Information-Management.pdf
VCE English Exam - Section C Student Revision Booklet
Sports Quiz easy sports quiz sports quiz
Microbial diseases, their pathogenesis and prophylaxis
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPH.pptx obstetrics and gynecology in nursing
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx

PRINCE2 Process Model

  • 1. The PRINCE2 Processes the  chronology  of  activities projectingIT PRINCE2 Pre-course reading Friday 8 February 13
  • 2. in this session... The SEVEN processes of PRINCE2 The anatomy of a process The project journey An overview of each process www.projectingIT.com 2 Processes Friday 8 February 13
  • 3. the PRINCE2 processes PRINCE2 is a process-based approach for project management www.projectingIT.com 3 Processes Friday 8 February 13
  • 4. a process is... a structured set of activities designed to accomplish a specific objective. www.projectingIT.com 4 Processes Friday 8 February 13
  • 5. the PRINCE2 processes There are SEVEN processes in PRINCE2, which provide the set of activities required to direct, manage and deliver a project www.projectingIT.com 5 Processes Friday 8 February 13
  • 6. the 7 PRINCE2 processes Starting up a Project Closing a Directing a Project Project Managing Initiating a a Stage Project Boundary Managing Controlling Product a Stage Delivery www.projectingIT.com 6 Processes Friday 8 February 13
  • 7. The process users Project   oard Project   B Ma nager Team   Man ager www.projectingIT.com 7 Processes Friday 8 February 13
  • 8. MANAGE BY STAGES Principles t is pl a n ne d , R INCE2 p ro je c AP le d o n a d and c o n t ro l m o n i t o re y-s t ag e b asis s t age -b www.projectingIT.com 8 Processes Friday 8 February 13
  • 9. A Management Stage... - is a partition of the project - provides review and decision points - PM delivers one management stage at a time - supports the Manage by Stages principle www.projectingIT.com 9 Processes Friday 8 February 13
  • 10. there MUST be at least... ...TWO management stages. INITIATION [plan the project] DELIVERY [execute the plan] www.projectingIT.com 10 Processes Friday 8 February 13
  • 11. Divide the delivery stage... ....into more number of management stages based on the project risks and complexity INITIATION Stage 1 Delivery Stage 2 Delivery Stage 3 Delivery Stage 4 www.projectingIT.com 11 Processes Friday 8 February 13
  • 12. The project journey Initiation Subsequent Final delivery Pre-Project Stage delivery stage(s) stage The Processes defines the activities, responsibility and templates for pre-project and each of the management stage of the project www.projectingIT.com 12 Processes Friday 8 February 13
  • 13. Pre-project -> Before initiation stage -> Determine feasibility -> Identify stakeholders Initiation Stage 2 Final Stage -> Define objectives -> Ensure justification www.projectingIT.com 13 Processes Friday 8 February 13
  • 14. the INITIATION stage -> Prepare strategies -> Develop plans Pre-Project -> Define controls Stage 2 Final Stage -> Obtain funding -> Refine Business Case www.projectingIT.com 14 Processes Friday 8 February 13
  • 15. Sub-sequent delivery stages -> Deliver products -> Monitor progress Pre-Project Initiation Final Stage -> Control -> Check viability www.projectingIT.com 15 Processes Friday 8 February 13
  • 16. Final stage -> Project acceptance -> Hand-over Pre-Project Initiation Stage 2 -> Evaluate performance -> Lessons www.projectingIT.com 16 Processes Friday 8 February 13
  • 17. The project journey Initiation Subsequent Final delivery Pre-Project Stage delivery stage(s) stage Directing Directing a Project SU SB SB CP Managing IP Controlling a Stage Controlling a Stage Delivering Managing Product Delivery Managing Product Delivery www.projectingIT.com 17 Processes Friday 8 February 13
  • 18. The Anatomy of a process inputs Activities outputs www.projectingIT.com 18 Processes Friday 8 February 13
  • 19. Each Process has a... => a Purpose => an Objective => List of Activities => Inputs => Outputs => Responsibilities www.projectingIT.com 19 Processes Friday 8 February 13
  • 20. Inputs the ingredients www.projectingIT.com 20 Processes Friday 8 February 13
  • 21. Activities > Each process has defined set of activities > Activity defines the work to do > Defined set of responsibility for each activity > Activity takes an input and creates an output > Appendix A provides a template for the output www.projectingIT.com 21 Processes Friday 8 February 13
  • 22. Outputs are the... Project Plan PID Risk Register End Project Report During stage 2, there were total 6 risks, 3 were external and ...... the risks related to cost was escalated to corporate by the Executive as .... ...the Management Products www.projectingIT.com Processes Friday 8 February 13 22
  • 23. the SEVEN processes... >> St arting up a Proje ct (SU) >> Di re ct ing a Proje ct (DP) >> In iti at ing a Proje ct (IP ) >> Co nt ro lli ng a St age (C S) >> M an ag ing Produc t De liver y (M P) >> M an ag ing a St age Bo un da ry (SB) >> Cl os ing a Proje ct (CP) www.projectingIT.com 23 Processes Friday 8 February 13
  • 24. Integrating processes... DP DP DP SB CS CP SU SB CS DP MP IP MP > the output of one process becomes an input to the next process > defined sequence of processes www.projectingIT.com 24 Processes Friday 8 February 13
  • 25. Mandate the Project Journey... Starting up a Directing a Project Project Initiating a Managing a Stage Boundary Closing a Project Project Controlling a Stage Managing Product Delivery www.projectingIT.com 25 Processes Friday 8 February 13
  • 26. Starting up a Project This process describes the project feasibility work to be done by the Project Manager, Project Board and Corporate, prior to project initiation to ensure the project is Project justified and viable Brief www.projectingIT.com 26 Processes Friday 8 February 13
  • 27. Directing a Project This process describes the work to be done by the Project Board to provide management control, governance and Decisions. direction to the project Approvals. Authorizations. www.projectingIT.com 27 Processes Friday 8 February 13
  • 28. Initiating a Project This process describes the detailed planning work to be done by the Project Manager to prepare project strategies and define how the project will be Pro je ct Ini t i monitored and controlled Do c u at io n me n t at io n www.projectingIT.com 28 Processes Friday 8 February 13
  • 29. Controlling a Stage This process describes the day- to-day work to be done by the Project Manager to monitor and Register control one management stage and deliver the stage within the Re p orts Logs agreed tolerances Work Package www.projectingIT.com 29 Processes Friday 8 February 13
  • 30. Managing Product Delivery This process describes the work to be done by the Team Manager to plan, execute and deliver the specialist Pla n Re p ort products of the project Pro duc t s www.projectingIT.com 30 Processes Friday 8 February 13
  • 31. Managing a Stage Boundary This process describes the work to be done by the Project Manager at the end of each management stage, except the final stage, to Re p ort Pla review the project progress and n plan the next stage Register P ID www.projectingIT.com 31 Processes Friday 8 February 13
  • 32. Closing a Project This process describes the work to be done by the Project Manager during the final stage of the project, to obtain acceptance, Re p ort hand-over products and to evaluate Lessons how the project was delivered www.projectingIT.com 32 Processes Friday 8 February 13
  • 33. Process vs. Themes Theme s support the activities within a process by providing more information about the activity Process > Starting up a Project Activity > Prepare an outline Business Case Theme > Business Case <<the theme provides information about who, what, why and how of the Business Case>> www.projectingIT.com 33 Processes Friday 8 February 13
  • 34. Process vs. Principles Process es support principles by defining activit ies and outputs that implement a PRINCE2 principle Process > Starting up a Project Activity > prepare an outline Business Case Principle > Continued Business Justification www.projectingIT.com 34 Processes Friday 8 February 13