Project SLOPE
1
WP 6 – System integration
Kick-off Meeting
2-4/Jul/2014
Agenda
• Work Package Goals
• Tasks Overview
• Timeline
• Deliverables
• Task Details
• Risks and Mitigation Actions
• Open Discussion
Kick-off Meeting
2-4/Jul/2014
Work Package Goals
“Achieve a complete integration of the different components that are part of
the SLOPE platform”
WP 2 Components
Forest information
collection and analysis
COA,FLY,GT,ITE,TRE
WP 3 Components
Integration of novel
intelligent harvesting systems
CNR,GRE,KES,ITE,MHG
WP 5 Components
Forest information
system development
CNR,TRE,BO
WP6 Integration (All Partners)
SLOPE PLATFORM
Kick-off Meeting
2-4/Jul/2014
Work Package Goals
• Build a WORKING System
• Ready for pilots and on the field testing
• 3 integration steps
• 3 main tasks (T.6.2,T.6.3,T.6.4)
• Technical and Economical Analysis
• Overall solution costs
• Social impacts
• Environmental impacts
T.6.2
T.6.3
T.6.4
Kick-off Meeting
2-4/Jul/2014
Tasks and Roles
• T.6.1 Definition of integration Steps
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE
• T.6.2 First Integration - Forest inventory & harvesting systems
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE
• T.6.3 Second integration – Forest management
• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE
• T.6.4 – Third integration - System validation
• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
• T.6.5 – Scientific Coordination
• Task leader: GRAPHITECH;
Kick-off Meeting
2-4/Jul/2014
Timeline
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
• WP 2,3,4,5 still running when T.6.1 starts
• WP 2,3,4,5 closed before the end of T.6.4
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverables
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.03 SLOPE System Field Trials Readiness Assessment Report
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverable & Milestone
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting
2-4/Jul/2014
Timeline & Deliverable & Milestone & Project Meetings
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D. 6.01 System Integration and Validation Plan
• Integration and validation procedures and timeline to validate the SLOPE system
• Based on the use cases in WP1
• D.6.03 SLOPE System Field Trials Readiness Assessment Report
• Assessment of the initial user experience and recommendations for the field trials
operations.
• Guidance and system operation manual for the Field Trials operators
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D. 6.021 System Integration Report I:
• Integration test and validation concept procedures results
• Assessment of the initial user experience
• Recommendations for field trials operations
• D 6.022 System Integration Report II:
• Integration test and validation concept procedures results (rev. 2)
• Assessment of the initial user experience (rev. 2)
• Recommendations for field trials operations (rev. 2)
• D 6.023 System Integration Report III:
• Integration test and validation concept procedures results (rev. 3)
• Assessment of the initial user experience (rev. 3)
• Recommendations for field trials operations (rev. 3)
Kick-off Meeting
2-4/Jul/2014
Deliverables
• D6.041 SLOPE System Techno-Economic Evaluation Report I:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Estimation phase
• D6.042 SLOPE System Techno-Economic Evaluation Report II:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Preliminary results phase
• D6.043 SLOPE System Techno-Economic Evaluation Report III:
• Analysis of technical and economical aspects of SLOPE system
• Current practices and the potential known alternatives comparison
• Final results phase
Kick-off Meeting
2-4/Jul/2014
Tasks Details
Kick-off Meeting
2-4/Jul/2014
Task 6.1
Definition of the integration steps
• Leader: Graphitech
• Participants: KESLA, MHG, FLY, ITENE
Objectives
• Define the integration steps
• Define validation concepts
• Functionalities
• Communication
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
1. System Architecture Analysis (from T.1.5)
• Component Diagram
2. Use case / general process Analysis (from T.1.1 and T.1.3)
• Functional Requirements (execute A, execute B, etc.)
• Non-functional reqirements (speed, reliability, etc.)
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
3. Enumerate all needed software components, hardware, tools etc.
• Forest model
• Measurement systems
• 3D Model Visualisation Software
• Other Software
4. Identify and verify connection between components
5. Plan how to connect between
1. Forest Model with Harvesting
2. Forest Model & Harvesting with Forest Management
Kick-off Meeting
2-4/Jul/2014
How to achieve these objectives?
6. For each integration step between two or more subsystems
1. For each identified interaction between subsystems components:
1. Describe the interaction
2. Describe the expected result
3. Define importance level (i.e. low, medium, high)
2. Define minimum threshold to be achieved
Test
N°
Interaction
Description
Expected result Obtained Result Achieved
Anomaly
Description
... ... ... ... ... ...
8
The user use the 3D
model to…
The application shows …. The application HAS shown… YES None
... ... ... ... ... ...
Kick-off Meeting
2-4/Jul/2014
Components to be integrated
WP2
WP3WP5
WP4
SLOPE DBSLOPE DBSLOPE DB
Kick-off Meeting
2-4/Jul/2014
Deliverables
Reports:
• D.6.01 System Integration and Validation Plan (M13)
Kick-off Meeting
2-4/Jul/2014
Expectations
• Contribution from each partner for its
component
• Joint contribution for each couple of
integrated components by the
corresponding partners
• Regular Telcos on a Monthly basis
• First Telco at Task’s start
Kick-off Meeting
2-4/Jul/2014
Risks
• Data Formats
• DB Model (T.1.5 and T.5.1)
• Reduce Harmonization/adaptation
• Images and other data formats
• Unreliable Services
• Hardware interfaces with software
• RFID
• BT
• Inability to reproduce planned test
field/conditions
• Component testing takes time!
Kick-off Meeting
2-4/Jul/2014
Mitigating Actions
• Exhaustive System Architecture
• T.1.5 and Parallel Session of Tomorrow
• Exhaustive Requirement analysis
• D.1.1 and D.1.2
• Common data model
• T.1.4
• Communication
• Skype (Small Group, no desktop sharing)
• WebEx (up to 25 persons with desktop sharing)
• Monthly Basis
Kick-off Meeting
2-4/Jul/2014
Open Discussion
Kick-off Meeting
2-4/Jul/2014
Thank you for your attention
DANIELE MAGLIOCCHETTI
daniele.magliocchetti@graphitech.it
Fondazione Graphitech
Via Alla Cascata 56C
38123 Trento (ITALY)
Phone: +39 0461.283395
Fax: +39 0461.283398
Kick-off Meeting
2-4/Jul/2014
Task 6.5
Scientific Coordination
• Leader: Graphitech
Objectives
• Technical supervision of technology functionalities as planned
• Management of issues related to Software licenses and/or required hardware
• Quality Assurance and assessment/evaluation of technology results
• Regular reporting of the technical development of the project

More Related Content

PDF
4th Technical Meeting - WP6
PDF
Kick-Off Meeting - WP6
PDF
3rd Technical Meeting - WP5
PDF
Mid-term Review Meeting - WP5
PPTX
Slope Final Review Meeting - WP6
PDF
3rd Technical Meeting - WP6
PPTX
Slope Final Review Meeting - WP5
PDF
2nd Technical Meeting - WP1
4th Technical Meeting - WP6
Kick-Off Meeting - WP6
3rd Technical Meeting - WP5
Mid-term Review Meeting - WP5
Slope Final Review Meeting - WP6
3rd Technical Meeting - WP6
Slope Final Review Meeting - WP5
2nd Technical Meeting - WP1

What's hot (20)

PDF
2nd Technical Meeting - WP6
PDF
Mid-term Review Meeting - WP6
PPTX
Slope Final Review Meeting - Introduction
PPTX
Slope Final Review Meeting - WP1
PDF
Kick-Off Meeting - WP5
PDF
4th Technical Meeting - WP3
PDF
Mid-term Review Meeting - WP3
PDF
Kick-Off Meeting - WP3
PPTX
Slope Final Review Meeting - WP3
PDF
Kick-Off Meeting - WP1
PDF
3rd Technical Meeting - WP7
PDF
Kick-Off Meeting - WP7
PDF
1st Technical Meeting - WP1
PDF
Kick-Off Meeting - WP2
PDF
1st Technical Meeting - WP5
PDF
SLOPE 2nd workshop - presentation 1
PDF
2nd Technical Meeting - WP3
PDF
3rd Technical Meeting - WP3
PDF
2nd Technical Meeting - WP2
PDF
Mid-term Review Meeting - WP1
2nd Technical Meeting - WP6
Mid-term Review Meeting - WP6
Slope Final Review Meeting - Introduction
Slope Final Review Meeting - WP1
Kick-Off Meeting - WP5
4th Technical Meeting - WP3
Mid-term Review Meeting - WP3
Kick-Off Meeting - WP3
Slope Final Review Meeting - WP3
Kick-Off Meeting - WP1
3rd Technical Meeting - WP7
Kick-Off Meeting - WP7
1st Technical Meeting - WP1
Kick-Off Meeting - WP2
1st Technical Meeting - WP5
SLOPE 2nd workshop - presentation 1
2nd Technical Meeting - WP3
3rd Technical Meeting - WP3
2nd Technical Meeting - WP2
Mid-term Review Meeting - WP1
Ad

Viewers also liked (18)

PDF
SLOPE Final Conference - innovative cable yarder
PDF
Kick-Off Meeting - WP8
PPTX
Slope Final Review Meeting - WP2
PDF
2nd Technical Meeting - WP7
PDF
Mid-term Review Meeting - WP7
PDF
3rd Technical Meeting - WP8
PDF
Mid-term Review Meeting - WP8
PDF
Mid-term Review Meeting - WP2
PPTX
Slope Final Review Meeting - WP7
PPTX
Slope Final Review Meeting - WP4
PDF
3rd Technical Meeting - WP2
PDF
4th Technical Meeting - WP7
PDF
Kick-Off Meeting - WP4
PPTX
SLOPE Final Conference - intelligent machines
PPTX
SLOPE Final Conference - electronic marking of trees
PDF
4th Technical Meeting - WP4
PDF
2nd Technical Meeting - WP5
PDF
4th Technical Meeting - WP5
SLOPE Final Conference - innovative cable yarder
Kick-Off Meeting - WP8
Slope Final Review Meeting - WP2
2nd Technical Meeting - WP7
Mid-term Review Meeting - WP7
3rd Technical Meeting - WP8
Mid-term Review Meeting - WP8
Mid-term Review Meeting - WP2
Slope Final Review Meeting - WP7
Slope Final Review Meeting - WP4
3rd Technical Meeting - WP2
4th Technical Meeting - WP7
Kick-Off Meeting - WP4
SLOPE Final Conference - intelligent machines
SLOPE Final Conference - electronic marking of trees
4th Technical Meeting - WP4
2nd Technical Meeting - WP5
4th Technical Meeting - WP5
Ad

Similar to 1st Technical Meeting - WP6 (20)

PPTX
Wp6 presentation by graphitech
DOCX
Blog #02 - Project management report for a call tracking system - A sample as...
PDF
Install PRESTO KPI in 5 weeks
PPTX
A Structured Approach to Estimating Software Intensive Projects - René Berghu...
PPTX
SUNSHINE short overview of the project and its objectives
PPTX
Howe Street Basic Project Approach
PDF
IRJET- Agricultural Productivity System
PDF
Fleet monitoring in thermal power plant
PPTX
Task 6.1 by graphitech
PPTX
Sofware project managementtt UNIT 4.pptx
PPTX
Alu GHGs inventory software for landuse and landcover
PDF
2014 LOOP Verification - Members' Briefing
DOCX
Implementation roadmap.docx
 
PPT
PPTX
Changes to ISO9001/ISO14001
PPTX
18 Apr 2015 NWFSC PMI presentation v7
PDF
Bballard2000 dissertation
PPTX
eCIO PPT Sunsetting strategy v 3 general distribution
PPT
BIPM Key Comparison Database for Measurement Quality
PPT
IQA_Project
Wp6 presentation by graphitech
Blog #02 - Project management report for a call tracking system - A sample as...
Install PRESTO KPI in 5 weeks
A Structured Approach to Estimating Software Intensive Projects - René Berghu...
SUNSHINE short overview of the project and its objectives
Howe Street Basic Project Approach
IRJET- Agricultural Productivity System
Fleet monitoring in thermal power plant
Task 6.1 by graphitech
Sofware project managementtt UNIT 4.pptx
Alu GHGs inventory software for landuse and landcover
2014 LOOP Verification - Members' Briefing
Implementation roadmap.docx
 
Changes to ISO9001/ISO14001
18 Apr 2015 NWFSC PMI presentation v7
Bballard2000 dissertation
eCIO PPT Sunsetting strategy v 3 general distribution
BIPM Key Comparison Database for Measurement Quality
IQA_Project

More from SLOPE Project (19)

PPTX
Slope Final Review Meeting - WP8
PPTX
SLOPE 2nd workshop - presentation 3
PPTX
SLOPE 2nd workshop - presentation 4
PDF
SLOPE Final Conference - sensors for timber grading in forest
PDF
SLOPE Final Conference - remote sensing systems
PDF
SLOPE 3rd workshop - presentation 3
PDF
SLOPE 3rd workshop - presentation 4
PDF
SLOPE 3rd workshop - presentation 1
PDF
SLOPE 4th workshop - presentation 5
PDF
SLOPE 4th workshop - presentation 4
PDF
SLOPE 4th workshop - presentation 2
PDF
SLOPE 4th workshop - presentation 1
PDF
SLOPE 3rd workshop - presentation 2
PDF
SLOPE 2nd workshop - presentation 2
PDF
SLOPE 1st workshop - presentation 7
PDF
SLOPE 1st workshop - presentation 6
PDF
SLOPE 1st workshop - presentation 5
PDF
SLOPE 1st workshop - presentation 4
PDF
SLOPE 1st workshop - presentation 3
Slope Final Review Meeting - WP8
SLOPE 2nd workshop - presentation 3
SLOPE 2nd workshop - presentation 4
SLOPE Final Conference - sensors for timber grading in forest
SLOPE Final Conference - remote sensing systems
SLOPE 3rd workshop - presentation 3
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 1
SLOPE 4th workshop - presentation 5
SLOPE 4th workshop - presentation 4
SLOPE 4th workshop - presentation 2
SLOPE 4th workshop - presentation 1
SLOPE 3rd workshop - presentation 2
SLOPE 2nd workshop - presentation 2
SLOPE 1st workshop - presentation 7
SLOPE 1st workshop - presentation 6
SLOPE 1st workshop - presentation 5
SLOPE 1st workshop - presentation 4
SLOPE 1st workshop - presentation 3

Recently uploaded (20)

PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PPTX
Introduction to Building Materials
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
HVAC Specification 2024 according to central public works department
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
TNA_Presentation-1-Final(SAVE)) (1).pptx
Weekly quiz Compilation Jan -July 25.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
What if we spent less time fighting change, and more time building what’s rig...
Unit 4 Computer Architecture Multicore Processor.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Computing-Curriculum for Schools in Ghana
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Introduction to pro and eukaryotes and differences.pptx
Introduction to Building Materials
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
LDMMIA Reiki Yoga Finals Review Spring Summer
Hazard Identification & Risk Assessment .pdf
B.Sc. DS Unit 2 Software Engineering.pptx
HVAC Specification 2024 according to central public works department

1st Technical Meeting - WP6

  • 1. Project SLOPE 1 WP 6 – System integration
  • 2. Kick-off Meeting 2-4/Jul/2014 Agenda • Work Package Goals • Tasks Overview • Timeline • Deliverables • Task Details • Risks and Mitigation Actions • Open Discussion
  • 3. Kick-off Meeting 2-4/Jul/2014 Work Package Goals “Achieve a complete integration of the different components that are part of the SLOPE platform” WP 2 Components Forest information collection and analysis COA,FLY,GT,ITE,TRE WP 3 Components Integration of novel intelligent harvesting systems CNR,GRE,KES,ITE,MHG WP 5 Components Forest information system development CNR,TRE,BO WP6 Integration (All Partners) SLOPE PLATFORM
  • 4. Kick-off Meeting 2-4/Jul/2014 Work Package Goals • Build a WORKING System • Ready for pilots and on the field testing • 3 integration steps • 3 main tasks (T.6.2,T.6.3,T.6.4) • Technical and Economical Analysis • Overall solution costs • Social impacts • Environmental impacts T.6.2 T.6.3 T.6.4
  • 5. Kick-off Meeting 2-4/Jul/2014 Tasks and Roles • T.6.1 Definition of integration Steps • Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE • T.6.2 First Integration - Forest inventory & harvesting systems • Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE • T.6.3 Second integration – Forest management • Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE • T.6.4 – Third integration - System validation • Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE • T.6.5 – Scientific Coordination • Task leader: GRAPHITECH;
  • 6. Kick-off Meeting 2-4/Jul/2014 Timeline 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination • WP 2,3,4,5 still running when T.6.1 starts • WP 2,3,4,5 closed before the end of T.6.4
  • 7. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverables 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.03 SLOPE System Field Trials Readiness Assessment Report D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III
  • 8. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverable & Milestone 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III MS04 SLOPE System Integration Planning is completed MS05 Forest Inventory and Intelligent Harvesting system integration MS07 Forest Management system integrated MS09 System testing ending D.6.03 SLOPE System Field Trials Readiness Assessment Report
  • 9. Kick-off Meeting 2-4/Jul/2014 Timeline & Deliverable & Milestone & Project Meetings 2014 2015 2016 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration – Forest inventory & harvesting systems T.6.3 Second integration – Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordination D.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III MS04 SLOPE System Integration Planning is completed MS05 Forest Inventory and Intelligent Harvesting system integration MS07 Forest Management system integrated MS09 System testing ending D.6.03 SLOPE System Field Trials Readiness Assessment Report
  • 10. Kick-off Meeting 2-4/Jul/2014 Deliverables • D. 6.01 System Integration and Validation Plan • Integration and validation procedures and timeline to validate the SLOPE system • Based on the use cases in WP1 • D.6.03 SLOPE System Field Trials Readiness Assessment Report • Assessment of the initial user experience and recommendations for the field trials operations. • Guidance and system operation manual for the Field Trials operators
  • 11. Kick-off Meeting 2-4/Jul/2014 Deliverables • D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience • Recommendations for field trials operations • D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2) • Assessment of the initial user experience (rev. 2) • Recommendations for field trials operations (rev. 2) • D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3) • Assessment of the initial user experience (rev. 3) • Recommendations for field trials operations (rev. 3)
  • 12. Kick-off Meeting 2-4/Jul/2014 Deliverables • D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Estimation phase • D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Preliminary results phase • D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison • Final results phase
  • 14. Kick-off Meeting 2-4/Jul/2014 Task 6.1 Definition of the integration steps • Leader: Graphitech • Participants: KESLA, MHG, FLY, ITENE Objectives • Define the integration steps • Define validation concepts • Functionalities • Communication
  • 15. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 1. System Architecture Analysis (from T.1.5) • Component Diagram 2. Use case / general process Analysis (from T.1.1 and T.1.3) • Functional Requirements (execute A, execute B, etc.) • Non-functional reqirements (speed, reliability, etc.)
  • 16. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 3. Enumerate all needed software components, hardware, tools etc. • Forest model • Measurement systems • 3D Model Visualisation Software • Other Software 4. Identify and verify connection between components 5. Plan how to connect between 1. Forest Model with Harvesting 2. Forest Model & Harvesting with Forest Management
  • 17. Kick-off Meeting 2-4/Jul/2014 How to achieve these objectives? 6. For each integration step between two or more subsystems 1. For each identified interaction between subsystems components: 1. Describe the interaction 2. Describe the expected result 3. Define importance level (i.e. low, medium, high) 2. Define minimum threshold to be achieved Test N° Interaction Description Expected result Obtained Result Achieved Anomaly Description ... ... ... ... ... ... 8 The user use the 3D model to… The application shows …. The application HAS shown… YES None ... ... ... ... ... ...
  • 18. Kick-off Meeting 2-4/Jul/2014 Components to be integrated WP2 WP3WP5 WP4 SLOPE DBSLOPE DBSLOPE DB
  • 19. Kick-off Meeting 2-4/Jul/2014 Deliverables Reports: • D.6.01 System Integration and Validation Plan (M13)
  • 20. Kick-off Meeting 2-4/Jul/2014 Expectations • Contribution from each partner for its component • Joint contribution for each couple of integrated components by the corresponding partners • Regular Telcos on a Monthly basis • First Telco at Task’s start
  • 21. Kick-off Meeting 2-4/Jul/2014 Risks • Data Formats • DB Model (T.1.5 and T.5.1) • Reduce Harmonization/adaptation • Images and other data formats • Unreliable Services • Hardware interfaces with software • RFID • BT • Inability to reproduce planned test field/conditions • Component testing takes time!
  • 22. Kick-off Meeting 2-4/Jul/2014 Mitigating Actions • Exhaustive System Architecture • T.1.5 and Parallel Session of Tomorrow • Exhaustive Requirement analysis • D.1.1 and D.1.2 • Common data model • T.1.4 • Communication • Skype (Small Group, no desktop sharing) • WebEx (up to 25 persons with desktop sharing) • Monthly Basis
  • 24. Kick-off Meeting 2-4/Jul/2014 Thank you for your attention DANIELE MAGLIOCCHETTI daniele.magliocchetti@graphitech.it Fondazione Graphitech Via Alla Cascata 56C 38123 Trento (ITALY) Phone: +39 0461.283395 Fax: +39 0461.283398
  • 25. Kick-off Meeting 2-4/Jul/2014 Task 6.5 Scientific Coordination • Leader: Graphitech Objectives • Technical supervision of technology functionalities as planned • Management of issues related to Software licenses and/or required hardware • Quality Assurance and assessment/evaluation of technology results • Regular reporting of the technical development of the project