Key elements
• S – Suppliers, those who supply input
into the process.
• I – Inputs, data, knowledge, resources
needed to generate at output.
• P – Process, high level view of the
process, an activity that transforms the
inputs to outputs.
Key elements
• O – Output, what comes out of the
process as a result of a transformation
• C – Customer, person receiving the
output
1. Process Mapping (SIPOC,
Detailed)
2. Cause & Effect (Root Cause
Analysis)
3. Failure Mode Effect Analysis
(FMEA )
Introduction to
Tools
Process Mapping (SIPOC) Objectives
1. What is SIPOC
2. What is the purpose
3. Key Elements of a SIPOC
4. Step to Generate a SIPOC
5. Example
Process Mapping (SIPOC)
SIPOC is a high level mapping
tool that allows the user to see
the process with limited detail.
It is often used to narrow down
the focus of a bigger process or
to aid in project selection.
Process Mapping (SIPOC)
1. Map Process
2. Define Outputs
3. List Customers (who receive output)
4. Identify Inputs (Resources, information)
5. List Suppliers (source of input)
Detailed Process Mapping Objectives
Why Do We Process Map (Benefits)
Who Should do a Process Map
Key Elements of a Detailed Process Map
Step to Generate a Detailed Process Map
Symbols
Example
Detailed Process Mapping
Benefits
Detailed Process Mapping
Benefits
Detailed Process Mapping
Benefits
Detailed Process Mapping
Detailed Process Mapping
Benefits
Key Elements of a Detailed
Process Map
•KPIV / KPOV
•Type of Input
•Value Added (VA) or Non-Value
•Added (NVA)
•Specifications
•Quality Indicator
KPIV=KEY PERFORMANCE INPUT VARIABLES
KPOV=KEY PERTFORMANCE OUTPUT VARIABLES
Key Elements of a Detailed Process Map
• Inspection opportunities
• Control Parameters
• Cost Per Unit
• Etc.
Steps to Detailed Process Mapping
Steps to Detailed Process Mapping
Steps to Detailed Process
Mapping
Detailed Process Symbols
Process mapping Symbols from Excel
Process Step
Connector
Decision
Start/Stop
Detailed Process In Excel
Detailed Process In Excel
Detailed Process In Excel
Detailed Process Mapping
Input Type KPIV Specs/Tolerance
Value
Added KPOV Specs Data Quality Indices
SOP Location 6" from split NVA
Correct
Location
Measure
d
Flush with Table
edge Visual
Parallel to side
SOP Location Right Edge NVA
Correct
Position Visual
Flush to Catapult
Base
SOP Location
Parallel to base of
Table NVA
Correct
Position
Measure
d
Flush with back
edge Visual
C Secure? NVA Secure Tape Visual
C Pin Placement 1
Proper Pin
Placement 1 Visual 120 +/- 2
C Stop Position 2 NVA
Proper Stop
Position 2 Visual 120 +/- 2
C Pull Back Angle 180 +/- 1
Proper Pull
Back Angle 180 +/- 1
Measure
d 120 +/- 2
C Ball Type Rubber Right Ball Rubber Visual 120 +/- 2
SOP
Implement Start
Positions NVA Inspection of Catapult
C
Operator
Position Sitting
Operator
Sitting Sitting Visual
SOP Ball Type Rubber NVA Proper Ball Rubber Visual
Start
Position Catapult
Clamp Catapult
Position Tape Measure
Secure Tape Measure
Determine Start Position
from Historical Data
Set Up Catapult
Place Proper Ball in Cup
Detailed Process Mapping
Input Type KPIV Specs/Tolerance
Value
Added KPOV Specs Data Quality Indices
C
Holding
Position
2 Fingers beneath
cup VA
Holding
Position
2 Fingers
beneath cup
Measure
d 120 +/- 2
C Firing Position Align with left side
Firing
Position
Align with
left side
Measure
d 120 +/- 2
N Hold Time < 2 seconds Hold Time < 2 seconds
Measure
d 120 +/- 2
C # of Measurers 2 NVA
# of
Measurers 2
Measure
d 120 +/- 2
C
Tape Measure Calibrated/Standard
inch tape measure
& Secured
Tape
Measure
Calibrated/St
andard inch
tape
measure &
Secured
Measure
d
120 +/- 2
N
Location of
Measurer +/1 12 inches
Location of
Measurer
+/1 12
inches
Measure
d 120 +/- 2
No
Yes
Fire Catapult
Measure and Record
Data
Did Ball
Hit
Target?
Stop
Root Cause Analysis Objectives
What is a root cause analysis
Why perform a root cause analysis
How to set up a root cause analysis
using the fishbone diagram
Steps to generate a root cause analysis
using the fishbone diagram
Example
What is a root cause analysis?
Why perform a root cause
analysis?
How to set up a fish bone diagram
Cause and Effect Diagram organizes
causes into 6 “M” distinct categories.
1.Man
2.Machine
3.Natural causes
4.Method
5.Measurement
6.Material
Steps to generate a fish bone
diagram
Organize the 6 M’s around the fishbone
MEASUREMENT METHODS MATERIALS
MANPOWER MACHINES MOTHER
NATURE
Steps to generate a fish bone
diagram
Steps to generate a fish bone
diagram
MEASUREMENT METHODS MATERIALS
MANPOWER MACHINES MOTHER
NATURE
Customer leaves
restaurant
dissatisfied rating
Food in uncooked
Food is over-cooked
Rating not discriminatory
Server is rude Restaurant is cold
Restaurant is hot
Limited menu
Cash register quit
Incorrect amount on bill
Food taste bad
Oven malfunctionedServer non-responsive
Don’t take credit
Don’t take checks
Not enough servers
Not enough cooks
FMEA Objectives
1. What is an FMEA
2. What areas typically use an FMEA
and why
3. How to set up an FMEA
4. Steps to generate an FMEA
5. Example
What is an FMEA
What areas typically use an FMEA
• Manufacturing processes
• Management Systems
• Design of new products and processes
• Service industries to maximize customer
satisfaction
• Defect minimization
• Identifying Safety Hazards
Each of these areas use FMEA to determine and
minimize
risk.
FMEA Template
Step Failure
Mode
Effect of
Failure
Mode
Severity
of Effect
(1-10)
Causes of
Failure
Likelihood
of Cause
(1-10)
Control to
Detect
Failure
Likelihood
of
Detection
(1-10)
RPN
Severity Scoring of FMEA
Effect of Failure Mode Severity of Effect Rank
Catastrophic without warning Failure is catastrophic with no warning 10
Catastrophic with warning Failure is catastrophic with warning 9
Very High Between 75%-100% of product is rejected.
Customer is immediately lost if defect is detected.
8
High 50%-75% of product is rejected. Customer will
eventually be lost if other options exist.
7
Medium 25-50% of the product is scrapped without sorting.
Customer is aware of the issue and begins looking
for other suppliers.
6
Low 0% of product is rejected. 75%-100% of product
reworked. Customer is dissatisfied, but loyal.
5
Very Low 50%-75% of product is reworked. Greater than
50% of customers notice the defect if found.
4
Minor 25%-50% of product is re-worked. Between 25%-
50% of customer notice the defect if found.
3
Very Minor Less than 25% of product is re-worked. Less than
25% of customers notice the defect if found.
2
None No effect 1
Occurrence Scoring of FMEA
Likelihood of
Cause
Probability of Cause Rank
Inevitable Between 90%-100% 10
Very high Between 75%-90% 9
High Between 50%-75% 8
Moderately High Between 25%-50% 7
Moderate Between 5%-25% 6
Moderately Low Between 1%-5% 5
Low Between .001%-1% 4
Very Low Between .0001%-.001% 3
Rare Between .000001%-.0001% 2
Extremely Rare Less than .000001% 1
Detection Scoring of FMEA
Detection Likelihood that Defect is Detected Rank
Not Detectable 0% chance of detecting defect 10
Very Rarely 0%-5% chance of detecting defect 9
Rarely 5%-10% chance of detecting defect 8
Low 10%-25% chance of detecting defect 7
Moderately Low 25%-40% chance of detecting defect 6
Moderate 40%-60% chance of detecting defect 5
Moderately High 60%-75% chance of detecting defect 4
High 75%-95% chance of detecting defect 3
Very High 95%-99.999% chance of detecting
defect
2
Almost Certain Greater than 99.999% chance of
detecting defect
1
Steps to perform an FMEA
Steps to perform an FMEA
Steps to perform an FMEA
FMEA Example
Step Failure
Mode
Effect of
Failure
Mode
Severity of
Effect
(1-10)
Causes of
Failure
Likelihood
(Occurrence)
of Cause
(1-10)
Control to
Detect
Failure
Likelihood
of Detection
(1-10)
RPN
Call
911
All lines
are busy
Must wait
for open
line
10
(catastrophic)
Not
enough
phone
lines
3
(very low)
Phone
usage logs
by phone
company
6
(moderately
low)
180
Not
enough
operators
5
(moderately
low)
Budgeting
for
number of
calls
received
3
(high)
150
Call is not
answered
Ambulance
not
dispatched
10
(catastrophic)
Not
enough
operators
5
(moderately
low)
Budgeting
for
number of
calls
received
3
(high)
150
All
Operators
are on
lunch
break
2
(rare)
Time card
system
2
(very high)
40

More Related Content

PDF
Introduction To Lean
PDF
Kaizen PPT revised 2.pdf
PDF
WEBINAR: How to Make the Swimlane Map Work for You
PPTX
Poka Yoke Final Ppt
PPT
"Visual management & 5S " in Lean T.P.S (Workshop slides)
PPTX
Fundamentals of Lean
PPTX
QCC Presentation
PDF
Value Stream Mapping
Introduction To Lean
Kaizen PPT revised 2.pdf
WEBINAR: How to Make the Swimlane Map Work for You
Poka Yoke Final Ppt
"Visual management & 5S " in Lean T.P.S (Workshop slides)
Fundamentals of Lean
QCC Presentation
Value Stream Mapping

What's hot (20)

PPTX
Business process mapping
PDF
Poka yoke (mistake proofing)
PPT
Six Sigma and Its Implementation
PDF
Customer specific requirements march 2012revised
PPTX
Six Sigma
PPTX
Lean six sigma Yellow Belt Complete training
PDF
Lean manufacturing
PPT
Lean Six Sigma Awareness Handouts
PDF
Lean Value Stream Mapping (VSM) Training Module
PDF
WEBINAR: How to Conduct an 8 Wastes “Waste Walk”
PDF
Business Process Improvement (BPI 7) Process Training Module
PPTX
Learning to see (VSM)
PPTX
13. value stream mapping
PDF
Lean Six Sigma: DMAIC In-Depth
PDF
PDF
7 qc toolsTraining pdf
PPTX
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
PPTX
Training_Module_4M_Change.pptx
PPTX
SMED - Quick Change Over
Business process mapping
Poka yoke (mistake proofing)
Six Sigma and Its Implementation
Customer specific requirements march 2012revised
Six Sigma
Lean six sigma Yellow Belt Complete training
Lean manufacturing
Lean Six Sigma Awareness Handouts
Lean Value Stream Mapping (VSM) Training Module
WEBINAR: How to Conduct an 8 Wastes “Waste Walk”
Business Process Improvement (BPI 7) Process Training Module
Learning to see (VSM)
13. value stream mapping
Lean Six Sigma: DMAIC In-Depth
7 qc toolsTraining pdf
LEAN: Understanding the SIPOC (Quality Systems Management Tools Series 2016)
Training_Module_4M_Change.pptx
SMED - Quick Change Over
Ad

Viewers also liked (20)

PDF
Checking code-with-pmd
PDF
Exercise E Answers Examples
PDF
Defect prevention software
PDF
ARP4754a, DO-178C 발표자료
PPT
Quality Quick Session #1 Big Y, Little Y And All The Xs
PPTX
DMAIC implementation
PDF
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
PDF
Qualification of Eclipse-based Tools according to ISO 26262
PDF
Achieve iso 26262 certification
PDF
Introduction to arp4754a
PPT
090 Process Mapping
PDF
ISO26262-6 Software development process (Ver 3.0)
PPT
PPTX
Basic quality tools and others
PDF
ISO 26262 Approval of Automotive Software Components
PDF
6 Sigma Catapult Project
PDF
Lean Six Sigma Mistake-Proofing Process Training Module
PDF
Risk Management by using FMEA
PPTX
ISO 26262 introduction
PPT
6 Sigma
Checking code-with-pmd
Exercise E Answers Examples
Defect prevention software
ARP4754a, DO-178C 발표자료
Quality Quick Session #1 Big Y, Little Y And All The Xs
DMAIC implementation
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
Qualification of Eclipse-based Tools according to ISO 26262
Achieve iso 26262 certification
Introduction to arp4754a
090 Process Mapping
ISO26262-6 Software development process (Ver 3.0)
Basic quality tools and others
ISO 26262 Approval of Automotive Software Components
6 Sigma Catapult Project
Lean Six Sigma Mistake-Proofing Process Training Module
Risk Management by using FMEA
ISO 26262 introduction
6 Sigma
Ad

Similar to 091 Process Mapping (20)

PPT
C & E Matrix.ppt
PDF
Fmea handout
PPT
QM-037-Using DFSS tool
PPT
fmea1 pfmea analysis overview introduction .ppt
PDF
Failure modes effect analysis
PDF
Unit 3
PPT
Failure mode and effects analysis
PPT
FMEA-Intro.ppt
PPTX
Unit v11 proactive maintenance analysis
PPS
Best Damn D-FMEA Method!
DOCX
Unit iii tqm
PDF
FMEA practice guide for Automotive industry in India only.pdf
PPT
Measure Phase
PDF
fmea-130116034507-phpapp01.pdf
PPT
Analyze for knwolade for complete 454544dsfsfdfdg445454gdfgdfgfdgfdgd.ppt
PPT
gfdgfggdfg878787gdfgd8778787gdfgfgfdgdfgfd.ppt
PPT
IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt
PPT
FMEA is a team tool There are two different types of FMEAs: Design Process In...
PPT
FMEA análise e odos de falhas e seus efeitos.ppt
PPT
IT 381_Chap_7.ppt
C & E Matrix.ppt
Fmea handout
QM-037-Using DFSS tool
fmea1 pfmea analysis overview introduction .ppt
Failure modes effect analysis
Unit 3
Failure mode and effects analysis
FMEA-Intro.ppt
Unit v11 proactive maintenance analysis
Best Damn D-FMEA Method!
Unit iii tqm
FMEA practice guide for Automotive industry in India only.pdf
Measure Phase
fmea-130116034507-phpapp01.pdf
Analyze for knwolade for complete 454544dsfsfdfdg445454gdfgdfgfdgfdgd.ppt
gfdgfggdfg878787gdfgd8778787gdfgfgfdgdfgfd.ppt
IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt
FMEA is a team tool There are two different types of FMEAs: Design Process In...
FMEA análise e odos de falhas e seus efeitos.ppt
IT 381_Chap_7.ppt

More from Dr Fereidoun Dejahang (20)

DOCX
27 j20 my news punch -dr f dejahang 27-01-2020
DOCX
28 dej my news punch rev 28-12-2019
DOCX
16 fd my news punch rev 16-12-2019
PPT
029 fast-tracking projects
PPT
028 fast-tracking projects &amp; cost overrun
PPT
027 fast-tracked projects-materials
PPT
026 fast react-productivity improvement
PPT
025 enterprise resources management
PPT
022 b construction productivity-write
PPT
022 a construction productivity (2)
PPT
021 construction productivity (1)
PPTX
019 competencies-managers
PPT
018 company productivity
PPT
017 communication
PPT
016 communication in construction sector
PPTX
015 changes-process model
PPTX
014 changes-cost overrun measurement
PPTX
013 changes in construction projects
PPT
012 bussiness planning process
PPT
011 business performance management
27 j20 my news punch -dr f dejahang 27-01-2020
28 dej my news punch rev 28-12-2019
16 fd my news punch rev 16-12-2019
029 fast-tracking projects
028 fast-tracking projects &amp; cost overrun
027 fast-tracked projects-materials
026 fast react-productivity improvement
025 enterprise resources management
022 b construction productivity-write
022 a construction productivity (2)
021 construction productivity (1)
019 competencies-managers
018 company productivity
017 communication
016 communication in construction sector
015 changes-process model
014 changes-cost overrun measurement
013 changes in construction projects
012 bussiness planning process
011 business performance management

Recently uploaded (20)

PPTX
Construction Project Organization Group 2.pptx
PPTX
Lecture Notes Electrical Wiring System Components
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Welding lecture in detail for understanding
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
Geodesy 1.pptx...............................................
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPT
Project quality management in manufacturing
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
CH1 Production IntroductoryConcepts.pptx
Construction Project Organization Group 2.pptx
Lecture Notes Electrical Wiring System Components
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Welding lecture in detail for understanding
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Geodesy 1.pptx...............................................
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Foundation to blockchain - A guide to Blockchain Tech
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
UNIT 4 Total Quality Management .pptx
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Project quality management in manufacturing
Model Code of Practice - Construction Work - 21102022 .pdf
CH1 Production IntroductoryConcepts.pptx

091 Process Mapping

  • 5. Key elements • S – Suppliers, those who supply input into the process. • I – Inputs, data, knowledge, resources needed to generate at output. • P – Process, high level view of the process, an activity that transforms the inputs to outputs.
  • 6. Key elements • O – Output, what comes out of the process as a result of a transformation • C – Customer, person receiving the output
  • 7. 1. Process Mapping (SIPOC, Detailed) 2. Cause & Effect (Root Cause Analysis) 3. Failure Mode Effect Analysis (FMEA ) Introduction to Tools
  • 8. Process Mapping (SIPOC) Objectives 1. What is SIPOC 2. What is the purpose 3. Key Elements of a SIPOC 4. Step to Generate a SIPOC 5. Example
  • 9. Process Mapping (SIPOC) SIPOC is a high level mapping tool that allows the user to see the process with limited detail. It is often used to narrow down the focus of a bigger process or to aid in project selection.
  • 10. Process Mapping (SIPOC) 1. Map Process 2. Define Outputs 3. List Customers (who receive output) 4. Identify Inputs (Resources, information) 5. List Suppliers (source of input)
  • 11. Detailed Process Mapping Objectives Why Do We Process Map (Benefits) Who Should do a Process Map Key Elements of a Detailed Process Map Step to Generate a Detailed Process Map Symbols Example
  • 17. Key Elements of a Detailed Process Map •KPIV / KPOV •Type of Input •Value Added (VA) or Non-Value •Added (NVA) •Specifications •Quality Indicator KPIV=KEY PERFORMANCE INPUT VARIABLES KPOV=KEY PERTFORMANCE OUTPUT VARIABLES
  • 18. Key Elements of a Detailed Process Map • Inspection opportunities • Control Parameters • Cost Per Unit • Etc.
  • 19. Steps to Detailed Process Mapping
  • 20. Steps to Detailed Process Mapping
  • 21. Steps to Detailed Process Mapping
  • 22. Detailed Process Symbols Process mapping Symbols from Excel Process Step Connector Decision Start/Stop
  • 26. Detailed Process Mapping Input Type KPIV Specs/Tolerance Value Added KPOV Specs Data Quality Indices SOP Location 6" from split NVA Correct Location Measure d Flush with Table edge Visual Parallel to side SOP Location Right Edge NVA Correct Position Visual Flush to Catapult Base SOP Location Parallel to base of Table NVA Correct Position Measure d Flush with back edge Visual C Secure? NVA Secure Tape Visual C Pin Placement 1 Proper Pin Placement 1 Visual 120 +/- 2 C Stop Position 2 NVA Proper Stop Position 2 Visual 120 +/- 2 C Pull Back Angle 180 +/- 1 Proper Pull Back Angle 180 +/- 1 Measure d 120 +/- 2 C Ball Type Rubber Right Ball Rubber Visual 120 +/- 2 SOP Implement Start Positions NVA Inspection of Catapult C Operator Position Sitting Operator Sitting Sitting Visual SOP Ball Type Rubber NVA Proper Ball Rubber Visual Start Position Catapult Clamp Catapult Position Tape Measure Secure Tape Measure Determine Start Position from Historical Data Set Up Catapult Place Proper Ball in Cup
  • 27. Detailed Process Mapping Input Type KPIV Specs/Tolerance Value Added KPOV Specs Data Quality Indices C Holding Position 2 Fingers beneath cup VA Holding Position 2 Fingers beneath cup Measure d 120 +/- 2 C Firing Position Align with left side Firing Position Align with left side Measure d 120 +/- 2 N Hold Time < 2 seconds Hold Time < 2 seconds Measure d 120 +/- 2 C # of Measurers 2 NVA # of Measurers 2 Measure d 120 +/- 2 C Tape Measure Calibrated/Standard inch tape measure & Secured Tape Measure Calibrated/St andard inch tape measure & Secured Measure d 120 +/- 2 N Location of Measurer +/1 12 inches Location of Measurer +/1 12 inches Measure d 120 +/- 2 No Yes Fire Catapult Measure and Record Data Did Ball Hit Target? Stop
  • 28. Root Cause Analysis Objectives What is a root cause analysis Why perform a root cause analysis How to set up a root cause analysis using the fishbone diagram Steps to generate a root cause analysis using the fishbone diagram Example
  • 29. What is a root cause analysis?
  • 30. Why perform a root cause analysis?
  • 31. How to set up a fish bone diagram Cause and Effect Diagram organizes causes into 6 “M” distinct categories. 1.Man 2.Machine 3.Natural causes 4.Method 5.Measurement 6.Material
  • 32. Steps to generate a fish bone diagram Organize the 6 M’s around the fishbone MEASUREMENT METHODS MATERIALS MANPOWER MACHINES MOTHER NATURE
  • 33. Steps to generate a fish bone diagram
  • 34. Steps to generate a fish bone diagram
  • 35. MEASUREMENT METHODS MATERIALS MANPOWER MACHINES MOTHER NATURE Customer leaves restaurant dissatisfied rating Food in uncooked Food is over-cooked Rating not discriminatory Server is rude Restaurant is cold Restaurant is hot Limited menu Cash register quit Incorrect amount on bill Food taste bad Oven malfunctionedServer non-responsive Don’t take credit Don’t take checks Not enough servers Not enough cooks
  • 36. FMEA Objectives 1. What is an FMEA 2. What areas typically use an FMEA and why 3. How to set up an FMEA 4. Steps to generate an FMEA 5. Example
  • 37. What is an FMEA
  • 38. What areas typically use an FMEA • Manufacturing processes • Management Systems • Design of new products and processes • Service industries to maximize customer satisfaction • Defect minimization • Identifying Safety Hazards Each of these areas use FMEA to determine and minimize risk.
  • 39. FMEA Template Step Failure Mode Effect of Failure Mode Severity of Effect (1-10) Causes of Failure Likelihood of Cause (1-10) Control to Detect Failure Likelihood of Detection (1-10) RPN
  • 40. Severity Scoring of FMEA Effect of Failure Mode Severity of Effect Rank Catastrophic without warning Failure is catastrophic with no warning 10 Catastrophic with warning Failure is catastrophic with warning 9 Very High Between 75%-100% of product is rejected. Customer is immediately lost if defect is detected. 8 High 50%-75% of product is rejected. Customer will eventually be lost if other options exist. 7 Medium 25-50% of the product is scrapped without sorting. Customer is aware of the issue and begins looking for other suppliers. 6 Low 0% of product is rejected. 75%-100% of product reworked. Customer is dissatisfied, but loyal. 5 Very Low 50%-75% of product is reworked. Greater than 50% of customers notice the defect if found. 4 Minor 25%-50% of product is re-worked. Between 25%- 50% of customer notice the defect if found. 3 Very Minor Less than 25% of product is re-worked. Less than 25% of customers notice the defect if found. 2 None No effect 1
  • 41. Occurrence Scoring of FMEA Likelihood of Cause Probability of Cause Rank Inevitable Between 90%-100% 10 Very high Between 75%-90% 9 High Between 50%-75% 8 Moderately High Between 25%-50% 7 Moderate Between 5%-25% 6 Moderately Low Between 1%-5% 5 Low Between .001%-1% 4 Very Low Between .0001%-.001% 3 Rare Between .000001%-.0001% 2 Extremely Rare Less than .000001% 1
  • 42. Detection Scoring of FMEA Detection Likelihood that Defect is Detected Rank Not Detectable 0% chance of detecting defect 10 Very Rarely 0%-5% chance of detecting defect 9 Rarely 5%-10% chance of detecting defect 8 Low 10%-25% chance of detecting defect 7 Moderately Low 25%-40% chance of detecting defect 6 Moderate 40%-60% chance of detecting defect 5 Moderately High 60%-75% chance of detecting defect 4 High 75%-95% chance of detecting defect 3 Very High 95%-99.999% chance of detecting defect 2 Almost Certain Greater than 99.999% chance of detecting defect 1
  • 43. Steps to perform an FMEA
  • 44. Steps to perform an FMEA
  • 45. Steps to perform an FMEA
  • 46. FMEA Example Step Failure Mode Effect of Failure Mode Severity of Effect (1-10) Causes of Failure Likelihood (Occurrence) of Cause (1-10) Control to Detect Failure Likelihood of Detection (1-10) RPN Call 911 All lines are busy Must wait for open line 10 (catastrophic) Not enough phone lines 3 (very low) Phone usage logs by phone company 6 (moderately low) 180 Not enough operators 5 (moderately low) Budgeting for number of calls received 3 (high) 150 Call is not answered Ambulance not dispatched 10 (catastrophic) Not enough operators 5 (moderately low) Budgeting for number of calls received 3 (high) 150 All Operators are on lunch break 2 (rare) Time card system 2 (very high) 40