General Information
Skill Matrix,
Multi Skill
Development
& Training Plan
General Information
Goal
Mampu membuat Skill
Matrix & Rencana Training
General Information
Coach’s Background
AJI WIJAYA KUSUMA, ST
Enthusiast & professional on Lean,
Improvement, people development
and motivation.
16 years experience in Apparel
Industry focus on practical lean
implementation, costing & capacity
management
471.wijayakusuma@gmail.com
+62 815 7898 6913
Aji Wijaya Kusuma
Lean Manufacturing
Industrial Engineering
Production Planning
Apparel CMT Costing & CPM
90%
90%
80%
85%
85%
Supplier Capacity Management
https://www.youtube.com/user/471WijayaKusuma/featured
https://www.facebook.com/Lets-LEAN-788239307962079
General Information
Masalah Pabrik
Garment
General Information
Layout
lama ± 1-2
hari Mesin
belum siap
pakai
Skill
operator
belum OK
Kalo sore
sisaan
permakan
masih ada
General Information
Training Within Industry
Perang Dunia Ke-2
General Information
Q1 Q2 Q3 Q4
1 2
2 5
3 6
4
1 1 2 2 2 2 1
GREENTEX LEAN DEPT-- SKILL MATRIX & TRAINING PLAN
SKILL NAME /PROCESS
1. Motion &
Time Study
4.
Presentation
3. 5S & Visual
Performance
7. Problem
Solving PDCA
2. Data
Analyze &
Visualization
5. Coaching 6. Inter Dept
Relation
REMARKS
ACTUAL CAPABILITIES
(75% PERFORMANCE)
Manpower Needs
Performance Needs
(Work Manner)
No.
Reni
5 6 7
Riski Chairani
NO SKILL
KNOW THE THEORY
CAN APPLY SOME OF THE THEORY
HAVE APPLIED IN MOST OF ACTUAL PROBLEM
CAN COACH OTHER WITH PROVEN RESULT
Winarsih
Putut Setiawan
Remarks
Job Needs
(Poduction Change)
RESULT OF
TRAINING
Beginning of Year
Middle of Year
End of Year
SKILL LEVEL
TARGET
LEAN TEAM NAME
General Information
Remarks
Job Needs
(Poduction Change)
End of Year
Middle of Year
RESULT OF
TRAINING
Beginning of Year
4
3 WATI
2 IKA
15
1 TINA
ACTUAL 10 3 2
6 52
6 2 5 3 5 3
TARGET TOTAL OPERATOR 10 5 5 2
No.
CAPABILITIES Manpower Needs
Q1 Q2 Q3 Q3
Performance Needs
(Work Manner)
JOIN
WB
CROSS
BOX
JOIN
HOOD
SNAP/BARTACK
PASANG
PLACKET
PASANG
ZIPPER
OVERDECK
MAKE
UP
OVERLOCK
SKILL MATRIX SEWING
Name:
Section/Group:
Date:
Process or
Operation
Name
PENGUASAAN MESIN PENGUASAAN PROSES SPESIAL
REMARKS
SINGLE
NEEDLE
DOIBLE
NEEDLE
TARGET SKILL
NAME
General Information
Creating a Planning Time-table
MULTI-FUNCTION WORKER TRAINING TIMETABLE
Name: REMARKS
Section/Group:
CAPABILITIES
Date:
NUMBER NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
= 100% Performance
= 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 1
Step 2
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 3
List Job
Names
General Information
1. Select Critical/Special Process/Machine
Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Namaoperator NIK
Cross box Jarum 1 V V Saenur GIU0494
Obras pasangtangan Obras benang4 V Witri GIU2351
Obras variasi samping Obras benang4 V -
Tutup kerah Jarum 1 V V Khomsiyatun GIU2088
Stick armhole Kamput V V Drsini GIU0971
Cross box Jarum 1 V V Mila GIU3636
Hemmingtangan Kamput V -
Tutup kerah Jarum 1 V V Heni GIU0273
Cross box Jarum 1 V V Masriah GIU0277
Pasangkerah Jarum 1 V V Siti GIU1956
Stick slit Jarum 1 V V Biut GIU3783
Hemmingtangan Kamput V V Suhartiningsih GIU0758
Stick armhole /printing Kamput V Rohani GIU0290
Make up Make up V V Risna GIU0354
Obras kerah Obras benang4 V V Nuraini GIU0337
Stick zipper Jarum 1 V V iis GIU0210
Tutup kerah Jarum 1 V V Elis GIU4130
Pasangzipper Jarum 1 V V Mimin GIU0217
Pasangzipper Jarum 1 V V Uli GIU3204
Stick zipper Jarum 1 V V -
Corongtape kerah Jarum 1 V V -
Stick tape Jarum 1 V V -
Stick zipper Jarum 1 V V Kiswati GIU2461
8 385FA
395FA
2
395FA
12
7
5
P31142
MSTR08390
DATA CRITICAL PROSES SEWING
POLO
6
15
16
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 4
Assess Skill
Levels
General Information
SKILL
LEVEL
PERSENTASE
C 1%-25% Hanya dapat melakukan langkah-langkah dasar, dan masih belum lepas dari pengawasan
B 26%-50%
Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan tapi
belum mencapai target waktu yang ditetapkan. Masih membutuhkan banyak pengawasan
S 76%-100%
Tidak membutuhkan pengawasan dan dapat melatih karyawan lain untuk melakukan proses
sewing yang ditargetkan
A 51%-75%
Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan dan
mencapai target waktu yang ditetapkan. Hanya butuh sedikit pengawasan
SIMBOL KETERANGAN
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Step 5
Ideal number: the ideal number
of people capable of doing the job
at 75% performance or better
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Step 6
Step 6
Add Total
Capabilities
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Performance needs:
• Individual adherence to quality, rate and safety standards
• Individual use of equipment and machines
• Waste, rework, damage to equipment and injuries
Step 8
Step 7
Manpower needs:
• New employees
• Promotions / transfers
• Vacations
• Temporary employees
• Job rotations
• Temporary assignments
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Production needs:
• Work that piles up
• Seasonal work
• Bottlenecks
• New Work
• Production changes
Step 9
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Compare :
• IDEAL CAPACITY to
• RESULT OF TRAINING
Examine :
• Manpower Needs
• Capabilities and
• Job Needs to determine
training needs.
Step 10
Step 10
• Plan for and record anticipated
training completion dates.
• Write dates next to individual circles.
Step 11
General Information
Copyright 2001 - 2008 Lean Associates,
Inc.
General Information
Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Nama operator NIK
Cross box Jarum 1 V V Saenur GIU 0494
Obras pasang tangan Obras benang 4 V Witri GIU 2351
Obras variasi samping Obras benang 4 V -
Tutup kerah Jarum 1 V V Khomsiyatun GIU 2088
Stick armhole Kamput V V Drsini GIU 0971
Cross box Jarum 1 V V Mila GIU 3636
Hemming tangan Kamput V -
Tutup kerah Jarum 1 V V Heni GIU 0273
Cross box Jarum 1 V V Masriah GIU 0277
Pasang kerah Jarum 1 V V Siti GIU 1956
Stick slit Jarum 1 V V Biut GIU 3783
Hemming tangan Kamput V V Suhartiningsih GIU 0758
Stick armhole /printing Kamput V Rohani GIU 0290
Make up Make up V V Risna GIU 0354
Obras kerah Obras benang 4 V V Nuraini GIU 0337
Stick zipper Jarum 1 V V iis GIU 0210
Tutup kerah Jarum 1 V V Elis GIU 4130
Pasang zipper Jarum 1 V V Mimin GIU 0217
Pasang zipper Jarum 1 V V Uli GIU 3204
Stick zipper Jarum 1 V V -
Corong tape kerah Jarum 1 V V -
Stick tape Jarum 1 V V -
Stick zipper Jarum 1 V V Kiswati GIU 2461
8 385 FA
395 FA
2
395 FA
12
7
5
P31142
MSTR08390
DATA CRITICAL PROSES SEWING
POLO
6
15
16
2. Select Best Operator To Do TOT (Training Of Trainer)
General Information
3. Train the best operator with
Lean Method (JI)
www.themegallery.com Company Logo
General Information
General Information
Perbaikan Terus-Menerus
❖ Update Weekly/Monthly untuk Skill Level %
❖ Merencanakan lebih awal jika ada resign dan rotasi
❖ Memperbaiki ISQ/RFT
Factory
Category Level - HR Data
S A B C
5% 25% 40% 30%
IY 01 12.4% 29.7% 34.5% 18.4%
IY 02 6.6% 17.0% 36.1% 26.1%
IY 03 7.9% 26.1% 35.7% 26.3%
IY 04 9.1% 27.5% 38.2% 21.4%
IY 05 9.1% 29.8% 28.5% 24.0%
IY 07 7.5% 31.4% 29.7% 19.8%
IY 08 7.3% 21.4% 36.8% 22.0%
IY 09 4.8% 15.1% 37.4% 29.2%
IY 10 6.0% 21.8% 40.3% 23.1%
IY 12 4.3% 21.1% 35.5% 25.6%
IY 13 6.9% 20.9% 33.9% 20.0%
IY 14 11.1% 36.1% 21.7% 23.4%
OUTSOLE 0.0% 34.8% 35.9% 4.0%
TOTAL 6.5% 25.9% 34.4% 20.3%
11_Skill Matrix_Multiskill Development & Training plan.pdf
Train for mechanic
development
Test Skill
Visual Control Mechanic
Development Skill
No NAME Machine
Problem
Focus
Analyze Std
Total
Time
Setting
+ repair
(Minute
)
Education Skill
Update:
19 Feb
Update:
26 Mar
Update:
16 Apr
Update:
11 Mei
Update:
3 Jun
Update:
15 Jun
Update:
07 Jul
Update:
10
August
Update:
19 Feb
Update:
26 Mar
Update:
16 Apr
Update:
11 Mei
Update:
3 Jun
Update:
15 Jun
Update:
07 Jul
Update:
10
August
1 Dendi
Overdeck
( 3
Neddle,
Cutt )
Jumping
Stitch
3,7 3,8 3,9 3,6 3,7 3,9
20
2 Tatang 3,7 3,7 3,8 3,8 3,4 3,6 3,6 3,7
3 Aji 2,0 2,6 3,6 3,0 2,9 3,3
4 Jenal 3,3 3,7 3,7 3,3 3,4 3,7
5 Andre 3,1 3,3 3,7 3,3 3,3 3,4
6 Hari 4,0 4,0 3,9 3,9
7 Willy 2,8 3,1 3,2 2,7 2,7 3,0
NOTE
SCORE REMARKS
0 Can not repairing machine
1 Can carry out basic repairing machine
2 Can carry out basic repairing machine + requires intermediate supervision
3 Can carry out basic repairing machine + requires advance supervision
4 Can carry out basic repairing machine , propose improvement ideas, be able to work with
other Dept. & can train other mechanics to make repairs
Score Mechanic skill before & after
project
2.8
2.0
3.1
3.3
3.7 3.7
4.0
3.2
3.6 3.7 3.7 3.8 3.9 4.0
WILLY AJI ANDRE JENAL TATANG DENDI HARI
SKILL MATRIX MECHANIC
BEFORE AFTER
3.
Result on machine breakdown
ADD A FOOTER 31
Neal Creative ©
FINISH
IMPROVEMENTS!
THANK YOU

More Related Content

PDF
Process Decision and Program Chart
PDF
KRA-Setting.pdf
PPTX
5 why analysis training presentaion
PPT
A3 Thinking Applied to Policy Deployment
PDF
2. Pengembangan RPP dan Perangkat Lainnyaa- PPG Unisma 2022 (1).pdf
PPS
PDF
Overview of Project Management Knowledge Areas and Processes
PDF
Gemba walk: the start of your lean journey
Process Decision and Program Chart
KRA-Setting.pdf
5 why analysis training presentaion
A3 Thinking Applied to Policy Deployment
2. Pengembangan RPP dan Perangkat Lainnyaa- PPG Unisma 2022 (1).pdf
Overview of Project Management Knowledge Areas and Processes
Gemba walk: the start of your lean journey

What's hot (20)

PPTX
ISO 9001-2015: New Risk Requirements
PDF
Mini-Training: Using root-cause analysis for problem management
PDF
Daily Management Overview
PPT
8D Problem Solving Report Template with Guidance
PDF
Lean Six Sigma Projects
PPTX
Planning and Scheduling Workshop
PDF
Skill matrix by Md. Mazharul Islam
PPTX
Project Management In The Automotive Industry
PDF
LSSBB Training Material Version.pdf
PDF
Root Cause Analysis (RCA) Tools
PDF
Six Sigma for Beginners- Yellow and Green Belt
PPTX
Kaizen janu 23 juli 2014
PPTX
abnormalityrule
PDF
Root cause analysis by: ICG Team
PPTX
project management
PDF
Modul kaizen
PPT
Model GKM 3P Gugus Kendali Mutu - sebuah contoh
PPTX
ISO 19011:2018 Pedoman Audit Sistem Manajemen
PPTX
Understanding KPIs and Key Metrics
ISO 9001-2015: New Risk Requirements
Mini-Training: Using root-cause analysis for problem management
Daily Management Overview
8D Problem Solving Report Template with Guidance
Lean Six Sigma Projects
Planning and Scheduling Workshop
Skill matrix by Md. Mazharul Islam
Project Management In The Automotive Industry
LSSBB Training Material Version.pdf
Root Cause Analysis (RCA) Tools
Six Sigma for Beginners- Yellow and Green Belt
Kaizen janu 23 juli 2014
abnormalityrule
Root cause analysis by: ICG Team
project management
Modul kaizen
Model GKM 3P Gugus Kendali Mutu - sebuah contoh
ISO 19011:2018 Pedoman Audit Sistem Manajemen
Understanding KPIs and Key Metrics
Ad

Similar to 11_Skill Matrix_Multiskill Development & Training plan.pdf (20)

PPTX
Progress 26.11.14
PPTX
4. DP SEJARAH PPT 2021 - SPM latest.pptx
PDF
Human Resources Performance Management Metrics PowerPoint Presentation Slides
PDF
Human Resources Performance Management Metrics Powerpoint Presentation Slides
PPT
Artistic apparel audit presentation ...
PPT
Cognitive Apprenticeship in Accounting Education
PPTX
Bicara Profesional.pptx
PDF
Human Resources Management Process Powerpoint Presentation Slides
PDF
Human Resources Management Process PowerPoint Presentation Slides
PDF
Mbs burial village oracle fusion implementation
PPT
Itb Chap 09
PPTX
Report
PPTX
What is kaizen
PDF
MFG Strategy 2015 AB
PDF
Ad september 2014 exam final
PPTX
Executive briefing business case- saudi electricity
PPTX
Keep 'em or kick 'em out: Evaluating student workforce performance
PDF
Lean - Tight Oil Design & Construction
DOCX
Maniiiii (3)
Progress 26.11.14
4. DP SEJARAH PPT 2021 - SPM latest.pptx
Human Resources Performance Management Metrics PowerPoint Presentation Slides
Human Resources Performance Management Metrics Powerpoint Presentation Slides
Artistic apparel audit presentation ...
Cognitive Apprenticeship in Accounting Education
Bicara Profesional.pptx
Human Resources Management Process Powerpoint Presentation Slides
Human Resources Management Process PowerPoint Presentation Slides
Mbs burial village oracle fusion implementation
Itb Chap 09
Report
What is kaizen
MFG Strategy 2015 AB
Ad september 2014 exam final
Executive briefing business case- saudi electricity
Keep 'em or kick 'em out: Evaluating student workforce performance
Lean - Tight Oil Design & Construction
Maniiiii (3)
Ad

More from Aji Wijaya Kusuma (20)

PPTX
Kaizen in healtcare industry_hospital.pptx
PDF
16_QCO.pdf
PDF
4_5S & Visual Management.pdf
PDF
14_PULL SYSTEM.pdf
PDF
12_Standar Kerja.pdf
PDF
15_One Piece Flow.pdf
PDF
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
PDF
2_Hoshin Kanri~Policy Deployment.pdf
PDF
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
PDF
3_Kaizen & Culture of Empowerment.pdf
PDF
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
PDF
7_Problem solving using PDCA thinking (A3 Report).pdf
PDF
PDF
Rft real implementation korean fty
PDF
Rft project real implementation
PDF
RFT Workshop
PPTX
Creating speed with 5 s
PPTX
New qco project greentex
PDF
Greentex indonesia utama lean implementation
PPT
BEFORE AFTER SHORT PRESENTATION SPREADING
Kaizen in healtcare industry_hospital.pptx
16_QCO.pdf
4_5S & Visual Management.pdf
14_PULL SYSTEM.pdf
12_Standar Kerja.pdf
15_One Piece Flow.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
2_Hoshin Kanri~Policy Deployment.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
3_Kaizen & Culture of Empowerment.pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf
Rft real implementation korean fty
Rft project real implementation
RFT Workshop
Creating speed with 5 s
New qco project greentex
Greentex indonesia utama lean implementation
BEFORE AFTER SHORT PRESENTATION SPREADING

Recently uploaded (20)

PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PDF
ICv2 White Paper - Gen Con Trade Day 2025
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PDF
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
DOCX
FINALS-BSHhchcuvivicucucucucM-Centro.docx
PPTX
basic introduction to research chapter 1.pptx
PDF
Booking.com The Global AI Sentiment Report 2025
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
Solaris Resources Presentation - Corporate August 2025.pdf
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
ICv2 White Paper - Gen Con Trade Day 2025
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Lecture 3344;;,,(,(((((((((((((((((((((((
Daniels 2024 Inclusive, Sustainable Development
Charisse Litchman: A Maverick Making Neurological Care More Accessible
Hand book of Entrepreneurship 4 Chapters.docx
Chapter 2 - AI chatbots and prompt engineering.pdf
FINALS-BSHhchcuvivicucucucucM-Centro.docx
basic introduction to research chapter 1.pptx
Booking.com The Global AI Sentiment Report 2025

11_Skill Matrix_Multiskill Development & Training plan.pdf

  • 1. General Information Skill Matrix, Multi Skill Development & Training Plan
  • 2. General Information Goal Mampu membuat Skill Matrix & Rencana Training
  • 3. General Information Coach’s Background AJI WIJAYA KUSUMA, ST Enthusiast & professional on Lean, Improvement, people development and motivation. 16 years experience in Apparel Industry focus on practical lean implementation, costing & capacity management 471.wijayakusuma@gmail.com +62 815 7898 6913 Aji Wijaya Kusuma Lean Manufacturing Industrial Engineering Production Planning Apparel CMT Costing & CPM 90% 90% 80% 85% 85% Supplier Capacity Management https://www.youtube.com/user/471WijayaKusuma/featured https://www.facebook.com/Lets-LEAN-788239307962079
  • 5. General Information Layout lama ± 1-2 hari Mesin belum siap pakai Skill operator belum OK Kalo sore sisaan permakan masih ada
  • 6. General Information Training Within Industry Perang Dunia Ke-2
  • 7. General Information Q1 Q2 Q3 Q4 1 2 2 5 3 6 4 1 1 2 2 2 2 1 GREENTEX LEAN DEPT-- SKILL MATRIX & TRAINING PLAN SKILL NAME /PROCESS 1. Motion & Time Study 4. Presentation 3. 5S & Visual Performance 7. Problem Solving PDCA 2. Data Analyze & Visualization 5. Coaching 6. Inter Dept Relation REMARKS ACTUAL CAPABILITIES (75% PERFORMANCE) Manpower Needs Performance Needs (Work Manner) No. Reni 5 6 7 Riski Chairani NO SKILL KNOW THE THEORY CAN APPLY SOME OF THE THEORY HAVE APPLIED IN MOST OF ACTUAL PROBLEM CAN COACH OTHER WITH PROVEN RESULT Winarsih Putut Setiawan Remarks Job Needs (Poduction Change) RESULT OF TRAINING Beginning of Year Middle of Year End of Year SKILL LEVEL TARGET LEAN TEAM NAME
  • 8. General Information Remarks Job Needs (Poduction Change) End of Year Middle of Year RESULT OF TRAINING Beginning of Year 4 3 WATI 2 IKA 15 1 TINA ACTUAL 10 3 2 6 52 6 2 5 3 5 3 TARGET TOTAL OPERATOR 10 5 5 2 No. CAPABILITIES Manpower Needs Q1 Q2 Q3 Q3 Performance Needs (Work Manner) JOIN WB CROSS BOX JOIN HOOD SNAP/BARTACK PASANG PLACKET PASANG ZIPPER OVERDECK MAKE UP OVERLOCK SKILL MATRIX SEWING Name: Section/Group: Date: Process or Operation Name PENGUASAAN MESIN PENGUASAAN PROSES SPESIAL REMARKS SINGLE NEEDLE DOIBLE NEEDLE TARGET SKILL NAME
  • 9. General Information Creating a Planning Time-table MULTI-FUNCTION WORKER TRAINING TIMETABLE Name: REMARKS Section/Group: CAPABILITIES Date: NUMBER NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. = 100% Performance = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks
  • 10. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 1 Step 2
  • 11. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 3 List Job Names
  • 12. General Information 1. Select Critical/Special Process/Machine Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Namaoperator NIK Cross box Jarum 1 V V Saenur GIU0494 Obras pasangtangan Obras benang4 V Witri GIU2351 Obras variasi samping Obras benang4 V - Tutup kerah Jarum 1 V V Khomsiyatun GIU2088 Stick armhole Kamput V V Drsini GIU0971 Cross box Jarum 1 V V Mila GIU3636 Hemmingtangan Kamput V - Tutup kerah Jarum 1 V V Heni GIU0273 Cross box Jarum 1 V V Masriah GIU0277 Pasangkerah Jarum 1 V V Siti GIU1956 Stick slit Jarum 1 V V Biut GIU3783 Hemmingtangan Kamput V V Suhartiningsih GIU0758 Stick armhole /printing Kamput V Rohani GIU0290 Make up Make up V V Risna GIU0354 Obras kerah Obras benang4 V V Nuraini GIU0337 Stick zipper Jarum 1 V V iis GIU0210 Tutup kerah Jarum 1 V V Elis GIU4130 Pasangzipper Jarum 1 V V Mimin GIU0217 Pasangzipper Jarum 1 V V Uli GIU3204 Stick zipper Jarum 1 V V - Corongtape kerah Jarum 1 V V - Stick tape Jarum 1 V V - Stick zipper Jarum 1 V V Kiswati GIU2461 8 385FA 395FA 2 395FA 12 7 5 P31142 MSTR08390 DATA CRITICAL PROSES SEWING POLO 6 15 16
  • 13. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 4 Assess Skill Levels
  • 14. General Information SKILL LEVEL PERSENTASE C 1%-25% Hanya dapat melakukan langkah-langkah dasar, dan masih belum lepas dari pengawasan B 26%-50% Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan tapi belum mencapai target waktu yang ditetapkan. Masih membutuhkan banyak pengawasan S 76%-100% Tidak membutuhkan pengawasan dan dapat melatih karyawan lain untuk melakukan proses sewing yang ditargetkan A 51%-75% Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan dan mencapai target waktu yang ditetapkan. Hanya butuh sedikit pengawasan SIMBOL KETERANGAN
  • 15. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Step 5 Ideal number: the ideal number of people capable of doing the job at 75% performance or better
  • 16. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Step 6 Step 6 Add Total Capabilities
  • 17. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Performance needs: • Individual adherence to quality, rate and safety standards • Individual use of equipment and machines • Waste, rework, damage to equipment and injuries Step 8 Step 7 Manpower needs: • New employees • Promotions / transfers • Vacations • Temporary employees • Job rotations • Temporary assignments
  • 18. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Production needs: • Work that piles up • Seasonal work • Bottlenecks • New Work • Production changes Step 9
  • 19. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Compare : • IDEAL CAPACITY to • RESULT OF TRAINING Examine : • Manpower Needs • Capabilities and • Job Needs to determine training needs. Step 10 Step 10 • Plan for and record anticipated training completion dates. • Write dates next to individual circles. Step 11
  • 20. General Information Copyright 2001 - 2008 Lean Associates, Inc.
  • 21. General Information Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Nama operator NIK Cross box Jarum 1 V V Saenur GIU 0494 Obras pasang tangan Obras benang 4 V Witri GIU 2351 Obras variasi samping Obras benang 4 V - Tutup kerah Jarum 1 V V Khomsiyatun GIU 2088 Stick armhole Kamput V V Drsini GIU 0971 Cross box Jarum 1 V V Mila GIU 3636 Hemming tangan Kamput V - Tutup kerah Jarum 1 V V Heni GIU 0273 Cross box Jarum 1 V V Masriah GIU 0277 Pasang kerah Jarum 1 V V Siti GIU 1956 Stick slit Jarum 1 V V Biut GIU 3783 Hemming tangan Kamput V V Suhartiningsih GIU 0758 Stick armhole /printing Kamput V Rohani GIU 0290 Make up Make up V V Risna GIU 0354 Obras kerah Obras benang 4 V V Nuraini GIU 0337 Stick zipper Jarum 1 V V iis GIU 0210 Tutup kerah Jarum 1 V V Elis GIU 4130 Pasang zipper Jarum 1 V V Mimin GIU 0217 Pasang zipper Jarum 1 V V Uli GIU 3204 Stick zipper Jarum 1 V V - Corong tape kerah Jarum 1 V V - Stick tape Jarum 1 V V - Stick zipper Jarum 1 V V Kiswati GIU 2461 8 385 FA 395 FA 2 395 FA 12 7 5 P31142 MSTR08390 DATA CRITICAL PROSES SEWING POLO 6 15 16 2. Select Best Operator To Do TOT (Training Of Trainer)
  • 22. General Information 3. Train the best operator with Lean Method (JI) www.themegallery.com Company Logo
  • 25. Perbaikan Terus-Menerus ❖ Update Weekly/Monthly untuk Skill Level % ❖ Merencanakan lebih awal jika ada resign dan rotasi ❖ Memperbaiki ISQ/RFT Factory Category Level - HR Data S A B C 5% 25% 40% 30% IY 01 12.4% 29.7% 34.5% 18.4% IY 02 6.6% 17.0% 36.1% 26.1% IY 03 7.9% 26.1% 35.7% 26.3% IY 04 9.1% 27.5% 38.2% 21.4% IY 05 9.1% 29.8% 28.5% 24.0% IY 07 7.5% 31.4% 29.7% 19.8% IY 08 7.3% 21.4% 36.8% 22.0% IY 09 4.8% 15.1% 37.4% 29.2% IY 10 6.0% 21.8% 40.3% 23.1% IY 12 4.3% 21.1% 35.5% 25.6% IY 13 6.9% 20.9% 33.9% 20.0% IY 14 11.1% 36.1% 21.7% 23.4% OUTSOLE 0.0% 34.8% 35.9% 4.0% TOTAL 6.5% 25.9% 34.4% 20.3%
  • 28. Visual Control Mechanic Development Skill No NAME Machine Problem Focus Analyze Std Total Time Setting + repair (Minute ) Education Skill Update: 19 Feb Update: 26 Mar Update: 16 Apr Update: 11 Mei Update: 3 Jun Update: 15 Jun Update: 07 Jul Update: 10 August Update: 19 Feb Update: 26 Mar Update: 16 Apr Update: 11 Mei Update: 3 Jun Update: 15 Jun Update: 07 Jul Update: 10 August 1 Dendi Overdeck ( 3 Neddle, Cutt ) Jumping Stitch 3,7 3,8 3,9 3,6 3,7 3,9 20 2 Tatang 3,7 3,7 3,8 3,8 3,4 3,6 3,6 3,7 3 Aji 2,0 2,6 3,6 3,0 2,9 3,3 4 Jenal 3,3 3,7 3,7 3,3 3,4 3,7 5 Andre 3,1 3,3 3,7 3,3 3,3 3,4 6 Hari 4,0 4,0 3,9 3,9 7 Willy 2,8 3,1 3,2 2,7 2,7 3,0 NOTE SCORE REMARKS 0 Can not repairing machine 1 Can carry out basic repairing machine 2 Can carry out basic repairing machine + requires intermediate supervision 3 Can carry out basic repairing machine + requires advance supervision 4 Can carry out basic repairing machine , propose improvement ideas, be able to work with other Dept. & can train other mechanics to make repairs
  • 29. Score Mechanic skill before & after project 2.8 2.0 3.1 3.3 3.7 3.7 4.0 3.2 3.6 3.7 3.7 3.8 3.9 4.0 WILLY AJI ANDRE JENAL TATANG DENDI HARI SKILL MATRIX MECHANIC BEFORE AFTER 3.
  • 30. Result on machine breakdown