SlideShare a Scribd company logo
Vehicle and Machinery Rescue Tarrant County College Day 1  Monday, April 4, 2011
Overview  The Technical Rescuer Introduction to Vehicle and Machinery Rescue PPE and Safety Size Up and Scene Security  Tools and TCC Layout Airbag Hotwiring  Phases of Rescue Drill Operations Level Skill Update  Large Vehicle Anatomy
The Technical Rescuer
The Technical Rescuer  Level I  Common passenger vehicles Simple small machinery Environments that are not high risk Level II Commercial and heavy vehicles Heavy and industrial machinery High risk environments
The Technical Rescuer Abilities of the Level I and II Vehicle and Machinery Rescuer Plan for an incident involving applicable machinery and vehicles Proper size up Organize the scene with ICS Identify hazards and establish hazard control zones Evaluate the need and attain extra resources  Documentation
Vehicle and Machinery Rescue NFPA 1006 Chapter 5 Technical Rescuer requirements (handout) Chapter 10 Vehicle and Machinery Rescue requirements (this class) Operational Protocols Agencies are to develop clear guidelines for resources and capabilities  Plan for the “unusual situation” See the Sample SOG’s in the student manual
Vehicle and Machinery Rescue Priorities are always the same Life Safety  First  Stabilizing the Incident is always  Second Finally, try to conserve the property  Third  Go over the Definitions found the student manual …
PPE and Safety
PPE and Safety  Eye Protection  The hazards and risk factors Requiring the use of eye protection The Protection  Primary and secondary protection  Goggles and helmet shields Prescription safety glasses Care and Safety  See the Model SOP for Protective Eyewear in the Student Manual
PPE and Safety Hearing cannot be replaced Hearing protection is simple and inexpensive insurance Ear Plugs Ear Muffs Vehicle and machinery rescue can become very loud and damaging to the ears The 4 C’s of hearing protection for consideration; Comfort Convenient  Communication  Care of the equipment and of hearing
PPE and Safety Bunker coat and helmet Markings  Colors Padding  Reflective Marking   Vests  Stripes Radio Flashlight   Be mindful when using a flashlight Use it wisely
Making the Scene Safe and Secure Scene Security   “ Immediate Surroundings” is a 20ft. Radius Scene Safety Zones Hot zone Warm zone Cold zone Make the area safe by… RIT Team Establishing; Safety Zones Site Security  Stabilization  Lock Out Tag Out Disentanglement  Utilities Support PPE Site control
Scene Security Hazard Recognition and Mitigation   DOT ERG, Awareness and Operational Level Hazmat Utilities  Electric Gas Water / Sanitary  etc Gas Struts  Wichita Kansas… LA County 1998…
Scene Security More Size Up Considerations  Shutting down the motor and ignition switch Engaging the Brake Using the power windows and locks before you shut down the electrical system Negative First Never Orange 5 second to 20 minutes
Scene Safety Scene Security Barriers Cones Flashlights Barrier Tape Flares Apparatus PD Support PPE Bunker coat and helmet Reflective marking Radio Flashlight Hearing protection  Traffic Control  Recognize Tools  Pedestrians  Notable Requirements
Size Up and Scene Security Deal with the Hazards At least a 1 ¾ inch  charged  hand line Up wind, up hill As soon as possible All potentials and hazmats identified  Explosion Hazards NIMS Extinguishment  Potentials
Size Up and Scope Scope and Magnitude Risk/Benefit Analysis Number and Size  Integrity and Stability Victims Scene Access  Hazards  Exposure to Traffic Environmental Factors Available/Needed Resources Size Up Considerations
Size Up and Scene Security Now Lets discuss the following pictures as they relate to these considerations…
Size Up Exercise
 
 
 
 
 
 
Operational Level Skill Update Possible Update Topics  Constructions Features  Full Frame Uni-body Space Frame  Defining the Vehicle Fender Strut Tower Posts Rocker Panel Quarter Panel
Vehicle Extrication Terminology
 
Vehicle Extrication VEHICLE ANATOMY Terminology Frame Material Frame Construction Body material Glass
Vehicle Extrication Frame Material HSLA is used to meet the  strength requirements needed to meet FMVSS 214 Locations Problems A, B and C Posts/Pillars   -  Difficulty in cutting Roof Rails   -  Frame members are harder to push/spread Rocker Channels   -  Frames may have a structural/sound absorbing Dashboard Reinforcement   material filling the void space of the structural  Component High strength low alloy
Vehicle Extrication Frame Construction Unibody and Space Frame This type of construction links frame sections together for greater strength.  Designers have begun to use HSLA steels to achieve the required strengths needed to meet FMVSS 214 Monocoque A design where the frame and the sheet metal become one.  HSLA steel is common in these designs Micro Alloy and Boron Steel Used in the sub-frame, doors and cross-cowl members.  Cutting these metals can prove difficult if not impossible
Vehicle Extrication Terminology
Tools and TCC Layout
Tools and TCC Layout See the student manual for a list of possible tools to be used during a machine and vehicle rescue incident TCC Tool Layout We will now go over the tools specific to TCC that will be used during the class TCC Extrication Trailer… Applicable ropes and knots… Skip Hotwiring PowerPoint
Training Vehicle Safety Acquired Vehicle Safety During Training  Inspect the vehicle Don’t be surprised  Hazards still exist  Use a check list See the handout “Acquired Vehicle Safety Inspection Checklist”
There are 16 possible locations for airbags in a vehicle today
Airbag Hotwiring Hotwiring an Airbag Never train with a live, un-deployed airbag 16 possible locations  Simple hand tools to do the job Common lamp cord 9 volt battery Small pry bar Socket set Vice Grips and Wire Cutters Needle Nose and Electric Pliers Wire Strippers
Airbag Hotwiring Cut and remove the plastic Find the “hockey puck” shaped device Strip the wires Hook up the battery when ready to deploy Be cautious…
“ Hot Wiring”   Vehicle Airbags Vehicle rescue training  should not   be conducted on vehicles with ‘live’, undeployed airbags!
Simple hand tools are used for airbag ‘Hot Wiring’ procedure.
A  9-volt  transistor radio battery will usually provide enough  current to deploy an airbag.  Use a  12-volt  or  18-volt  battery if  the bag won’t deploy off the 9 volts. (i.e. Ford Escort airbags)
Cutting away side covering exposes inflator unit wires  which detonator lamp cord is spliced into
Unscrew airbag module to expose inflator unit wires that detonator lamp cord is spliced into.
Recip saw is best to remove section of instrument panel, providing access to end of inflator unit
Inflator module is a cylinder-shaped unit.  Detonator lamp cord is spliced  into wires coming out of end of unit.
Close-up view of end of passenger frontal airbag inflator  unit with lamp cord spliced in.
For a door side-impact airbag, remove portions of  door panel to access wires of inflator unit.
Typical stored gas inflator module for door side-impact airbag with airbag wiring harness visible.  Splice into this wire.
Remove this upholstery area to expose the airbag igniter unit.
Typical stored gas inflator wiring harness for passenger’s seat side-impact airbag.
Stored gas inflator modules have a cylinder shape with a pair of thin-gauge wires connected to one end.
For roof airbags, strip the trim to find the  stored gas inflator mounted to the roof structure
For knee bags, remove portions of the instrument  panel to locate the inflator unit wiring harness.
Hot Wiring Precautions Your cutting into any one of the airbag wires can cause that ‘live’ airbag to suddenly deploy.  Always work clear of the airbag inflation zone; 10”,  20”, & 5” Always treat a ‘live’ airbag as a dangerous commodity and respect it for its’ potential to cause injury or death to you or your crewmembers during this demonstration. When you get sloppy or careless, you are at your most vulnerable moment.
Phases of Rescue  This is a drill designed to assess the training level of each team Given an engine company and a 4 door acquired vehicle, each team will go through a timed evolution.  There are four phases to each evolution  Students will be divided into 4 groups  Two groups will be performing the drill while two watch After completion, the groups will switch
Phases of Rescue”  Drill Program Standardized National model for extrication training and team evaluation.  Participation in this national model drill allows the department to measure our extrication efficiency against national benchmark timeframes.  Timing each portion of the drill as explained in this program and documenting these times allows the department to provide each company and crew an ‘A’, ‘B’ or ‘Needs Improvement’ rating.  Continued practice with this Phases of Rescue drill allows each company to record the improvement in elapsed times over a period of weeks and months.
Phases of Rescue”  Drill Program Successful completion of the Phases drill with a team score of “A” (exceeds expectations) or “B” (meets expectations) demonstrates the ability to meet or exceed the Operations level vehicle rescue competencies of Chapter 2 and Chapter 6 of the National Fire Protection Association Standard 1670, Standard on Operations and Training for Technical Rescue.
Rules of Engagement 4-door acquired vehicle (all doors closed, windows up, doors locked) Vehicle on level surface, Vehicle on 4-wheels, Simulation of unconscious, unprotected driver and front seat passenger patients, Simulation that all doors are ‘jammed’,
all rescue tools are set in a tool staging area, company of 3 or 4 personnel including one member as officer starting line minimum of 6 feet from acquired vehicle, tools to be used for each Phase can be completely hooked up, power plants running, hydraulic lines charged, plugged in, etc. crew lines up at starting line with full PPP donned properly, Rules of Engagement
tools may be at starting line and in the hands of crew, crew crosses starting line upon signal from  Timekeeper and stopwatch begins crew leader holds arms up upon conclusion of final tasks signaling completion of all work for that Phase and stopping of the clock, times are recorded on Phases of Rescue scorecard, crew discusses their plan, prepares tools and lines up at starting line when ready to begin next evolution, Rules of Engagement
PHASES OF RESCUE Phase 1
Team pre-planning and preparation
Tool Staging Prior to Start of Phases Drill
Tools are preconnected, lines charged, engines running,  and may be held by personnel if desired.
Tools ‘ready’ for seatbelt cutting, glass breaking,  stripping trim, and covering the patients.
Phase 1 Arrival and safe positioning at crash scene  (simulated by crossing the starting line), scene size-up/assessment 360 , establishing Command , scene  &  vehicle stabilization , airbag “scanning ”, battery access and electrical system shutdown , hazard control (fluid leak or spill) assessment,  initial patient access opening  (removal of window glass),  initial interior access ,  patient contact patient protection/safety  (cover front seat with blanket),  determining contents of trunk .
“ Team  Ready… Set…Go!
Arrival, Establishing Command,  360 Survey & Hazard Assessment
Stabilization
Electrical System Shutdown
“ Double Cut’ Negative & Positive Cables
Initial Access and Patient Contact
Covered seats indicate ‘protected’ patient with EMS personnel at their side (simulated)
Determine Contents of Trunk
Upon completion of all required Phase One activities, the team members or crew leader raise their arms in the air, the Timekeeper stops the clock and records the elapsed time.  If there were safety violations or errors in tool operation, a penalty of five seconds is added to the elapsed time for each infraction.  The crew returns their tools to the starting line, dresses down, rehabs and critiques their evolution.
PHASES OF RESCUE Phase 2
Phase Two, total sidewall removal,  must  include; re-checking vehicle stabilization, re-checking patient protection/safety, removing side window glass, cutting/removing seatbelts, removing interior trim panel materials  (B-pillar), total sidewall removal including ,  front door ,  rear door , B-pillar ,  covering exposed metal.
Condition of a typical vehicle upon start of Phase 2
Total Sidewall Removal Begins…
 
Total Sidewall Removal Requires Seatbelts to Be Cut
 
 
 
 
Use of Multiple Tools at Same Time Decreases Operating time
One Option for Total Sidewall Removal
Total Sidewall Removal Completed
Example of Sharps Protection… Extrication Guards tm
PHASES OF RESCUE Phase 3
Phase 3 re-checking vehicle stabilization , re-checking patient protection/safety , side and rear glass removal , windshield glass cutting or total removal , cutting/removing seatbelts , removing interior trim panel materials at roof pillars , severing roof pillars ,  roof removal to debris area , and covering exposed metal .
“ Strip the Trim” Prior to Roof Removal
Begin at Rear Posts and Work Forward
Roof Removed with Windshield Intact
Roof Removal to Location 6’ From Vehicle
Cover Your ‘Sharps’.
PHASES OF RESCUE Phase 4
Phase 4 re-checking vehicle stabilization , re-checking patient protection/safety , cutting/bending of steering wheel ring ,  cutting A-pillar and/or rocker channel ,  “ rolling” of dash , or “ jacking” of dash , and  covering exposed metal .
Cut and Remove Lower Portion of Steering Wheel Ring
Jacking Dash Evolution…Open Tool to Maximum Spread
 
Extrication Blanket tm
 
Calculating “Total Tool Time” Upon completion of each of the eight (8)evolutions of the drill, elapsed times are recorded on the scorecard.  Phase Two and Phase Four are performed twice using both sides of the vehicle.  The teams rest and critique their work after each Phase of the drill. To determine total tool time, add the elapsed time from Phase One to the best (shortest) time from the Phase Two evolutions.  Add this sum to the Phase Three time.  Finally, add in the best time from the Phase Four evolutions.  This results in your crew’s  total tool time . For example consider that a team completed all Phases of the drill and recorded the following six times; 1:58 PHASE ONE 4:50 PHASE TWO DRIVER’S SIDE 3:34 PHASE TWO PASSENGER’S SIDE 2:55 PHASE THREE 1:57 PHASE FOUR DRIVER’S SIDE 1:40 PHASE FOUR PASSENGER’S SIDE
‘ Total Tool Time’ To determine total tool time, add Phase One’s 1:58 to the best Phase Two time of 3:34.  Add to this the Phase Three time of 1:57 and the best Phase Four time of 1:40.  The total tool time for this crew is 10:07.  This is a  ‘B’  performance and is rated as  Acceptable/Meets Expectations .
If this total time is less than nine minutes and thirty seconds  (< 9:30),  you get an  ‘A’ , and have scored among the top 10% of departments nationwide who have participated in this national drill.  Your total tool time  Exceeds Expectations .
If your total tool time is between nine minutes, thirty seconds and twelve minutes, thirty seconds  (9:30 – 12:30) , you get a  ‘B’ . This is the  Acceptable/Meets Expectations  operating time for the national drill and represents what 70% of all departments participating in this drill are able to accomplish.
If your total tool time exceeds twelve minutes and thirty seconds  (>12:30) , your crew  Needs Improvement   in your extrication operation.  More practice with the rescue equipment, getting in the habit of keeping all team member busy doing simultaneous work, having better Command, and showing more team ‘hustle’ will allow you to reduce your total tool time.
Operational Level Skill Update Modified Dash Rollup… Pulling the Steering Wheel… Pulling the Dash… Moving and Removing the Seats… Through the Floor… Creating Access and Egress Openings
Operational Level Skill Update Under-Ride MVA A wedge on wheels Predictable tactical actions  Hazard Control  Scene Control Trunk Tunneling and Dash Lift Consider the “Sidewall Opening” and “Roof Removal”
Operational Level Skill Update Trunk Tunneling The goal is to enter the trunk area and access the interior of the vehicle Think of the vehicle as a “hatch back” Consider a roof opening in addition to the “hatch back” strategy  Always start with stabilization Remember that the seats are moveable
Operational Level Skill Update Hazards to note and avoid during tunneling through the vehicle or machine; Time Constraints  Sharp and Cutting Edges  Glass Hydraulics Electrical  These items might require the IC to establish a Safety Officer
Street Tips
Response and Dispatch Information.
What information is available? Don’t forget your cell phone?
Scene Size-up Is the scene secure?
 
Rescue VS. Recovery
Take your own pulse first!
A Rescue + A Recovery
 
Crime Scene or Your Scene
Access
Additional Resources
Patient Locations
Can we move a vehicle?
Rescuer Fatigue
Mental Aspect  (Firefighters and Customers)
 
Recovery.  What’s your tool of choice?
Non-Conventional Tools
 
Terminating the Incident.
 
Corrective Actions
Corrective Actions  Student Evalution… Potential Issues  Stable to Unstable Safety Enhancement  Rope or cable use Chocking wheels Airbag Scanning Avoiding loaded bumpers Covering Edges Noting and dealing with adverse weather
Training Issues  Scene Related Corrections Traffic Hazmats Stopping leaks Gas lines Gasoline leaks Patient Corrections ABC’s Spine and neck immobilization  Privacy
Vehicle Size-Up Potential Victim Locations  Front and Back Seats… Floor Areas… Exterior of the Vehicle or Machine…
Safety Operations Emergency Evacuation and Safety Signals Procedures for any emergency or Training  PAR’s should be performed quickly Common Signals Command Should assign a safety officer  Never get distracted by being too close Always be conservative with safety issues
Large Vehicle Anatomy
Large Vehicle Anatomy Bus Rescue   Bus Construction Four Types of Buses Type A Type B Type C Type D Variation of C and D See School Bus Construction Handout
Large Vehicle Anatomy Common feature of most large machinery and equipment Truck Frame Wheels and Suspension Fuel Tanks  Battery Storage and Systems Various Hydraulic Systems Outriggers in some cases More than one steering positions  Many other moving parts
Large Vehicle Anatomy Here are some categories to discuss… Aggregate Equipment Asphalt, Paving and Concrete Equipment Cranes Dozers Excavators Forklifts Graders Tractor and Trailers Fire Trucks
Heavy Equipment Discussion
End of Day 1

More Related Content

PPTX
Research assignment
PPT
Safety features simulators
PDF
Uses and Risks of Commercial Drones in Stadiums
PPT
Crossing Guard Training Module 3 Safety
PPT
Iowa Crossing Guard Training 3 Safety
PPTX
PPTX
Safety Management Systems in Business & Corporate Aviation
DOCX
Ashish gupta cv
Research assignment
Safety features simulators
Uses and Risks of Commercial Drones in Stadiums
Crossing Guard Training Module 3 Safety
Iowa Crossing Guard Training 3 Safety
Safety Management Systems in Business & Corporate Aviation
Ashish gupta cv

What's hot (18)

PPTX
Challenges to airport
PPTX
Aviation sanabeer salahudeen
PPT
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
PPT
30)Ambulance Operations
PPT
Ambulance
PDF
FAA Risk Management
PPS
Safety Tool Box Talk
PPTX
ARFF for Structural Fire Departments
PPT
ACO-2 Aircraft Familiarization
PPTX
Management of Change 22.4.15
PPTX
Aviation Indeed trainigs
PPT
ACO9 - Aviation Firefighting for Structual Trucks
PDF
Airside Safety
PPTX
NFPA 402 -- ARFF By the Book
PDF
FAA Risk Managment
PDF
Cabin Interior And Ice and Rain System
PPT
Medivac safety airplane
PPTX
Armed forces
Challenges to airport
Aviation sanabeer salahudeen
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
30)Ambulance Operations
Ambulance
FAA Risk Management
Safety Tool Box Talk
ARFF for Structural Fire Departments
ACO-2 Aircraft Familiarization
Management of Change 22.4.15
Aviation Indeed trainigs
ACO9 - Aviation Firefighting for Structual Trucks
Airside Safety
NFPA 402 -- ARFF By the Book
FAA Risk Managment
Cabin Interior And Ice and Rain System
Medivac safety airplane
Armed forces
Ad

Viewers also liked (9)

PPTX
ASIL
PDF
4 roadside hazard management
PPT
Roadside Safety Management
PPTX
A Brief discussion on Consumerism and Environmentalism.
PPT
3 -industrial safety-pp beura
PPTX
ParkingLots-2015
PPT
Risk Management in Insurance Sector
PPTX
Risk Management in insurance business of Bangladesh.
PPTX
V2V tech
ASIL
4 roadside hazard management
Roadside Safety Management
A Brief discussion on Consumerism and Environmentalism.
3 -industrial safety-pp beura
ParkingLots-2015
Risk Management in Insurance Sector
Risk Management in insurance business of Bangladesh.
V2V tech
Ad

Similar to 2011 vm rescue day 1 final (20)

PPT
Best practices in vehicle rescue fdic 2010 pp03
PPT
Chapter 16 rescue procedures 6 07
PPT
Hot topics08 short pp03
PPTX
Flight Line Safety is a requirement for safe practice.
PDF
The automobile basic book
PPT
Chapter 09
PPT
Chapter 09-Transporation Fires and Related Safety Issues
DOCX
Automobile safety seminar report
DOCX
M7 Maintenance Practices essay (CAT A1)
PPTX
SmartParachute
PPT
Module 02 2004
PPT
Home Builders Training Program | Chris Collins Dacula ga
PDF
02 crown victoria
PPTX
Refueling study guide
PPT
Conveyor Safety
PDF
SRS THEORY AND OPERATION.pdf
PPTX
Carry out vehicle and trailer inspections - Major
PPTX
Working of safety air bags and their manufacturing
PPT
Vehicle technology impacts on rescue (v.1.2)
PPT
Chapter 06
 
Best practices in vehicle rescue fdic 2010 pp03
Chapter 16 rescue procedures 6 07
Hot topics08 short pp03
Flight Line Safety is a requirement for safe practice.
The automobile basic book
Chapter 09
Chapter 09-Transporation Fires and Related Safety Issues
Automobile safety seminar report
M7 Maintenance Practices essay (CAT A1)
SmartParachute
Module 02 2004
Home Builders Training Program | Chris Collins Dacula ga
02 crown victoria
Refueling study guide
Conveyor Safety
SRS THEORY AND OPERATION.pdf
Carry out vehicle and trailer inspections - Major
Working of safety air bags and their manufacturing
Vehicle technology impacts on rescue (v.1.2)
Chapter 06
 

Recently uploaded (20)

PDF
Trump Administration's workforce development strategy
PDF
01-Introduction-to-Information-Management.pdf
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
GDM (1) (1).pptx small presentation for students
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
Pharma ospi slides which help in ospi learning
PPTX
Cell Types and Its function , kingdom of life
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
O7-L3 Supply Chain Operations - ICLT Program
PPTX
Cell Structure & Organelles in detailed.
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
VCE English Exam - Section C Student Revision Booklet
Trump Administration's workforce development strategy
01-Introduction-to-Information-Management.pdf
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Abdominal Access Techniques with Prof. Dr. R K Mishra
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
GDM (1) (1).pptx small presentation for students
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Orientation - ARALprogram of Deped to the Parents.pptx
Pharma ospi slides which help in ospi learning
Cell Types and Its function , kingdom of life
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
O7-L3 Supply Chain Operations - ICLT Program
Cell Structure & Organelles in detailed.
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
STATICS OF THE RIGID BODIES Hibbelers.pdf
Microbial diseases, their pathogenesis and prophylaxis
Microbial disease of the cardiovascular and lymphatic systems
VCE English Exam - Section C Student Revision Booklet

2011 vm rescue day 1 final

  • 1. Vehicle and Machinery Rescue Tarrant County College Day 1 Monday, April 4, 2011
  • 2. Overview The Technical Rescuer Introduction to Vehicle and Machinery Rescue PPE and Safety Size Up and Scene Security Tools and TCC Layout Airbag Hotwiring Phases of Rescue Drill Operations Level Skill Update Large Vehicle Anatomy
  • 4. The Technical Rescuer Level I Common passenger vehicles Simple small machinery Environments that are not high risk Level II Commercial and heavy vehicles Heavy and industrial machinery High risk environments
  • 5. The Technical Rescuer Abilities of the Level I and II Vehicle and Machinery Rescuer Plan for an incident involving applicable machinery and vehicles Proper size up Organize the scene with ICS Identify hazards and establish hazard control zones Evaluate the need and attain extra resources Documentation
  • 6. Vehicle and Machinery Rescue NFPA 1006 Chapter 5 Technical Rescuer requirements (handout) Chapter 10 Vehicle and Machinery Rescue requirements (this class) Operational Protocols Agencies are to develop clear guidelines for resources and capabilities Plan for the “unusual situation” See the Sample SOG’s in the student manual
  • 7. Vehicle and Machinery Rescue Priorities are always the same Life Safety First Stabilizing the Incident is always Second Finally, try to conserve the property Third Go over the Definitions found the student manual …
  • 9. PPE and Safety Eye Protection The hazards and risk factors Requiring the use of eye protection The Protection Primary and secondary protection Goggles and helmet shields Prescription safety glasses Care and Safety See the Model SOP for Protective Eyewear in the Student Manual
  • 10. PPE and Safety Hearing cannot be replaced Hearing protection is simple and inexpensive insurance Ear Plugs Ear Muffs Vehicle and machinery rescue can become very loud and damaging to the ears The 4 C’s of hearing protection for consideration; Comfort Convenient Communication Care of the equipment and of hearing
  • 11. PPE and Safety Bunker coat and helmet Markings Colors Padding Reflective Marking Vests Stripes Radio Flashlight Be mindful when using a flashlight Use it wisely
  • 12. Making the Scene Safe and Secure Scene Security “ Immediate Surroundings” is a 20ft. Radius Scene Safety Zones Hot zone Warm zone Cold zone Make the area safe by… RIT Team Establishing; Safety Zones Site Security Stabilization Lock Out Tag Out Disentanglement Utilities Support PPE Site control
  • 13. Scene Security Hazard Recognition and Mitigation DOT ERG, Awareness and Operational Level Hazmat Utilities Electric Gas Water / Sanitary etc Gas Struts Wichita Kansas… LA County 1998…
  • 14. Scene Security More Size Up Considerations Shutting down the motor and ignition switch Engaging the Brake Using the power windows and locks before you shut down the electrical system Negative First Never Orange 5 second to 20 minutes
  • 15. Scene Safety Scene Security Barriers Cones Flashlights Barrier Tape Flares Apparatus PD Support PPE Bunker coat and helmet Reflective marking Radio Flashlight Hearing protection Traffic Control Recognize Tools Pedestrians Notable Requirements
  • 16. Size Up and Scene Security Deal with the Hazards At least a 1 ¾ inch charged hand line Up wind, up hill As soon as possible All potentials and hazmats identified Explosion Hazards NIMS Extinguishment Potentials
  • 17. Size Up and Scope Scope and Magnitude Risk/Benefit Analysis Number and Size Integrity and Stability Victims Scene Access Hazards Exposure to Traffic Environmental Factors Available/Needed Resources Size Up Considerations
  • 18. Size Up and Scene Security Now Lets discuss the following pictures as they relate to these considerations…
  • 20.  
  • 21.  
  • 22.  
  • 23.  
  • 24.  
  • 25.  
  • 26. Operational Level Skill Update Possible Update Topics Constructions Features Full Frame Uni-body Space Frame Defining the Vehicle Fender Strut Tower Posts Rocker Panel Quarter Panel
  • 28.  
  • 29. Vehicle Extrication VEHICLE ANATOMY Terminology Frame Material Frame Construction Body material Glass
  • 30. Vehicle Extrication Frame Material HSLA is used to meet the strength requirements needed to meet FMVSS 214 Locations Problems A, B and C Posts/Pillars - Difficulty in cutting Roof Rails - Frame members are harder to push/spread Rocker Channels - Frames may have a structural/sound absorbing Dashboard Reinforcement material filling the void space of the structural Component High strength low alloy
  • 31. Vehicle Extrication Frame Construction Unibody and Space Frame This type of construction links frame sections together for greater strength. Designers have begun to use HSLA steels to achieve the required strengths needed to meet FMVSS 214 Monocoque A design where the frame and the sheet metal become one. HSLA steel is common in these designs Micro Alloy and Boron Steel Used in the sub-frame, doors and cross-cowl members. Cutting these metals can prove difficult if not impossible
  • 33. Tools and TCC Layout
  • 34. Tools and TCC Layout See the student manual for a list of possible tools to be used during a machine and vehicle rescue incident TCC Tool Layout We will now go over the tools specific to TCC that will be used during the class TCC Extrication Trailer… Applicable ropes and knots… Skip Hotwiring PowerPoint
  • 35. Training Vehicle Safety Acquired Vehicle Safety During Training Inspect the vehicle Don’t be surprised Hazards still exist Use a check list See the handout “Acquired Vehicle Safety Inspection Checklist”
  • 36. There are 16 possible locations for airbags in a vehicle today
  • 37. Airbag Hotwiring Hotwiring an Airbag Never train with a live, un-deployed airbag 16 possible locations Simple hand tools to do the job Common lamp cord 9 volt battery Small pry bar Socket set Vice Grips and Wire Cutters Needle Nose and Electric Pliers Wire Strippers
  • 38. Airbag Hotwiring Cut and remove the plastic Find the “hockey puck” shaped device Strip the wires Hook up the battery when ready to deploy Be cautious…
  • 39. “ Hot Wiring” Vehicle Airbags Vehicle rescue training should not be conducted on vehicles with ‘live’, undeployed airbags!
  • 40. Simple hand tools are used for airbag ‘Hot Wiring’ procedure.
  • 41. A 9-volt transistor radio battery will usually provide enough current to deploy an airbag. Use a 12-volt or 18-volt battery if the bag won’t deploy off the 9 volts. (i.e. Ford Escort airbags)
  • 42. Cutting away side covering exposes inflator unit wires which detonator lamp cord is spliced into
  • 43. Unscrew airbag module to expose inflator unit wires that detonator lamp cord is spliced into.
  • 44. Recip saw is best to remove section of instrument panel, providing access to end of inflator unit
  • 45. Inflator module is a cylinder-shaped unit. Detonator lamp cord is spliced into wires coming out of end of unit.
  • 46. Close-up view of end of passenger frontal airbag inflator unit with lamp cord spliced in.
  • 47. For a door side-impact airbag, remove portions of door panel to access wires of inflator unit.
  • 48. Typical stored gas inflator module for door side-impact airbag with airbag wiring harness visible. Splice into this wire.
  • 49. Remove this upholstery area to expose the airbag igniter unit.
  • 50. Typical stored gas inflator wiring harness for passenger’s seat side-impact airbag.
  • 51. Stored gas inflator modules have a cylinder shape with a pair of thin-gauge wires connected to one end.
  • 52. For roof airbags, strip the trim to find the stored gas inflator mounted to the roof structure
  • 53. For knee bags, remove portions of the instrument panel to locate the inflator unit wiring harness.
  • 54. Hot Wiring Precautions Your cutting into any one of the airbag wires can cause that ‘live’ airbag to suddenly deploy. Always work clear of the airbag inflation zone; 10”, 20”, & 5” Always treat a ‘live’ airbag as a dangerous commodity and respect it for its’ potential to cause injury or death to you or your crewmembers during this demonstration. When you get sloppy or careless, you are at your most vulnerable moment.
  • 55. Phases of Rescue This is a drill designed to assess the training level of each team Given an engine company and a 4 door acquired vehicle, each team will go through a timed evolution. There are four phases to each evolution Students will be divided into 4 groups Two groups will be performing the drill while two watch After completion, the groups will switch
  • 56. Phases of Rescue” Drill Program Standardized National model for extrication training and team evaluation. Participation in this national model drill allows the department to measure our extrication efficiency against national benchmark timeframes. Timing each portion of the drill as explained in this program and documenting these times allows the department to provide each company and crew an ‘A’, ‘B’ or ‘Needs Improvement’ rating. Continued practice with this Phases of Rescue drill allows each company to record the improvement in elapsed times over a period of weeks and months.
  • 57. Phases of Rescue” Drill Program Successful completion of the Phases drill with a team score of “A” (exceeds expectations) or “B” (meets expectations) demonstrates the ability to meet or exceed the Operations level vehicle rescue competencies of Chapter 2 and Chapter 6 of the National Fire Protection Association Standard 1670, Standard on Operations and Training for Technical Rescue.
  • 58. Rules of Engagement 4-door acquired vehicle (all doors closed, windows up, doors locked) Vehicle on level surface, Vehicle on 4-wheels, Simulation of unconscious, unprotected driver and front seat passenger patients, Simulation that all doors are ‘jammed’,
  • 59. all rescue tools are set in a tool staging area, company of 3 or 4 personnel including one member as officer starting line minimum of 6 feet from acquired vehicle, tools to be used for each Phase can be completely hooked up, power plants running, hydraulic lines charged, plugged in, etc. crew lines up at starting line with full PPP donned properly, Rules of Engagement
  • 60. tools may be at starting line and in the hands of crew, crew crosses starting line upon signal from Timekeeper and stopwatch begins crew leader holds arms up upon conclusion of final tasks signaling completion of all work for that Phase and stopping of the clock, times are recorded on Phases of Rescue scorecard, crew discusses their plan, prepares tools and lines up at starting line when ready to begin next evolution, Rules of Engagement
  • 61. PHASES OF RESCUE Phase 1
  • 62. Team pre-planning and preparation
  • 63. Tool Staging Prior to Start of Phases Drill
  • 64. Tools are preconnected, lines charged, engines running, and may be held by personnel if desired.
  • 65. Tools ‘ready’ for seatbelt cutting, glass breaking, stripping trim, and covering the patients.
  • 66. Phase 1 Arrival and safe positioning at crash scene (simulated by crossing the starting line), scene size-up/assessment 360 , establishing Command , scene & vehicle stabilization , airbag “scanning ”, battery access and electrical system shutdown , hazard control (fluid leak or spill) assessment, initial patient access opening (removal of window glass), initial interior access , patient contact patient protection/safety (cover front seat with blanket), determining contents of trunk .
  • 67. “ Team Ready… Set…Go!
  • 68. Arrival, Establishing Command, 360 Survey & Hazard Assessment
  • 71. “ Double Cut’ Negative & Positive Cables
  • 72. Initial Access and Patient Contact
  • 73. Covered seats indicate ‘protected’ patient with EMS personnel at their side (simulated)
  • 75. Upon completion of all required Phase One activities, the team members or crew leader raise their arms in the air, the Timekeeper stops the clock and records the elapsed time. If there were safety violations or errors in tool operation, a penalty of five seconds is added to the elapsed time for each infraction. The crew returns their tools to the starting line, dresses down, rehabs and critiques their evolution.
  • 76. PHASES OF RESCUE Phase 2
  • 77. Phase Two, total sidewall removal, must include; re-checking vehicle stabilization, re-checking patient protection/safety, removing side window glass, cutting/removing seatbelts, removing interior trim panel materials (B-pillar), total sidewall removal including , front door , rear door , B-pillar , covering exposed metal.
  • 78. Condition of a typical vehicle upon start of Phase 2
  • 80.  
  • 81. Total Sidewall Removal Requires Seatbelts to Be Cut
  • 82.  
  • 83.  
  • 84.  
  • 85.  
  • 86. Use of Multiple Tools at Same Time Decreases Operating time
  • 87. One Option for Total Sidewall Removal
  • 89. Example of Sharps Protection… Extrication Guards tm
  • 90. PHASES OF RESCUE Phase 3
  • 91. Phase 3 re-checking vehicle stabilization , re-checking patient protection/safety , side and rear glass removal , windshield glass cutting or total removal , cutting/removing seatbelts , removing interior trim panel materials at roof pillars , severing roof pillars , roof removal to debris area , and covering exposed metal .
  • 92. “ Strip the Trim” Prior to Roof Removal
  • 93. Begin at Rear Posts and Work Forward
  • 94. Roof Removed with Windshield Intact
  • 95. Roof Removal to Location 6’ From Vehicle
  • 97. PHASES OF RESCUE Phase 4
  • 98. Phase 4 re-checking vehicle stabilization , re-checking patient protection/safety , cutting/bending of steering wheel ring , cutting A-pillar and/or rocker channel , “ rolling” of dash , or “ jacking” of dash , and covering exposed metal .
  • 99. Cut and Remove Lower Portion of Steering Wheel Ring
  • 100. Jacking Dash Evolution…Open Tool to Maximum Spread
  • 101.  
  • 103.  
  • 104. Calculating “Total Tool Time” Upon completion of each of the eight (8)evolutions of the drill, elapsed times are recorded on the scorecard. Phase Two and Phase Four are performed twice using both sides of the vehicle. The teams rest and critique their work after each Phase of the drill. To determine total tool time, add the elapsed time from Phase One to the best (shortest) time from the Phase Two evolutions. Add this sum to the Phase Three time. Finally, add in the best time from the Phase Four evolutions. This results in your crew’s total tool time . For example consider that a team completed all Phases of the drill and recorded the following six times; 1:58 PHASE ONE 4:50 PHASE TWO DRIVER’S SIDE 3:34 PHASE TWO PASSENGER’S SIDE 2:55 PHASE THREE 1:57 PHASE FOUR DRIVER’S SIDE 1:40 PHASE FOUR PASSENGER’S SIDE
  • 105. ‘ Total Tool Time’ To determine total tool time, add Phase One’s 1:58 to the best Phase Two time of 3:34. Add to this the Phase Three time of 1:57 and the best Phase Four time of 1:40. The total tool time for this crew is 10:07. This is a ‘B’ performance and is rated as Acceptable/Meets Expectations .
  • 106. If this total time is less than nine minutes and thirty seconds (< 9:30), you get an ‘A’ , and have scored among the top 10% of departments nationwide who have participated in this national drill. Your total tool time Exceeds Expectations .
  • 107. If your total tool time is between nine minutes, thirty seconds and twelve minutes, thirty seconds (9:30 – 12:30) , you get a ‘B’ . This is the Acceptable/Meets Expectations operating time for the national drill and represents what 70% of all departments participating in this drill are able to accomplish.
  • 108. If your total tool time exceeds twelve minutes and thirty seconds (>12:30) , your crew Needs Improvement in your extrication operation. More practice with the rescue equipment, getting in the habit of keeping all team member busy doing simultaneous work, having better Command, and showing more team ‘hustle’ will allow you to reduce your total tool time.
  • 109. Operational Level Skill Update Modified Dash Rollup… Pulling the Steering Wheel… Pulling the Dash… Moving and Removing the Seats… Through the Floor… Creating Access and Egress Openings
  • 110. Operational Level Skill Update Under-Ride MVA A wedge on wheels Predictable tactical actions Hazard Control Scene Control Trunk Tunneling and Dash Lift Consider the “Sidewall Opening” and “Roof Removal”
  • 111. Operational Level Skill Update Trunk Tunneling The goal is to enter the trunk area and access the interior of the vehicle Think of the vehicle as a “hatch back” Consider a roof opening in addition to the “hatch back” strategy Always start with stabilization Remember that the seats are moveable
  • 112. Operational Level Skill Update Hazards to note and avoid during tunneling through the vehicle or machine; Time Constraints Sharp and Cutting Edges Glass Hydraulics Electrical These items might require the IC to establish a Safety Officer
  • 114. Response and Dispatch Information.
  • 115. What information is available? Don’t forget your cell phone?
  • 116. Scene Size-up Is the scene secure?
  • 117.  
  • 119. Take your own pulse first!
  • 120. A Rescue + A Recovery
  • 121.  
  • 122. Crime Scene or Your Scene
  • 123. Access
  • 126. Can we move a vehicle?
  • 128. Mental Aspect (Firefighters and Customers)
  • 129.  
  • 130. Recovery. What’s your tool of choice?
  • 132.  
  • 134.  
  • 136. Corrective Actions Student Evalution… Potential Issues Stable to Unstable Safety Enhancement Rope or cable use Chocking wheels Airbag Scanning Avoiding loaded bumpers Covering Edges Noting and dealing with adverse weather
  • 137. Training Issues Scene Related Corrections Traffic Hazmats Stopping leaks Gas lines Gasoline leaks Patient Corrections ABC’s Spine and neck immobilization Privacy
  • 138. Vehicle Size-Up Potential Victim Locations Front and Back Seats… Floor Areas… Exterior of the Vehicle or Machine…
  • 139. Safety Operations Emergency Evacuation and Safety Signals Procedures for any emergency or Training PAR’s should be performed quickly Common Signals Command Should assign a safety officer Never get distracted by being too close Always be conservative with safety issues
  • 141. Large Vehicle Anatomy Bus Rescue Bus Construction Four Types of Buses Type A Type B Type C Type D Variation of C and D See School Bus Construction Handout
  • 142. Large Vehicle Anatomy Common feature of most large machinery and equipment Truck Frame Wheels and Suspension Fuel Tanks Battery Storage and Systems Various Hydraulic Systems Outriggers in some cases More than one steering positions Many other moving parts
  • 143. Large Vehicle Anatomy Here are some categories to discuss… Aggregate Equipment Asphalt, Paving and Concrete Equipment Cranes Dozers Excavators Forklifts Graders Tractor and Trailers Fire Trucks

Editor's Notes

  • #31: -Problems encountered are due to a combination of use of HSLA steels and new construction methods. i.e. the ‘corrugated’ pillar/post; foam material used to fill the void spaces in the frame for stiffening/sound reduction. -Most common HSLA are vanadium, columbium and titanium
  • #32: HSLA steel is three times stronger than low carbon steel. It is used in roof pillars, cross roof members, cross floor beams and other areas Low Carbon steel has a strength of approx 23,000 psi, Micro Alloy and Boron have a strength of 110,000 – 210,000 psi Monocoque (one shell) chassis have some interesting characteristics. The shell, which bears a distinct resemblance to a space frame, acquires enhanced strength when sheet metal body panels are attached. Depending on the manufacturing process, some monocoque chassis give the impression that there is a frame under the car. The metal that goes into this type of frame varies from mild box steel to HSLA (high strength/low alloy) steel. This metal is up to three times stronger than low carbon steel and is more difficult to cut, which adds to extrication time. Space Frames , which are prevalent today, formerly have been described as a chassis resembling a bird cage; however, many new space frames tend to resemble monocoque chassis. The actual space frame is made from box sheet metal or aluminum, with body panels attached to the shell. Space frames, like many other chassis, have progressive crush zones that make them very rigid. Body panels attached to the structure are often plastic.