The
Hydrostatic Testing
Best Practices Plan
to
Verify, Trace, & Precisely
Record Documentation
Jared Head
Hydrostatic
Testing
BestPractices
Verify, Trace, & Record PHMSA Best Practice CTA
Test Computations
Test Plan
Test Report
Data Gathering
Final Confirmation
Asset Audits
File Documents
Approvals/Sigs
Reg. Compliance
Lead Time to Plan
Operating Capacity
Asset longevity
Protocol
Hydrostatic test computations
Precise estimations of pipeline features & descriptions
-Diameter, wall thickness, length, pipe grade, age, etc.
-API vs ASME/ANSI Rating on operation pressure
-SMYS: 90%-100% & MOP: 125% for 4 hours
-Accurate elevations of pipeline
-Test medium (water), volume of medium, & temperature
stabilization
Line sections based on elevations and SMYS
Project Manager Verification of job scope
-Project Managing Engineer
-Customer Asset Manager
H y d r o s t a t i c t e s t c o m p u t a t i o n s
MOP validated
by hydro test outcome
Hydrostatic test plan
Follow the PHMSA standard IMP with environmental
compliance
-Environmental questions need to be solved to
obtain permits for compliance: EPA, NEPA, BLM,
SPE, FERC, DOT, OSHA, etc.
-Locate areas that supply water sources, consult
with operators/contractors to solve these issues,
and find discharge areas that are compliant.
Fabricated test = 4 hours | Mainline test = 8 hours
-Long bore hours before pipe install and fabricated test for
HDDs
-Test for mainline once installed to test for HDDs
Hydrostatic test plan
Environment Rules & Regulations
-Water source
-Discharge area
-Quality of water
Order of test plan steps
-Line fill and applying pressure
-Testing
-Data gathering
-Finishing test
-Dewatering the section
-Push slug of water to next section or use new water
-Drying to dewpoint & cleaning
-Final Confirmation with approvals
Hydrostatic test plan
Minimum, Target, & MOP for each section for pressure
DOT/PHMSA Rules
-Test type: spike, strength, leak
-Test medium, equipment,
instruments
-OQ certs of personnel doing test
-Test failures, leaks, blowouts
-Test duration
-Test data & drawings
-Proper approvals from project personnel
-These will be all required to be maintained as part of the test
plan
Hydrostatic test plan
Items needed for approval before starting test
-This should be communicated between asset owner
and contractors/subcontractors before performing the
work so there isn't any delay in the project schedule.
-Emails, drawings, Gantt charts, and conference calls
are a great way to communicate job expectations, area
of concerns, strategies, etc.
Hydrostatic test report
Meeting between job managers to
understand the data found is stored before
job kick-off
According to operating company's
procedures while following DOT/PHMSA
compliance
Thorough, step-by-step program
Hydrostatic test report
Accurate measurements
-Pipe diameter & WT
-Pipe grade & SMYS/ANSI rating
-Line location & elevation
-Test medium: source & volume
-Chemicals: used & volume
-Test schedule (ex: Gantt chart)
-Test pressure: time recorded
-Temperature of pipe & medium
-Weather
-Test lengths per segment
Hydrostatic test report
Accuracy of Recorded data
-All written data must
be transported to digital
format for storage
-Written information can
be lost or misread
-Written information has
a shelf life
Hydrostatic test data gathering
Researching & implementing
Knowing the test reports & records
-Personnel verifying the test data
-Shows those collaborating with the
reports what is mandatory to be
gathered and what steps are needed
to be approved
Make sure all written data
is stored in Final
Confirmation Book
Hydrostatic test data gathering
Equipment & measuring devices are calibrated
-High horse-powered pump with hoses and gauges to fill
the line
-Injection pump for chemicals, dyes, & gases
-Speed pump with volume per stroke & stroke counter
-Pressure sensory instrument or deadweights testing &
recording sheet
-Test medium temperature tracker instrument & recording
sheet
-Your surrounding environment temperature gauge &
recording sheet
-Test medium sampling instrument
-Gas/O2 sensing instrument
Hydrostatic test data gathering
Record all info on the mandatory reports
-Test medium: pressures, time-length,
volume, temperatures
-Environment temperatures & weather
-Pipe quality and pipe specs (wt, OD,
high/low)
-Calibration certs & info
-Blow-outs, leaks, failed test, etc.
-Project leaders signing approvals
Keep records of all engineering designs,
drawings, blue prints, etc.
-Have it in the correct place in the Final Book
Keep all the failed data gathered
Hydrostatic test data gathering
Temperature gauges
-Weather can effect the test medium with
constant pressure on pipeline
-Place temperature bulb against pipe,
insulate, & backfill to surface level 12 hours
before test
-12 hours let test medium, line, surface
temps to stabilize
-Find temp bulbs on pipeline at least 500 feet
from exposed pipe
Hydrostatic test data gathering
Temperature gauges
-Temp increases = pressure increases
-Temp decreases = pressure decreases
-Temp change creates volatility in volume of
test medium in the line
-Avoid testing times with high temperature
gain/loss in the day
Hydrostatic test data gathering
Is it a leak or change in temperature?
-Pipe temp change vs. Weather temp change
-Pipe temp change should run parallel with
environment temp change
-Volume estimations at start & end of test are
taken into play with: pressure change +
temperature change = volume change
-Verified volumes will be recorded on
spreadsheet
Final Confirmation
Get confirmation that the Final Book is complete
and contains the right details in 1 location
-Test plans & correct recordings
-Test specs & descriptions
-Survey info
-Copies of calibrated certs
-Test reports
-Test charts (Gantt, temp. plot, etc.)
Final Confirmation
Since the entire report will be structured in 1 place, it
will be easy to gather the proper documents to give to
auditors
Make sure the following personnel have signed off on
the report & data:
-Anyone who recorded the data
-Supervisor of the test
-Constr. Supervisor
-Engineer
-PM
-Customer project rep.
DOT/PHMSA
Asset audits
-Reviews while constructing to confirm correct
records obtained
-Job docs are the first requirement verified during
a field audit
All records are maintained
-Stored in an area where it easily reachable for
any company personnel to
review the file to give
indications of pipeline
details
Any questions?
Ain't nothing finer,  than being a pipeliner!

More Related Content

PPTX
Piping Hydrostatic Test / Hydrotesting
PPTX
Tightness testing of gravity pipelines
PPT
pipefitting pressure-test
PDF
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
PDF
7) hydro test 3
PDF
HAZARDS-Pneumatic Test(1)
PPTX
Hydro test pump
DOCX
HYDROSTATIC TESTING
Piping Hydrostatic Test / Hydrotesting
Tightness testing of gravity pipelines
pipefitting pressure-test
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
7) hydro test 3
HAZARDS-Pneumatic Test(1)
Hydro test pump
HYDROSTATIC TESTING

What's hot (20)

PDF
Industrial Boiler Optimization Toolkit
PDF
Sizing of relief valves for supercritical fluids
PPT
Ekit (B) Sdn Bhd
PPTX
PPT
Hydrotest
PDF
Pressure Safety Valve Sizing - API 520/521/526
PPT
Ai Ch E Overpressure Protection Training
PDF
Water-Gas-Shift Reactor Loading & Unloading Considerations
PPT
Api 2000 5th vs 6th final
PDF
Ijmet 10 01_042
PPTX
control valve functional testing - Swetha
PDF
Testing/Manufacture/Radiaor Leakage Tester
PPTX
Valve sizing
PPT
Overpressure scenarios overview final
PPTX
PPTX
PDF
Final Expo Poster_Team 24
PDF
Sop125v3 1
PPT
Field transmitters
PDF
Liquid Level Measurement Using the Bubbler Method
Industrial Boiler Optimization Toolkit
Sizing of relief valves for supercritical fluids
Ekit (B) Sdn Bhd
Hydrotest
Pressure Safety Valve Sizing - API 520/521/526
Ai Ch E Overpressure Protection Training
Water-Gas-Shift Reactor Loading & Unloading Considerations
Api 2000 5th vs 6th final
Ijmet 10 01_042
control valve functional testing - Swetha
Testing/Manufacture/Radiaor Leakage Tester
Valve sizing
Overpressure scenarios overview final
Final Expo Poster_Team 24
Sop125v3 1
Field transmitters
Liquid Level Measurement Using the Bubbler Method
Ad

Viewers also liked (20)

PPTX
Introduction to Hydrostatic Pressure
PDF
Hydrostatics 1 n 2
PPTX
Hydrostatics
PPTX
Interstitial fluid hydrostatic pressure
PDF
New prsentation 23 9-2010
PPTX
Hydrolec
PPT
Buoyancy Demonstration
PPTX
Introduction to Buoyancy
PPTX
Hydrostatic transmission
PPTX
Hydraulic system
DOCX
Hydrostatic pressure
PPT
Pascal's principle
PPSX
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
PPTX
Manometer
PDF
AP Physics 2 - Hydrostatics
PPTX
Pressure gauge calibration process
PDF
Center of pressure and hydrostatic force on a submerged body rev
PDF
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
PPTX
State of Pascal’s law
Introduction to Hydrostatic Pressure
Hydrostatics 1 n 2
Hydrostatics
Interstitial fluid hydrostatic pressure
New prsentation 23 9-2010
Hydrolec
Buoyancy Demonstration
Introduction to Buoyancy
Hydrostatic transmission
Hydraulic system
Hydrostatic pressure
Pascal's principle
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
Manometer
AP Physics 2 - Hydrostatics
Pressure gauge calibration process
Center of pressure and hydrostatic force on a submerged body rev
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
State of Pascal’s law
Ad

Similar to 3 Best Practices for 100% Regulatory Compliant Testing (9)

PDF
WWW.ZELGHARABAWI.COM
DOCX
495265750-Hydro-Test-Procedure.docx
PPTX
PIPELINE Present.pptxrvcrdvfevfevfev fevc
PDF
Pressure testing
PPTX
DUG 2010 Technical Workshop Presentation
PDF
20 Essential Hydrotest Safety Checklist
DOCX
Piping System Internal Cleaning criteria.docx
PPTX
Rfi Flow Meter Product Guide
PDF
Wire line lecture talks about wireline operations and equipment
WWW.ZELGHARABAWI.COM
495265750-Hydro-Test-Procedure.docx
PIPELINE Present.pptxrvcrdvfevfevfev fevc
Pressure testing
DUG 2010 Technical Workshop Presentation
20 Essential Hydrotest Safety Checklist
Piping System Internal Cleaning criteria.docx
Rfi Flow Meter Product Guide
Wire line lecture talks about wireline operations and equipment

Recently uploaded (20)

PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
IFRS Notes in your pocket for study all the time
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Booking.com The Global AI Sentiment Report 2025
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Daniels 2024 Inclusive, Sustainable Development
PPTX
sales presentation، Training Overview.pptx
PDF
Blood Collected straight from the donor into a blood bag and mixed with an an...
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
How to Get Approval for Business Funding
PDF
How to Get Funding for Your Trucking Business
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
Deliverable file - Regulatory guideline analysis.pdf
IFRS Notes in your pocket for study all the time
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
NEW - FEES STRUCTURES (01-july-2024).pdf
Principles of Marketing, Industrial, Consumers,
Tata consultancy services case study shri Sharda college, basrur
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Keppel_Proposed Divestment of M1 Limited
Booking.com The Global AI Sentiment Report 2025
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Daniels 2024 Inclusive, Sustainable Development
sales presentation، Training Overview.pptx
Blood Collected straight from the donor into a blood bag and mixed with an an...
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
How to Get Approval for Business Funding
How to Get Funding for Your Trucking Business
1911 Gold Corporate Presentation Aug 2025.pdf
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...

3 Best Practices for 100% Regulatory Compliant Testing

  • 1. The Hydrostatic Testing Best Practices Plan to Verify, Trace, & Precisely Record Documentation Jared Head
  • 2. Hydrostatic Testing BestPractices Verify, Trace, & Record PHMSA Best Practice CTA Test Computations Test Plan Test Report Data Gathering Final Confirmation Asset Audits File Documents Approvals/Sigs Reg. Compliance Lead Time to Plan Operating Capacity Asset longevity Protocol
  • 3. Hydrostatic test computations Precise estimations of pipeline features & descriptions -Diameter, wall thickness, length, pipe grade, age, etc. -API vs ASME/ANSI Rating on operation pressure -SMYS: 90%-100% & MOP: 125% for 4 hours -Accurate elevations of pipeline -Test medium (water), volume of medium, & temperature stabilization Line sections based on elevations and SMYS Project Manager Verification of job scope -Project Managing Engineer -Customer Asset Manager
  • 4. H y d r o s t a t i c t e s t c o m p u t a t i o n s MOP validated by hydro test outcome
  • 5. Hydrostatic test plan Follow the PHMSA standard IMP with environmental compliance -Environmental questions need to be solved to obtain permits for compliance: EPA, NEPA, BLM, SPE, FERC, DOT, OSHA, etc. -Locate areas that supply water sources, consult with operators/contractors to solve these issues, and find discharge areas that are compliant. Fabricated test = 4 hours | Mainline test = 8 hours -Long bore hours before pipe install and fabricated test for HDDs -Test for mainline once installed to test for HDDs
  • 6. Hydrostatic test plan Environment Rules & Regulations -Water source -Discharge area -Quality of water Order of test plan steps -Line fill and applying pressure -Testing -Data gathering -Finishing test -Dewatering the section -Push slug of water to next section or use new water -Drying to dewpoint & cleaning -Final Confirmation with approvals
  • 7. Hydrostatic test plan Minimum, Target, & MOP for each section for pressure DOT/PHMSA Rules -Test type: spike, strength, leak -Test medium, equipment, instruments -OQ certs of personnel doing test -Test failures, leaks, blowouts -Test duration -Test data & drawings -Proper approvals from project personnel -These will be all required to be maintained as part of the test plan
  • 8. Hydrostatic test plan Items needed for approval before starting test -This should be communicated between asset owner and contractors/subcontractors before performing the work so there isn't any delay in the project schedule. -Emails, drawings, Gantt charts, and conference calls are a great way to communicate job expectations, area of concerns, strategies, etc.
  • 9. Hydrostatic test report Meeting between job managers to understand the data found is stored before job kick-off According to operating company's procedures while following DOT/PHMSA compliance Thorough, step-by-step program
  • 10. Hydrostatic test report Accurate measurements -Pipe diameter & WT -Pipe grade & SMYS/ANSI rating -Line location & elevation -Test medium: source & volume -Chemicals: used & volume -Test schedule (ex: Gantt chart) -Test pressure: time recorded -Temperature of pipe & medium -Weather -Test lengths per segment
  • 11. Hydrostatic test report Accuracy of Recorded data -All written data must be transported to digital format for storage -Written information can be lost or misread -Written information has a shelf life
  • 12. Hydrostatic test data gathering Researching & implementing Knowing the test reports & records -Personnel verifying the test data -Shows those collaborating with the reports what is mandatory to be gathered and what steps are needed to be approved Make sure all written data is stored in Final Confirmation Book
  • 13. Hydrostatic test data gathering Equipment & measuring devices are calibrated -High horse-powered pump with hoses and gauges to fill the line -Injection pump for chemicals, dyes, & gases -Speed pump with volume per stroke & stroke counter -Pressure sensory instrument or deadweights testing & recording sheet -Test medium temperature tracker instrument & recording sheet -Your surrounding environment temperature gauge & recording sheet -Test medium sampling instrument -Gas/O2 sensing instrument
  • 14. Hydrostatic test data gathering Record all info on the mandatory reports -Test medium: pressures, time-length, volume, temperatures -Environment temperatures & weather -Pipe quality and pipe specs (wt, OD, high/low) -Calibration certs & info -Blow-outs, leaks, failed test, etc. -Project leaders signing approvals Keep records of all engineering designs, drawings, blue prints, etc. -Have it in the correct place in the Final Book Keep all the failed data gathered
  • 15. Hydrostatic test data gathering Temperature gauges -Weather can effect the test medium with constant pressure on pipeline -Place temperature bulb against pipe, insulate, & backfill to surface level 12 hours before test -12 hours let test medium, line, surface temps to stabilize -Find temp bulbs on pipeline at least 500 feet from exposed pipe
  • 16. Hydrostatic test data gathering Temperature gauges -Temp increases = pressure increases -Temp decreases = pressure decreases -Temp change creates volatility in volume of test medium in the line -Avoid testing times with high temperature gain/loss in the day
  • 17. Hydrostatic test data gathering Is it a leak or change in temperature? -Pipe temp change vs. Weather temp change -Pipe temp change should run parallel with environment temp change -Volume estimations at start & end of test are taken into play with: pressure change + temperature change = volume change -Verified volumes will be recorded on spreadsheet
  • 18. Final Confirmation Get confirmation that the Final Book is complete and contains the right details in 1 location -Test plans & correct recordings -Test specs & descriptions -Survey info -Copies of calibrated certs -Test reports -Test charts (Gantt, temp. plot, etc.)
  • 19. Final Confirmation Since the entire report will be structured in 1 place, it will be easy to gather the proper documents to give to auditors Make sure the following personnel have signed off on the report & data: -Anyone who recorded the data -Supervisor of the test -Constr. Supervisor -Engineer -PM -Customer project rep.
  • 20. DOT/PHMSA Asset audits -Reviews while constructing to confirm correct records obtained -Job docs are the first requirement verified during a field audit All records are maintained -Stored in an area where it easily reachable for any company personnel to review the file to give indications of pipeline details