ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
ATEC 4370
Project Management for Arts & Technology - I
Agenda
• Project Management
• The Iron Triangle
• Project Management from 50,000 Feet level
• Brief History and Timeline of Project Management
• Who is a Project Manager?
• Why Study Project Management?
ATEC 4370
Project Management for Arts & Technology - I
Project Management
ATEC
ARTS & TECHNOLOGY
PMBOK , 5th Edition
ATEC 4370
Project Management for Arts & Technology - I
What is a Project?
A Project can be defined as a temporary endeavor undertaken to create a
unique product, result or service.
Major Characteristics of a Project:
• Has an established objective
• Are Unique
• Are temporary in nature and have a defined life span with a beginning and an end
• Requires across – the – organizational participation
• Are completed when the project goals are achieved or it’s determined the project
is no longer viable.
• Involves doing something never been done before
• Has specific time, cost and performance requirements
ATEC
ARTS & TECHNOLOGY
PMBOK , 5th Edition
ATEC 4370
Project Management for Arts & Technology - I
Project Vs Operations?
An operation is different from a project in the following way:
• It does not create a unique product, service or a result.
• It does not have a definite beginning and an end.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Who is a Project Stakeholder?
According to PMI, the word Project Stakeholder refers to, ‘an individual, group,
or organization, who may affect, be affected by, or perceive itself to be affected
by a decision, activity, or outcome of a project. These stakeholders may be inside
or outside an organization which:
• Sponsor a project
• Have an interest or a gain upon a successful completion of a project
• May have a positive or negative influence in project completion
PMBOK 5th Edition
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Some Examples of Project Stakeholders -
• Project Manager
• Project Sponsor
• Customer
• Business Partners
• Executive Managers
• Organizational Groups
• Vendors
• Functional Managers
• Project Management Office
• Consultants to the project
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
What is Project Management?
“Project management is the application of knowledge, skills, tools, and
techniques to project activities to meet the project requirements”.
In Simple words, Project Management brings together a set of tools and
techniques – performed by people – to describe, organize, and monitor the work
of project activities.
ATEC 4370
Project Management for Arts & Technology - I
The Triple Constraint (Iron Triangle)
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Project Management from 50,000 Feet level
Projects typically have identifiable phases and each phase and each phase has a
set of unique challenges for the project manage. If we view a project from the
highest level, five basic project phases can be identified:
• Initiating,
• Planning,
• Executing,
• Monitoring and Controlling, and
• Closing.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Phase 1: Initiation
• During this phase, the need is identified.
• An appropriate response to the need is determined and described. (This is
actually where the project begins!)
• The major deliverables and the participating work groups are identified.
• The team begins to take shape.
• Issues of feasibility (Can we do the project?) and justification (Should we do
the project?) are addressed.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Phase 2: Planning
• During this phase, project solution is developed in as much detail as possible.
• Intermediate work products are identified, along with the strategy of
producing them.
• Estimates are made regarding the amount of time and money needed to
perform the work and when the work is to be done.
• The question of feasibility and justification surfaces again, as formal approval
to proceed with the project is ordinarily sought before proceeding.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Phase 3: Execution
• During this phase, the prescribed work is performed under the watchful eye
of the project manager.
• Throughout this phase, the project team remains focused on meeting the
objectives developed and agreed upon at the outset of the project.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Phase 4: Monitoring and Controlling
• During this phase, progress is continuously monitored and appropriate
adjustments are made and recorded as variances from the original plan.
• The objective of this phase is to track, review and regulate the progress and
performance of the project; identify any areas in which changes to the plan
are required; and initiate the corresponding changes.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Phase 5: Closing
• During this phase, the emphasis is on verifying that the project has satisfied or
will satisfy the original need.
• The project customer accepts and uses the deliverables.
• Throughout this phase, the project resources are gradually re – deployed and
the project finally shuts down.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Project Management from 50,000 Feet (Cont…)
Managing a project typically includes, but is not limited to:
• Identifying requirements;
• Addressing the various needs, concerns, and expectations of the stakeholders in
planning and executing the project;
• Setting up, maintaining, and carrying out communications among stakeholders that are
active, effective, and collaborative in nature;
• Managing stakeholders towards meeting project requirements and creating project
deliverables;
• Balancing the competing project constraints, which include, but are not limited to:
– Scope,
– Quality,
– Schedule,
– Budget,
– Resources, and
– Risks.
ATEC 4370
Project Management for Arts & Technology - I
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
https://www.projectsmart.co.uk/brief-history-of-project-management.php
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Project Management History and Timeline…
• 2570 BC: The Great Pyramid of Giza Completed - Ancient records show there
were managers for each of the four faces of the Great Pyramid, responsible
for overseeing their completion. We know there was some degree of
planning, execution and control involved in managing this project.
• 1917: The Gantt chart Developed by Henry Gantt (1861-1919) - One of the
forefathers of project management, Henry Gantt, is best-known for creating
his self-named scheduling diagram, the Gantt chart. One of its first uses was
on the Hoover Dam project started in 1931. Gantt charts are still in use today
and form an important part of the project managers' toolkit.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
• 1958: The Program Evaluation Review Technique (PERT) Invented for the U.S.
Navy's Polaris Project - The United States Department of Defense's US Navy
Special Projects Office developed PERT as part of the Polaris mobile
submarine-launched ballistic missile project during the cold war. PERT is a
method for analyzing the tasks involved in completing a project, especially the
time needed to complete each task and identifying the minimum time needed
to complete the total project.
• 1962: United States Department of Defense Mandate the Work Breakdown
Structure (WBS) Approach - The United States Department of Defense (DOD)
created the WBS concept as part of the Polaris mobile submarine-launched
ballistic missile project. WBS is an exhaustive, hierarchical tree structure of
deliverables and tasks that need to be performed to complete a project. Later
adopted by the private sector, the WBS remains one of the most common and
useful project management tools.
Project Management History and Timeline…
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
• 1969: Project Management Institute (PMI) Launched to Promote the Project
Management Profession - Five volunteers founded PMI as a non-profit
professional organization dedicated to advance the practice, science and
profession of project management.
• 1987: A Guide to the Project Management Body of Knowledge (PMBOK
Guide) Published by PMI - First published by the PMI as a white paper in
1987, the PMBOK Guide was an attempt to document and standardize
accepted project management information and practices.
• 2012: 5th Edition of PMBOK Guide Released - The fifth edition of the guide,
published in December 2012, provides guidelines, rules and characteristics for
project management recognized as good practice in the profession. Note:
sixth edition to be released this year (2017).
Project Management History and Timeline…
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Who is a Project Manager?
• According to PMI, a Project Manager is a person assigned by the performing
organization to lead the team that is responsible for achieving the project
objectives.
• In general, the project managers have the responsibility to satisfy the needs:
task needs, team needs and individual needs.
• As project management is a critical discipline, the project manager becomes
the link between the strategy and the team.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Competencies of a Project Manager:
• Knowledge—what the project manager knows about project management.
• Performance—what the project manager is able to do or accomplish while
applying his or her project management knowledge.
• Personal—how the project manager behaves when performing the project or
related activity. Personal effectiveness encompasses attitudes, core
personality characteristics, and leadership, which provides the ability to guide
the project team while achieving project objectives and balancing the project
constraints.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Interpersonal skills of a Project Manager-
• Leadership,
• Team building,
• Motivation,
• Communication,
• Influencing,
• Decision making,
• Political and cultural awareness,
• Negotiation,
• Trust building,
• Conflict management, and
• Coaching.
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Why Study Project Management?
Life
Classes
Career
ATEC
ARTS & TECHNOLOGY
ATEC 4370
Project Management for Arts & Technology - I
Quiz Time!
4370 Week Two: History and Overview

More Related Content

PPTX
Atec 2340 lecture7
PPTX
Atec 4370 lecture3
PPTX
Atec 2340 lecture6
PPTX
ATEC 2340/4370 Lecture 4
PDF
Best Practices: Project Documentation and Construction Management
PDF
Promo_Epc project rule of credit and progress measurement
PDF
Proposed Project Office Strategy
PPTX
Pmp – pmbok 5th edition chapter4 project integration management final
Atec 2340 lecture7
Atec 4370 lecture3
Atec 2340 lecture6
ATEC 2340/4370 Lecture 4
Best Practices: Project Documentation and Construction Management
Promo_Epc project rule of credit and progress measurement
Proposed Project Office Strategy
Pmp – pmbok 5th edition chapter4 project integration management final

What's hot (19)

PPTX
Managing & Supervising Projects, Consultants & Contractors
PPTX
The Program Management Framework—What's New?
PPTX
Project Management
PPT
Episode 23 : PROJECT TIME MANAGEMENT
PDF
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PPTX
Lecture slides4; Construction Project Planning
PPT
Lecture 1
DOCX
Pm chapter 7
PDF
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
PPT
Software Project Management( lecture 1)
PPT
The Project Charter
PPT
Capello Pw 2011
PPTX
Project planning and scheduling
PPTX
Project scope management
PPT
Episode 23 : PROJECT TIME MANAGEMENT
PPTX
Construction phases
PPTX
4.project integrationmanagement
PPT
Project Management
PDF
Project Management Project 1
Managing & Supervising Projects, Consultants & Contractors
The Program Management Framework—What's New?
Project Management
Episode 23 : PROJECT TIME MANAGEMENT
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
Lecture slides4; Construction Project Planning
Lecture 1
Pm chapter 7
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
Software Project Management( lecture 1)
The Project Charter
Capello Pw 2011
Project planning and scheduling
Project scope management
Episode 23 : PROJECT TIME MANAGEMENT
Construction phases
4.project integrationmanagement
Project Management
Project Management Project 1
Ad

Similar to 4370 Week Two: History and Overview (20)

PPTX
Introduction to Project Management & Planning
PPT
1. introduction
PPTX
13115 intro to project management presentation
PPT
Chap 1 Modern Project Management
PPT
Project Management Principles and Best Practices
DOC
Project management chapter 1 notes
PPTX
Project Management
PPT
Innovation As Project Management Pm Showcase SA 2007
PPTX
Chapter 1
PPTX
Project Management chapter 1 slide1.pptx
PPTX
PPM Report about Project Management (MGD)
PDF
Introduction-to-Project-Management-4-files-merged.pdf
PPT
Ch01
PPT
01-Introduction to Project Management.ppt
PPTX
INTRODUCTION TO Project Management ch 1.pptx
PPT
introduction to project management
PPTX
Project management
PPT
01 itpm6
PPTX
Is project management a discipline
PPT
Pe ch 1
Introduction to Project Management & Planning
1. introduction
13115 intro to project management presentation
Chap 1 Modern Project Management
Project Management Principles and Best Practices
Project management chapter 1 notes
Project Management
Innovation As Project Management Pm Showcase SA 2007
Chapter 1
Project Management chapter 1 slide1.pptx
PPM Report about Project Management (MGD)
Introduction-to-Project-Management-4-files-merged.pdf
Ch01
01-Introduction to Project Management.ppt
INTRODUCTION TO Project Management ch 1.pptx
introduction to project management
Project management
01 itpm6
Is project management a discipline
Pe ch 1
Ad

Recently uploaded (20)

PDF
How IoT Sensor Integration in 2025 is Transforming Industries Worldwide
PDF
Comparative analysis of machine learning models for fake news detection in so...
PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PDF
sustainability-14-14877-v2.pddhzftheheeeee
PDF
A proposed approach for plagiarism detection in Myanmar Unicode text
PPTX
2018-HIPAA-Renewal-Training for executives
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
Convolutional neural network based encoder-decoder for efficient real-time ob...
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
Flame analysis and combustion estimation using large language and vision assi...
PDF
CloudStack 4.21: First Look Webinar slides
PDF
1 - Historical Antecedents, Social Consideration.pdf
PPTX
Microsoft Excel 365/2024 Beginner's training
PDF
Enhancing plagiarism detection using data pre-processing and machine learning...
PDF
The influence of sentiment analysis in enhancing early warning system model f...
PDF
Consumable AI The What, Why & How for Small Teams.pdf
PDF
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
PDF
OpenACC and Open Hackathons Monthly Highlights July 2025
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
How IoT Sensor Integration in 2025 is Transforming Industries Worldwide
Comparative analysis of machine learning models for fake news detection in so...
A contest of sentiment analysis: k-nearest neighbor versus neural network
sustainability-14-14877-v2.pddhzftheheeeee
A proposed approach for plagiarism detection in Myanmar Unicode text
2018-HIPAA-Renewal-Training for executives
Benefits of Physical activity for teenagers.pptx
Convolutional neural network based encoder-decoder for efficient real-time ob...
Final SEM Unit 1 for mit wpu at pune .pptx
Flame analysis and combustion estimation using large language and vision assi...
CloudStack 4.21: First Look Webinar slides
1 - Historical Antecedents, Social Consideration.pdf
Microsoft Excel 365/2024 Beginner's training
Enhancing plagiarism detection using data pre-processing and machine learning...
The influence of sentiment analysis in enhancing early warning system model f...
Consumable AI The What, Why & How for Small Teams.pdf
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
OpenACC and Open Hackathons Monthly Highlights July 2025
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
Taming the Chaos: How to Turn Unstructured Data into Decisions

4370 Week Two: History and Overview

  • 1. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I
  • 2. ATEC 4370 Project Management for Arts & Technology - I Agenda • Project Management • The Iron Triangle • Project Management from 50,000 Feet level • Brief History and Timeline of Project Management • Who is a Project Manager? • Why Study Project Management?
  • 3. ATEC 4370 Project Management for Arts & Technology - I Project Management
  • 4. ATEC ARTS & TECHNOLOGY PMBOK , 5th Edition ATEC 4370 Project Management for Arts & Technology - I What is a Project? A Project can be defined as a temporary endeavor undertaken to create a unique product, result or service. Major Characteristics of a Project: • Has an established objective • Are Unique • Are temporary in nature and have a defined life span with a beginning and an end • Requires across – the – organizational participation • Are completed when the project goals are achieved or it’s determined the project is no longer viable. • Involves doing something never been done before • Has specific time, cost and performance requirements
  • 5. ATEC ARTS & TECHNOLOGY PMBOK , 5th Edition ATEC 4370 Project Management for Arts & Technology - I Project Vs Operations? An operation is different from a project in the following way: • It does not create a unique product, service or a result. • It does not have a definite beginning and an end.
  • 6. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Who is a Project Stakeholder? According to PMI, the word Project Stakeholder refers to, ‘an individual, group, or organization, who may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project. These stakeholders may be inside or outside an organization which: • Sponsor a project • Have an interest or a gain upon a successful completion of a project • May have a positive or negative influence in project completion PMBOK 5th Edition
  • 7. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Some Examples of Project Stakeholders - • Project Manager • Project Sponsor • Customer • Business Partners • Executive Managers • Organizational Groups • Vendors • Functional Managers • Project Management Office • Consultants to the project
  • 8. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I What is Project Management? “Project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements”. In Simple words, Project Management brings together a set of tools and techniques – performed by people – to describe, organize, and monitor the work of project activities.
  • 9. ATEC 4370 Project Management for Arts & Technology - I The Triple Constraint (Iron Triangle)
  • 10. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Project Management from 50,000 Feet level Projects typically have identifiable phases and each phase and each phase has a set of unique challenges for the project manage. If we view a project from the highest level, five basic project phases can be identified: • Initiating, • Planning, • Executing, • Monitoring and Controlling, and • Closing.
  • 11. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Phase 1: Initiation • During this phase, the need is identified. • An appropriate response to the need is determined and described. (This is actually where the project begins!) • The major deliverables and the participating work groups are identified. • The team begins to take shape. • Issues of feasibility (Can we do the project?) and justification (Should we do the project?) are addressed.
  • 12. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Phase 2: Planning • During this phase, project solution is developed in as much detail as possible. • Intermediate work products are identified, along with the strategy of producing them. • Estimates are made regarding the amount of time and money needed to perform the work and when the work is to be done. • The question of feasibility and justification surfaces again, as formal approval to proceed with the project is ordinarily sought before proceeding.
  • 13. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Phase 3: Execution • During this phase, the prescribed work is performed under the watchful eye of the project manager. • Throughout this phase, the project team remains focused on meeting the objectives developed and agreed upon at the outset of the project.
  • 14. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Phase 4: Monitoring and Controlling • During this phase, progress is continuously monitored and appropriate adjustments are made and recorded as variances from the original plan. • The objective of this phase is to track, review and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.
  • 15. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Phase 5: Closing • During this phase, the emphasis is on verifying that the project has satisfied or will satisfy the original need. • The project customer accepts and uses the deliverables. • Throughout this phase, the project resources are gradually re – deployed and the project finally shuts down.
  • 16. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Project Management from 50,000 Feet (Cont…) Managing a project typically includes, but is not limited to: • Identifying requirements; • Addressing the various needs, concerns, and expectations of the stakeholders in planning and executing the project; • Setting up, maintaining, and carrying out communications among stakeholders that are active, effective, and collaborative in nature; • Managing stakeholders towards meeting project requirements and creating project deliverables; • Balancing the competing project constraints, which include, but are not limited to: – Scope, – Quality, – Schedule, – Budget, – Resources, and – Risks.
  • 17. ATEC 4370 Project Management for Arts & Technology - I
  • 18. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I https://www.projectsmart.co.uk/brief-history-of-project-management.php
  • 19. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Project Management History and Timeline… • 2570 BC: The Great Pyramid of Giza Completed - Ancient records show there were managers for each of the four faces of the Great Pyramid, responsible for overseeing their completion. We know there was some degree of planning, execution and control involved in managing this project. • 1917: The Gantt chart Developed by Henry Gantt (1861-1919) - One of the forefathers of project management, Henry Gantt, is best-known for creating his self-named scheduling diagram, the Gantt chart. One of its first uses was on the Hoover Dam project started in 1931. Gantt charts are still in use today and form an important part of the project managers' toolkit.
  • 20. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I • 1958: The Program Evaluation Review Technique (PERT) Invented for the U.S. Navy's Polaris Project - The United States Department of Defense's US Navy Special Projects Office developed PERT as part of the Polaris mobile submarine-launched ballistic missile project during the cold war. PERT is a method for analyzing the tasks involved in completing a project, especially the time needed to complete each task and identifying the minimum time needed to complete the total project. • 1962: United States Department of Defense Mandate the Work Breakdown Structure (WBS) Approach - The United States Department of Defense (DOD) created the WBS concept as part of the Polaris mobile submarine-launched ballistic missile project. WBS is an exhaustive, hierarchical tree structure of deliverables and tasks that need to be performed to complete a project. Later adopted by the private sector, the WBS remains one of the most common and useful project management tools. Project Management History and Timeline…
  • 21. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I • 1969: Project Management Institute (PMI) Launched to Promote the Project Management Profession - Five volunteers founded PMI as a non-profit professional organization dedicated to advance the practice, science and profession of project management. • 1987: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Published by PMI - First published by the PMI as a white paper in 1987, the PMBOK Guide was an attempt to document and standardize accepted project management information and practices. • 2012: 5th Edition of PMBOK Guide Released - The fifth edition of the guide, published in December 2012, provides guidelines, rules and characteristics for project management recognized as good practice in the profession. Note: sixth edition to be released this year (2017). Project Management History and Timeline…
  • 22. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Who is a Project Manager? • According to PMI, a Project Manager is a person assigned by the performing organization to lead the team that is responsible for achieving the project objectives. • In general, the project managers have the responsibility to satisfy the needs: task needs, team needs and individual needs. • As project management is a critical discipline, the project manager becomes the link between the strategy and the team.
  • 23. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Competencies of a Project Manager: • Knowledge—what the project manager knows about project management. • Performance—what the project manager is able to do or accomplish while applying his or her project management knowledge. • Personal—how the project manager behaves when performing the project or related activity. Personal effectiveness encompasses attitudes, core personality characteristics, and leadership, which provides the ability to guide the project team while achieving project objectives and balancing the project constraints.
  • 24. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Interpersonal skills of a Project Manager- • Leadership, • Team building, • Motivation, • Communication, • Influencing, • Decision making, • Political and cultural awareness, • Negotiation, • Trust building, • Conflict management, and • Coaching.
  • 25. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I
  • 26. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Why Study Project Management? Life Classes Career
  • 27. ATEC ARTS & TECHNOLOGY ATEC 4370 Project Management for Arts & Technology - I Quiz Time!

Editor's Notes

  • #27: Everyone will work on projects in life, in classes, and during your career. Most aspects of life in general require time management, budgeting resources relating to people Classes often require projects – individual or team, and knowing PM concepts can provide framework for better final projects and grades and experience Career – even as artists typically will be part of a team; - animation and gaming are large teams Understanding PM makes a better team member More opportunities in a highly competitive field More versatile therefore more valuable More options within a career