SlideShare a Scribd company logo
2015
KAUSTAVLAHIRI
AEGIS BPO
4/9/2015
APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
APPLYING DMAIC STEPS TO IMPROVE PROCESS IMPROVEMENT TOPOLOGIES.
Project managers, in just about any industry, are faced with the challenge of improving the efficiency and
productivity of their businesses. To do this, they need to understand the best methodology and tools to
study and analyze processes correctly. After all, to improve results, the best approach is to improve the
process that gives you those results.
So, it is imperative for project managers to have a rudimentary understanding of process thinking when
managing improvement efforts. As shown in the graph above, a process can be broken down into three
basic elements: the inputs to the process, the process under study and the outputs from the
process. The concept of improvement is quite simple; to improve the outputs of a process you simply
improve the inputs and the process itself. To improve the output, also called the “Y” or the “Key
Measure”, identify, measure and improve the inputs and process metrics, also known as the “X’s”.
Focusing on the results, the output Y measures instead of the X’s is an after-the-fact, reactive, expensive
and inefficient approach to improving results. The concept that Y is a function of X (Y=f(X1, X2, …Xn) is
at the core of the: Define, Measure, Analyze, Improve and Control; also known as DMAIC, steps.
The roadmap for improving processes and key measures of a business is a straightforward, easy to
understand set of those five steps. DMAIC is an iterative process that gives structure and guidance to
improving processes and productivity in the workplace. Project managers and Six Sigma practitioners
apply the DMAIC steps and appropriate analysis tools under each step, to analyze and improve key
metrics of a business. Metrics are established, variation is studied and reduced and processes are
improved and optimized. The result is improved performance, fewer errors and increased efficiency and
productivity.
The DMAIC steps are the true backbone of any process improvement initiative. The steps make sense,
they are easy to understand and they are logical in their sequence. The steps allow a team to
adequately scope the problem, measure the current performance, analyze the root causes of problems
and inefficiency, test and verify improvement recommendations and then implement changes for
sustainability over the long haul. Process improvement projects are the norm these days. Improving
key measures is something every project manager is going to be faced with sooner or later; therefore, a
project manager should be skilled in the art of applying the DMAIC steps to improve results.
Understand the Process and then Measure the Process!
The DMAIC steps work because they are understandable and make sense. These steps can be applied to
any process, any industry, any company to help guide a process improvement team. Before they can be
applied, however, the project leader should lead his or her team to scope the problem, perhaps using a
Supplier, Input, Process, Output, and Customer or SIPOC diagram as shown below. Using the SIPOC tool
can help project managers scope the problem, think in terms of processes, and help the team pinpoint
what and where to measure. The SIPOC tool helps link metrics to the inputs, the process, and the
outputs thus allowing for the Y=f(X) thinking.
The SIPOC tool is something that can be done in the Define step of the DMAIC steps.
DEFINE
Essentially the purpose of the Define step is to set your project up for success. Project managers are
familiar with the things that need to be done when starting off a project. Essential project elements are
accomplished in this step:
 Attain sponsorship for the project.
 Establish the project charter and appropriate scope.
 Identify stakeholders and team members.
 Establish team ground rules.
 Plan and conduct a successful kickoff meeting.
In addition to the normal project deliverables listed above, for a process improvement effort, the project
manager would facilitate his or her team in developing an “As-Is” process map. This will help the team
not only get on the same page in terms of the process, but also will help the team identify problematic
steps in the process. Process maps, or Deployment maps (a.k.a. Swim-lanes), can also be useful in
identifying non-value added steps and can be vital in determining process measures.
Lastly, the team may require some basic training on the application of the DMAIC steps so that everyone
knows what to do and when to do it.
MEASURE
The Measure step is often a step which, unfortunately, is skimmed over by most teams. One of the
biggest mistakes made when trying to improve results is to make decisions based on “gut” feeling,
intuition or anecdotal information. Instead, what is imperative is to base decisions on facts and data and
that is the main goal of the measure step. In the Measure step, the team should:
 Identify and operationally define key metrics.
 Develop a data collection plan.
 Conduct a measurement system analysis to verify that the data is accurate.
 Stratify the data.
 Establish baseline charts.
 Make charts and graphs to help the team better understand what the process is currently delivering in
terms of processing times, errors or defects.
ANALYZE
The Analyze step is all about getting to the root-cause of the problem. Too often when trying to solve a
problem, people or teams tend to focus on a symptom as opposed to the true root cause of the
problem. The tools and techniques in the Analyze step lead project teams to gather clues for
improvement and ascertain what the root cause, or causes, are that are the most important drivers. The
Y is a function of X formula is at play in the Analyze step. A team will analyze the process, perhaps
using value-added analysis, statistical analysis, or maybe a fishbone chart, a cause and effect diagram, to
get to what they think are the root causes. Then the team would gather data on the root causes to
determine if there is a cause and effect relationship with the problem. Verifying cause and effect is a
crucial step in the Analyze phase; a step which many people, unfortunately, skip or simply take for
granted based on their opinions.
IMPROVE
Once a team moves through the Define, Measure and Analyze steps, they are now ready to use what
they’ve learned about the process to be innovative when solving the problem at hand. Improve is the
step where creative solutions to existing problems can be developed and tested, using various
experiment or piloting techniques. The key deliverable in the improve step is verifiable improvement
through measurement. The best ideas for improvement, based on what was learned in Measure and
Analyze, are tested and implemented on a limited basis to determine if there is statistical evidence of
sustained improvement. Once a team improves a process, the results should become quite clear on a
control chart; like the example shown above. When stakeholders can see the proof of improved
performance, they will be more likely to accept and actually implement the team’s
recommendations. Improve is about taking the emotion out of decision making. Improve is about
verification and validation of recommendations. Often times, teams make the mistake of thinking they
“know” what will work. Thus, they blindly implement what they think is the best solution without proper
testing. The result, more times than not, is that there is no measurable or sustainable improvement.
CONTROL
The real strength of the DMAIC steps is the Control step. Too often, teams do a lot of hard work,
actually improve the process and results, and then implementation of the improved process doesn’t go
smoothly. There is pressure to move on; time isn’t spent on having a smooth transition and the buy-in
for full implementation just isn’t quite there. The result is that sustaining the improvement realized in the
Improve step becomes difficult and sustained improvement is difficult. The purpose of the Control step
is to ensure a
successful implementation of the team’s recommendation so that long term
success will be attained. The new and improved process will be flowcharted and these new methods will
become the new standard operation procedures. Results will continue to be tracked, so that any “drift”
back to previous results can be monitored and addressed in a proactive manner.The Control step is about
the transfer of responsibilities and establishing plans for lon-term process control.
MAKING BETTER DECISIONS
Once the DMAIC steps are understood, then managing the process of how to improve results becomes
clear and straightforward. If used properly, the following decision tree can lead to better decision
making by helping business leaders ask the right questions to avoiding making knee-jerk reactions.
Instead, it encourages an understanding of variation and reinforces the use of the DMAIC steps to
address as the roadmap to continuous improvement.
In Conclusion
The DMAIC steps are a proven road map for any process improvement project. There are only five steps
so they are relatively easy to remember. They offer a structured approach to solving problems and
improving results. There are certain questions to be addressed under each step and certain tools and
techniques can be utilized to answer those questions through facts and data.
When the DMAIC steps are properly applied, they offer any project team an organized approach, a
structure, to solving key business problems. The DMAIC steps are flexible and can be used in any
industry or with any type of process improvement effort. They just make sense, which is why they are so
powerful. Every team leader should be familiar with, and incorporate, the DMAIC steps into all process
improvement projects.

More Related Content

PDF
DMAIC for sharing
PPTX
The DMAIC process
PPTX
Presentation
DOCX
Quality in operations management
PPT
PDF
Using the DMAIC Process for SEO Projects
PDF
Using the DMAIC Process for SEO Projects
PPT
DMAIC for sharing
The DMAIC process
Presentation
Quality in operations management
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects

What's hot (20)

PDF
Lean 6sigma and DMAIC
PPT
DMAIC Methodology
PDF
Lean Six Sigma: DMAIC In-Depth
PPT
Lean Six Sigma Leadership 062507
PPTX
An introduction to the PDCA cycle
PPTX
Continuous improvement & pdca
PPTX
Process development and implementation
PPT
PDCA & Tools
PDF
Six sigma
PPTX
M1 Refresher Training Master Final Version non client linkedin
PPTX
Six sigma an overview | Online Mini MBA (Free)
PDF
Six Sigma Presentation
PPTX
Deming Cycle
PPTX
Plan do-check-act
PPT
Lean Six Sigma Awareness Handouts
PPT
iACT Global | DMAIC Methodology
PDF
PDF
PPT
Dmaic
Lean 6sigma and DMAIC
DMAIC Methodology
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma Leadership 062507
An introduction to the PDCA cycle
Continuous improvement & pdca
Process development and implementation
PDCA & Tools
Six sigma
M1 Refresher Training Master Final Version non client linkedin
Six sigma an overview | Online Mini MBA (Free)
Six Sigma Presentation
Deming Cycle
Plan do-check-act
Lean Six Sigma Awareness Handouts
iACT Global | DMAIC Methodology
Dmaic
Ad

Similar to APPLYING DMAIC TO PROCESS IMPROVEMENT’S. (20)

PPTX
DMAIC.pptx
PDF
Quality Engineering material
PDF
slidesgo-mastering-six-sigma-a-deep-dive-into-the-dmaic-methodology-202411071...
PPT
Six sigma awareness
PPT
Basic Six Sigma Presentation
PDF
WEBINAR: Introduction to DMAIC
PPTX
Six Sigma
PPTX
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
PPTX
Basic understanding of lean six sigma approach for improvement
PPTX
Introduction to DMAIC Training
PPTX
PPT
Six Sigma Process Improvement
PPTX
Introduction to Six Sigma.pptx
PPT
QM-029-Six Sigma Overview
PDF
Webinar: DMAIC: Common Challenges & How to Overcome Them
PPTX
You_Exec_-_Process_Improvement_Free.pptx
PPTX
Lean Six Sigma Overview (presentation version)
PDF
PI Boot Camp 2015.06 Participant Packet
PDF
Measuring Performance Improvement
PDF
Quality Metrics
DMAIC.pptx
Quality Engineering material
slidesgo-mastering-six-sigma-a-deep-dive-into-the-dmaic-methodology-202411071...
Six sigma awareness
Basic Six Sigma Presentation
WEBINAR: Introduction to DMAIC
Six Sigma
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Basic understanding of lean six sigma approach for improvement
Introduction to DMAIC Training
Six Sigma Process Improvement
Introduction to Six Sigma.pptx
QM-029-Six Sigma Overview
Webinar: DMAIC: Common Challenges & How to Overcome Them
You_Exec_-_Process_Improvement_Free.pptx
Lean Six Sigma Overview (presentation version)
PI Boot Camp 2015.06 Participant Packet
Measuring Performance Improvement
Quality Metrics
Ad

Recently uploaded (20)

PPT
Quality review (1)_presentation of this 21
PDF
Galatica Smart Energy Infrastructure Startup Pitch Deck
PDF
TRAFFIC-MANAGEMENT-AND-ACCIDENT-INVESTIGATION-WITH-DRIVING-PDF-FILE.pdf
PDF
Foundation of Data Science unit number two notes
PPTX
Business Ppt On Nestle.pptx huunnnhhgfvu
PDF
22.Patil - Early prediction of Alzheimer’s disease using convolutional neural...
PPTX
Introduction to Knowledge Engineering Part 1
PPTX
MODULE 8 - DISASTER risk PREPAREDNESS.pptx
PPTX
The THESIS FINAL-DEFENSE-PRESENTATION.pptx
PPTX
Data_Analytics_and_PowerBI_Presentation.pptx
PDF
Clinical guidelines as a resource for EBP(1).pdf
PPTX
05. PRACTICAL GUIDE TO MICROSOFT EXCEL.pptx
PDF
Launch Your Data Science Career in Kochi – 2025
PPTX
Database Infoormation System (DBIS).pptx
PPTX
Supervised vs unsupervised machine learning algorithms
PPT
Chapter 3 METAL JOINING.pptnnnnnnnnnnnnn
PPTX
Computer network topology notes for revision
PPTX
Moving the Public Sector (Government) to a Digital Adoption
PPT
Chapter 2 METAL FORMINGhhhhhhhjjjjmmmmmmmmm
Quality review (1)_presentation of this 21
Galatica Smart Energy Infrastructure Startup Pitch Deck
TRAFFIC-MANAGEMENT-AND-ACCIDENT-INVESTIGATION-WITH-DRIVING-PDF-FILE.pdf
Foundation of Data Science unit number two notes
Business Ppt On Nestle.pptx huunnnhhgfvu
22.Patil - Early prediction of Alzheimer’s disease using convolutional neural...
Introduction to Knowledge Engineering Part 1
MODULE 8 - DISASTER risk PREPAREDNESS.pptx
The THESIS FINAL-DEFENSE-PRESENTATION.pptx
Data_Analytics_and_PowerBI_Presentation.pptx
Clinical guidelines as a resource for EBP(1).pdf
05. PRACTICAL GUIDE TO MICROSOFT EXCEL.pptx
Launch Your Data Science Career in Kochi – 2025
Database Infoormation System (DBIS).pptx
Supervised vs unsupervised machine learning algorithms
Chapter 3 METAL JOINING.pptnnnnnnnnnnnnn
Computer network topology notes for revision
Moving the Public Sector (Government) to a Digital Adoption
Chapter 2 METAL FORMINGhhhhhhhjjjjmmmmmmmmm

APPLYING DMAIC TO PROCESS IMPROVEMENT’S.

  • 2. APPLYING DMAIC STEPS TO IMPROVE PROCESS IMPROVEMENT TOPOLOGIES. Project managers, in just about any industry, are faced with the challenge of improving the efficiency and productivity of their businesses. To do this, they need to understand the best methodology and tools to study and analyze processes correctly. After all, to improve results, the best approach is to improve the process that gives you those results. So, it is imperative for project managers to have a rudimentary understanding of process thinking when managing improvement efforts. As shown in the graph above, a process can be broken down into three basic elements: the inputs to the process, the process under study and the outputs from the process. The concept of improvement is quite simple; to improve the outputs of a process you simply improve the inputs and the process itself. To improve the output, also called the “Y” or the “Key Measure”, identify, measure and improve the inputs and process metrics, also known as the “X’s”. Focusing on the results, the output Y measures instead of the X’s is an after-the-fact, reactive, expensive and inefficient approach to improving results. The concept that Y is a function of X (Y=f(X1, X2, …Xn) is at the core of the: Define, Measure, Analyze, Improve and Control; also known as DMAIC, steps.
  • 3. The roadmap for improving processes and key measures of a business is a straightforward, easy to understand set of those five steps. DMAIC is an iterative process that gives structure and guidance to improving processes and productivity in the workplace. Project managers and Six Sigma practitioners apply the DMAIC steps and appropriate analysis tools under each step, to analyze and improve key metrics of a business. Metrics are established, variation is studied and reduced and processes are improved and optimized. The result is improved performance, fewer errors and increased efficiency and productivity. The DMAIC steps are the true backbone of any process improvement initiative. The steps make sense, they are easy to understand and they are logical in their sequence. The steps allow a team to adequately scope the problem, measure the current performance, analyze the root causes of problems and inefficiency, test and verify improvement recommendations and then implement changes for sustainability over the long haul. Process improvement projects are the norm these days. Improving key measures is something every project manager is going to be faced with sooner or later; therefore, a project manager should be skilled in the art of applying the DMAIC steps to improve results. Understand the Process and then Measure the Process! The DMAIC steps work because they are understandable and make sense. These steps can be applied to any process, any industry, any company to help guide a process improvement team. Before they can be applied, however, the project leader should lead his or her team to scope the problem, perhaps using a Supplier, Input, Process, Output, and Customer or SIPOC diagram as shown below. Using the SIPOC tool
  • 4. can help project managers scope the problem, think in terms of processes, and help the team pinpoint what and where to measure. The SIPOC tool helps link metrics to the inputs, the process, and the outputs thus allowing for the Y=f(X) thinking.
  • 5. The SIPOC tool is something that can be done in the Define step of the DMAIC steps. DEFINE Essentially the purpose of the Define step is to set your project up for success. Project managers are familiar with the things that need to be done when starting off a project. Essential project elements are accomplished in this step:  Attain sponsorship for the project.  Establish the project charter and appropriate scope.  Identify stakeholders and team members.  Establish team ground rules.  Plan and conduct a successful kickoff meeting.
  • 6. In addition to the normal project deliverables listed above, for a process improvement effort, the project manager would facilitate his or her team in developing an “As-Is” process map. This will help the team not only get on the same page in terms of the process, but also will help the team identify problematic steps in the process. Process maps, or Deployment maps (a.k.a. Swim-lanes), can also be useful in identifying non-value added steps and can be vital in determining process measures. Lastly, the team may require some basic training on the application of the DMAIC steps so that everyone knows what to do and when to do it.
  • 7. MEASURE The Measure step is often a step which, unfortunately, is skimmed over by most teams. One of the biggest mistakes made when trying to improve results is to make decisions based on “gut” feeling, intuition or anecdotal information. Instead, what is imperative is to base decisions on facts and data and that is the main goal of the measure step. In the Measure step, the team should:  Identify and operationally define key metrics.  Develop a data collection plan.  Conduct a measurement system analysis to verify that the data is accurate.
  • 8.  Stratify the data.  Establish baseline charts.  Make charts and graphs to help the team better understand what the process is currently delivering in terms of processing times, errors or defects. ANALYZE
  • 9. The Analyze step is all about getting to the root-cause of the problem. Too often when trying to solve a problem, people or teams tend to focus on a symptom as opposed to the true root cause of the problem. The tools and techniques in the Analyze step lead project teams to gather clues for improvement and ascertain what the root cause, or causes, are that are the most important drivers. The Y is a function of X formula is at play in the Analyze step. A team will analyze the process, perhaps using value-added analysis, statistical analysis, or maybe a fishbone chart, a cause and effect diagram, to get to what they think are the root causes. Then the team would gather data on the root causes to determine if there is a cause and effect relationship with the problem. Verifying cause and effect is a crucial step in the Analyze phase; a step which many people, unfortunately, skip or simply take for granted based on their opinions. IMPROVE Once a team moves through the Define, Measure and Analyze steps, they are now ready to use what they’ve learned about the process to be innovative when solving the problem at hand. Improve is the step where creative solutions to existing problems can be developed and tested, using various experiment or piloting techniques. The key deliverable in the improve step is verifiable improvement through measurement. The best ideas for improvement, based on what was learned in Measure and Analyze, are tested and implemented on a limited basis to determine if there is statistical evidence of sustained improvement. Once a team improves a process, the results should become quite clear on a control chart; like the example shown above. When stakeholders can see the proof of improved performance, they will be more likely to accept and actually implement the team’s recommendations. Improve is about taking the emotion out of decision making. Improve is about verification and validation of recommendations. Often times, teams make the mistake of thinking they
  • 10. “know” what will work. Thus, they blindly implement what they think is the best solution without proper testing. The result, more times than not, is that there is no measurable or sustainable improvement.
  • 11. CONTROL The real strength of the DMAIC steps is the Control step. Too often, teams do a lot of hard work, actually improve the process and results, and then implementation of the improved process doesn’t go smoothly. There is pressure to move on; time isn’t spent on having a smooth transition and the buy-in for full implementation just isn’t quite there. The result is that sustaining the improvement realized in the Improve step becomes difficult and sustained improvement is difficult. The purpose of the Control step is to ensure a successful implementation of the team’s recommendation so that long term success will be attained. The new and improved process will be flowcharted and these new methods will become the new standard operation procedures. Results will continue to be tracked, so that any “drift”
  • 12. back to previous results can be monitored and addressed in a proactive manner.The Control step is about the transfer of responsibilities and establishing plans for lon-term process control. MAKING BETTER DECISIONS Once the DMAIC steps are understood, then managing the process of how to improve results becomes clear and straightforward. If used properly, the following decision tree can lead to better decision making by helping business leaders ask the right questions to avoiding making knee-jerk reactions. Instead, it encourages an understanding of variation and reinforces the use of the DMAIC steps to address as the roadmap to continuous improvement.
  • 13. In Conclusion The DMAIC steps are a proven road map for any process improvement project. There are only five steps so they are relatively easy to remember. They offer a structured approach to solving problems and improving results. There are certain questions to be addressed under each step and certain tools and techniques can be utilized to answer those questions through facts and data.
  • 14. When the DMAIC steps are properly applied, they offer any project team an organized approach, a structure, to solving key business problems. The DMAIC steps are flexible and can be used in any industry or with any type of process improvement effort. They just make sense, which is why they are so powerful. Every team leader should be familiar with, and incorporate, the DMAIC steps into all process improvement projects.