Main characteristics of the Project
  proposal selection process in Latvia
• Specific, very targeted activities on the basis of wider
  policy targets
• Line ministries, stakeholders, regional and local
  partners involved in elaboration of the Project
  selection criteria, not the selection of projects
• Project selection process perceived as administratively
  technical work (comparison of various investment
  options in order to choose the best one)
• Impact of each Project towards attainment of the
  common policy targets is assessed
• Selected Projects are budgeted for the whole
  implementation stage of the particular Project

                                                             2
Project selection process in Latvia




                                      3
Example: insolation of houses
• Policy target for 2013: Decrease of energy
  compsumption in renovated houses – at least
  15% in comparison with the situation before
  the project
• Criteria: Thermal energy saving after
  renovation of the multi-apartment residential
  building is at least 20% per year of calculated
  energy efficiency assessment in energy audit
  added to project application

                                                    4
Example: internet access points
Policy target for 2013: Number of newly created public internet
access points – 400 (target in 2009 – 80).
Criteria:
As the result of project will be created and developed public Internet      The minimal
                                                                         estimation 1 point
access points:


2.1. 70 percent or more of the project planned results are the newly             2
established Internet access points;
2.2. 50 – 70 percent of the project planned results are the newly                1
established Internet access points;                                              0
2.3. requirements stated in 2.2.paragraph are not met.




                                                                                              5
Example: 1st class roads
• Policy target for 2013: Passengers time saving
  resulting from paving of state category 1 roads – 611
  734 EUR/year (target in 2009 – 218 741 EUR/year).
• Criteria:
Project’s transport economy cost (hereafter
– C) – benefit (hereafter – B) ratio (in
calculation users’ benefits are considered-
time economy, reduction in vehicles’
operational costs, reduction in traffic
accidents costs in relation to original
                                                  Points=
                                            B/C
investment and maintenance costs)                  B/C*5
Points will be awarded according to B/C
ratio and coefficient - 5 .
For example, if project’s B/C=2, it will be
awarded in this criteria 2x5=10 points.
                                                            6
Example: wastewater treatment
• Policy target for 2013: Share of inhabitants provided with
  wastewater management services according to the standarts
  – 64% (base value in 2004 – 9%, target in 2009 – 56%)
Benefit from the project - cost efficiency analysis (number of inhabitants benefited
from the project in terms of service quality and accessibility against eligible
expenditure).
•   project cost efficiency analysis is less than average project application
                                                                                                    1
    selection round cost efficiency analysis and the difference is more than 20 %
    project cost efficiency analysis is less than average project application selection round
    cost efficiency analysis and the difference is between 10 % till 20%                            2

    project cost efficiency analysis is equal with average project application selection round
    cost efficiency analysis, exceeds the project cost efficiency analysis by 10% or is less than   3
    the project cost efficiency analysis by 10%
    project cost efficiency analysis is more than average project application
    selection round cost efficiency analysis and the difference is between 10 % till                4
    20%
    project cost efficiency analysis is more than average project application
    selection round cost efficiency analysis and the difference is more than 20 %                   5   7
Example: policentric development
• Policy target for 2013: Increase of ranks of territorial
  development index in cities and towns supported – by 3 ranks
  in each of the national development centres and by 5 ranks in
  each of the regional development centres (target in 2009 – by
  1 rank for national importance development centres and by 2
  ranks for regional importance development centres)
• Criteria:
- Integrated approach for urban infrastructure development is
  used in the project application creating the connection with
  development programme of the local government
- Current job positions will be retained and new job positions
  will be created in the development centres (city)

                                                              8
Example: waste collection points
• Policy target for 2013: 1 separated waste collection point for
  500 inhabitants (base value in 2004 – 1 collection point for 2
  000 inhabitants; target in 2009 – 1 collection point for 800
  inhabitants)
•    Separate waste collection points (SCP) according with Cabinet of ministers approved regional
     waste management plans, one (SWC) point on 400 inhabitants:

           project application is not describing how many percentage of inhabitants of the
           municipal waste management region will be provided with service                           0

           planned SCPs will provide services to not less than 20 percentage of inhabitants within
           municipal waste management region                                                         1

           planned SCPs will provide services from 20 till 40 percentage (not including) of
           inhabitants within municipal waste management region                                      2

           planned SCPs will provide services from 40 till 60 percentage (not including) of
           inhabitants within municipal waste management region                                      4

           planned SCPs will provide services from 60 till 80 percentage (not including) of
           inhabitants within municipal waste management region                                      6

           planned SCPs will provide services from 80 till 100 percentage of inhabitants within
           municipal waste management region                                                         8

                                                                                                         9
Horizontal mechanisms for ballanced
      territorial development
- Regional quota (used for renovation of 1st
  class roads, water treatment, ect);
- Vertical intervention for solving of particular
  problem (business support in specially
  assisted territories, support for growth poles);
- Different co-financing rates (less developed
  territory can co-finance less)


                                                 10

More Related Content

PDF
Broadway corridor-planning-program-presentation-may-2018
PPTX
Green Cities in Belarus: energy -efficiency measures and promotion of sustain...
PPTX
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
PPTX
CIL Legal Update- Oliver Martin, RTPI West Midlands CPD
PPTX
Carwg afolu project development presentation v2
PPTX
Dan Nicholls, Cornwall CC - Localising the benefits
PPTX
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
PPT
Getting to Grips with the New Technical Standards for Housing
Broadway corridor-planning-program-presentation-may-2018
Green Cities in Belarus: energy -efficiency measures and promotion of sustain...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
CIL Legal Update- Oliver Martin, RTPI West Midlands CPD
Carwg afolu project development presentation v2
Dan Nicholls, Cornwall CC - Localising the benefits
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
Getting to Grips with the New Technical Standards for Housing

What's hot (11)

PPTX
Stephen Cook - Renewable Energy
PDF
GPC Launch Slides
PPTX
Housing Standards Review: DCLG Presentation
PPTX
Allerdale Borough Council Local Authority Experience – The Cockermouth Neighb...
PPT
Minor Alterations to the London Plan
PPT
Regional Growth Strategy Feb 9 09 Council Presentation
PPTX
Making non revenue water reduction a national priority the case of viet nam -...
PPTX
MLPS Presentation for the Steering Committee Session from February 21, 2014
PDF
EnMS and SEAPs Development_Diputaciòn Ourense
PDF
Vilnius Presentation
PPTX
120530 Da Nang Municipal Wastewater
Stephen Cook - Renewable Energy
GPC Launch Slides
Housing Standards Review: DCLG Presentation
Allerdale Borough Council Local Authority Experience – The Cockermouth Neighb...
Minor Alterations to the London Plan
Regional Growth Strategy Feb 9 09 Council Presentation
Making non revenue water reduction a national priority the case of viet nam -...
MLPS Presentation for the Steering Committee Session from February 21, 2014
EnMS and SEAPs Development_Diputaciòn Ourense
Vilnius Presentation
120530 Da Nang Municipal Wastewater
Ad

Viewers also liked (20)

PPT
project selection
PPT
Project Selection
PPTX
The Process of Project Selection
PDF
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
PPT
Successfully Achieving And Delivering Results Through Rigorous Project Select...
PPT
D. strategic + project selection
PPT
Example Project: Strategic Project Selection and Accelerated Development by J...
PPT
Pm Session 2
PPTX
evaluation techniques in HCI
PPTX
Project Selection
PPT
PPT
D06 Project Selection
PDF
暴走漫画数据挖掘从0到1
PPTX
Analytic hierarchy process
PPT
Project selection
PPT
Spm unit2
PPT
HCI 3e - Ch 9: Evaluation techniques
PDF
敏捷开发全景视图(流程、方法和最佳实践)
PPT
Concept Evaluation And Selection
project selection
Project Selection
The Process of Project Selection
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
Successfully Achieving And Delivering Results Through Rigorous Project Select...
D. strategic + project selection
Example Project: Strategic Project Selection and Accelerated Development by J...
Pm Session 2
evaluation techniques in HCI
Project Selection
D06 Project Selection
暴走漫画数据挖掘从0到1
Analytic hierarchy process
Project selection
Spm unit2
HCI 3e - Ch 9: Evaluation techniques
敏捷开发全景视图(流程、方法和最佳实践)
Concept Evaluation And Selection
Ad

Similar to Approaches to Project Selection (20)

PPTX
Presentation of the Modernization of Local Public Services in the RM Project
PPTX
Prezentare MLPS Comitet Director din 19 noiembrie 2012
PDF
Cost Effectiveness of LID Implementation
PDF
Citizen Monitoring for Waste Management Services in Maputo
PPTX
3.6–3.8-Group-Exercise-on-PPP-Feasibility-Studies.pptx
PPT
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
PDF
Nigrad: Smart City Maribor
PDF
Infrastructure & PPPs - Ana-Maria Ruiz Rivadeneira, OECD
PDF
Financial Model and Future Operations Plan - Business Case Submission 09
PPT
Urban CDM Challenges & Opportunities-Kim
PDF
Leed Goals And Strategies 2.3.09
PPTX
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
PPT
Improvement of solid waste management system
PPTX
Methodological reflections and the practice of evaluation, main outputs of th...
PPTX
Day2 session1 costing and mtef
PPTX
Indicator Framework and Results
PDF
San Jose Sustainability CEE22X Final Presentation
PDF
social cost benefit.pdf
PPTX
Project Management
PDF
Climate finance - K. Enting (kfw) CCXG GF March 2014
Presentation of the Modernization of Local Public Services in the RM Project
Prezentare MLPS Comitet Director din 19 noiembrie 2012
Cost Effectiveness of LID Implementation
Citizen Monitoring for Waste Management Services in Maputo
3.6–3.8-Group-Exercise-on-PPP-Feasibility-Studies.pptx
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
Nigrad: Smart City Maribor
Infrastructure & PPPs - Ana-Maria Ruiz Rivadeneira, OECD
Financial Model and Future Operations Plan - Business Case Submission 09
Urban CDM Challenges & Opportunities-Kim
Leed Goals And Strategies 2.3.09
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
Improvement of solid waste management system
Methodological reflections and the practice of evaluation, main outputs of th...
Day2 session1 costing and mtef
Indicator Framework and Results
San Jose Sustainability CEE22X Final Presentation
social cost benefit.pdf
Project Management
Climate finance - K. Enting (kfw) CCXG GF March 2014

More from ADR Nord (20)

PPTX
RAPORT cu privire la activitatea CRD Nord pe parcursul anilor 2015-2017
PPTX
Cu privire la promovării granturilor disponibile pentru finanțarea tinerilor ...
PPTX
Proiectul Regulamentului Comisiilor Regionale Sectoriale
PPTX
Raport pentru semestrul I al a.2017 privind implementarea SDR Nord 2016-2020
PPTX
Proiectul Programului Regional Sectorial în domeniul Infrastructurii de Spri...
PPTX
Moldova-Letonia - Forum
PPTX
Suport în dezvoltarea turismului rural sustenabil în RDN, Moldova
PPT
Planul de afaceri
PPTX
Raport ADR Nord 2016
PDF
North Development Region (2016)
PDF
Regiunea de Dezvoltare Nord în cifre (2016)
PPTX
Modernizarea serviciilor publice locale în Republica Moldova - CRD Nord
PPT
2016 ia larga_evaluarea_impactului
PPTX
Raportul privind realizarea SDR Nord, perioada ianuarie-septembrie 2016
PPTX
REZULTATELE CONCURSULUI PROPUNERILOR DE PROIECTE // ETAPA II
PPT
MDS // RDN
PPTX
Memorandum MDS // nord
PPTX
Proiectul „Crearea sistemului integrat de dezvoltare durabilă a sectorului ap...
PPTX
Raportul vizitei de studiu a apicultorilor din Regiunea de Dezvoltare Nord în...
PPTX
Surse de finanțare în domeniul eficienței energetice și surselor de energie r...
RAPORT cu privire la activitatea CRD Nord pe parcursul anilor 2015-2017
Cu privire la promovării granturilor disponibile pentru finanțarea tinerilor ...
Proiectul Regulamentului Comisiilor Regionale Sectoriale
Raport pentru semestrul I al a.2017 privind implementarea SDR Nord 2016-2020
Proiectul Programului Regional Sectorial în domeniul Infrastructurii de Spri...
Moldova-Letonia - Forum
Suport în dezvoltarea turismului rural sustenabil în RDN, Moldova
Planul de afaceri
Raport ADR Nord 2016
North Development Region (2016)
Regiunea de Dezvoltare Nord în cifre (2016)
Modernizarea serviciilor publice locale în Republica Moldova - CRD Nord
2016 ia larga_evaluarea_impactului
Raportul privind realizarea SDR Nord, perioada ianuarie-septembrie 2016
REZULTATELE CONCURSULUI PROPUNERILOR DE PROIECTE // ETAPA II
MDS // RDN
Memorandum MDS // nord
Proiectul „Crearea sistemului integrat de dezvoltare durabilă a sectorului ap...
Raportul vizitei de studiu a apicultorilor din Regiunea de Dezvoltare Nord în...
Surse de finanțare în domeniul eficienței energetice și surselor de energie r...

Recently uploaded (16)

PDF
Corporate Finance, 12th Edition, Stephen Ross, Randolph Westerfield, Jeffrey ...
PDF
Top Investment Opportunities in Nepal (1).pdf
PDF
The-Importance-of-Mutual-Funds-in-Your-Financial-Life (1).pdf
PDF
North Arrow Corporate and Kraaipan Gold Project Update
PDF
Investor Presentation - Q2 FY 25 - 6 November 2024.pdf
PPTX
Chemistry.pptxjhghjgghgyughgyghhhvhbhghjbjb
PDF
202507_Sansan presentation materials FY2024
PDF
Cyberagent_For New Investors_EN_250808.pdf
PPTX
TTL1_LMS-Presenfdufgdfgdgduhfudftation.pptx
PDF
Methanex Investor Presentation - July 2025
PDF
How Foreign Investment in Nepal Makes a Difference.pdf
PDF
How to Analyze Market Trends in Precious Metal.pdf
PPTX
investment-opportunities-in-rajasthan.pptx
DOC
École毕业证学历认证,劳伦森大学毕业证毕业证文凭
PDF
OR Royalties Inc. - Corporate Presentation, August 2025
PDF
Buy Verified Chime Accounts - Lori Donato's blo.pdf
Corporate Finance, 12th Edition, Stephen Ross, Randolph Westerfield, Jeffrey ...
Top Investment Opportunities in Nepal (1).pdf
The-Importance-of-Mutual-Funds-in-Your-Financial-Life (1).pdf
North Arrow Corporate and Kraaipan Gold Project Update
Investor Presentation - Q2 FY 25 - 6 November 2024.pdf
Chemistry.pptxjhghjgghgyughgyghhhvhbhghjbjb
202507_Sansan presentation materials FY2024
Cyberagent_For New Investors_EN_250808.pdf
TTL1_LMS-Presenfdufgdfgdgduhfudftation.pptx
Methanex Investor Presentation - July 2025
How Foreign Investment in Nepal Makes a Difference.pdf
How to Analyze Market Trends in Precious Metal.pdf
investment-opportunities-in-rajasthan.pptx
École毕业证学历认证,劳伦森大学毕业证毕业证文凭
OR Royalties Inc. - Corporate Presentation, August 2025
Buy Verified Chime Accounts - Lori Donato's blo.pdf

Approaches to Project Selection

  • 1. Capacity building in Regional development in the Republic of Moldova MD10/ENP-PCA/OT/10 Approaches to Project Selection Inta Liepa Dace Gruberte 1
  • 2. Main characteristics of the Project proposal selection process in Latvia • Specific, very targeted activities on the basis of wider policy targets • Line ministries, stakeholders, regional and local partners involved in elaboration of the Project selection criteria, not the selection of projects • Project selection process perceived as administratively technical work (comparison of various investment options in order to choose the best one) • Impact of each Project towards attainment of the common policy targets is assessed • Selected Projects are budgeted for the whole implementation stage of the particular Project 2
  • 4. Example: insolation of houses • Policy target for 2013: Decrease of energy compsumption in renovated houses – at least 15% in comparison with the situation before the project • Criteria: Thermal energy saving after renovation of the multi-apartment residential building is at least 20% per year of calculated energy efficiency assessment in energy audit added to project application 4
  • 5. Example: internet access points Policy target for 2013: Number of newly created public internet access points – 400 (target in 2009 – 80). Criteria: As the result of project will be created and developed public Internet The minimal estimation 1 point access points: 2.1. 70 percent or more of the project planned results are the newly 2 established Internet access points; 2.2. 50 – 70 percent of the project planned results are the newly 1 established Internet access points; 0 2.3. requirements stated in 2.2.paragraph are not met. 5
  • 6. Example: 1st class roads • Policy target for 2013: Passengers time saving resulting from paving of state category 1 roads – 611 734 EUR/year (target in 2009 – 218 741 EUR/year). • Criteria: Project’s transport economy cost (hereafter – C) – benefit (hereafter – B) ratio (in calculation users’ benefits are considered- time economy, reduction in vehicles’ operational costs, reduction in traffic accidents costs in relation to original Points= B/C investment and maintenance costs) B/C*5 Points will be awarded according to B/C ratio and coefficient - 5 . For example, if project’s B/C=2, it will be awarded in this criteria 2x5=10 points. 6
  • 7. Example: wastewater treatment • Policy target for 2013: Share of inhabitants provided with wastewater management services according to the standarts – 64% (base value in 2004 – 9%, target in 2009 – 56%) Benefit from the project - cost efficiency analysis (number of inhabitants benefited from the project in terms of service quality and accessibility against eligible expenditure). • project cost efficiency analysis is less than average project application 1 selection round cost efficiency analysis and the difference is more than 20 % project cost efficiency analysis is less than average project application selection round cost efficiency analysis and the difference is between 10 % till 20% 2 project cost efficiency analysis is equal with average project application selection round cost efficiency analysis, exceeds the project cost efficiency analysis by 10% or is less than 3 the project cost efficiency analysis by 10% project cost efficiency analysis is more than average project application selection round cost efficiency analysis and the difference is between 10 % till 4 20% project cost efficiency analysis is more than average project application selection round cost efficiency analysis and the difference is more than 20 % 5 7
  • 8. Example: policentric development • Policy target for 2013: Increase of ranks of territorial development index in cities and towns supported – by 3 ranks in each of the national development centres and by 5 ranks in each of the regional development centres (target in 2009 – by 1 rank for national importance development centres and by 2 ranks for regional importance development centres) • Criteria: - Integrated approach for urban infrastructure development is used in the project application creating the connection with development programme of the local government - Current job positions will be retained and new job positions will be created in the development centres (city) 8
  • 9. Example: waste collection points • Policy target for 2013: 1 separated waste collection point for 500 inhabitants (base value in 2004 – 1 collection point for 2 000 inhabitants; target in 2009 – 1 collection point for 800 inhabitants) • Separate waste collection points (SCP) according with Cabinet of ministers approved regional waste management plans, one (SWC) point on 400 inhabitants: project application is not describing how many percentage of inhabitants of the municipal waste management region will be provided with service 0 planned SCPs will provide services to not less than 20 percentage of inhabitants within municipal waste management region 1 planned SCPs will provide services from 20 till 40 percentage (not including) of inhabitants within municipal waste management region 2 planned SCPs will provide services from 40 till 60 percentage (not including) of inhabitants within municipal waste management region 4 planned SCPs will provide services from 60 till 80 percentage (not including) of inhabitants within municipal waste management region 6 planned SCPs will provide services from 80 till 100 percentage of inhabitants within municipal waste management region 8 9
  • 10. Horizontal mechanisms for ballanced territorial development - Regional quota (used for renovation of 1st class roads, water treatment, ect); - Vertical intervention for solving of particular problem (business support in specially assisted territories, support for growth poles); - Different co-financing rates (less developed territory can co-finance less) 10