COST ESTIMATION AND LINK WITH
MTEF (MEDIUM-TERM EXPENDITURE
FRAMEWORK)
Rafał Stanek
SST-CONSULT /Kommunalkredit Public Consulting
Promoting Clean Urban Public Transport in Kazakhstan:
Designing a Green Investment Programme
14 December 2016, Astana
• Introduction to programme costing
• Three methods of programme
costing:
–bottom-up
–average unit costs
–top-down
• Financial flows, METF and one year
budget
Structure of the presentation
• Correct estimation of the costs of
implementation of an environmental
programme is crucial for the success of
future implementation
• No single theoretical methodology can be
used for costing of environmental
programmes
• A number of internationally recognised
good practices in this field do exist
Major methods of environmental
programme costing
• Bottom-up: by collecting information
from the field (prospective investors, such
as local governments, utilities, etc.)
• Using Average Unit Costs
• Top-down: by imposing rules and
procedures that ensure that only projects
within a specific (scope, costs,
environmental effect) margin are
implemented
Estimating the costs of an
environmental programme
• For example, local governments are asked to
provide detailed information (investment
costs, period of implementation) on specific
projects
• This method has a very high accuracy:
information on projects under preparation is
collected
• Local governments, however, may
overestimate the scope – need for
verification
Bottom-up
Costs of the national programme
Verification
Aggregation
on the
regional level
Aggregation
on the
regional level
Beneficiary /for example municipal/ level - investments and its
cost
Bottom-up
• Polish National Programme for Municipal
Waste Water Treatment prepared to implement
EU Directive 91/271/EEC of 21 May 1991 on
urban wastewater treatment
• Local governments proposed the scope, which
was then negotiated with the central government
• Very broad definitions of agglomeration and local
governments tended to ensure that every
settlement was put into the programme
Bottom-up - example
• Total costs of the implementation of the
Urban Wastewater Directive in Poland
–The National Programme for Municipal
Waste Water Treatment 2003: PLN 35
billion
–Update 2005: PLN 42.6 billion
–Update 2010: PLN 31.9 billion
–Update 2015: PLN 55.963 billion was spent
by the end of 2014 and there is a need for
additional PLN 29 billion
Bottom-up - example
• Easy to use, but prone to high inaccuracy
• For example:
– 30% of the country's population is connected
to the sewage system
– If we want to achieve a target of a 90%
connection rate, we need to multiply 60% of
the population by the unit cost of building
sewage systems with WWTPs
Total outlays for the
programme
=
Population to be
connected
Unit costs to connect
one person
*
Average unit costs
Total outlays for the
programme
=
Number of new
LPG buses
Average unit costs of
LPG bus
*
Number of new
CNG buses
Average unit costs of
CNG bus
*
Number of new
EURO6 diesel
buses
Average unit costs of
modern diesel bus
*
+
+
Average unit costs
• When the wastewater infrastructure is partially built
(sewer mains and WWTPs are in place), expanding the
system by building sewerage connections may cost less
than the average
• If the sewer network is constructed in high density
areas first, however, expanding it to areas with lower
population density may cost more than the average
• When energy efficiency projects are promoted for
several years, the most cost-effective are usually those
projects implemented at the beginning. Projects in later
years, in turn, may cost more than the average
Average versus marginal costs
• Easy to calculate, but highly inaccurate
• Sometimes marginal unit costs should be used instead of
average unit costs
• To increase accuracy, it is necessary to break down
components into small types of projects, such as:
– WWTP: small, medium-sized, large
– sewer network in: flat urban area, flat rural area, hilly urban area, in
hilly rural area
– or even more detail
– Only then: estimate the unit costs for each type
• Problems occur when scope of the programme is changed
due to political pressure
Average unit costs - conclusions
• Programme promoter decides on relatively
small margin of the projects' scope and
costs
• Programme may contain a number of
types of projects, but the programme
promoter needs to know the details on
each type of project
• Programme is usually prepared after
conducting research or implementing pilot
projects
Top-down
Costs of the national programme and project
parameters are decided by the programme promoter
Beneficiary level
Application forms
Top-down
• Example of solar collectors:
• Polish EcoFund (debt-for-environment swap, programme
now closed):
– Maximum grant per unit: 250 EUR/m2
– Annual limit: EUR 2.5 million EUR
– Grant limit of up to 40% of the project costs
• Polish National Environmental Fund:
– Maximum project costs 600 EUR/m2
– Up to 1.5 m2 per person
– Grant limit of up to 45% of project costs
• Very detailed definition what projects costs may include
Top-down
• Every good method to implement programmes
consisting of many replicable projects
• Good to implement programmes where programme
promoter subsidizes only part of the project costs
• Programme costing requires good and detailed
knowledge about potential projects – research or pilot
projects first
• Projects outside the range set by programme promoter
are lost, even if they would be useful in achieving targets
• Cheapest projects are implemented first, thus
procedures require update after a few years
Top-down
• Regardless the method used for programme costing, when the
total budget is agreed, we need to see how to disburse the
budget over the years
• This can be done looking at several constrains:
– availability of the public support over the years (for example, we will
have available maximum 5 billion tenge per year
– Market readiness to deliver goods needed for programme
implementation (if average bus production in the country is 300, we
cannot estimate replacement of 500 buses in the first year of the
programme implementation)
– Readiness of beneficiaries to implement the programme – the market
study shall estimate how many project beneficiaries are ready to
implement such projects per year (could vary from year to year due to
better market penetration)
Financial flows
• When possible disbursement schedule is
determined and the level of the support from
the state budget is calculated (next
presentation), the programme can be
included into the Medium Term Expenditure
Framework
• Medium Term Expenditure Framework (or
multiyear budget) is a resource envelope for a
high cost government-wide programmes
Financial flows and MTEF
• Then, specific costs for a given year are
allocated to the annual budgets
• The monitoring of the programme
implementation also gives an input to the
annual budget allocations – for example, if not
all funds were spent in the given year, next
year allocation may take it into account plus
improvements in the programme
implementation shall be considered
MTEF and annual budget

More Related Content

PPT
4 biomass
PDF
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
PDF
Data collection and monitoring
PPTX
Low Carbon Transport Options - Yanni Papapanagiotou
PPTX
SMART Plan Preliminary Financial Plan Options
PDF
Monitoring of SEAPs - Melica
PPTX
PLAN 2040 RTP Update Overview
PPTX
Prezentare MLPS Comitet Director din 19 noiembrie 2012
4 biomass
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
Data collection and monitoring
Low Carbon Transport Options - Yanni Papapanagiotou
SMART Plan Preliminary Financial Plan Options
Monitoring of SEAPs - Melica
PLAN 2040 RTP Update Overview
Prezentare MLPS Comitet Director din 19 noiembrie 2012

What's hot (19)

PPTX
Day1 session1 institutional arrangements
PDF
Session2 the mediterranean solar plan status and recent developments-authored...
PDF
CCXG Global Forum March 2018, Transparency of reporting in technology support...
PPT
Cbp Seminar Presentation
PDF
Facilitation of further regional disaggregation of the ETSAP-TIAM model
PPTX
Mr. Paul VAN DEN OOSERTKAMP - Global trends and developments in the renewable...
PDF
170601 Energy Community Electricity Forum
PDF
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
PDF
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
PDF
Modelling flexible electric vehicle charging in local energy communities
PPT
PDF
GHG emission reduction due to energy efficiency measures under climate policy
PPT
Value of GI in local government2013 09-27
PDF
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
PDF
Generic Open Source Governance for Governments By the Dutch Provinces
PPTX
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
PDF
tew (10.10.18) - Policy guidelines for distribution network tariffs
PPTX
MLPS Presentation for the Steering Committee Session from February 21, 2014
PPTX
Bob Smith WEIL 7-10-15
Day1 session1 institutional arrangements
Session2 the mediterranean solar plan status and recent developments-authored...
CCXG Global Forum March 2018, Transparency of reporting in technology support...
Cbp Seminar Presentation
Facilitation of further regional disaggregation of the ETSAP-TIAM model
Mr. Paul VAN DEN OOSERTKAMP - Global trends and developments in the renewable...
170601 Energy Community Electricity Forum
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Modelling flexible electric vehicle charging in local energy communities
GHG emission reduction due to energy efficiency measures under climate policy
Value of GI in local government2013 09-27
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
Generic Open Source Governance for Governments By the Dutch Provinces
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
tew (10.10.18) - Policy guidelines for distribution network tariffs
MLPS Presentation for the Steering Committee Session from February 21, 2014
Bob Smith WEIL 7-10-15
Ad

Viewers also liked (20)

PPTX
Day2 session2 subsidy
PPTX
Day2 session1 case study
PPTX
Day2 session1 case study
PPTX
Day1 session2 market study
PPTX
Day1 session3 international climate finance
PPTX
Day2 session3 multi-criteria-analysis
PPTX
Day2 session3 pcm milestones
PPTX
Day2 session1 programming
PPTX
Development of a National Monitoring and Evaluation Framework for WASH activi...
 
PPTX
Day1 session3 modelling_russian
PPTX
Day2 session1 case study_russian
PPTX
Day1 session2 market study_russian
PPTX
Day1 session1 on state programmes_russian
PPTX
Day2 session1 costing and mtef_russian
PPTX
Day1 session2 clean fuels and technologies_russian
PPT
Day1 session2 project introduction_russian
PPTX
Day1 session3 international climate finance_russian
PPTX
Day1 session1 institutional arrangements_russian
PDF
Breakout 2 summary slides CCXG GF September 2016
PPTX
Day2 session1 case study_russian
Day2 session2 subsidy
Day2 session1 case study
Day2 session1 case study
Day1 session2 market study
Day1 session3 international climate finance
Day2 session3 multi-criteria-analysis
Day2 session3 pcm milestones
Day2 session1 programming
Development of a National Monitoring and Evaluation Framework for WASH activi...
 
Day1 session3 modelling_russian
Day2 session1 case study_russian
Day1 session2 market study_russian
Day1 session1 on state programmes_russian
Day2 session1 costing and mtef_russian
Day1 session2 clean fuels and technologies_russian
Day1 session2 project introduction_russian
Day1 session3 international climate finance_russian
Day1 session1 institutional arrangements_russian
Breakout 2 summary slides CCXG GF September 2016
Day2 session1 case study_russian
Ad

Similar to Day2 session1 costing and mtef (20)

PDF
An old recipe for an emerging issue
PPT
Financial & Economic Evaluation of projects
PPTX
Lcca for sussvcdelivery_rreddy
 
PPTX
Ben Owen - International Experiences in Evaluation and Selection of Mass Tran...
PPTX
Neri seminar assessing funding models for water services provision
PDF
Presentation - OECD workshop on the performance of utilities for wastewater, ...
PDF
Item 5a_GPIP overview_D.Simek_OECD.pdf
PDF
Presentation - Workshop 4: Cost recovery, Tim Keyworth
PPT
Conserve To Preserve
PPT
Conserve To Preserve
PPTX
Env Economics
PPTX
The Economics of Sanitation Initiative: An Introduction
PPTX
Monitoring-fit for purpose?
 
PDF
Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...
PDF
Sustainability Challenges of High-speed Railway Megaprojects from a Systems T...
PDF
Presentation - OECD workshop on the performance of utilities for wastewater -...
PDF
DYNAMICS OF GOVERNMENT CONTRACTING: PROPOSALS FOR EFFICIENCY AND SATISFACTION...
PDF
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
DOC
Model Based Systems Thinking
PDF
Frank Hovorka_caisse des depots_2011-11-02_Sustainable performance and value
An old recipe for an emerging issue
Financial & Economic Evaluation of projects
Lcca for sussvcdelivery_rreddy
 
Ben Owen - International Experiences in Evaluation and Selection of Mass Tran...
Neri seminar assessing funding models for water services provision
Presentation - OECD workshop on the performance of utilities for wastewater, ...
Item 5a_GPIP overview_D.Simek_OECD.pdf
Presentation - Workshop 4: Cost recovery, Tim Keyworth
Conserve To Preserve
Conserve To Preserve
Env Economics
The Economics of Sanitation Initiative: An Introduction
Monitoring-fit for purpose?
 
Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...
Sustainability Challenges of High-speed Railway Megaprojects from a Systems T...
Presentation - OECD workshop on the performance of utilities for wastewater -...
DYNAMICS OF GOVERNMENT CONTRACTING: PROPOSALS FOR EFFICIENCY AND SATISFACTION...
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
Model Based Systems Thinking
Frank Hovorka_caisse des depots_2011-11-02_Sustainable performance and value

More from OECD Environment (20)

PDF
First OECD Roundtable on Financing Water
PDF
First OECD Roundtable on Financing Water
PDF
First OECD Roundtable on Financing Water
PDF
OECD Green Talks LIVE | Securing a sustainable plastics future for Southeast ...
PDF
12th Roundtable on Financing Water: Strengthening the sustainability of water...
PDF
12th Roundtable on Financing Water: Strengthening the sustainability of water...
PDF
12th Roundtable on Financing Water: Strengthening the sustainability of water...
PDF
Green Talks LIVE | Adapting to a drier world in a changing climate: Launch of...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
PDF
International expert workshop on forestry for the future 26-28 May 2025: Pres...
First OECD Roundtable on Financing Water
First OECD Roundtable on Financing Water
First OECD Roundtable on Financing Water
OECD Green Talks LIVE | Securing a sustainable plastics future for Southeast ...
12th Roundtable on Financing Water: Strengthening the sustainability of water...
12th Roundtable on Financing Water: Strengthening the sustainability of water...
12th Roundtable on Financing Water: Strengthening the sustainability of water...
Green Talks LIVE | Adapting to a drier world in a changing climate: Launch of...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...
International expert workshop on forestry for the future 26-28 May 2025: Pres...

Recently uploaded (20)

PPTX
Psychological Support for Elderly During Health Crises.pptx
PPTX
Pollution, it's Types and Impacts on Global context.pptx
PPTX
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
PPTX
14.1 Opinion Essay (Writing). to teach opinion
PPTX
Climate_Change_Renewable_and_Energy.pptx
PDF
BD4E4- DISASTER MANAGEMENT BY A.R.SIVANESH.pdf
DOCX
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
PPTX
Untitled 1.pptxhhhhhhjjjbbbbb bikinis sis son ka s
PDF
rainfed swc for nature and agroforestrys
DOCX
Anaerobic Digester Tanks An ideal solution for a circular economy..docx
PPTX
APR 05.05.25.pptx gffdtkdtxfxtdytdtdcfcfxr
DOCX
Biogas Tank for Bio CNG Plants The main container for biogas digestion..docx
DOCX
Aluminum Dome Roofs for Silo Tanks Provides a Weatherproof Cover for Bulk Mat...
PPTX
IMO 2020 - FUELS AND LUBES UPDATE -cs.pptx
DOCX
Biogas Balloon for Dairy Farm Plants Provides gas storage for dairy manure..docx
PPTX
Drought management class in a simplified manner
DOCX
Biogas Tank for Breweries & Food Processing The main container for biogas dig...
PPTX
he document discusses solid waste management. It defines different types of s...
PDF
Lesson_1_Readings.pdfjjjjjjjjjjjjjjjjjjjjjjjjjjjjj
PPTX
BASIC FIRST AID WITH CPR & AED SAFETY TR
Psychological Support for Elderly During Health Crises.pptx
Pollution, it's Types and Impacts on Global context.pptx
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
14.1 Opinion Essay (Writing). to teach opinion
Climate_Change_Renewable_and_Energy.pptx
BD4E4- DISASTER MANAGEMENT BY A.R.SIVANESH.pdf
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
Untitled 1.pptxhhhhhhjjjbbbbb bikinis sis son ka s
rainfed swc for nature and agroforestrys
Anaerobic Digester Tanks An ideal solution for a circular economy..docx
APR 05.05.25.pptx gffdtkdtxfxtdytdtdcfcfxr
Biogas Tank for Bio CNG Plants The main container for biogas digestion..docx
Aluminum Dome Roofs for Silo Tanks Provides a Weatherproof Cover for Bulk Mat...
IMO 2020 - FUELS AND LUBES UPDATE -cs.pptx
Biogas Balloon for Dairy Farm Plants Provides gas storage for dairy manure..docx
Drought management class in a simplified manner
Biogas Tank for Breweries & Food Processing The main container for biogas dig...
he document discusses solid waste management. It defines different types of s...
Lesson_1_Readings.pdfjjjjjjjjjjjjjjjjjjjjjjjjjjjjj
BASIC FIRST AID WITH CPR & AED SAFETY TR

Day2 session1 costing and mtef

  • 1. COST ESTIMATION AND LINK WITH MTEF (MEDIUM-TERM EXPENDITURE FRAMEWORK) Rafał Stanek SST-CONSULT /Kommunalkredit Public Consulting Promoting Clean Urban Public Transport in Kazakhstan: Designing a Green Investment Programme 14 December 2016, Astana
  • 2. • Introduction to programme costing • Three methods of programme costing: –bottom-up –average unit costs –top-down • Financial flows, METF and one year budget Structure of the presentation
  • 3. • Correct estimation of the costs of implementation of an environmental programme is crucial for the success of future implementation • No single theoretical methodology can be used for costing of environmental programmes • A number of internationally recognised good practices in this field do exist Major methods of environmental programme costing
  • 4. • Bottom-up: by collecting information from the field (prospective investors, such as local governments, utilities, etc.) • Using Average Unit Costs • Top-down: by imposing rules and procedures that ensure that only projects within a specific (scope, costs, environmental effect) margin are implemented Estimating the costs of an environmental programme
  • 5. • For example, local governments are asked to provide detailed information (investment costs, period of implementation) on specific projects • This method has a very high accuracy: information on projects under preparation is collected • Local governments, however, may overestimate the scope – need for verification Bottom-up
  • 6. Costs of the national programme Verification Aggregation on the regional level Aggregation on the regional level Beneficiary /for example municipal/ level - investments and its cost Bottom-up
  • 7. • Polish National Programme for Municipal Waste Water Treatment prepared to implement EU Directive 91/271/EEC of 21 May 1991 on urban wastewater treatment • Local governments proposed the scope, which was then negotiated with the central government • Very broad definitions of agglomeration and local governments tended to ensure that every settlement was put into the programme Bottom-up - example
  • 8. • Total costs of the implementation of the Urban Wastewater Directive in Poland –The National Programme for Municipal Waste Water Treatment 2003: PLN 35 billion –Update 2005: PLN 42.6 billion –Update 2010: PLN 31.9 billion –Update 2015: PLN 55.963 billion was spent by the end of 2014 and there is a need for additional PLN 29 billion Bottom-up - example
  • 9. • Easy to use, but prone to high inaccuracy • For example: – 30% of the country's population is connected to the sewage system – If we want to achieve a target of a 90% connection rate, we need to multiply 60% of the population by the unit cost of building sewage systems with WWTPs Total outlays for the programme = Population to be connected Unit costs to connect one person * Average unit costs
  • 10. Total outlays for the programme = Number of new LPG buses Average unit costs of LPG bus * Number of new CNG buses Average unit costs of CNG bus * Number of new EURO6 diesel buses Average unit costs of modern diesel bus * + + Average unit costs
  • 11. • When the wastewater infrastructure is partially built (sewer mains and WWTPs are in place), expanding the system by building sewerage connections may cost less than the average • If the sewer network is constructed in high density areas first, however, expanding it to areas with lower population density may cost more than the average • When energy efficiency projects are promoted for several years, the most cost-effective are usually those projects implemented at the beginning. Projects in later years, in turn, may cost more than the average Average versus marginal costs
  • 12. • Easy to calculate, but highly inaccurate • Sometimes marginal unit costs should be used instead of average unit costs • To increase accuracy, it is necessary to break down components into small types of projects, such as: – WWTP: small, medium-sized, large – sewer network in: flat urban area, flat rural area, hilly urban area, in hilly rural area – or even more detail – Only then: estimate the unit costs for each type • Problems occur when scope of the programme is changed due to political pressure Average unit costs - conclusions
  • 13. • Programme promoter decides on relatively small margin of the projects' scope and costs • Programme may contain a number of types of projects, but the programme promoter needs to know the details on each type of project • Programme is usually prepared after conducting research or implementing pilot projects Top-down
  • 14. Costs of the national programme and project parameters are decided by the programme promoter Beneficiary level Application forms Top-down
  • 15. • Example of solar collectors: • Polish EcoFund (debt-for-environment swap, programme now closed): – Maximum grant per unit: 250 EUR/m2 – Annual limit: EUR 2.5 million EUR – Grant limit of up to 40% of the project costs • Polish National Environmental Fund: – Maximum project costs 600 EUR/m2 – Up to 1.5 m2 per person – Grant limit of up to 45% of project costs • Very detailed definition what projects costs may include Top-down
  • 16. • Every good method to implement programmes consisting of many replicable projects • Good to implement programmes where programme promoter subsidizes only part of the project costs • Programme costing requires good and detailed knowledge about potential projects – research or pilot projects first • Projects outside the range set by programme promoter are lost, even if they would be useful in achieving targets • Cheapest projects are implemented first, thus procedures require update after a few years Top-down
  • 17. • Regardless the method used for programme costing, when the total budget is agreed, we need to see how to disburse the budget over the years • This can be done looking at several constrains: – availability of the public support over the years (for example, we will have available maximum 5 billion tenge per year – Market readiness to deliver goods needed for programme implementation (if average bus production in the country is 300, we cannot estimate replacement of 500 buses in the first year of the programme implementation) – Readiness of beneficiaries to implement the programme – the market study shall estimate how many project beneficiaries are ready to implement such projects per year (could vary from year to year due to better market penetration) Financial flows
  • 18. • When possible disbursement schedule is determined and the level of the support from the state budget is calculated (next presentation), the programme can be included into the Medium Term Expenditure Framework • Medium Term Expenditure Framework (or multiyear budget) is a resource envelope for a high cost government-wide programmes Financial flows and MTEF
  • 19. • Then, specific costs for a given year are allocated to the annual budgets • The monitoring of the programme implementation also gives an input to the annual budget allocations – for example, if not all funds were spent in the given year, next year allocation may take it into account plus improvements in the programme implementation shall be considered MTEF and annual budget