Rank positional weight
 It is a heuristic algorithm used to solve the assembly line balancing
problem. This methods depends on the processing times for all tasks and
their followers.
RPW Example
 The below figure shows the tasks, times and precedence relation for each
element used in cashew machine assembly.
Tas Time
(min)
Description Predecessor
1 20 Frame assembly -
2 20 Cutter assembly 1
3 45 Motor assembly 2
4 10 Crank assembly 3
5 7 Pickup assembly 2
6 5 Belt cover assembly 5
7 8 Cup assembly 5
8 20 Bucket and disk assembly with
shaft
5
9 15 Feed motor and belt assembly 5
10 5 Circuit assembly 5
11 4 Hopper assembly 6,7,8,9,10
12 45 Connect wires 11,4
13 6 Outer cover assembly 12
Precedence diagram
RPW solution method
 1-draw precedence diagram.
 2- for each task find the transitive followers (followers of followers till you
reach the end of the graph).
 3- calculate the RPW for each task (i). (RPW(i)= time of the task (i)+
summation of times of tasks in the transitive followers (i)
 4-re-arrange tasks according to their RPW in descending order
 5-open a work station and assign the feasible tasks till the cycle time is
reached or no more assignable tasks in the station.
 6- Repeat step 5 till all tasksare added to work stations.
RPW
Task RPW
1 210
2 190
3 106
4 61
5 115
6 60
7 63
8 75
9 70
10 60
11 55
12 51
13 6
RPW in descending order
Task RPW
1 210
2 190
5 106
3 61
8 115
9 60
7 63
4 75
6 70
10 60
11 55
12 51
13 6
Assign to work stations
Station task time Sum of station time
1
1 20 20
2 20 40
5 7 47
7 8 55
2
3 45 45
4 10 55
3
8 20 20
9 15 35
6 5 40
10 5 45
11 4 49
4
12 45 45
13 6 51
RPW software
 The RPW software available can be purchased by 10$ only
 Contact me for more information
 Shadymagdy@windowslive.com
Thank You!
SOMEONE@EXAMPLE.COM

More Related Content

PPTX
Assembly line balancing
PPTX
Line balancing
PPTX
Line balancing
PPT
Assembly line balancing
PPTX
assembly line balancing
PPTX
Line balancing
PPT
79971255 assembly-line-balancing
PPT
79971255 assembly-line-balancing
Assembly line balancing
Line balancing
Line balancing
Assembly line balancing
assembly line balancing
Line balancing
79971255 assembly-line-balancing
79971255 assembly-line-balancing

What's hot (20)

PPTX
Scheduling
PPTX
Assembly line balancing
PPTX
Value stream mapping
PPT
Chapter 2 line_balancing no pics
PDF
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
PPTX
Ranked Positional Weight Method | Management
DOCX
Assembly Line Balancing
PPTX
Time study part 2
PPT
Lean presentation ppt
PPT
Line balancing and its formulation
PPTX
Value Stream Mapping
PDF
Line balancing example
PPT
Line balancing ppt By Wakil Kumar
PDF
The Seven Wastes
PPTX
Line balancing
PPT
PPT
Method Study
PPTX
Operations Management : Line Balancing
PPTX
TIME STUDY
Scheduling
Assembly line balancing
Value stream mapping
Chapter 2 line_balancing no pics
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
Ranked Positional Weight Method | Management
Assembly Line Balancing
Time study part 2
Lean presentation ppt
Line balancing and its formulation
Value Stream Mapping
Line balancing example
Line balancing ppt By Wakil Kumar
The Seven Wastes
Line balancing
Method Study
Operations Management : Line Balancing
TIME STUDY
Ad

Similar to Assembly line balancing using Rank positional weight (RPW) (20)

PPT
final Line balancing slide12.ppt
PDF
chapter 17.pdf
PPT
scheduling_1.ppt
PDF
Production activity control - schedulling
PPT
introduction of LINE BALANCING process.ppt
PPTX
C17
PDF
79971255-assembly-line-balancing-130223195412-phpapp02.pdf
PPTX
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
PDF
[CCC'21] Evaluation of Work Stealing Algorithms
PDF
XPDDS18: Real Time in XEN on ARM - Andrii Anisov, EPAM Systems Inc.
PPT
Scheduling
PPT
Scheduling
PPT
Scheduling
PPT
Computer_Architecture_3rd_Edition_by_Moris_Mano_Ch_09.ppt
PPT
Unit 3-pipelining & vector processing
PPT
5.CPU Scheduling
PPTX
Online Architecture Assignment Help
PDF
Lecture-7-and-8-Transiesssssssssssnts-and-control-system.pdf
PPTX
chapter 17.pptx of scheduling in operations
PPTX
UTC Aerospace System - Value Stream Mapping
final Line balancing slide12.ppt
chapter 17.pdf
scheduling_1.ppt
Production activity control - schedulling
introduction of LINE BALANCING process.ppt
C17
79971255-assembly-line-balancing-130223195412-phpapp02.pdf
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
[CCC'21] Evaluation of Work Stealing Algorithms
XPDDS18: Real Time in XEN on ARM - Andrii Anisov, EPAM Systems Inc.
Scheduling
Scheduling
Scheduling
Computer_Architecture_3rd_Edition_by_Moris_Mano_Ch_09.ppt
Unit 3-pipelining & vector processing
5.CPU Scheduling
Online Architecture Assignment Help
Lecture-7-and-8-Transiesssssssssssnts-and-control-system.pdf
chapter 17.pptx of scheduling in operations
UTC Aerospace System - Value Stream Mapping
Ad

Recently uploaded (20)

PDF
composite construction of structures.pdf
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
PPT on Performance Review to get promotions
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
Well-logging-methods_new................
PPT
Mechanical Engineering MATERIALS Selection
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
additive manufacturing of ss316l using mig welding
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
web development for engineering and engineering
PPTX
UNIT 4 Total Quality Management .pptx
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
DOCX
573137875-Attendance-Management-System-original
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
composite construction of structures.pdf
Model Code of Practice - Construction Work - 21102022 .pdf
PPT on Performance Review to get promotions
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
CH1 Production IntroductoryConcepts.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Well-logging-methods_new................
Mechanical Engineering MATERIALS Selection
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
additive manufacturing of ss316l using mig welding
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
CYBER-CRIMES AND SECURITY A guide to understanding
web development for engineering and engineering
UNIT 4 Total Quality Management .pptx
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
573137875-Attendance-Management-System-original
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks

Assembly line balancing using Rank positional weight (RPW)

  • 1. Rank Positional weight (RPW) for assembly line balancing HEURISTIC METHOD
  • 2. Rank positional weight  It is a heuristic algorithm used to solve the assembly line balancing problem. This methods depends on the processing times for all tasks and their followers.
  • 3. RPW Example  The below figure shows the tasks, times and precedence relation for each element used in cashew machine assembly. Tas Time (min) Description Predecessor 1 20 Frame assembly - 2 20 Cutter assembly 1 3 45 Motor assembly 2 4 10 Crank assembly 3 5 7 Pickup assembly 2 6 5 Belt cover assembly 5 7 8 Cup assembly 5 8 20 Bucket and disk assembly with shaft 5 9 15 Feed motor and belt assembly 5 10 5 Circuit assembly 5 11 4 Hopper assembly 6,7,8,9,10 12 45 Connect wires 11,4 13 6 Outer cover assembly 12
  • 5. RPW solution method  1-draw precedence diagram.  2- for each task find the transitive followers (followers of followers till you reach the end of the graph).  3- calculate the RPW for each task (i). (RPW(i)= time of the task (i)+ summation of times of tasks in the transitive followers (i)  4-re-arrange tasks according to their RPW in descending order  5-open a work station and assign the feasible tasks till the cycle time is reached or no more assignable tasks in the station.  6- Repeat step 5 till all tasksare added to work stations.
  • 6. RPW Task RPW 1 210 2 190 3 106 4 61 5 115 6 60 7 63 8 75 9 70 10 60 11 55 12 51 13 6
  • 7. RPW in descending order Task RPW 1 210 2 190 5 106 3 61 8 115 9 60 7 63 4 75 6 70 10 60 11 55 12 51 13 6
  • 8. Assign to work stations Station task time Sum of station time 1 1 20 20 2 20 40 5 7 47 7 8 55 2 3 45 45 4 10 55 3 8 20 20 9 15 35 6 5 40 10 5 45 11 4 49 4 12 45 45 13 6 51