SlideShare a Scribd company logo
Assignment OverviewType:
Group Project
Unit:
Project Quality and Risk Management
Due Date:
Thurs, 1/25/18
Grading Type:
Numeric
Points Possible:
165
Points Earned:
0
Deliverable Length:
7–10 slides per student
View objectives for this assignment
Go To:
Assignment Details
Scenario
Learning Materials
Reading Assignment
My Work:
Online Deliverables:
Submissions
Discussion Board
Group Live Chat
Looking for tutoring?
Go to Smarthinking
Project Human Resource (to be developed by individual)
Describe the roles and responsibilities that need to be filled on
the project. Give a rationale for the staff for the project, assign
roles, and describe staff involvement with each major
deliverable. Decide if you will use vendors to supplement the
team, and ascertain their roles and responsibilities as well as
your rationale for making the decision. Describe how staffing
changes will be identified, escalated, and resolved.
Project Schedule (to be developed by individual)
Use a work breakdown structure or similar tool to explain the
major activities that will be completed as part of the project.
Describe the major milestones for the project. For each
milestone, identify the associated deliverable, the approximate
effort involved in creating the deliverable, and the people
involved. For 2 of the milestones, detail the activities to be
completed to achieve the milestone. Be sure to address
dependencies, duration, and resource effort. Describe how
changes to the schedule will be identified, escalated, and
resolved.
Project Budget (to be developed by individual)
Describe the budgeting process that will be used for the project.
Identify the components of the budget, the items that will need
to have costs associated with them, and the mechanisms that
could be used to estimate the project. Describe how changes to
the budget will be identified, escalated, and resolved.
Project Risks (to be developed by individual)
Describe the possible risk events for the project. Identify the
high-probability, high-impact risk events. For each of those risk
events, identify the possible actions to mitigate the risk.
Describe how changes to the risk management plan will be
identified, reviewed, and approved.
Project Communication (to be developed by individual)
Describe the system that will be used throughout the project for
recording and sharing project information related to schedule,
budget, utilization, and status components. Describe the tools
and techniques you will use to capture and report metrics.
Describe the frequency with which the metrics will be captured
and how the resulting analysis will be applied and
communicated.
Project Stakeholders (to be developed by individual)
Describe how stakeholders were identified and analyzed, what
tools and techniques were used to categorize and understand
stakeholder interests. Describe your stakeholders, who they are
and what their interests are in the outcome of the project.
Describe the strategies planned to manage stakeholder
engagement.
This task will be completed as a true group project. The groups
will consolidate the individual responses into a single
presentation. It will be determined by the members of the group
whether the group will have a single member do each section or
merge the responses of each member for the 5 areas of interest
listed above.
Assignment Guidelines:
Individual Portion
Complete your individual portion of the presentation based on
the decision that the group made previously with regard to the
project management areas of interest.
Submit your slides, and allow sufficient time for peer review by
the other group members.
Note:
Each slide must be submitted with 150–200 words of speaker
notes.
If necessary, make any corrections or modifications.
Other Information
Amazing Coffee Houses (ACHs) is a coffee shop that will be
located in Milwaukee, WI. We have been able to purchase our
own building within the city near Milwaukee’s top tourist
attraction site near the Gold Rock Museum. The building is not
renovated. Our market analysis of Milwaukee, WI indicated the
city is the top city for coffee drinking in WI. Because we’re
close to the city’s museum, we plan to become the top
destination for local and American and foreign customers who
visit Milwaukee each year.
Our customers will have a wide range of coffee flavors to
choose from including dark roast to light roast as well as
specialty flavors throughout the year. They will also enjoy
freshly baked low-fat donuts that aren’t available anywhere in
the state. ACHs will hold true to its vision and mission of
providing customers with a premier café experience. By
creating a new twist for the café experience, ACHs will increase
sales by more than $125,000 over the next three years and
maintain a gross margin of 70%. The shop is 5,500 square foot
of open space. Our plan is to have 2 bathrooms, a coffee bar,
and enough tables to seat at least 50 customers. This is a coffee
shop that also makes and sells donuts. The renovation must
account for all that is needed to get the shop ready for both
coffee and donuts. The project has an initial budget of
$650,000. It is now January and Sam and Gloria would like the
new location to be up and running no later on July 4th.
Project Introduction
The Amazing Coffee Houses (ACHs) targets the community of
Milwaukee, WI. The main focus on the company is the
renovation of the company’s building which is near the Gold
Rock Museum. This is the strategic position and location to
develop the company’s coffee shop. This will help in focusing
on the current market by targeting the Milwaukee community’s
coffee takers. The approach will focus on targeting the
company’s approach into winning the market research and
making the project work within the company’s budget and
market targets.
Project Charter
The project charter will focus on the main and gains on the
project scope, deliverables and objectives of the project. As
specified by the company, the project charter entails:
a) Project Scope
The project targets the renovation of the company’s building at
the community of Milwaukee, WI. This will entails the
development of the coffee shop and donut making bakery. This
will also target the development of bathrooms for staff and
customers. There is also the need for building a consumer seater
which can accommodate over 50 customers at any given time.
The project will also include the completion of the renovation
of the building within the initial 6 months.
b) Project Deliverables
The project should focus on developing the project plans and
requirements. This will be the deliverable focusing on the work
breakdown structure and requirement specifications. Through
the development of the project budget and planning will help in
targeting the project initiation plans. There is also an
opportunity for developing the necessary plans for project
execution and deliverables of renovated building and able to
build a 50 seater free space for customer and staff.
c) Objectives
The objectives of the project are to develop a final product
within the first 6 months. This is the timeline which the
company should focus and will focus on increasing and
improving the allocation of support while meeting the
expectations of the company. There also the need for developing
the project to meet the key budget and timeline of the company
by improving production, service delivery and quality standards
for its consumers.
Project Sponsor
The project sponsor will be the project manager of theAmazing
Coffee Houses (ACHs). The project manager will be the
responsible partner in meeting the expectations of the company
through ensuring The Amazing Coffee Houses (ACHs) have
implemented the new project development in the Milwaukee
community. The project sponsor will be responsible for
developing the business needs and aligning the project
objectives to meet the needs of consumers.
Project Customer
The project customers include all the parties with the vested
interests on the proposed project and under construction. Based
on the project description, the project customers include the
vested parties for the project of developing the new coffee
house. This includes The Amazing Coffee Houses (ACHs)
company who are responsible for developing the budget and
offering the necessary resources to meet the expectations of the
project. There is also the project team headed by the project
manager and will be responsible in meeting the project scope
and objectives.
Components of the Project Plan
The components of a project plan include project scope
management critical in managing the project scope. There is
also scheduling which is essential in focusing on the project
resources and processes. It is also essential in meeting the
expectations of the project while focusing on value and resource
allocations. There is also the resource, budget and cost
management for the project, which evaluates, generates and
maintains the project’s resources for a successful completion of
the project goals and objectives.
References
Burke, R. (2013).
Project Management: Planning and Control Techniques
. New Jersey, USA.
Fitzsimmons, J., & Fitzsimmons, M. (2013).
Service Management: Operations, Strategy, Information
Technology
. Mcgraw-Hill Higher Education.
Kerzner, H. R. (2013).
Project Management: A Systems Approach to Planning,
Scheduling, and Controlling
. John Wiley & Sons.
Schwalbe, K. (2015).
Information Technology Project Management
. Cengage Learning.
Walker, A. (2015).
Project Management in Construction
. John Wiley & Sons.
Assignment OverviewType Group ProjectUnit  Project Quality

More Related Content

DOCX
Problem-Based Learning (PBL) Scenario Amazing Coffee Houses (ACHs.docx
DOCX
Additional InformationThe discussion on stakeholders went better.docx
DOCX
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
PPTX
Creating a Coffee Shop
DOCX
Creek Vista Marine FARAAZ KHAN WORK Report.docx
DOCX
Assignment 3 Project Proposal – Execution, Control, and Closure .docx
DOCX
V 2.0Project NameCoffee Shop in a Small town with no.docx
DOCX
Below are the notes from todays meeting.  By Wednesday everyone sh.docx
Problem-Based Learning (PBL) Scenario Amazing Coffee Houses (ACHs.docx
Additional InformationThe discussion on stakeholders went better.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
Creating a Coffee Shop
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Assignment 3 Project Proposal – Execution, Control, and Closure .docx
V 2.0Project NameCoffee Shop in a Small town with no.docx
Below are the notes from todays meeting.  By Wednesday everyone sh.docx

Similar to Assignment OverviewType Group ProjectUnit  Project Quality (20)

DOCX
CPMGT_300 Week_5__Project Life Cycle Paper.docx
DOCX
Running head THE OPENING OF A COFFEE SHOP1The opening of a .docx
DOCX
Assignment brief project management
DOCX
Use of Classes and arrays#include iostreamusing namespace.docx
PPTX
construction-project-management-ppt-india-ppt.pptx
DOCX
Coffee ShopCommunication Management PlanA. General Informati.docx
DOCX
Kinsley FosterJuly 27, 2019PM 430Software .docx
DOC
project on construction of house report.
PDF
Project management questions list
DOCX
This assignment has several different pieces that complete a proje.docx
DOCX
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
DOCX
Project Management Report
DOCX
Section-1 250 words Subject Initiating the ProjectR.docx
DOCX
Project management final report.By- SANKET SENAPATI
DOCX
Chapter 1
DOCX
Sheet1Silver Fiddle Company Risk MatrixRisk DescriptionProbability.docx
PPTX
6 sept project fiche
PDF
Definition of requirements for each project phases.pdf
DOCX
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
PDF
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
CPMGT_300 Week_5__Project Life Cycle Paper.docx
Running head THE OPENING OF A COFFEE SHOP1The opening of a .docx
Assignment brief project management
Use of Classes and arrays#include iostreamusing namespace.docx
construction-project-management-ppt-india-ppt.pptx
Coffee ShopCommunication Management PlanA. General Informati.docx
Kinsley FosterJuly 27, 2019PM 430Software .docx
project on construction of house report.
Project management questions list
This assignment has several different pieces that complete a proje.docx
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
Project Management Report
Section-1 250 words Subject Initiating the ProjectR.docx
Project management final report.By- SANKET SENAPATI
Chapter 1
Sheet1Silver Fiddle Company Risk MatrixRisk DescriptionProbability.docx
6 sept project fiche
Definition of requirements for each project phases.pdf
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Ad

More from meghanthrelkeld256 (20)

DOCX
Directions In this module, you will explore how living organisms .docx
DOCX
Directions Here is a list of stressful events and situation that .docx
DOCX
Directions Describe the following terms.Responses to each t.docx
DOCX
Directions Be sure to save an electronic copy of your answer befo.docx
DOCX
Directions Choose three different versions of the UNIX® or Li.docx
DOCX
Directions for Supplemental Material Forum Complete these steps.docx
DOCX
Directions Choose a crime from the list below.  Find statistics f.docx
DOCX
Directions In a paper of at least 2 to 3 pages in length, pleas.docx
DOCX
Directions Complete Medelian Genetics in the lab manual. Scan.docx
DOCX
Dialects are often used as a way to paint a picture of a particular .docx
DOCX
Diagnosis ofas Mentally ChallengedRetardation is based on the .docx
DOCX
Dimitri Williamscopy of ACC 201_Fall 2_2013_Langley copy of A.docx
DOCX
Digital Laws  Please respond to the followingWith just a few ke.docx
DOCX
Dicussion Question    1 or 2 paragraphs     Must be original .docx
DOCX
Digital image processing using java ..create plugin using Jedit an.docx
DOCX
Diameter of the Sun Activity (25 points)Brief Overview of Activity.docx
DOCX
Deviance and Social Class” Please respond to the followingS.docx
DOCX
Develop a thesis statement for your research essay using the follo.docx
DOCX
Develop Part II of a comprehensive plan to implement an organiza.docx
DOCX
Develop a detailed comprehensive outline of your proposition to pr.docx
Directions In this module, you will explore how living organisms .docx
Directions Here is a list of stressful events and situation that .docx
Directions Describe the following terms.Responses to each t.docx
Directions Be sure to save an electronic copy of your answer befo.docx
Directions Choose three different versions of the UNIX® or Li.docx
Directions for Supplemental Material Forum Complete these steps.docx
Directions Choose a crime from the list below.  Find statistics f.docx
Directions In a paper of at least 2 to 3 pages in length, pleas.docx
Directions Complete Medelian Genetics in the lab manual. Scan.docx
Dialects are often used as a way to paint a picture of a particular .docx
Diagnosis ofas Mentally ChallengedRetardation is based on the .docx
Dimitri Williamscopy of ACC 201_Fall 2_2013_Langley copy of A.docx
Digital Laws  Please respond to the followingWith just a few ke.docx
Dicussion Question    1 or 2 paragraphs     Must be original .docx
Digital image processing using java ..create plugin using Jedit an.docx
Diameter of the Sun Activity (25 points)Brief Overview of Activity.docx
Deviance and Social Class” Please respond to the followingS.docx
Develop a thesis statement for your research essay using the follo.docx
Develop Part II of a comprehensive plan to implement an organiza.docx
Develop a detailed comprehensive outline of your proposition to pr.docx
Ad

Recently uploaded (20)

PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
Institutional Correction lecture only . . .
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Pharma ospi slides which help in ospi learning
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
Cell Types and Its function , kingdom of life
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Classroom Observation Tools for Teachers
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Module 4: Burden of Disease Tutorial Slides S2 2025
Complications of Minimal Access Surgery at WLH
Final Presentation General Medicine 03-08-2024.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Anesthesia in Laparoscopic Surgery in India
O5-L3 Freight Transport Ops (International) V1.pdf
STATICS OF THE RIGID BODIES Hibbelers.pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Microbial diseases, their pathogenesis and prophylaxis
Institutional Correction lecture only . . .
Final Presentation General Medicine 03-08-2024.pptx
Pharma ospi slides which help in ospi learning
Chinmaya Tiranga quiz Grand Finale.pdf
Cell Types and Its function , kingdom of life
GDM (1) (1).pptx small presentation for students
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Classroom Observation Tools for Teachers
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx

Assignment OverviewType Group ProjectUnit  Project Quality

  • 1. Assignment OverviewType: Group Project Unit: Project Quality and Risk Management Due Date: Thurs, 1/25/18 Grading Type: Numeric Points Possible: 165 Points Earned: 0 Deliverable Length: 7–10 slides per student View objectives for this assignment Go To: Assignment Details Scenario Learning Materials Reading Assignment My Work: Online Deliverables: Submissions
  • 2. Discussion Board Group Live Chat Looking for tutoring? Go to Smarthinking Project Human Resource (to be developed by individual) Describe the roles and responsibilities that need to be filled on the project. Give a rationale for the staff for the project, assign roles, and describe staff involvement with each major deliverable. Decide if you will use vendors to supplement the team, and ascertain their roles and responsibilities as well as your rationale for making the decision. Describe how staffing changes will be identified, escalated, and resolved. Project Schedule (to be developed by individual) Use a work breakdown structure or similar tool to explain the major activities that will be completed as part of the project. Describe the major milestones for the project. For each milestone, identify the associated deliverable, the approximate effort involved in creating the deliverable, and the people involved. For 2 of the milestones, detail the activities to be completed to achieve the milestone. Be sure to address dependencies, duration, and resource effort. Describe how changes to the schedule will be identified, escalated, and resolved.
  • 3. Project Budget (to be developed by individual) Describe the budgeting process that will be used for the project. Identify the components of the budget, the items that will need to have costs associated with them, and the mechanisms that could be used to estimate the project. Describe how changes to the budget will be identified, escalated, and resolved. Project Risks (to be developed by individual) Describe the possible risk events for the project. Identify the high-probability, high-impact risk events. For each of those risk events, identify the possible actions to mitigate the risk. Describe how changes to the risk management plan will be identified, reviewed, and approved. Project Communication (to be developed by individual) Describe the system that will be used throughout the project for recording and sharing project information related to schedule, budget, utilization, and status components. Describe the tools and techniques you will use to capture and report metrics. Describe the frequency with which the metrics will be captured and how the resulting analysis will be applied and communicated. Project Stakeholders (to be developed by individual) Describe how stakeholders were identified and analyzed, what tools and techniques were used to categorize and understand stakeholder interests. Describe your stakeholders, who they are and what their interests are in the outcome of the project. Describe the strategies planned to manage stakeholder engagement.
  • 4. This task will be completed as a true group project. The groups will consolidate the individual responses into a single presentation. It will be determined by the members of the group whether the group will have a single member do each section or merge the responses of each member for the 5 areas of interest listed above. Assignment Guidelines: Individual Portion Complete your individual portion of the presentation based on the decision that the group made previously with regard to the project management areas of interest. Submit your slides, and allow sufficient time for peer review by the other group members. Note: Each slide must be submitted with 150–200 words of speaker notes. If necessary, make any corrections or modifications. Other Information
  • 5. Amazing Coffee Houses (ACHs) is a coffee shop that will be located in Milwaukee, WI. We have been able to purchase our own building within the city near Milwaukee’s top tourist attraction site near the Gold Rock Museum. The building is not renovated. Our market analysis of Milwaukee, WI indicated the city is the top city for coffee drinking in WI. Because we’re close to the city’s museum, we plan to become the top destination for local and American and foreign customers who visit Milwaukee each year. Our customers will have a wide range of coffee flavors to choose from including dark roast to light roast as well as specialty flavors throughout the year. They will also enjoy freshly baked low-fat donuts that aren’t available anywhere in the state. ACHs will hold true to its vision and mission of providing customers with a premier café experience. By creating a new twist for the café experience, ACHs will increase sales by more than $125,000 over the next three years and maintain a gross margin of 70%. The shop is 5,500 square foot of open space. Our plan is to have 2 bathrooms, a coffee bar, and enough tables to seat at least 50 customers. This is a coffee shop that also makes and sells donuts. The renovation must account for all that is needed to get the shop ready for both coffee and donuts. The project has an initial budget of $650,000. It is now January and Sam and Gloria would like the new location to be up and running no later on July 4th. Project Introduction The Amazing Coffee Houses (ACHs) targets the community of Milwaukee, WI. The main focus on the company is the
  • 6. renovation of the company’s building which is near the Gold Rock Museum. This is the strategic position and location to develop the company’s coffee shop. This will help in focusing on the current market by targeting the Milwaukee community’s coffee takers. The approach will focus on targeting the company’s approach into winning the market research and making the project work within the company’s budget and market targets. Project Charter The project charter will focus on the main and gains on the project scope, deliverables and objectives of the project. As specified by the company, the project charter entails: a) Project Scope The project targets the renovation of the company’s building at the community of Milwaukee, WI. This will entails the development of the coffee shop and donut making bakery. This will also target the development of bathrooms for staff and customers. There is also the need for building a consumer seater which can accommodate over 50 customers at any given time. The project will also include the completion of the renovation of the building within the initial 6 months. b) Project Deliverables The project should focus on developing the project plans and requirements. This will be the deliverable focusing on the work breakdown structure and requirement specifications. Through the development of the project budget and planning will help in targeting the project initiation plans. There is also an opportunity for developing the necessary plans for project execution and deliverables of renovated building and able to build a 50 seater free space for customer and staff.
  • 7. c) Objectives The objectives of the project are to develop a final product within the first 6 months. This is the timeline which the company should focus and will focus on increasing and improving the allocation of support while meeting the expectations of the company. There also the need for developing the project to meet the key budget and timeline of the company by improving production, service delivery and quality standards for its consumers. Project Sponsor The project sponsor will be the project manager of theAmazing Coffee Houses (ACHs). The project manager will be the responsible partner in meeting the expectations of the company through ensuring The Amazing Coffee Houses (ACHs) have implemented the new project development in the Milwaukee community. The project sponsor will be responsible for developing the business needs and aligning the project objectives to meet the needs of consumers. Project Customer The project customers include all the parties with the vested interests on the proposed project and under construction. Based on the project description, the project customers include the vested parties for the project of developing the new coffee house. This includes The Amazing Coffee Houses (ACHs) company who are responsible for developing the budget and offering the necessary resources to meet the expectations of the project. There is also the project team headed by the project manager and will be responsible in meeting the project scope and objectives.
  • 8. Components of the Project Plan The components of a project plan include project scope management critical in managing the project scope. There is also scheduling which is essential in focusing on the project resources and processes. It is also essential in meeting the expectations of the project while focusing on value and resource allocations. There is also the resource, budget and cost management for the project, which evaluates, generates and maintains the project’s resources for a successful completion of the project goals and objectives. References Burke, R. (2013). Project Management: Planning and Control Techniques . New Jersey, USA. Fitzsimmons, J., & Fitzsimmons, M. (2013). Service Management: Operations, Strategy, Information Technology . Mcgraw-Hill Higher Education. Kerzner, H. R. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling . John Wiley & Sons. Schwalbe, K. (2015). Information Technology Project Management . Cengage Learning. Walker, A. (2015). Project Management in Construction . John Wiley & Sons.