Technical information
Requirements for operation of high-pressure boiler
systems without constant supervision
High-pressure steam and hot water boiler (equipped on the basis of EN
12953)
TI012
Version 3 (03/18)
1
1 General
According to EC agreements, the sale and distribution of CE-designated products may not be restricted or obstructed (see
also Notes on "Guideline for the implementation of the Directive adopted according to the new concept and the overall
concept" – also known as the "New Approach" for short –- online at
http://ec.europa.eu/enterprise/newapproach/legislation/guide/index.htm). Additional measures in individual countries aimed
at the protection of employees or of the environment are allowed, but may not lead to any changes to the product.
For shell boilers, this means that, with suitable equipment and corresponding test requirements, operation without constant
supervision is specified by the manufacturer. Individual countries, however, may lay down uniform, equal test requirements
and test periods that are as long as possible for products which are technically the same or similar.
It should be noted that if applicable operation without constant supervision requires a permit and that this must be clarified
with supervisory authorities and/or monitoring organizations.
In compliance with authoritative guidelines relating to the Pressure Vessels Directive 2014/68/EU, this Technical Information
sheet describes what the requirements for operation without constant supervision are in terms of the boiler and the system.
2 Boiler-related requirements for operation without constant supervision
As the boiler manufacturer, we equip our shell boilers for high-pressure steam and hot water in accordance with EN 12953,
Part 6 (equipment), Part 7 (burner) and Part 8 (safety valve). All boilers are intended and suitable for operation for a
maximum of 72 hours without constant supervision.
The preconditions for operation without constant supervision are compliance with the requirements for the boiler, feed and
make-up water in accordance with Operating Instructions B002 (Steam Boilers) or B004 (Hot Water Boilers) and with those
for regular inspections for high-pressure boilers in accordance with the Operating Instructions B006, B009 or B011
(depending on boiler type).
Operating, maintenance and inspection work on the boiler system by the operating and maintenance staff are carried out on
the basis of check lists in the Operating Instructions B001 or B007 (depending on boiler type). In accordance with operation
without constant supervision, the shortest inspection periods are specified as 3 days (i.e. 72 h). In addition to these
checklists for operation, the Operating Instructions for the individual components must be complied with.
In order to make the best use of the period of 72 hours for operation without constant supervision and not to have to visit the
boiler more frequently for operating tasks, it is recommended that certain equipment parts are automated. For example, on
the steam boiler: with manual blowdown (see Operating Instructions K005), the valve must be operated several times a day,
depending on the water characteristics. If an automatic blow-down system is connected (see Operating Instructions G353 or
G354) with an BCO Boiler Control, this is no longer necessary. Functional checks, however, are necessary for both versions
every 72 hours.
Additional options - such as for example, in the case of steam boilers, their own electrode for maximum water level or a
desalination unit - can be fitted on request.
3 System-related requirements for operation without constant supervision
System-related requirements for operation without constant supervision depend on the national and / or local regulations.
Structural requirements such as the need for a separate boiler house or minimum opening sizes for vent and aeration
openings must be taken from the local and / or national regulations. You will also find general instructions in our Technical
Information sheet TI024.
Organizational requirements such as the appropriate training of the operating and maintenance staff must be taken from the
local and / or national regulations.
Technical information
Requirements for operation of high-pressure boiler
systems without constant supervision
High-pressure steam and hot water boiler (equipped on the basis of EN
12953)
TI012
Version 3 (03/18)
2
The following chapters describe system-related requirements for operation without constant supervision aimed at protecting
the boiler, the boiler system and people. The precise requirements must be taken from the local and / or national regulations.
The necessary monitoring devices must be generally suitable for this and must have all the necessary permits.
Important! The condensate/make-up water monitoring facility must be executed based on the system situation
and the probability of foreign matter ingress (a risk assessment may need to be conducted here). If necessary,
the condensate/make-up monitoring facility should be executed with a safety cutout (i.e. integrated into the boiler
safety chain).
3.1 Monitoring of make-up water
The following measuring devices are required:
Material Measuring device Remarks
salt-containing make-up
water
Hardness measurement, e.g. via
Softcontrol (see operating
instructions I544)
Limit value corresponding to operating instructions
B002 and B004 at 0.1 °dH or 0.02 mmol/l (see
operating instructions G442 in the case of use with a
SCO system control monitoring via hardness)
Make-up water low in salt
or salt-free
Conductivity measurement e.g. via
conductivity transducer CST 1 (see
operating instructions I008)
Pre-set limit value from the boiler manufacturer:
75 µS/cm (see operating instructions G440 in the
case of the use with a SCO system control of a
foreign body monitoring device via conductivity)
Oil, grease, acids, leaching
solutions, seawater, etc.
if monitoring is necessary: see chapter 3.2
If limit values are exceeded, the flow of make-up water to the feed water container must be interrupted, for example, using a
solenoid valve.
3.2 Monitoring the condensate flows
Possible leaks of oil, fat, hardness or other foreign matter, such as acids, alkalis, sea water etc. via condensate into the
water circuit require automatic continuous monitoring of the condensate circuit. Separate condensate circuits with different
criteria should be monitored individually and equipped with corresponding switchover devices.
If the permitted limit values are exceeded, the condensate flows must be rejected, for example, via drain-off devices.
The following measuring devices are required:
Material Measuring device Remarks
Oil / Grease Measurement of cloudiness Pre-set limit values from the boiler manufacturer:
Disregard for condensate streams greater than 5 ppm
(see operating instructions G441 in the case of the
use of a cloudiness warning device with a SCO
system control)
Hardness
Acids / leaching
solutions
Sea water
Conductivity measurement e.g. via
conductivity transducer CST 1 (see
operating instructions I008)
All the named materials have an effect on
conductivity.
Pre-set limit value from the boiler manufacturer:
75 µS/cm (see operating instructions G440 in the
case of the use with a SCO system control of a
foreign body monitoring device via conductivity)
Technical information
Requirements for operation of high-pressure boiler
systems without constant supervision
High-pressure steam and hot water boiler (equipped on the basis of EN
12953)
TI012
Version 3 (03/18)
3
These requirements are not absolutely necessary as long as there is no danger of a slump.
If the monitoring mentioned under 3.1 and /or 3.2 only takes place in or after the feed water container, the firing must be
switched off and locked if the permitted limit values are exceeded.
As the boiler manufacturer, we do not implement this solution, since the whole system is contaminated if there is an
incursion into individual flows, and the system is then no longer ready for operation since the complete water circuit has to
be exchanged (resulting in very high costs for cleaning).
3.3 Safety shutoff device in the fuel line
 A suitable fuel safety shutoff valve must be provided in the fuel line.
 The location, in the case of gas, should be outside the boiler installation room and, with oil, in the near from the oil
storage container.
 If the fuel safety shutoff valve in combination with further shutoff device encloses fuel in areas, the content of which
expands with heat, these areas must be secured to prevent an unpermitted rise in pressure.
 If the fuel safety shutoff valve is located in the open air, these valves must be suitable for the stresses affecting them
(freezing, moisture, etc.).
 With hand operated safety shutoff valves a fast and safe access and operation must be assured.
 Electrically headed safety shutoff valves must be closed without current.
3.4 Emergency shutdown device
 Emergency shutdown devices should be located outside the boiler installation room in such a way that they are easily
accessible and easy to trigger.
 Emergency shutdown devices must switch off the power circuits of the electrical operating equipment of the firing
system in the event of danger. For this, the boiler safety chain incorporates the facility to loop in an emergency
shutdown contact.
 If further signals, for monitoring basic dangers in the boiler house, for example, such as fire alarms, are to be
incorporated, these must be grouped together by the client into an emergency shutdown contact in accordance with the
valid rules and regulations for emergency shutdown devices and looped into the boiler's safety chain.

More Related Content

PDF
Uscatoare cu ciclu frigorifer CECCATO
PDF
Digital Vortex Flowmeters From Yokogawa
PDF
Compressed Air Flowmeters
PDF
Dissolved Oxygen Sensors-Oxymax COS22/22D
PPTX
Siemens Air velocity sensor
PPT
Ventilation
PDF
Medical Gases Training.
PDF
Liquiline system ca80 no endress+hauser datasheet-colorimetric analyzer for n...
Uscatoare cu ciclu frigorifer CECCATO
Digital Vortex Flowmeters From Yokogawa
Compressed Air Flowmeters
Dissolved Oxygen Sensors-Oxymax COS22/22D
Siemens Air velocity sensor
Ventilation
Medical Gases Training.
Liquiline system ca80 no endress+hauser datasheet-colorimetric analyzer for n...

What's hot (20)

PDF
Chap 43
PDF
Indumax cls50 d endress+hauser datasheet-inductive conductivity sensor
PDF
Flowfit cca250 endress+hauser datasheet-flow assembly for chlorine and p h:or...
PDF
Memograph m rsg 40 endress+hauser datasheet-record, visualize, analyze and co...
PDF
Fire Fighting Training.
PDF
Overview of Conflow Products
PDF
T switch - att11-endress+hauser datasheet-thermal flow switch
PDF
GE Consolidated Pressure Relief and Safety Valves
PPT
Replacement Parts Industries (RPI) Everything You Ever Wanted to Know About S...
PDF
CUM223 253 endress+hauser datasheet-turbidity and suspended solids transmitter
PDF
Turbimax cus31 endress+hauser datasheet-turbidity sensor
PPTX
Understanding cqi9 iss3 (intermediate)
PDF
MID Heat Metering For RHI Report
PDF
Flow, Pressure & Vapor Instrumentation
PDF
Variable Area Flow Meter - SeeFlo
PDF
pH.ORP Transmitter-Analog and digital glass
PDF
Omnigrad s taf11, taf12x, taf16 endress+hauser datasheet-high temperature ass...
PDF
Flowphant t dtt31, dtt35 endress+hauser datasheet-flow switch
PPTX
A Guide To Fume Extraction Systems & Components
PDF
Flexim Fluxus Ultrasonic Gas Flow Meters - G Gas Meter Series - Brochure - en...
Chap 43
Indumax cls50 d endress+hauser datasheet-inductive conductivity sensor
Flowfit cca250 endress+hauser datasheet-flow assembly for chlorine and p h:or...
Memograph m rsg 40 endress+hauser datasheet-record, visualize, analyze and co...
Fire Fighting Training.
Overview of Conflow Products
T switch - att11-endress+hauser datasheet-thermal flow switch
GE Consolidated Pressure Relief and Safety Valves
Replacement Parts Industries (RPI) Everything You Ever Wanted to Know About S...
CUM223 253 endress+hauser datasheet-turbidity and suspended solids transmitter
Turbimax cus31 endress+hauser datasheet-turbidity sensor
Understanding cqi9 iss3 (intermediate)
MID Heat Metering For RHI Report
Flow, Pressure & Vapor Instrumentation
Variable Area Flow Meter - SeeFlo
pH.ORP Transmitter-Analog and digital glass
Omnigrad s taf11, taf12x, taf16 endress+hauser datasheet-high temperature ass...
Flowphant t dtt31, dtt35 endress+hauser datasheet-flow switch
A Guide To Fume Extraction Systems & Components
Flexim Fluxus Ultrasonic Gas Flow Meters - G Gas Meter Series - Brochure - en...
Ad

Similar to Boiler operation technical information (20)

PDF
Eberspahcer Hydronic 10 Technical Manual
PDF
Epa method 5(m-05)
PDF
Thermal mass flow meter English manual
PDF
Eberspacher D3L/B3L Installation Manual
PDF
One slider for qualification and validation of depyrogenation and sterilizati...
PDF
Introduction to Boiler Control Systems
PDF
Hướng dẫn sử dụng máy đo đa năng Testo 550 KIT
PPTX
Qualification of gc equipment by manoj kumar
PPSX
Centralized Cooling System1
PPTX
Qualification of Analytical Equipments
PDF
Thermal mass flow meter Operational Manual.pdf
PPTX
Qualification of gc equipment
PPTX
about oil and gas management system cgd station
PDF
94716008 burner-management-system-et-2008
PDF
Training Seminar - Standards, Heat Tracing Options & Application Optimization...
PDF
Maintenance and inspection_of_transformer
PDF
Graphite 52 m mcerts certificate
PDF
Hướng dẫn sử dụng testo 550
PDF
Combustion control
Eberspahcer Hydronic 10 Technical Manual
Epa method 5(m-05)
Thermal mass flow meter English manual
Eberspacher D3L/B3L Installation Manual
One slider for qualification and validation of depyrogenation and sterilizati...
Introduction to Boiler Control Systems
Hướng dẫn sử dụng máy đo đa năng Testo 550 KIT
Qualification of gc equipment by manoj kumar
Centralized Cooling System1
Qualification of Analytical Equipments
Thermal mass flow meter Operational Manual.pdf
Qualification of gc equipment
about oil and gas management system cgd station
94716008 burner-management-system-et-2008
Training Seminar - Standards, Heat Tracing Options & Application Optimization...
Maintenance and inspection_of_transformer
Graphite 52 m mcerts certificate
Hướng dẫn sử dụng testo 550
Combustion control
Ad

Recently uploaded (20)

PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PDF
Unit1 - AIML Chapter 1 concept and ethics
PPTX
PRASUNET_20240614003_231416_0000[1].pptx
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PPTX
wireless networks, mobile computing.pptx
PPTX
Measurement Uncertainty and Measurement System analysis
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Computer organization and architecuture Digital Notes....pdf
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
Software Engineering and software moduleing
PDF
First part_B-Image Processing - 1 of 2).pdf
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Unit1 - AIML Chapter 1 concept and ethics
PRASUNET_20240614003_231416_0000[1].pptx
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
wireless networks, mobile computing.pptx
Measurement Uncertainty and Measurement System analysis
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Soil Improvement Techniques Note - Rabbi
Computer organization and architecuture Digital Notes....pdf
August -2025_Top10 Read_Articles_ijait.pdf
distributed database system" (DDBS) is often used to refer to both the distri...
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Information Storage and Retrieval Techniques Unit III
Software Engineering and software moduleing
First part_B-Image Processing - 1 of 2).pdf
August 2025 - Top 10 Read Articles in Network Security & Its Applications
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK

Boiler operation technical information

  • 1. Technical information Requirements for operation of high-pressure boiler systems without constant supervision High-pressure steam and hot water boiler (equipped on the basis of EN 12953) TI012 Version 3 (03/18) 1 1 General According to EC agreements, the sale and distribution of CE-designated products may not be restricted or obstructed (see also Notes on "Guideline for the implementation of the Directive adopted according to the new concept and the overall concept" – also known as the "New Approach" for short –- online at http://ec.europa.eu/enterprise/newapproach/legislation/guide/index.htm). Additional measures in individual countries aimed at the protection of employees or of the environment are allowed, but may not lead to any changes to the product. For shell boilers, this means that, with suitable equipment and corresponding test requirements, operation without constant supervision is specified by the manufacturer. Individual countries, however, may lay down uniform, equal test requirements and test periods that are as long as possible for products which are technically the same or similar. It should be noted that if applicable operation without constant supervision requires a permit and that this must be clarified with supervisory authorities and/or monitoring organizations. In compliance with authoritative guidelines relating to the Pressure Vessels Directive 2014/68/EU, this Technical Information sheet describes what the requirements for operation without constant supervision are in terms of the boiler and the system. 2 Boiler-related requirements for operation without constant supervision As the boiler manufacturer, we equip our shell boilers for high-pressure steam and hot water in accordance with EN 12953, Part 6 (equipment), Part 7 (burner) and Part 8 (safety valve). All boilers are intended and suitable for operation for a maximum of 72 hours without constant supervision. The preconditions for operation without constant supervision are compliance with the requirements for the boiler, feed and make-up water in accordance with Operating Instructions B002 (Steam Boilers) or B004 (Hot Water Boilers) and with those for regular inspections for high-pressure boilers in accordance with the Operating Instructions B006, B009 or B011 (depending on boiler type). Operating, maintenance and inspection work on the boiler system by the operating and maintenance staff are carried out on the basis of check lists in the Operating Instructions B001 or B007 (depending on boiler type). In accordance with operation without constant supervision, the shortest inspection periods are specified as 3 days (i.e. 72 h). In addition to these checklists for operation, the Operating Instructions for the individual components must be complied with. In order to make the best use of the period of 72 hours for operation without constant supervision and not to have to visit the boiler more frequently for operating tasks, it is recommended that certain equipment parts are automated. For example, on the steam boiler: with manual blowdown (see Operating Instructions K005), the valve must be operated several times a day, depending on the water characteristics. If an automatic blow-down system is connected (see Operating Instructions G353 or G354) with an BCO Boiler Control, this is no longer necessary. Functional checks, however, are necessary for both versions every 72 hours. Additional options - such as for example, in the case of steam boilers, their own electrode for maximum water level or a desalination unit - can be fitted on request. 3 System-related requirements for operation without constant supervision System-related requirements for operation without constant supervision depend on the national and / or local regulations. Structural requirements such as the need for a separate boiler house or minimum opening sizes for vent and aeration openings must be taken from the local and / or national regulations. You will also find general instructions in our Technical Information sheet TI024. Organizational requirements such as the appropriate training of the operating and maintenance staff must be taken from the local and / or national regulations.
  • 2. Technical information Requirements for operation of high-pressure boiler systems without constant supervision High-pressure steam and hot water boiler (equipped on the basis of EN 12953) TI012 Version 3 (03/18) 2 The following chapters describe system-related requirements for operation without constant supervision aimed at protecting the boiler, the boiler system and people. The precise requirements must be taken from the local and / or national regulations. The necessary monitoring devices must be generally suitable for this and must have all the necessary permits. Important! The condensate/make-up water monitoring facility must be executed based on the system situation and the probability of foreign matter ingress (a risk assessment may need to be conducted here). If necessary, the condensate/make-up monitoring facility should be executed with a safety cutout (i.e. integrated into the boiler safety chain). 3.1 Monitoring of make-up water The following measuring devices are required: Material Measuring device Remarks salt-containing make-up water Hardness measurement, e.g. via Softcontrol (see operating instructions I544) Limit value corresponding to operating instructions B002 and B004 at 0.1 °dH or 0.02 mmol/l (see operating instructions G442 in the case of use with a SCO system control monitoring via hardness) Make-up water low in salt or salt-free Conductivity measurement e.g. via conductivity transducer CST 1 (see operating instructions I008) Pre-set limit value from the boiler manufacturer: 75 µS/cm (see operating instructions G440 in the case of the use with a SCO system control of a foreign body monitoring device via conductivity) Oil, grease, acids, leaching solutions, seawater, etc. if monitoring is necessary: see chapter 3.2 If limit values are exceeded, the flow of make-up water to the feed water container must be interrupted, for example, using a solenoid valve. 3.2 Monitoring the condensate flows Possible leaks of oil, fat, hardness or other foreign matter, such as acids, alkalis, sea water etc. via condensate into the water circuit require automatic continuous monitoring of the condensate circuit. Separate condensate circuits with different criteria should be monitored individually and equipped with corresponding switchover devices. If the permitted limit values are exceeded, the condensate flows must be rejected, for example, via drain-off devices. The following measuring devices are required: Material Measuring device Remarks Oil / Grease Measurement of cloudiness Pre-set limit values from the boiler manufacturer: Disregard for condensate streams greater than 5 ppm (see operating instructions G441 in the case of the use of a cloudiness warning device with a SCO system control) Hardness Acids / leaching solutions Sea water Conductivity measurement e.g. via conductivity transducer CST 1 (see operating instructions I008) All the named materials have an effect on conductivity. Pre-set limit value from the boiler manufacturer: 75 µS/cm (see operating instructions G440 in the case of the use with a SCO system control of a foreign body monitoring device via conductivity)
  • 3. Technical information Requirements for operation of high-pressure boiler systems without constant supervision High-pressure steam and hot water boiler (equipped on the basis of EN 12953) TI012 Version 3 (03/18) 3 These requirements are not absolutely necessary as long as there is no danger of a slump. If the monitoring mentioned under 3.1 and /or 3.2 only takes place in or after the feed water container, the firing must be switched off and locked if the permitted limit values are exceeded. As the boiler manufacturer, we do not implement this solution, since the whole system is contaminated if there is an incursion into individual flows, and the system is then no longer ready for operation since the complete water circuit has to be exchanged (resulting in very high costs for cleaning). 3.3 Safety shutoff device in the fuel line  A suitable fuel safety shutoff valve must be provided in the fuel line.  The location, in the case of gas, should be outside the boiler installation room and, with oil, in the near from the oil storage container.  If the fuel safety shutoff valve in combination with further shutoff device encloses fuel in areas, the content of which expands with heat, these areas must be secured to prevent an unpermitted rise in pressure.  If the fuel safety shutoff valve is located in the open air, these valves must be suitable for the stresses affecting them (freezing, moisture, etc.).  With hand operated safety shutoff valves a fast and safe access and operation must be assured.  Electrically headed safety shutoff valves must be closed without current. 3.4 Emergency shutdown device  Emergency shutdown devices should be located outside the boiler installation room in such a way that they are easily accessible and easy to trigger.  Emergency shutdown devices must switch off the power circuits of the electrical operating equipment of the firing system in the event of danger. For this, the boiler safety chain incorporates the facility to loop in an emergency shutdown contact.  If further signals, for monitoring basic dangers in the boiler house, for example, such as fire alarms, are to be incorporated, these must be grouped together by the client into an emergency shutdown contact in accordance with the valid rules and regulations for emergency shutdown devices and looped into the boiler's safety chain.