2
Presentation Overview
BIM Overview
BIM in Detail
BIM Project Management
Question and Answer
BIM Demonstration
3
Evolution
4D, 5D, ?
6
What is BIM?
Building Information Modeling
“digital representation of physical and functional
characteristics of a facility”
National Institute of Building Sciences, Model Standard 22 (2007)
7
What is BIM?
Building Information Modeling
BIM means radically different things to different
people
Use often limited to 3D drafting
9
Building Information Modeling
Load, voltage, type
3D - size, location, routing
10
BIM to an Owner
Opportunity to take advantage of new technology
and skills to add value to their projects
- Build more for less
- Opportunity Reduce Risk
- Control Cost
- Manage Schedule
- Use BIM model throughout the life of the building
11
BIM to a Design Engineer
Allow the engineer to combine all the design process
and information a single model to streamline the
creation and production of designs
Better coordinated designs
Faster response to design changes
Increase accuracy (schedules)
Sustainability
12
BIM to a Contractor
Allows the contractor to improve efficiencies and
streamline the construction process
- Encourages collaboration
- Reduce risk and improve construction predictability
- Allows for better examination of alternates
- More efficient layouts and networks
- Compatible with LEAN
“most effective when contractor engaged early and often
in the design phase”
13
Turning Expectations into Reality
Understand the Value Point for all stakeholders
Clearly define expectations and deliverables early in
process
Be realistic about capabilities and limitations of the
BIM delivery method
14
Turning Expectations into Reality
Clearly define expectations and deliverables early in
process
Understand the Value Point for all stakeholders
Be realistic about capabilities and limitations of the
BIM delivery method
well….doesn't Revit do that?
15
Define Expectations
“This project will utilize Building Information
Management (BIM) strategies and protocols, to assist
in the design and construction process”
Extract from a recent RFP
Big BIM or Little BIM?
16
Standards & Guidelines
17
BIM – In Detail
Geoff Gunn PE
18
BIM – In Detail
Capabilities Overview
“How BIM’s supposed to work”
Case Study
“How BIM actually works”
19
BIM – Software Setup
Electrical Project
Database (EPD)
Smart Panels
Drawing
Power &
Signal
Lighting Fire Alarm
Smart Panels
Drawing
ANTHONY
TO
CHANGE
AutoCAD MEP Revit MEP
20
BIM – 3D Modeling
21
BIM – Intelligent Devices
22
BIM - Really Intelligent Devices
23
BIM - Intelligent Device Circuiting
24
BIM - Intelligent Drawings
25
BIM - Intelligent Panels
Smart Panels
Drawing
26
BIM - Intelligent Schedules
Generates Panelboard schedules that are directly linked to your design.
As your design changes schedules are automatically updated`
Reduces potential for errors
Architects: Anshen + Allen
27
BIM – Case Study – UCSF Medical Center
Architects: Stantec
Hospital
Outpatient
Building
Future
Outpatient
Cancer
Building
Energy Center
28
BIM – Case Study – UCSF Medical Center
Energy Center
Statistics
3 Buildings
Hospital – 289 patient beds
Outpatient building
Energy Center
Total Building Area – 878,000 sf
Total Electrical Load – 16.5MW
29
BIM – Case Study – Project Timeline
2007 Project Start
SD phase completed
Design started in AutoCAD MEP 2008
2008
DD phase completed
2009
50% CD completed
Project “upgraded” to AutoCAD MEP 2010
2010
100% CD completed
2011
OSHPD permit received
30
BIM – Case Study – File Setup
Working drawings limited to
approx 20k sf due to
computer speed.
31
BIM – Case Study – File Setup
Electrical Project
Database (EPD)
and Smart Panels
24
Power
Drawings
23
Lighting
Drawings
Hospital
Electrical Project
Database (EPD)
and Smart Panels
17
Power
Drawings
15
Lighting
Drawings
Hospital
Electrical Project
Database (EPD)
and Smart Panels
3
Power
Drawings
3
Lighting
Drawings
Hospital
No way to link EPDs together from each building
88 total BIM drawings
32
BIM – Case Study – Complications
AutoCAD MEP 2008
Our version was heavily customized in order to realize
maximum BIM potential
Maximum size of EPD file due to 64-bit computers not being
supported
AutoCAD MEP 2010
Automatic Transfer Switches are not supported
Panelboard schedules did not meet OSHPD requirements out
of the box
No way to link EPD files from different projects
Some circuit loads were mis-recorded
33
BIM – Case Study – Lessons Learned
Proper project setup essential
All devices, demand factor styles, file structures, etc. should
be properly setup before any circuiting is started
Slow and Steady work flow
Adding extra BIM technicians and Engineers to meet a
deadline often results in crashes or corrupted files
Hardware and Software limitations
Limits due to hardware or software performance should be
reviewed in advance
34
BIM – Management
Anthony Fresquez
35
BIM Management
Managing Arup BIM Team
4 Electrical BIM Technicians
3 Mechanical BIM Technicians
3 plumbing BIM Technicians
4 Structural BIM Technicians
90+ SMEP Engineers
University of California, Davis Physical Sciences
Expansion – Perkins & Will Architects
Release 9
36
BIM Management
Work Culture
Communication
Challenges
Time Management
Software
Hardware
Next Steps
37
Work Culture
Transition from 2D CAD to 3D Modeling
Performing design within software
Increased roles and responsibility performing 3D coordination
Due to design skill specialization staff cannot switch easily
between disciplines
Hiring profile change seeking people with design experience
Recognizing some people may not make the transition
38
Communication
Communication is critical and occurs at a higher level within
design team.
- Entire team must understand engineering concepts
- Team members are not easily replaceable.
Model is very sensitive, because it is dynamic, which
necessitates more reviews and back checks.
Not just hard clashes, also soft checking
Demand Factors, Loads, Voltage
Challenges
39
BIM Management
Time management
Training
- Formal training is recommended. Train the trainer method not
beneficial.
Resourcing
- Plan ahead to avoid last minute allocation of resources as it’s
difficult to find contract resources with BIM skills.
Workflow
- Multiple users saving to EPD file caused software to crash with
AutoCAD MEP 2010. Issued resolved with AutoCAD MEP 2011
Trouble shooting
- Plan on it you’re going to spend plenty of time solving problems,
especially around deadlines.
40
BIM Management
Software
Constantly releasing new versions
- Autodesk has committed to releasing a new version of the every
year which can present a problem as projects can continue for 5+
years
- Difficulty upgrading to the new release as upgrading to new could
impact the display of AEC objects or new drawing format.
Licenses, various platforms, support
- Distributed server configuration
- Suite base products AutoCAD and Revit Structure, AutoCAD
MEP and Revit MEP plus we also use Navisworks.
- Autodesk Subscription online support
- Autodesk reseller ‘Ideate’ training, user groups and support.
41
BIM Management
Hardware
HP Z400 Workstation, Genuine Windows® 7 Professional 64-bit OS
10,000RPM 320gb Hard Drive
Intel® Xeon® 23350 3.06, 8MB/1066 QC CPU
16GB (4x4gb) DDR3-1333 MHz/PC3 10600-unbuffered- ECC RAM
NVIDIA Quadro FX3800 1GB Graphics Card
Dual Monitors is essential when working within the model
environment.
42
Next Steps
Revit MEP
- Recognized as industry standard for design firms
Capture I in BIM
- Information is key
- Superior scheduling functionally
- Single model allows better design processes
More capabilities
- Ideal workflow with architectural revit model
- More efficient 3D coordination and production tool
- Content development from manufacturers
Link to e-Specs
- Interfaces with Revit's parametric database, instantly updating your project
specifications to the requirements of the building model
43
Building and Maintaining Relationships
Beta-Testing program:
- Revit Structure
- AutoCAD MEP
- Revit MEP
- Navisworks
- Microstation Structural Triforma
Working with Software Designer to ensure software meets the
demands of the design industry
44
Summary
Great potential
Increased accuracy
Increased productivity
Major Challenges
Steep learning curve
High entry cost
- Training
- Software & Hardware
BIM is here to stay!
45
Questions and Comments
john.griffiths@arup.com
geoff.gunn@arup.com
anthony.fresquez@arup.com

More Related Content

PDF
081204 Virtual Design & Construction
PDF
Bim and project management
PPT
BIM and other softwares
PPTX
Building Information Modeling Services New Zealand
PPTX
Use of BIM in planning and construction and implementation in real project
DOCX
Bim implementation
PDF
Virtual design and construction
PDF
Bim Facades.Final
081204 Virtual Design & Construction
Bim and project management
BIM and other softwares
Building Information Modeling Services New Zealand
Use of BIM in planning and construction and implementation in real project
Bim implementation
Virtual design and construction
Bim Facades.Final

What's hot (19)

PDF
Lean construction & BIM
PDF
CAD and BIM Outsourcing Services
PDF
Bim for facility management
PDF
Sustainable design & bim technology
PPT
BIM from an FM perspective
PDF
Implementing BIM for Owners
PDF
Quy trình BIM
PPTX
Safety implementation in BIM
PPTX
What is bim, building information modeling
PDF
CM - An introduction to Building Information Modelling (BIM)
PDF
Building Information Modelling (BIM) for Handover and Facilities Management
PDF
Application of BIM for Scheduling and Costing of Construction Project
PDF
Sustainable design & bim technology
PDF
BIM & Sustainability
PDF
Optimize bim for reducing errors
PDF
BIM and FM: Bridging the divide between AEC and owner
PPTX
BIM comp
PPT
Role of Building Information Modelling in Construction
Lean construction & BIM
CAD and BIM Outsourcing Services
Bim for facility management
Sustainable design & bim technology
BIM from an FM perspective
Implementing BIM for Owners
Quy trình BIM
Safety implementation in BIM
What is bim, building information modeling
CM - An introduction to Building Information Modelling (BIM)
Building Information Modelling (BIM) for Handover and Facilities Management
Application of BIM for Scheduling and Costing of Construction Project
Sustainable design & bim technology
BIM & Sustainability
Optimize bim for reducing errors
BIM and FM: Bridging the divide between AEC and owner
BIM comp
Role of Building Information Modelling in Construction
Ad

Viewers also liked (20)

PPTX
1 installasi-xampp-dan-mysql (1)
PDF
1 sist. komputer_
PPT
3.4 analysing transformer
PDF
1 sist. komputer_00
PDF
ThinkBIM - Rachel Park (Mace)
PDF
BIM - a Faithful & Gould perspective from Adrian Malone
PPTX
Single phase transformer
PDF
Lse open data construction and critiques
PDF
Construction Games For Robots - Lecture#01
PPT
Digital Models For Construction
PDF
Scaling up digital learning support for smart workforce development in cluste...
PDF
BIM - a BIM Technologies overveiw
PDF
Under construction: a digital strategy TM
PDF
Shaping the Future of Construction - World Economic Forum Report 2016
PDF
Relatório ensaios em transformadores
PDF
1 sist. komputer_00
PDF
How BIM is Transforming the Design and Construction Industry
PDF
La construcción colaborativa de proyectos como metodología para adquirir comp...
PPTX
BIM and trends in construction | Empowering you in a BIM World
PPS
America's Bridge Collapse
1 installasi-xampp-dan-mysql (1)
1 sist. komputer_
3.4 analysing transformer
1 sist. komputer_00
ThinkBIM - Rachel Park (Mace)
BIM - a Faithful & Gould perspective from Adrian Malone
Single phase transformer
Lse open data construction and critiques
Construction Games For Robots - Lecture#01
Digital Models For Construction
Scaling up digital learning support for smart workforce development in cluste...
BIM - a BIM Technologies overveiw
Under construction: a digital strategy TM
Shaping the Future of Construction - World Economic Forum Report 2016
Relatório ensaios em transformadores
1 sist. komputer_00
How BIM is Transforming the Design and Construction Industry
La construcción colaborativa de proyectos como metodología para adquirir comp...
BIM and trends in construction | Empowering you in a BIM World
America's Bridge Collapse
Ad

Similar to Building information modeling (20)

PPTX
Building information modeling BIM
PDF
Bim implementation
PPTX
BIM for Construction, BPMs and Owners
PDF
RIBA Part 3 Course: BIM Overview + Application
PPTX
Processo de Implantação do BIM em escritorio de projetos
PPTX
Cc 2009 091202
PPTX
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
PPTX
Building Information Modeling Introduction
PPTX
International BIM Implementation for The Saudi Big 5
PDF
BIM-Era of digital construction
PPTX
BIM: The Promise of an Integrated Approach to Project Delivery
PPTX
Introduction to Building Information Modeling
PPTX
introdução ao BIM Building Information Modeling_Impactos e benefícios nos esc...
PDF
Ricci Piper
PPT
Uclan Bim.V1
PDF
Building Information Modelling M.arch.pdf
PPTX
Innovation in practice presentation 10 06-15
PPTX
BIM SHOW LIVE 14 - SME architectural BIM journey
Building information modeling BIM
Bim implementation
BIM for Construction, BPMs and Owners
RIBA Part 3 Course: BIM Overview + Application
Processo de Implantação do BIM em escritorio de projetos
Cc 2009 091202
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
Building Information Modeling Introduction
International BIM Implementation for The Saudi Big 5
BIM-Era of digital construction
BIM: The Promise of an Integrated Approach to Project Delivery
Introduction to Building Information Modeling
introdução ao BIM Building Information Modeling_Impactos e benefícios nos esc...
Ricci Piper
Uclan Bim.V1
Building Information Modelling M.arch.pdf
Innovation in practice presentation 10 06-15
BIM SHOW LIVE 14 - SME architectural BIM journey

More from michaeljmack (20)

PDF
Auburn, NY - 200 Years of History 1793-1993
PDF
Auburn High School, Auburn, NY, 1982 Yearbook
PDF
Auburn High School, Auburn, NY, 1980 Yearbook
PDF
Surge Protection
PDF
Diesel Particulate Filters Control Systems
PDF
Understanding Arc Flash
PDF
Siemens MV GIS Switchgear
PDF
Fundamentals of transformer inrush
PDF
15 years of experience stator ground fault protection
PPT
Emergency, Legally Required and Optional Standby Systems
PDF
Lighting Control Solutions for Daylit Spaces
PDF
COPS: An Arresting Look at NEC Article 708
PDF
Seismic Compliance of Electrical Distribution
PDF
Generator Set Transient Performance
PDF
Modeling of a digital protective relay in a RT Digital Simulator
PDF
Facts on Grid Friendly Wind Plants
PDF
Power Plant Horror Stories
PDF
Blackout Avoidance & Undervoltage Load Shedding
PDF
Transformer Fundamentals
PDF
Arc Flash
Auburn, NY - 200 Years of History 1793-1993
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbook
Surge Protection
Diesel Particulate Filters Control Systems
Understanding Arc Flash
Siemens MV GIS Switchgear
Fundamentals of transformer inrush
15 years of experience stator ground fault protection
Emergency, Legally Required and Optional Standby Systems
Lighting Control Solutions for Daylit Spaces
COPS: An Arresting Look at NEC Article 708
Seismic Compliance of Electrical Distribution
Generator Set Transient Performance
Modeling of a digital protective relay in a RT Digital Simulator
Facts on Grid Friendly Wind Plants
Power Plant Horror Stories
Blackout Avoidance & Undervoltage Load Shedding
Transformer Fundamentals
Arc Flash

Recently uploaded (20)

PDF
PPT on Performance Review to get promotions
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PPT
Project quality management in manufacturing
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
DOCX
573137875-Attendance-Management-System-original
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
UNIT 4 Total Quality Management .pptx
PPT on Performance Review to get promotions
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Internet of Things (IOT) - A guide to understanding
Project quality management in manufacturing
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
573137875-Attendance-Management-System-original
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Foundation to blockchain - A guide to Blockchain Tech
Embodied AI: Ushering in the Next Era of Intelligent Systems
UNIT 4 Total Quality Management .pptx

Building information modeling

  • 1. Building Information Modeling What Does it Mean for the Electrical Engineer? John Griffiths PE Geoff Gunn PE Anthony Fresquez
  • 2. 2 Presentation Overview BIM Overview BIM in Detail BIM Project Management Question and Answer BIM Demonstration
  • 4. 6 What is BIM? Building Information Modeling “digital representation of physical and functional characteristics of a facility” National Institute of Building Sciences, Model Standard 22 (2007)
  • 5. 7 What is BIM? Building Information Modeling BIM means radically different things to different people Use often limited to 3D drafting
  • 6. 9 Building Information Modeling Load, voltage, type 3D - size, location, routing
  • 7. 10 BIM to an Owner Opportunity to take advantage of new technology and skills to add value to their projects - Build more for less - Opportunity Reduce Risk - Control Cost - Manage Schedule - Use BIM model throughout the life of the building
  • 8. 11 BIM to a Design Engineer Allow the engineer to combine all the design process and information a single model to streamline the creation and production of designs Better coordinated designs Faster response to design changes Increase accuracy (schedules) Sustainability
  • 9. 12 BIM to a Contractor Allows the contractor to improve efficiencies and streamline the construction process - Encourages collaboration - Reduce risk and improve construction predictability - Allows for better examination of alternates - More efficient layouts and networks - Compatible with LEAN “most effective when contractor engaged early and often in the design phase”
  • 10. 13 Turning Expectations into Reality Understand the Value Point for all stakeholders Clearly define expectations and deliverables early in process Be realistic about capabilities and limitations of the BIM delivery method
  • 11. 14 Turning Expectations into Reality Clearly define expectations and deliverables early in process Understand the Value Point for all stakeholders Be realistic about capabilities and limitations of the BIM delivery method well….doesn't Revit do that?
  • 12. 15 Define Expectations “This project will utilize Building Information Management (BIM) strategies and protocols, to assist in the design and construction process” Extract from a recent RFP Big BIM or Little BIM?
  • 14. 17 BIM – In Detail Geoff Gunn PE
  • 15. 18 BIM – In Detail Capabilities Overview “How BIM’s supposed to work” Case Study “How BIM actually works”
  • 16. 19 BIM – Software Setup Electrical Project Database (EPD) Smart Panels Drawing Power & Signal Lighting Fire Alarm Smart Panels Drawing ANTHONY TO CHANGE AutoCAD MEP Revit MEP
  • 17. 20 BIM – 3D Modeling
  • 19. 22 BIM - Really Intelligent Devices
  • 20. 23 BIM - Intelligent Device Circuiting
  • 22. 25 BIM - Intelligent Panels Smart Panels Drawing
  • 23. 26 BIM - Intelligent Schedules Generates Panelboard schedules that are directly linked to your design. As your design changes schedules are automatically updated` Reduces potential for errors Architects: Anshen + Allen
  • 24. 27 BIM – Case Study – UCSF Medical Center Architects: Stantec Hospital Outpatient Building Future Outpatient Cancer Building Energy Center
  • 25. 28 BIM – Case Study – UCSF Medical Center Energy Center Statistics 3 Buildings Hospital – 289 patient beds Outpatient building Energy Center Total Building Area – 878,000 sf Total Electrical Load – 16.5MW
  • 26. 29 BIM – Case Study – Project Timeline 2007 Project Start SD phase completed Design started in AutoCAD MEP 2008 2008 DD phase completed 2009 50% CD completed Project “upgraded” to AutoCAD MEP 2010 2010 100% CD completed 2011 OSHPD permit received
  • 27. 30 BIM – Case Study – File Setup Working drawings limited to approx 20k sf due to computer speed.
  • 28. 31 BIM – Case Study – File Setup Electrical Project Database (EPD) and Smart Panels 24 Power Drawings 23 Lighting Drawings Hospital Electrical Project Database (EPD) and Smart Panels 17 Power Drawings 15 Lighting Drawings Hospital Electrical Project Database (EPD) and Smart Panels 3 Power Drawings 3 Lighting Drawings Hospital No way to link EPDs together from each building 88 total BIM drawings
  • 29. 32 BIM – Case Study – Complications AutoCAD MEP 2008 Our version was heavily customized in order to realize maximum BIM potential Maximum size of EPD file due to 64-bit computers not being supported AutoCAD MEP 2010 Automatic Transfer Switches are not supported Panelboard schedules did not meet OSHPD requirements out of the box No way to link EPD files from different projects Some circuit loads were mis-recorded
  • 30. 33 BIM – Case Study – Lessons Learned Proper project setup essential All devices, demand factor styles, file structures, etc. should be properly setup before any circuiting is started Slow and Steady work flow Adding extra BIM technicians and Engineers to meet a deadline often results in crashes or corrupted files Hardware and Software limitations Limits due to hardware or software performance should be reviewed in advance
  • 32. 35 BIM Management Managing Arup BIM Team 4 Electrical BIM Technicians 3 Mechanical BIM Technicians 3 plumbing BIM Technicians 4 Structural BIM Technicians 90+ SMEP Engineers University of California, Davis Physical Sciences Expansion – Perkins & Will Architects Release 9
  • 33. 36 BIM Management Work Culture Communication Challenges Time Management Software Hardware Next Steps
  • 34. 37 Work Culture Transition from 2D CAD to 3D Modeling Performing design within software Increased roles and responsibility performing 3D coordination Due to design skill specialization staff cannot switch easily between disciplines Hiring profile change seeking people with design experience Recognizing some people may not make the transition
  • 35. 38 Communication Communication is critical and occurs at a higher level within design team. - Entire team must understand engineering concepts - Team members are not easily replaceable. Model is very sensitive, because it is dynamic, which necessitates more reviews and back checks. Not just hard clashes, also soft checking Demand Factors, Loads, Voltage Challenges
  • 36. 39 BIM Management Time management Training - Formal training is recommended. Train the trainer method not beneficial. Resourcing - Plan ahead to avoid last minute allocation of resources as it’s difficult to find contract resources with BIM skills. Workflow - Multiple users saving to EPD file caused software to crash with AutoCAD MEP 2010. Issued resolved with AutoCAD MEP 2011 Trouble shooting - Plan on it you’re going to spend plenty of time solving problems, especially around deadlines.
  • 37. 40 BIM Management Software Constantly releasing new versions - Autodesk has committed to releasing a new version of the every year which can present a problem as projects can continue for 5+ years - Difficulty upgrading to the new release as upgrading to new could impact the display of AEC objects or new drawing format. Licenses, various platforms, support - Distributed server configuration - Suite base products AutoCAD and Revit Structure, AutoCAD MEP and Revit MEP plus we also use Navisworks. - Autodesk Subscription online support - Autodesk reseller ‘Ideate’ training, user groups and support.
  • 38. 41 BIM Management Hardware HP Z400 Workstation, Genuine Windows® 7 Professional 64-bit OS 10,000RPM 320gb Hard Drive Intel® Xeon® 23350 3.06, 8MB/1066 QC CPU 16GB (4x4gb) DDR3-1333 MHz/PC3 10600-unbuffered- ECC RAM NVIDIA Quadro FX3800 1GB Graphics Card Dual Monitors is essential when working within the model environment.
  • 39. 42 Next Steps Revit MEP - Recognized as industry standard for design firms Capture I in BIM - Information is key - Superior scheduling functionally - Single model allows better design processes More capabilities - Ideal workflow with architectural revit model - More efficient 3D coordination and production tool - Content development from manufacturers Link to e-Specs - Interfaces with Revit's parametric database, instantly updating your project specifications to the requirements of the building model
  • 40. 43 Building and Maintaining Relationships Beta-Testing program: - Revit Structure - AutoCAD MEP - Revit MEP - Navisworks - Microstation Structural Triforma Working with Software Designer to ensure software meets the demands of the design industry
  • 41. 44 Summary Great potential Increased accuracy Increased productivity Major Challenges Steep learning curve High entry cost - Training - Software & Hardware BIM is here to stay!