Business Framework Driven Software Projects
Example of the Connected Health Framework
How to create robust and responsive software at 60% of the cost of traditional approaches
Classical Software Project
• The classical approach to conducting most software
projects is the Marketing Driven one.
• This type of project favors a top down approach where
the software development life cycle includes the
following 5 phases:
– 1 Product vision definition
– 2 Business Requirements definition based on the product
vision
– 3 Definition of the software conceptual/logical models
– 4 Definition of the software physical architecture and
components
– 5 Creation of the software code itself
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
2
Team Roles in a Marketing Driven
Project
• The five life cycle phases previously listed each host
specific efforts conducted by specific project team
members:
– Marketing and Domain Experts are responsible for the
Product Vision definition
– Business Analysts and Domain Experts elicit, analyze, and
document Business Requirements
– Software Architects and System Analysts create the
software Conceptual/Logical models
– Software Architects and Software Engineers design the
software Physical Architecture and components
– Software Engineers and developers write the Software
Code
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
3
Lifecycle Phases Relative Efforts in a
Marketing Driven Project
• The relative amount of efforts dedicated to
each lifecycle phase varies throughout a
Marketing driven project.
• We have developed a quantitative model that
predicts the relative degree of efforts invested
in each lifecycle phase as a project unfolds.
• An important fact is that very quickly all team
roles become simultaneously engaged in the
project but at varying degrees of involvement.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
4
Lifecycle Phases Relative Efforts in a
Marketing Driven Project
• We have ranked on a scale of 1 to 5 each
phase relative amount of efforts with respect
to the other phases.
• A rank of 1 has the most efforts while a rank
of 5 has the least efforts.
• As the project unfolds, each phase’s rank
changes. The following graph presents
changes in phase’ s rank and relative duration
of each phase’s rank.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
5
Lifecycle Phases Relative Efforts in a
Marketing Driven Project
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 V R R L L L L P C
2 R V L R R P P L P
3 LPC L V P P R C C L
4 PC P P V C C R R R
5 C C C V V V V V
L:Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code
-The 5 phases are color coded: blue, red, yellow, green, and purple.
-The first column is the phase relative amount of efforts rank.
-The first row is the set of steps over which phase’s efforts ranking change
-By step 17 the efforts ranking remains unchanged -indicating a close to completion project.
Characterizing Efforts in a Marketing
Driven Project
• Step 1: The project begins with all its efforts focused on
defining the Product Vision.
• Steps 1 to 5: As the Vision gets refined, it is quickly
translated into business requirements.
• Steps 4 to 15: When business requirements begin to
crystalize, a Software logical/conceptual architecture is
initiated and further elaborated over 12 steps. During
these steps business requirements refinement efforts
take place and slowly decline in magnitude while the
software physical architecture matures by requiring
increasing efforts. Some early coding also takes place
but it involves lesser efforts.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
7
Characterizing Efforts in a Marketing
Driven Project
• Step 16: The software physical architecture creation
efforts pick up, relegating the logical architecture
efforts to second place.
• Step 17: The predominant efforts are dedicated to
coding then comes the refinement of the physical
architecture followed by logical architecture touch-ups.
Much less efforts are required to update business
requirements which by this stage should be rather
robust. The Product Vision requires the least efforts as
it is by then fully realized in the software business
requirements, its the logical and physical architectures
and its implemented code.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
8
Business Framework Driven Project
• A software project is driven by a Business Framework
when it uses at its onset pre-defined logical and
conceptual models that together capture the services
offered by a specific Business Domain (such as
Healthcare or Insurance) through its structural and
behavioral business characteristics.
• The Framework is selected because it is very relevant
to the software project ultimate purpose.
• A Business Framework driven project involves the same
lifecycle phases and team roles as the marketing driven
one; the main difference being the significantly lesser
amount of time it requires to reach completion.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
9
Lifecycle Phases Relative Efforts in a Business
Framework Driven Project
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
10
L: Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code
-The 5 phases are color coded: blue, red, yellow, green, and purple.
-The first column is the phase relative amount of efforts rank.
-The first row is the set of steps over which phase’s efforts ranking change
-By step 10 the efforts ranking remains unchanged -indicating a close to completion project.
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 L L P P C
2 P P L C P
3 R R C L L
4 V C R R R
5 C V V V V
Characterizing Efforts in Business
Framework Driven Projects
• Step 1 to 7: The project begins by focusing its efforts on
customizing the Business Framework to relevant software
logical/conceptual models.
• For example, the Microsoft Connected Health Framework
contains highly reusable business components relevant to
Electronic Health Information management; it can be for
the most part readily incorporated into the software
logical/ conceptual models, hence minimizing substantial
efforts that would otherwise be required as in the case of
the Marketing driven project.
• During these 7 initial steps, efforts are allocated to creating
the physical architecture simultaneously with deriving
business requirements, both activities based on the
customized Business Framework.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
11
Characterizing Efforts in Business
Framework Driven Projects
• Step 1 to 7: The Product Vision can also be formally defined
during these initial 7 steps along with developing early
software code. The Product Vision becomes stable by step
4 and it only requires minimal updates from that point
forward.
• Step 8 to 9: The physical architecture occupies the most
efforts and reaches maturity while enabling more efforts to
be dedicated to quickly developing software code. The
logical architecture and business requirements can also be
refined but both would require much less efforts.
• Step 10: Efforts ranking remains unchanged -indicating a
close to completion project with a main focus on finishing
the software code.
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
12
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 L L P P C
2 P P L C P
3 R R C L L
4 V C R R R
5 C V V V V
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 V R R L L L L P C
2 R V L R R P P L P
3 LPC L V P P R C C L
4 PC P P V C C R R R
5 C C C V V V V V
Business Framework Driven Project
Marketing Driven Project
L:Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
13
Conclusion
• A Business Framework Driven project:
– Can be completed in about 60% of the time it would
require if it were conducted using a Marketing driven
approach.
– Places much less pressure and risks on Marketing,
Domain Experts, and Business Analysts by allowing
them to extensively leverages the use of a preexisting
Business Framework.
– Generates less complex resource management plans
through less changes in the priority/importance of
lifecycle phases efforts (up 50% less complex).
Copyrights (c) 2012 - Pragmatic Cohesion
Consulting
14
Copyright (c) 2012 Pragmatic Cohesion
Consulting
15
Contact Didier at Pragmatic Cohesion Consulting to find out how
to implement an effective Cost Saving Strategy for your Software
Development Projects.
http://pragmaticohesion.com/

More Related Content

PPT
Software Project Management
PPTX
Building a Credible Performance Measurement Baseling
PDF
DHS - Using functions points to estimate agile development programs (v2)
PPTX
Agile Business Rhythm
PPT
Activites and Time Planning
PDF
A Guide for Capital Project Mamnagers
PDF
The Critical Success Factors For Erp Implementation An Organisational Fit Per...
PDF
WBS Compliance Challenges for Agile ERP Projects
Software Project Management
Building a Credible Performance Measurement Baseling
DHS - Using functions points to estimate agile development programs (v2)
Agile Business Rhythm
Activites and Time Planning
A Guide for Capital Project Mamnagers
The Critical Success Factors For Erp Implementation An Organisational Fit Per...
WBS Compliance Challenges for Agile ERP Projects

What's hot (20)

PDF
IMP as the Definition of Done
PPT
Other software processes (Software project Management)
PDF
Calculating Physical Percent Complete on Agile Projects
PPT
Epm7e slides ch10 agile project management
PDF
Software Project Management
DOCX
RajeshKanchi_Resume_Latest_2016
PDF
Agile project management is systems management
PPTX
Software project management introduction
PDF
Process Flow and Narrative for Agile
PPTX
SE1 - Integrating SE and PPM to Increase the Probability of Success
PDF
Integrated Program Performance Management
PDF
Spm tutorials
PPTX
5 Immutable Principles of Capital Project SUccess
PDF
From arms race to green space
PDF
Heliotropic Abundance
PPT
Earned value, XP and government contracts
PDF
Scrum Lifecycle At Enterprise Levels
PDF
3. Project Management A Case Study Of A Successful Erp Implementation
PDF
Alleman coonce-agile-2017 may2
IMP as the Definition of Done
Other software processes (Software project Management)
Calculating Physical Percent Complete on Agile Projects
Epm7e slides ch10 agile project management
Software Project Management
RajeshKanchi_Resume_Latest_2016
Agile project management is systems management
Software project management introduction
Process Flow and Narrative for Agile
SE1 - Integrating SE and PPM to Increase the Probability of Success
Integrated Program Performance Management
Spm tutorials
5 Immutable Principles of Capital Project SUccess
From arms race to green space
Heliotropic Abundance
Earned value, XP and government contracts
Scrum Lifecycle At Enterprise Levels
3. Project Management A Case Study Of A Successful Erp Implementation
Alleman coonce-agile-2017 may2
Ad

Viewers also liked (20)

DOCX
Sample business plan (online shop)
PPT
Report Writing - Conclusions & Recommendations sections
PDF
Business plan - best practices
PPTX
Summary, Conclusions and Recommendations
PDF
Business Analysis - Scrum/Agile Methodology & Relation to Project Management
PPT
Business plan presentation summary
PPTX
Martin Renke as an Agent of Change - Business Analysis Example
PPTX
Holidaymathfunneh
PDF
Company Analysis Example_AAA Road Materials
PPT
Agile Produktentwicklung in Kombination mit Scrum und V-Modell
PDF
Example of Business Operations Analysis
PDF
BIA - Example of Business Impact Analysis and Dependencies
DOC
Business analysis sample report, Business Impact Analysis Report ,Business An...
PDF
Mushroom business plan in sri lanka
PPTX
Petrol pump plan
PPTX
Packaging materials for bakery products prasad
PPTX
ERP on School Management System
PDF
Gathering And Documenting Your Bi Business Requirements
DOCX
Hershey`s marketing plan report
PPTX
Customer service training for mobil filling station attendants(1)
Sample business plan (online shop)
Report Writing - Conclusions & Recommendations sections
Business plan - best practices
Summary, Conclusions and Recommendations
Business Analysis - Scrum/Agile Methodology & Relation to Project Management
Business plan presentation summary
Martin Renke as an Agent of Change - Business Analysis Example
Holidaymathfunneh
Company Analysis Example_AAA Road Materials
Agile Produktentwicklung in Kombination mit Scrum und V-Modell
Example of Business Operations Analysis
BIA - Example of Business Impact Analysis and Dependencies
Business analysis sample report, Business Impact Analysis Report ,Business An...
Mushroom business plan in sri lanka
Petrol pump plan
Packaging materials for bakery products prasad
ERP on School Management System
Gathering And Documenting Your Bi Business Requirements
Hershey`s marketing plan report
Customer service training for mobil filling station attendants(1)
Ad

Similar to Business analysis and business framework driven projects - Example of the Microsoft Connected Health Framework (20)

PPT
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
PPTX
Developing Enterprise Ready Software
PPT
Corporate project management model
PPT
PDF
SE18_Lec 13_ Project Planning
PPT
PROCESS MODELS.ppt
PPTX
ERP solution architect role, part I
PDF
Balancing software project drivers a rational quantitative approach
PPT
Rational unified process lecture-5
PPT
Chp14 Tactical Execution
PPTX
Agile Implementations
PDF
A littlebook about agile
PPTX
Brief introduction to project management and project management tools
PPT
SDLC or Software Development Life Cycle
PPTX
Introduction to Software Engineering
PPTX
Introduction to Software Engineering.pptx
PPT
Selection of an appropriate project approach
PPSX
Agile, User Stories, Domain Driven Design
PPT
Contracting for Agile Software Development
PPTX
UNIT V - 1 SPM.pptx
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
Developing Enterprise Ready Software
Corporate project management model
SE18_Lec 13_ Project Planning
PROCESS MODELS.ppt
ERP solution architect role, part I
Balancing software project drivers a rational quantitative approach
Rational unified process lecture-5
Chp14 Tactical Execution
Agile Implementations
A littlebook about agile
Brief introduction to project management and project management tools
SDLC or Software Development Life Cycle
Introduction to Software Engineering
Introduction to Software Engineering.pptx
Selection of an appropriate project approach
Agile, User Stories, Domain Driven Design
Contracting for Agile Software Development
UNIT V - 1 SPM.pptx

More from Pragmatic Cohesion Consulting, LLC (20)

PDF
Applying the integrative propositional analysis (ipa) to the ebmm – triads
PPTX
Viewers locations usa - 30000
PPTX
Viewers locations outside USA - 30000
PDF
Comparing four major organizational cultures and the challenges faced when tr...
PDF
Obstacles to effective knowledge elicitation
PPTX
Viewers locations in the USA
PPTX
Viewers locations outside the USA
PDF
Framework for assessing business analysts situational awareness
PDF
The dynamics of cohesive and inconsistent project requirements and how they i...
PDF
Creating queuing system simulations with enterprise architect sysml parametri...
PDF
Agile scope creep and the Golden Ratio – Balancing Project Flexibility and Co...
PDF
The non intuitive impact of software defects on development efforts time esti...
PDF
The dynamic interaction of passed and failed requirements during software tes...
PDF
M theory for business analysts - 11 dimensions of empowerment
PDF
Effective Listening - a cornerstone of effective business analysis
PDF
About the benefits and pitfalls of relying on analytical methods
PDF
Deductive, inductive, and abductive reasoning and their application in trans...
PDF
34,000 delicious Food and Beverage combinations for your holidays!
PDF
Business analysis compass mapping to the iiba babok v2
PDF
Business requirements what versus how
Applying the integrative propositional analysis (ipa) to the ebmm – triads
Viewers locations usa - 30000
Viewers locations outside USA - 30000
Comparing four major organizational cultures and the challenges faced when tr...
Obstacles to effective knowledge elicitation
Viewers locations in the USA
Viewers locations outside the USA
Framework for assessing business analysts situational awareness
The dynamics of cohesive and inconsistent project requirements and how they i...
Creating queuing system simulations with enterprise architect sysml parametri...
Agile scope creep and the Golden Ratio – Balancing Project Flexibility and Co...
The non intuitive impact of software defects on development efforts time esti...
The dynamic interaction of passed and failed requirements during software tes...
M theory for business analysts - 11 dimensions of empowerment
Effective Listening - a cornerstone of effective business analysis
About the benefits and pitfalls of relying on analytical methods
Deductive, inductive, and abductive reasoning and their application in trans...
34,000 delicious Food and Beverage combinations for your holidays!
Business analysis compass mapping to the iiba babok v2
Business requirements what versus how

Recently uploaded (20)

PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPTX
sap open course for s4hana steps from ECC to s4
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
Machine Learning_overview_presentation.pptx
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Encapsulation theory and applications.pdf
PPTX
Big Data Technologies - Introduction.pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Machine learning based COVID-19 study performance prediction
PPTX
Cloud computing and distributed systems.
PPTX
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
Dropbox Q2 2025 Financial Results & Investor Presentation
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Chapter 3 Spatial Domain Image Processing.pdf
NewMind AI Weekly Chronicles - August'25-Week II
sap open course for s4hana steps from ECC to s4
Review of recent advances in non-invasive hemoglobin estimation
Encapsulation_ Review paper, used for researhc scholars
Network Security Unit 5.pdf for BCA BBA.
Machine Learning_overview_presentation.pptx
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Encapsulation theory and applications.pdf
Big Data Technologies - Introduction.pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Machine learning based COVID-19 study performance prediction
Cloud computing and distributed systems.
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
Spectral efficient network and resource selection model in 5G networks
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Per capita expenditure prediction using model stacking based on satellite ima...

Business analysis and business framework driven projects - Example of the Microsoft Connected Health Framework

  • 1. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 1 Business Framework Driven Software Projects Example of the Connected Health Framework How to create robust and responsive software at 60% of the cost of traditional approaches
  • 2. Classical Software Project • The classical approach to conducting most software projects is the Marketing Driven one. • This type of project favors a top down approach where the software development life cycle includes the following 5 phases: – 1 Product vision definition – 2 Business Requirements definition based on the product vision – 3 Definition of the software conceptual/logical models – 4 Definition of the software physical architecture and components – 5 Creation of the software code itself Copyrights (c) 2012 - Pragmatic Cohesion Consulting 2
  • 3. Team Roles in a Marketing Driven Project • The five life cycle phases previously listed each host specific efforts conducted by specific project team members: – Marketing and Domain Experts are responsible for the Product Vision definition – Business Analysts and Domain Experts elicit, analyze, and document Business Requirements – Software Architects and System Analysts create the software Conceptual/Logical models – Software Architects and Software Engineers design the software Physical Architecture and components – Software Engineers and developers write the Software Code Copyrights (c) 2012 - Pragmatic Cohesion Consulting 3
  • 4. Lifecycle Phases Relative Efforts in a Marketing Driven Project • The relative amount of efforts dedicated to each lifecycle phase varies throughout a Marketing driven project. • We have developed a quantitative model that predicts the relative degree of efforts invested in each lifecycle phase as a project unfolds. • An important fact is that very quickly all team roles become simultaneously engaged in the project but at varying degrees of involvement. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 4
  • 5. Lifecycle Phases Relative Efforts in a Marketing Driven Project • We have ranked on a scale of 1 to 5 each phase relative amount of efforts with respect to the other phases. • A rank of 1 has the most efforts while a rank of 5 has the least efforts. • As the project unfolds, each phase’s rank changes. The following graph presents changes in phase’ s rank and relative duration of each phase’s rank. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 5
  • 6. Lifecycle Phases Relative Efforts in a Marketing Driven Project Copyrights (c) 2012 - Pragmatic Cohesion Consulting 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 V R R L L L L P C 2 R V L R R P P L P 3 LPC L V P P R C C L 4 PC P P V C C R R R 5 C C C V V V V V L:Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code -The 5 phases are color coded: blue, red, yellow, green, and purple. -The first column is the phase relative amount of efforts rank. -The first row is the set of steps over which phase’s efforts ranking change -By step 17 the efforts ranking remains unchanged -indicating a close to completion project.
  • 7. Characterizing Efforts in a Marketing Driven Project • Step 1: The project begins with all its efforts focused on defining the Product Vision. • Steps 1 to 5: As the Vision gets refined, it is quickly translated into business requirements. • Steps 4 to 15: When business requirements begin to crystalize, a Software logical/conceptual architecture is initiated and further elaborated over 12 steps. During these steps business requirements refinement efforts take place and slowly decline in magnitude while the software physical architecture matures by requiring increasing efforts. Some early coding also takes place but it involves lesser efforts. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 7
  • 8. Characterizing Efforts in a Marketing Driven Project • Step 16: The software physical architecture creation efforts pick up, relegating the logical architecture efforts to second place. • Step 17: The predominant efforts are dedicated to coding then comes the refinement of the physical architecture followed by logical architecture touch-ups. Much less efforts are required to update business requirements which by this stage should be rather robust. The Product Vision requires the least efforts as it is by then fully realized in the software business requirements, its the logical and physical architectures and its implemented code. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 8
  • 9. Business Framework Driven Project • A software project is driven by a Business Framework when it uses at its onset pre-defined logical and conceptual models that together capture the services offered by a specific Business Domain (such as Healthcare or Insurance) through its structural and behavioral business characteristics. • The Framework is selected because it is very relevant to the software project ultimate purpose. • A Business Framework driven project involves the same lifecycle phases and team roles as the marketing driven one; the main difference being the significantly lesser amount of time it requires to reach completion. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 9
  • 10. Lifecycle Phases Relative Efforts in a Business Framework Driven Project Copyrights (c) 2012 - Pragmatic Cohesion Consulting 10 L: Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code -The 5 phases are color coded: blue, red, yellow, green, and purple. -The first column is the phase relative amount of efforts rank. -The first row is the set of steps over which phase’s efforts ranking change -By step 10 the efforts ranking remains unchanged -indicating a close to completion project. R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 L L P P C 2 P P L C P 3 R R C L L 4 V C R R R 5 C V V V V
  • 11. Characterizing Efforts in Business Framework Driven Projects • Step 1 to 7: The project begins by focusing its efforts on customizing the Business Framework to relevant software logical/conceptual models. • For example, the Microsoft Connected Health Framework contains highly reusable business components relevant to Electronic Health Information management; it can be for the most part readily incorporated into the software logical/ conceptual models, hence minimizing substantial efforts that would otherwise be required as in the case of the Marketing driven project. • During these 7 initial steps, efforts are allocated to creating the physical architecture simultaneously with deriving business requirements, both activities based on the customized Business Framework. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 11
  • 12. Characterizing Efforts in Business Framework Driven Projects • Step 1 to 7: The Product Vision can also be formally defined during these initial 7 steps along with developing early software code. The Product Vision becomes stable by step 4 and it only requires minimal updates from that point forward. • Step 8 to 9: The physical architecture occupies the most efforts and reaches maturity while enabling more efforts to be dedicated to quickly developing software code. The logical architecture and business requirements can also be refined but both would require much less efforts. • Step 10: Efforts ranking remains unchanged -indicating a close to completion project with a main focus on finishing the software code. Copyrights (c) 2012 - Pragmatic Cohesion Consulting 12
  • 13. R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 L L P P C 2 P P L C P 3 R R C L L 4 V C R R R 5 C V V V V R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 V R R L L L L P C 2 R V L R R P P L P 3 LPC L V P P R C C L 4 PC P P V C C R R R 5 C C C V V V V V Business Framework Driven Project Marketing Driven Project L:Logical ArchitectureV: Product Vision R: Business Requirements P: Physical Architecture C: Software Code Copyrights (c) 2012 - Pragmatic Cohesion Consulting 13
  • 14. Conclusion • A Business Framework Driven project: – Can be completed in about 60% of the time it would require if it were conducted using a Marketing driven approach. – Places much less pressure and risks on Marketing, Domain Experts, and Business Analysts by allowing them to extensively leverages the use of a preexisting Business Framework. – Generates less complex resource management plans through less changes in the priority/importance of lifecycle phases efforts (up 50% less complex). Copyrights (c) 2012 - Pragmatic Cohesion Consulting 14