MONITORING
&
EVALUATION
PRESENTATION
SUBMITTED TO: SIR SAAD
SUBMITTED BY : ASIM RIAZ
NADEEM NAWAZ
FAHIM ULLAH JAN
Summary Of The Case Study
 Project is between ZTE (Zhongxing Telecom –
Pakistan ) and Telenor Pakistan
 ZTE Corporation is a leading global provider of
telecommunications equipment and network solutions
 ZTE is listed on both the Hong Kong and Shenzhen
Stock Exchanges and is China’s largest listed telecoms
equipment company.
 In 2011 ZTE won the project of Telenor for
maintaining and running the setup of Telenor and ZTE
became the sole vendor
 We have a case in which we have to look after the
maintenance of the all sites of Telenor.
 A site means the base transceiver station (BTS) is a
piece of equipment that facilitates wireless
communication between user equipment (UE) and a
network.
 This program contributes to facilitates and make the
working of all stations to provide the best quality
services to their clients / end-users.
 The program provides the space for all of the user of
24*7 working of their systems and proper running of
functionalities and it is monitored continuously.
Remote Monitoring System
 Reduced energy consumption
 Energy metering will help you make the right
decisions
 Reduced service trips
 Perform service only when needed
 Increased lifetime of batteries
 Keeping track of temperatures in your BTS will
increase lifetime
 No malfunctioning gensets
 Improve reliability and operation of back-up power
generators
 Minimized fuel theft
 Immediate alarms when fuel levels drop too fast
Monitoring Teams
 HEAD QUARTER of Telenor – Pakistan monitoring
the systems continuously with the help of RMS
(Remote Monitoring System)
 Review the program for approving priorities for
capacity development initiatives directed at multiple
areas.
Reason why the case selected
 This case study implements a program, which requires
a continuous check and balance
 It needs to be check and needy action is to be taken
accordingly and to the time.
 Potential stakeholders are involved accordingly with
respect to perform the needy actions.
How it works
 A Remote Monitoring System is connected to the equipment
in your base station using a serial, Ethernet or I/O
connection.
 The gateway sends information via the Internet or the mobile
network (GSM/GPRS/3G) to the cloud-based system data
center.
 By accessing there server from Head Quarter , they can
monitor parameters such as temperatures, statuses and levels
in a regular user interface.
 Trending tools (dashboards) are available to analyze
recorded data and alarms are sent whenever a critical event
occurs in the field.
RMS ALLOWS YOU TO
REMOTELY HANDLE:
 Fault management (FM) such as alarms and
notifications at critical events.
 Configuration management (CM) for example setting
the cooling temperature on your FCU or air
conditioning.
 Performance management (PM) - generate instant or
scheduled statistics and reports.
Findings on the case’s M&E
framework
 User interface is having the complete information about
the working systems
This is the mode which is being used and working
activities accordingly.
Methodology with example a
flowchart
 If the system accesses any problem the following
process is used to evaluate and then the necessary
action is taken.
 End users
 Signal Transformations:
Monitoring
 Designed to control large or complex facilities
such as factories, power plants, network operations
centers, airports, and spacecraft, with some degree
of automation.
 M&C systems may receive data from sensors,
telemetry streams, user inputs, and pre-
programmed procedures.
Correction of system flaws
 Fault management (FM) such as alarms and
notifications at critical events.
 Configuration management (CM) for example
setting the cooling temperature on your FCU or air
conditioning.
 Performance management (PM) - generate instant
or scheduled statistics and reports.
Program level Monitoring
 As they are having the complete setup online and
system based setup to monitor the actual sites.
 Identifying, designing, and providing capacity
development support activities;
 Responding to requests for assistance about the error
 Financial and grant administration
 The quarterly reports submitted by each partner and
will distil the following information:
 Common factors influencing project implementation
 The log is maintained accordingly
 Log is checked on weekly basis
 Reports to Head Quarter
 Actions on Reports
Key Evaluation Questions (KEQs)
 During the Evaluation the following are the common
questions which are carefully handled.
1. How and to what extent has the System affected the sites
and networks
2. How and to what extent have the teams worked
efficiently?
3. How much the time is taken to resolved the error / issue ?
4. what errors are continuously coming?
5. What possible actions are to be taken ?
6. what are reasons to eliminate the error permanently?
 After completion of all the tasks the following are
the data is ready to analyze and can be used in
other future decisions.
• Monitoring processes at partner and program level;
• Successive data is analyzed
• A comparison of the baseline and mid-term actions
taken
• Relevant actions and authenticity is generated
Effectiveness of project M&E
System
1. Outcomes and process focused:
 M&E focuses on the quality of implementation
processes carried out, and equally on what
outcomes have occurred as a result of these
activities.
 Outcomes can be positive or negative, expected or
unexpected.
2. Monitoring
 Remote monitoring and control (M&C) systems are
designed to control large or complex facilities such
as factories, power plants, network operations
centers, airports, and spacecraft, with some degree
of automation
 Once limited to SCADA in industrial settings, remote
monitoring and control is now applied in numerous
fields, including:
 Smart grids
 Positive train control
 Structural health monitoring
 Pipeline sensors
 Patient monitoring
 Desktop/server monitoring
4. A user-focused orientation
 The M&E system has been structured to provide the
right information in the right format to key
stakeholders when they need it.
Case Study - Monitoring and Evaluating the working of Telenor and ZTE

More Related Content

PPTX
Condition Based Monitoring Solution_Rockwell Automation
PPTX
Perfexpert
PDF
PPTX
Network Operations Center
PPTX
Information system audit
PPT
Meter Operations in a Post AMI World
PDF
iBMS - SmartCity fundamentals (Example)
PPT
Meter Operations in a Post AMI World
Condition Based Monitoring Solution_Rockwell Automation
Perfexpert
Network Operations Center
Information system audit
Meter Operations in a Post AMI World
iBMS - SmartCity fundamentals (Example)
Meter Operations in a Post AMI World

What's hot (19)

PPT
Meter Operations in a Post AMI World
PPTX
PlantConnect Presentation
PPTX
Pre-Amble for Monitoring Applications
PPTX
PlantConnect insights
PPTX
PlantConnect RAMS - Give Voice to Your Machines
PPTX
IT General Controls
PPTX
Auditing in Computerized Environment
PPT
PPTX
Continual Monitoring
PPT
Meter Operations in a Post AMI World
PPT
Meter Operations in a Post AMI World
PPT
Safety Management Systems (SMS) Fundamentals: Safety Assurance
PPTX
IT environment analytics service
PPTX
Spur Infrastructure Performance With Proactive IT Monitoring
PPT
Asset Management Gas Meter Farms
PPTX
WMATA Security Certification Plan
PPT
Purpose of Embedded Systems
PDF
Technology considerations
PDF
IRJET- Building Management System and its Network Design
Meter Operations in a Post AMI World
PlantConnect Presentation
Pre-Amble for Monitoring Applications
PlantConnect insights
PlantConnect RAMS - Give Voice to Your Machines
IT General Controls
Auditing in Computerized Environment
Continual Monitoring
Meter Operations in a Post AMI World
Meter Operations in a Post AMI World
Safety Management Systems (SMS) Fundamentals: Safety Assurance
IT environment analytics service
Spur Infrastructure Performance With Proactive IT Monitoring
Asset Management Gas Meter Farms
WMATA Security Certification Plan
Purpose of Embedded Systems
Technology considerations
IRJET- Building Management System and its Network Design
Ad

Similar to Case Study - Monitoring and Evaluating the working of Telenor and ZTE (20)

PPTX
HUMS-Final-PPT.pptx
DOC
Performance management strategy
PDF
Plant Maintenance & Condition Monitoring
PDF
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...
PDF
Building management system from link vue system
PPTX
Maintenance and Operation Management-Emergency Management System
PPT
PDF
PLC Training in Noida | PLC Scada Training in Delhi
PDF
Delta Telecom O&m presentation
DOC
dinesh techom - with outpic revised
PDF
Best practices for building network operations center
PDF
A Survey on Smart DRIP Irrigation System
PDF
Shankar.V-CV
PDF
Smart Operations
PPTX
LTE MTC evolution
PPTX
Andrew Schafer, Managing Director, EMEA - Verisae Inc
PPT
Real time monitoring proposal 2011
PDF
Fusion of mantenance and control data A need For the process.pdf
PDF
OIES : M2M integrated with Field Service Management
PPT
Sema 2016- Managing Vendor Issues on AMI Design
HUMS-Final-PPT.pptx
Performance management strategy
Plant Maintenance & Condition Monitoring
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...
Building management system from link vue system
Maintenance and Operation Management-Emergency Management System
PLC Training in Noida | PLC Scada Training in Delhi
Delta Telecom O&m presentation
dinesh techom - with outpic revised
Best practices for building network operations center
A Survey on Smart DRIP Irrigation System
Shankar.V-CV
Smart Operations
LTE MTC evolution
Andrew Schafer, Managing Director, EMEA - Verisae Inc
Real time monitoring proposal 2011
Fusion of mantenance and control data A need For the process.pdf
OIES : M2M integrated with Field Service Management
Sema 2016- Managing Vendor Issues on AMI Design
Ad

Recently uploaded (20)

PPTX
Embedded for Artificial Intelligence 1.pptx
PPTX
Presentation 1.pptxnshshdhhdhdhdhdhhdhdhdhd
PPTX
A Clear View_ Interpreting Scope Numbers and Features
DOCX
fsdffdghjjgfxfdghjvhjvgfdfcbchghgghgcbjghf
PPTX
Lecture-3-Computer-programming for BS InfoTech
DOCX
A PROPOSAL ON IoT climate sensor 2.docx
PPT
FABRICATION OF MOS FET BJT DEVICES IN NANOMETER
PDF
ICT grade for 8. MATATAG curriculum .P2.pdf
PPT
Lines and angles cbse class 9 math chemistry
PPTX
Presentacion compuuuuuuuuuuuuuuuuuuuuuuu
PDF
Smarter Security: How Door Access Control Works with Alarms & CCTV
PPTX
Fundamentals of Computer.pptx Computer BSC
PPT
Hypersensitivity Namisha1111111111-WPS.ppt
PDF
Presented by ATHUL KRISHNA.S_20250813_191657_0000.pdf
PDF
PPT Determiners.pdf.......................
DOCX
Edukasi kultural untuk kita semua maka c
PPTX
Nanokeyer nano keyekr kano ketkker nano keyer
PPTX
DEATH AUDIT MAY 2025.pptxurjrjejektjtjyjjy
PPTX
Entre CHtzyshshshshshshshzhhzzhhz 4MSt.pptx
PPTX
material for studying about lift elevators escalation
Embedded for Artificial Intelligence 1.pptx
Presentation 1.pptxnshshdhhdhdhdhdhhdhdhdhd
A Clear View_ Interpreting Scope Numbers and Features
fsdffdghjjgfxfdghjvhjvgfdfcbchghgghgcbjghf
Lecture-3-Computer-programming for BS InfoTech
A PROPOSAL ON IoT climate sensor 2.docx
FABRICATION OF MOS FET BJT DEVICES IN NANOMETER
ICT grade for 8. MATATAG curriculum .P2.pdf
Lines and angles cbse class 9 math chemistry
Presentacion compuuuuuuuuuuuuuuuuuuuuuuu
Smarter Security: How Door Access Control Works with Alarms & CCTV
Fundamentals of Computer.pptx Computer BSC
Hypersensitivity Namisha1111111111-WPS.ppt
Presented by ATHUL KRISHNA.S_20250813_191657_0000.pdf
PPT Determiners.pdf.......................
Edukasi kultural untuk kita semua maka c
Nanokeyer nano keyekr kano ketkker nano keyer
DEATH AUDIT MAY 2025.pptxurjrjejektjtjyjjy
Entre CHtzyshshshshshshshzhhzzhhz 4MSt.pptx
material for studying about lift elevators escalation

Case Study - Monitoring and Evaluating the working of Telenor and ZTE

  • 1. MONITORING & EVALUATION PRESENTATION SUBMITTED TO: SIR SAAD SUBMITTED BY : ASIM RIAZ NADEEM NAWAZ FAHIM ULLAH JAN
  • 2. Summary Of The Case Study  Project is between ZTE (Zhongxing Telecom – Pakistan ) and Telenor Pakistan  ZTE Corporation is a leading global provider of telecommunications equipment and network solutions  ZTE is listed on both the Hong Kong and Shenzhen Stock Exchanges and is China’s largest listed telecoms equipment company.
  • 3.  In 2011 ZTE won the project of Telenor for maintaining and running the setup of Telenor and ZTE became the sole vendor  We have a case in which we have to look after the maintenance of the all sites of Telenor.  A site means the base transceiver station (BTS) is a piece of equipment that facilitates wireless communication between user equipment (UE) and a network.
  • 4.  This program contributes to facilitates and make the working of all stations to provide the best quality services to their clients / end-users.  The program provides the space for all of the user of 24*7 working of their systems and proper running of functionalities and it is monitored continuously.
  • 5. Remote Monitoring System  Reduced energy consumption  Energy metering will help you make the right decisions  Reduced service trips  Perform service only when needed
  • 6.  Increased lifetime of batteries  Keeping track of temperatures in your BTS will increase lifetime  No malfunctioning gensets  Improve reliability and operation of back-up power generators  Minimized fuel theft  Immediate alarms when fuel levels drop too fast
  • 7. Monitoring Teams  HEAD QUARTER of Telenor – Pakistan monitoring the systems continuously with the help of RMS (Remote Monitoring System)  Review the program for approving priorities for capacity development initiatives directed at multiple areas.
  • 8. Reason why the case selected  This case study implements a program, which requires a continuous check and balance  It needs to be check and needy action is to be taken accordingly and to the time.  Potential stakeholders are involved accordingly with respect to perform the needy actions.
  • 9. How it works  A Remote Monitoring System is connected to the equipment in your base station using a serial, Ethernet or I/O connection.  The gateway sends information via the Internet or the mobile network (GSM/GPRS/3G) to the cloud-based system data center.  By accessing there server from Head Quarter , they can monitor parameters such as temperatures, statuses and levels in a regular user interface.  Trending tools (dashboards) are available to analyze recorded data and alarms are sent whenever a critical event occurs in the field.
  • 10. RMS ALLOWS YOU TO REMOTELY HANDLE:  Fault management (FM) such as alarms and notifications at critical events.  Configuration management (CM) for example setting the cooling temperature on your FCU or air conditioning.  Performance management (PM) - generate instant or scheduled statistics and reports.
  • 11. Findings on the case’s M&E framework  User interface is having the complete information about the working systems This is the mode which is being used and working activities accordingly.
  • 12. Methodology with example a flowchart  If the system accesses any problem the following process is used to evaluate and then the necessary action is taken.  End users  Signal Transformations:
  • 14.  Designed to control large or complex facilities such as factories, power plants, network operations centers, airports, and spacecraft, with some degree of automation.  M&C systems may receive data from sensors, telemetry streams, user inputs, and pre- programmed procedures.
  • 15. Correction of system flaws  Fault management (FM) such as alarms and notifications at critical events.  Configuration management (CM) for example setting the cooling temperature on your FCU or air conditioning.  Performance management (PM) - generate instant or scheduled statistics and reports.
  • 16. Program level Monitoring  As they are having the complete setup online and system based setup to monitor the actual sites.  Identifying, designing, and providing capacity development support activities;  Responding to requests for assistance about the error  Financial and grant administration
  • 17.  The quarterly reports submitted by each partner and will distil the following information:  Common factors influencing project implementation  The log is maintained accordingly  Log is checked on weekly basis  Reports to Head Quarter  Actions on Reports
  • 18. Key Evaluation Questions (KEQs)  During the Evaluation the following are the common questions which are carefully handled. 1. How and to what extent has the System affected the sites and networks 2. How and to what extent have the teams worked efficiently? 3. How much the time is taken to resolved the error / issue ? 4. what errors are continuously coming? 5. What possible actions are to be taken ? 6. what are reasons to eliminate the error permanently?
  • 19.  After completion of all the tasks the following are the data is ready to analyze and can be used in other future decisions. • Monitoring processes at partner and program level; • Successive data is analyzed • A comparison of the baseline and mid-term actions taken • Relevant actions and authenticity is generated
  • 20. Effectiveness of project M&E System 1. Outcomes and process focused:  M&E focuses on the quality of implementation processes carried out, and equally on what outcomes have occurred as a result of these activities.  Outcomes can be positive or negative, expected or unexpected.
  • 21. 2. Monitoring  Remote monitoring and control (M&C) systems are designed to control large or complex facilities such as factories, power plants, network operations centers, airports, and spacecraft, with some degree of automation
  • 22.  Once limited to SCADA in industrial settings, remote monitoring and control is now applied in numerous fields, including:  Smart grids  Positive train control  Structural health monitoring  Pipeline sensors  Patient monitoring  Desktop/server monitoring
  • 23. 4. A user-focused orientation  The M&E system has been structured to provide the right information in the right format to key stakeholders when they need it.