Post-Tensioning in Bridge Applications




    Local Presence – Global Competence

1   AzSCE Bridge Technical Committee Presentation – December 8, 2009
Post-tensioning Overview


       Bonded vs. Unbonded Post-tensioning

       Internal Tendons vs. External Tendons

       Strand Systems


       Bar Systems


       Applications




2
Unbonded Post-Tensioning

       Greased & PE Sheathed Strand Tendons
       Ungrouted Bar Tendons
       External Tendons (May be Grouted)
       Stress Increases are Distributed Along Tendon
     Length




3
Bonded Post-Tensioning

     Tendons Grouted Following Tensioning
     Provides Corrosion Protection to PT Steel
  Anchorage Redundancy Provided through
Bond Transfer
     Stress Increases in PT Steel are Localized




 4
Typical Threadbar PT System Details
    DYWIDAG Threadbar
    • Minimum 150ksi Ultimate
    • Conforms to ASTM A722
    • Most Efficient with Shorter Tendon Lengths
         • Anchor Losses ~0.035“ vs. 0.375“ for Strand
    DYWIDAG Threadbar Anchorage System
    • Conforms to AASHTO Normal Anchorage Definition
    • Anchorage Acceptance by Calculation




5
Threadbar PT System Specifications




6
Typical Strand PT System Details
    DYWIDAG MA Anchorage System
       Use of 0.5“ or 0.6“ Strand
       Capacity varies from 5-0.6“ to 37-0.6“
       Special Anchorage Device per AASHTO
            Approval through Proof Testing
            ADOT Acceptance based upon Caltrans
          Approval
            Additional Local Zone Confinement by
          Supplier




7
DYWIDAG MA Anchorage System




8
Duct Installation




9
Strand Installation




10
Stressing Operations




11
Grouting Operations




12
PT System Specifications
     AASHTO
         Stringent Anchorage Testing Requirements
                 Testing to 1.2GUTS
                 Additional Local Zone Reinforcement

     State DOT
         Generally Local Adaptations of AASHTO or Other States
         May Accept Anchorage Systems on the Basis of Other State„s Prequalification
         May Account for Regional Climate Conditions and Construction Practices


     PTI – Post-Tensioning Institute
         Bonded & Unbonded PT
         Rock and Soil Anchors
         Stay Cables
         Specification for Grouting of Post-Tensioned Structures



13
PT Grouting Specifications
     Evolution of Grouting Practices
         New Specifications originating with Florida DOT
               Born from corrosion problems discovered in poorly grouted tendons.
               Revises both material specifications and construction practices.
               Certification of Personnel (ASBI / PTI)
               Adopted in most eastern states, in progress in Nevada.

     Prepackaged Grouts
         Prequalification testing required.
         Use of Colloidal Mixing Equipment.
         Zero Bleed requirements.
         Extensive production testing
               Flow Cone, Wet Density (Mud Balance), Wick-induced Bleed, etc.
     Permanent Grout Caps (SS or Reinforced Plastic)
     Air Testing




14
Typical PT Layout Details




                        Typical Simple-Span Widening


15
Typical PT Layout Details




                        Typical Simple-Span Widening


16
Common Design Issues
     Areas where special detailing may be required:
       Large Abutment Skew Angles
       Shallow Structure Depths
       Upper Bent Cap Reinforcement
       Girder Clearance for Ducts
       Small Radii Horizontal Curves
       Hinges




17
Common Design Issues
     Large Abutment Skew Angles
            Limited Abutment Diaphragm Thickness
            Large Blockout Depths
            Staggering of Blockouts at Sloped Exterior Girders




18
Common Design Issues
     Shallow Structure Depths
              Adequate Depth to Fit All Anchorages
              Joint Seal Blockout Clearance to Upper Anchorage Spiral
              Staggering of Anchorages to Meet CGS at Abutments




                                                                         Exposed Spiral at
                                                                        Joint Seal Blockout




             3ft. structure depth with 12” joint seal notch
      required use of smaller, multiple anchorages to meet CGS.




19
Common Design Issues
     Bent Cap Reinforcement
           Adequate Clearance for PT Ducts at High Points
           Bundled Top Cap Reinforcement
           Column Hoop Reinforcement




                                                            Ducts must clear below bundled main cap
                                                            reinforcement at high point.




                                                            Ducts must also be protected from
                                                            damage if exposed above construction
                                                            joint.




20
Common Design Issues
     Girder Clearance for Ducts
            Clearance Above Soffit Reinf. at Low Points
            Increased Horizontal Reinforcement Size = Reduced Duct Clearance




           Web thickness increased near bents to provide duct clearance with #25 horiz. reinforcement.




21
Common Design Issues
     Hinges
              Adequate Stressing Clearance between Frames
              Vertical Clearance for Anchorages at Seat-end




22
Common Design Issues
       Horizontal Curvature
            Ducts Tied to Outside of Curve
            Duct Tie Reinforcement added for Horizontal Restraint




23
Problem Areas


        Anchor Zone Congestion


        Importance of Concrete Consolidation




24
Problem Areas




             Voids resulting from poor consolidation of concrete near anchorages.




                                        Complete removal of all loose concrete is
                                        mandatory for repair to restore full anchorage
                                        performance.
25
Problem Areas


        Where did my anchorages go?




26
Problem Areas

        They„re in here!




27
Thank You


     Contact us!
             - Preliminary Design Concerns
             - Unique Applications
             - Specification Development
             - Repair & Strengthening


     DSI is available to help.




28
Local Presence – Global Competence




29

More Related Content

PPT
Prestressed concrete
PPTX
Prestressed concrete
PPTX
Optimum design of precast prestressed concrete structural element
DOCX
Prestressed
PPTX
Prestressed concrete
PPT
Introduction to prestressed concrete structures
PPTX
5. pre stressed & pre-cast members
PDF
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya
Prestressed concrete
Prestressed concrete
Optimum design of precast prestressed concrete structural element
Prestressed
Prestressed concrete
Introduction to prestressed concrete structures
5. pre stressed & pre-cast members
Prestressed concrete structures and its applications By Mukesh Singh Ghuraiya

What's hot (20)

PPTX
Shear in prestress concrete
PDF
Prestressed concrete
PPTX
Pre stress concrete
PDF
What Is Post Tensioning
PDF
CCL Post Tensioned Concrete Slab Brochure
PPTX
Prestressed Concrete
PDF
2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part2)
PDF
Pre stressed concrete Bridge
PDF
PRESTRESSED CONCRETE
PPT
Ce572 introductiontoprestressing1
PPT
PRE STRESSED CONCRETE
PDF
Mega prefab post tension catalog
PPT
Prestressed Concrete Basics
PPTX
Prestressed Concrete Structures
PPTX
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
PPTX
Shear, bond bearing,camber & deflection in prestressed concrete
PDF
CT 3 +5 prestressing b+
PPT
Prestressed concrete&metrorail 22-11-12
PDF
2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part1)
Shear in prestress concrete
Prestressed concrete
Pre stress concrete
What Is Post Tensioning
CCL Post Tensioned Concrete Slab Brochure
Prestressed Concrete
2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part2)
Pre stressed concrete Bridge
PRESTRESSED CONCRETE
Ce572 introductiontoprestressing1
PRE STRESSED CONCRETE
Mega prefab post tension catalog
Prestressed Concrete Basics
Prestressed Concrete Structures
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
Shear, bond bearing,camber & deflection in prestressed concrete
CT 3 +5 prestressing b+
Prestressed concrete&metrorail 22-11-12
2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part1)
Ad

Viewers also liked (10)

PPT
System 100
PDF
Post tensioning شد لاحق - مسبق الاجهاد
PPTX
Prestressed concrete
PPTX
Bc prestressing
PPT
Prestressed concrete
PPTX
Pt slabs
PPT
Post-Tension Concrete - Info session for Contractors
PPTX
Prestressed Concrete
PPTX
7 losses in prestress
PPT
Introduction to prestressed concrete
System 100
Post tensioning شد لاحق - مسبق الاجهاد
Prestressed concrete
Bc prestressing
Prestressed concrete
Pt slabs
Post-Tension Concrete - Info session for Contractors
Prestressed Concrete
7 losses in prestress
Introduction to prestressed concrete
Ad

Similar to C:\fakepath\dsi bridge pt presentation (20)

PDF
BTC: Bottom Termination Component or Biggest Technical Challenge?
PDF
Drilling Engineering - Casing Design
PDF
Posttension vs flat slab
PDF
Structural strengthening Westfield
PPTX
Rigid-Flex Design Eases System Assembly
PDF
Pt slab design philosophy with slides and pictures showing benefit
PDF
PDF
Experimental study of shear in reinforced concrete one way slabs subjected to...
PPTX
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
PPTX
Defining Stack-Ups for Flex & Rigid-Flex Circuit Boards
PDF
Presentation 6 casing design
PDF
Contech Slotted Drain for Commercial Markets
PDF
Expansion joints in bridge
PPTX
Designing Flex and Rigid-Flex PCBs to Prevent Failure
PDF
Rehab Solutions for Today's Infrastructure
PDF
Want To Know About Concrete Wall System?
PDF
Presentation1 integrity problems of concrete piles-emergency
PPTX
culverts-channeline-international.pptx
PDF
Tubular Rivet Foundation (Part 1) .pdf
PPTX
BTC: Bottom Termination Component or Biggest Technical Challenge?
Drilling Engineering - Casing Design
Posttension vs flat slab
Structural strengthening Westfield
Rigid-Flex Design Eases System Assembly
Pt slab design philosophy with slides and pictures showing benefit
Experimental study of shear in reinforced concrete one way slabs subjected to...
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
Defining Stack-Ups for Flex & Rigid-Flex Circuit Boards
Presentation 6 casing design
Contech Slotted Drain for Commercial Markets
Expansion joints in bridge
Designing Flex and Rigid-Flex PCBs to Prevent Failure
Rehab Solutions for Today's Infrastructure
Want To Know About Concrete Wall System?
Presentation1 integrity problems of concrete piles-emergency
culverts-channeline-international.pptx
Tubular Rivet Foundation (Part 1) .pdf

Recently uploaded (20)

DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
cuic standard and advanced reporting.pdf
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPTX
Machine Learning_overview_presentation.pptx
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PPT
Teaching material agriculture food technology
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Encapsulation theory and applications.pdf
PPTX
sap open course for s4hana steps from ECC to s4
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
The AUB Centre for AI in Media Proposal.docx
Diabetes mellitus diagnosis method based random forest with bat algorithm
cuic standard and advanced reporting.pdf
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Assigned Numbers - 2025 - Bluetooth® Document
Agricultural_Statistics_at_a_Glance_2022_0.pdf
The Rise and Fall of 3GPP – Time for a Sabbatical?
NewMind AI Weekly Chronicles - August'25-Week II
Machine Learning_overview_presentation.pptx
Mobile App Security Testing_ A Comprehensive Guide.pdf
Programs and apps: productivity, graphics, security and other tools
Building Integrated photovoltaic BIPV_UPV.pdf
Dropbox Q2 2025 Financial Results & Investor Presentation
Teaching material agriculture food technology
Chapter 3 Spatial Domain Image Processing.pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
MYSQL Presentation for SQL database connectivity
Encapsulation theory and applications.pdf
sap open course for s4hana steps from ECC to s4
Digital-Transformation-Roadmap-for-Companies.pptx

C:\fakepath\dsi bridge pt presentation

  • 1. Post-Tensioning in Bridge Applications Local Presence – Global Competence 1 AzSCE Bridge Technical Committee Presentation – December 8, 2009
  • 2. Post-tensioning Overview Bonded vs. Unbonded Post-tensioning Internal Tendons vs. External Tendons Strand Systems Bar Systems Applications 2
  • 3. Unbonded Post-Tensioning Greased & PE Sheathed Strand Tendons Ungrouted Bar Tendons External Tendons (May be Grouted) Stress Increases are Distributed Along Tendon Length 3
  • 4. Bonded Post-Tensioning Tendons Grouted Following Tensioning Provides Corrosion Protection to PT Steel Anchorage Redundancy Provided through Bond Transfer Stress Increases in PT Steel are Localized 4
  • 5. Typical Threadbar PT System Details DYWIDAG Threadbar • Minimum 150ksi Ultimate • Conforms to ASTM A722 • Most Efficient with Shorter Tendon Lengths • Anchor Losses ~0.035“ vs. 0.375“ for Strand DYWIDAG Threadbar Anchorage System • Conforms to AASHTO Normal Anchorage Definition • Anchorage Acceptance by Calculation 5
  • 6. Threadbar PT System Specifications 6
  • 7. Typical Strand PT System Details DYWIDAG MA Anchorage System Use of 0.5“ or 0.6“ Strand Capacity varies from 5-0.6“ to 37-0.6“ Special Anchorage Device per AASHTO Approval through Proof Testing ADOT Acceptance based upon Caltrans Approval Additional Local Zone Confinement by Supplier 7
  • 13. PT System Specifications AASHTO Stringent Anchorage Testing Requirements Testing to 1.2GUTS Additional Local Zone Reinforcement State DOT Generally Local Adaptations of AASHTO or Other States May Accept Anchorage Systems on the Basis of Other State„s Prequalification May Account for Regional Climate Conditions and Construction Practices PTI – Post-Tensioning Institute Bonded & Unbonded PT Rock and Soil Anchors Stay Cables Specification for Grouting of Post-Tensioned Structures 13
  • 14. PT Grouting Specifications Evolution of Grouting Practices New Specifications originating with Florida DOT Born from corrosion problems discovered in poorly grouted tendons. Revises both material specifications and construction practices. Certification of Personnel (ASBI / PTI) Adopted in most eastern states, in progress in Nevada. Prepackaged Grouts Prequalification testing required. Use of Colloidal Mixing Equipment. Zero Bleed requirements. Extensive production testing Flow Cone, Wet Density (Mud Balance), Wick-induced Bleed, etc. Permanent Grout Caps (SS or Reinforced Plastic) Air Testing 14
  • 15. Typical PT Layout Details Typical Simple-Span Widening 15
  • 16. Typical PT Layout Details Typical Simple-Span Widening 16
  • 17. Common Design Issues Areas where special detailing may be required: Large Abutment Skew Angles Shallow Structure Depths Upper Bent Cap Reinforcement Girder Clearance for Ducts Small Radii Horizontal Curves Hinges 17
  • 18. Common Design Issues Large Abutment Skew Angles Limited Abutment Diaphragm Thickness Large Blockout Depths Staggering of Blockouts at Sloped Exterior Girders 18
  • 19. Common Design Issues Shallow Structure Depths Adequate Depth to Fit All Anchorages Joint Seal Blockout Clearance to Upper Anchorage Spiral Staggering of Anchorages to Meet CGS at Abutments Exposed Spiral at Joint Seal Blockout 3ft. structure depth with 12” joint seal notch required use of smaller, multiple anchorages to meet CGS. 19
  • 20. Common Design Issues Bent Cap Reinforcement Adequate Clearance for PT Ducts at High Points Bundled Top Cap Reinforcement Column Hoop Reinforcement Ducts must clear below bundled main cap reinforcement at high point. Ducts must also be protected from damage if exposed above construction joint. 20
  • 21. Common Design Issues Girder Clearance for Ducts Clearance Above Soffit Reinf. at Low Points Increased Horizontal Reinforcement Size = Reduced Duct Clearance Web thickness increased near bents to provide duct clearance with #25 horiz. reinforcement. 21
  • 22. Common Design Issues Hinges Adequate Stressing Clearance between Frames Vertical Clearance for Anchorages at Seat-end 22
  • 23. Common Design Issues Horizontal Curvature Ducts Tied to Outside of Curve Duct Tie Reinforcement added for Horizontal Restraint 23
  • 24. Problem Areas Anchor Zone Congestion Importance of Concrete Consolidation 24
  • 25. Problem Areas Voids resulting from poor consolidation of concrete near anchorages. Complete removal of all loose concrete is mandatory for repair to restore full anchorage performance. 25
  • 26. Problem Areas Where did my anchorages go? 26
  • 27. Problem Areas They„re in here! 27
  • 28. Thank You Contact us! - Preliminary Design Concerns - Unique Applications - Specification Development - Repair & Strengthening DSI is available to help. 28