Agenda
• Procurement Goals
• Evaluation Options
• Types of Procurement
• Considerations for Selection of Procurement
Type
Procurement Goals
• Attract the best competition from the
qualified DB teams
• Obtain an acceptable market price for DB
services
• Obtain acceptable contract terms to meet
Owner’s project objectives with acceptable
risk allocation
Evaluation Options
Qualifications Cost
Evaluation Options
Qualifications Cost
Qualifications Based Selection
Price Based Selection
Best Value Selection
Design-Build Procurement Approaches
Design-Builder is selected
based on Qualifications
alone.
RFQ
A price for the project is developed
at a specified level of design and
could be GMP or Lump Sum
Qualifications Based Selection
Design-Build Procurement Approaches
Design-Builder is selected
based on price alone
(i.e. lowest responsive price)
RFP
(requires some level of design)
Qualifications Based Selection
Price Based Selection
Design-Build Procurement Approaches
Design-Builder is
selected based on a
combination of
qualifications and
price
RFPor RFQ&RFP
Qualifications Based Selection
Price Based Selection
Best Value Selection
Qualifications Based Selection
ADVANTAGES
• Reduces procurement time and cost
• Most qualified Design-Builder is selected
• High degree of Owner control
• Owner defines/negotiates scope, quality, price and
schedule
Project
Definition
Predesign
Final
Design
Construction Startup
Qualifications Based Selection
DISADVANTAGES
• May not be legally permissible
• Is counter to “public low bid” psyche
• Could be “tough sell”
• May need to engage a procurement advisor
Project
Definition
Predesign
Final
Design
Construction Startup
Qualifications Based Selection
QUALITATIVE CONSIDERATIONS
* Qualifications * Experience
* Technical Approach * Management Approach
* Risk Allocation * Key Personnel
* Team Organization * Schedule Control
* QA/QC Approach * Insurance / Bonding
Project
Definition
Predesign
Final
Design
Construction Startup
Price Based Selection
ADVANTAGES
• Price certainty at time of proposal submission
• Detailed technical information provided
Project
Definition
Predesign
Final
Design
Construction Startup
Price Based Selection
DISADVANTAGES
• Large time investment in procurement
• Greater effort to review proposals
• Owner input only during procurement development
• Life-cycle cost considerations limited
Project
Definition
Predesign
Final
Design
Construction Startup
Price Based Selection
Predesign Final Design
Performance Based Prescriptive Based
INNOVATION CONTROL
Performance vs. Prescriptive
Predesign Final Design
Performance Based Prescriptive Based
INNOVATION CONTROL
Performance Based Prescriptive Based
• Maximum potential for cost
savings through innovation
• Maximum transfer of
design-related performance
risk
• Relatively low costs to
prepare RFP / Proposal
• Substantial control over
project design and O&M
costs
• Proposal selection can
emphasize project design
build costs
• High level of project
definition at time contract is
signed
ADVANTAGES
Performance vs. Prescriptive
Predesign Final Design
Performance Based Prescriptive Based
INNOVATION CONTROL
Performance Based Prescriptive Based
• May result in higher O&M
costs
• Proposal evaluation and
selection is more complex
• Potential for decreased
participation due to higher
preparation costs
• Limited Owner input into
design after proposal is
accepted
• Procurement duration is
longer
• RFP preparation is more
costly due to high level of
design
• Design risk not clearly
assumed by the Design-
Builder
DISADVANTAGES
Best Value Selection
CostQualifications
ADVANTAGES
• Price certainty at time of proposal submission (maybe)
• Detailed technical/qualifications information provided
• Depending upon cost component – collaboration can still exist
Best Value Selection
Best Value Selection
CostQualifications
DISADVANTAGES
• Large time investment in procurement
• Greater effort to review proposals
• Life-cycle cost considerations limited
Best Value Selection
Weighting Costs and Quals
Progressive D-B
Progressive Design-Build
In a progressive design-build
procurement, the design-builder
is selected primarily based on
qualifications before substantial
design is completed. Together,
the owner and the design-build
team advance the design,
incorporating the details desired
by the owner and providing the
owner with cost input regarding
options the owner is considering.
This open-book approach
enables the owner to make well-
informed decisions on the
overall quality of the project.
(Chapter 3, page 25)
Progressive Design-Build
Design/Builder
Design Development and ConstructionDesign
Definition
Owner
PM/OA
100%
Guaranteed maximum price
established at the right time:
Risk and contingency reduced,
schedule needs met
Construction estimating can
start very early in design,
allowing comparison of specific
technical solutions
First fully detailed estimate
can be used to establish a
scope baseline. Estimating
process is “open book”
“Progressive” estimates keep
owners informed and support-
informed scope adjustment
decisions
Owners can use third-parties to
verify cost . . .
. . . and go to the hard-bid market
if needed (the “off-ramp”)
Progressive Design-Build
Design/Builder
Design Development and ConstructionDesign
Definition
Owner
PM/OA
100%
• Investment in projects, not procurements
• Offers owners maximum flexibility/opportunity to collaborate on
design/permitting
• Minimizes overall schedule
• Owners have an “off-ramp” in case of permitting issues or if GMP
can’t be negotiated
• Very successful evolving model
Considerations for Selecting
Procurement Approach
• Project Goals and Objectives
• Legal Feasibility
• Level of Design Definition
www.waterdesignbuild.org www.awwa.org
Design-Build Procurement Approaches

More Related Content

PDF
How to Choose a Project Delivery Method
PPTX
Chapter_2-Procurement and Contract management.pptx
PDF
Contract Administration Presentation
DOCX
Procurement Methods
PPTX
Contracts & Claims Management Workshop (Session-1)
PPTX
Fidic Form of Contract.
PPTX
Extension of time in construction contracts
PPT
3. construction planning. construction project management
How to Choose a Project Delivery Method
Chapter_2-Procurement and Contract management.pptx
Contract Administration Presentation
Procurement Methods
Contracts & Claims Management Workshop (Session-1)
Fidic Form of Contract.
Extension of time in construction contracts
3. construction planning. construction project management

What's hot (20)

PPSX
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
PDF
Training fidic moustafa ismail 2017 _ lec 4
PPT
Lecture 1 introduction to construction procurement process.
PPT
Construction contracts docuements_08092008
PDF
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
PPTX
Project management procurement
PDF
Quantity surveying practise
PPTX
PDF
Professional Practice 1
DOCX
Traditional procurement method
DOCX
Professional practce assignment report
PDF
Measurement 4 Tender Document
PDF
Conditions Of Contract
PDF
Civil Quantity Survey and Estimation
PPTX
Construction phases
PDF
Fidic contract
PDF
FIDIC SIlver Book in Power Projects
PDF
Project Management Project 1
PDF
9. project procurement management
PPTX
Site Possession
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
Training fidic moustafa ismail 2017 _ lec 4
Lecture 1 introduction to construction procurement process.
Construction contracts docuements_08092008
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
Project management procurement
Quantity surveying practise
Professional Practice 1
Traditional procurement method
Professional practce assignment report
Measurement 4 Tender Document
Conditions Of Contract
Civil Quantity Survey and Estimation
Construction phases
Fidic contract
FIDIC SIlver Book in Power Projects
Project Management Project 1
9. project procurement management
Site Possession
Ad

Similar to Design-Build Procurement Approaches (20)

PPTX
Developing Procurement Documents for Progressive Design-Build Projects
PDF
Suggested Best Practices for Design-Build in Transportation Construction
PDF
Chapter One Procrument An Overview.pdf
PPTX
Mesurement presentation pavaruban
PPTX
Quality Assurance and Cost Control for Construction
PDF
Introduction to Building Procurement Systems 2nd Edition Dr Jack Masterman
PPT
Project Management For Good Procurement Practices
PPTX
Procurement system
PDF
Collaborative procurement methods - Investigating the impact of use of Buildi...
PPTX
Strategies in building procurement (summarized)
PPTX
Construction Contract Relationships Presentation.pptx
PPT
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
 
PPT
PROCUREMENT PLANNING.ppt
PPTX
A weaver cost management top gear corporation
PPTX
Construction Engineering lecture 1.pptx civil engineering
PPT
Project Management-2025.ppt Project Management-2025.ppt
PPTX
Construction Contract Approaches Feb14
PDF
Procurement Strategies: A Seminar
PPT
6 Sigma
PDF
RFPs and RFQs: Selecting the Design-Builder
Developing Procurement Documents for Progressive Design-Build Projects
Suggested Best Practices for Design-Build in Transportation Construction
Chapter One Procrument An Overview.pdf
Mesurement presentation pavaruban
Quality Assurance and Cost Control for Construction
Introduction to Building Procurement Systems 2nd Edition Dr Jack Masterman
Project Management For Good Procurement Practices
Procurement system
Collaborative procurement methods - Investigating the impact of use of Buildi...
Strategies in building procurement (summarized)
Construction Contract Relationships Presentation.pptx
CON_CONTRACTS_all_till_mid. bgf uggttyy ppt
 
PROCUREMENT PLANNING.ppt
A weaver cost management top gear corporation
Construction Engineering lecture 1.pptx civil engineering
Project Management-2025.ppt Project Management-2025.ppt
Construction Contract Approaches Feb14
Procurement Strategies: A Seminar
6 Sigma
RFPs and RFQs: Selecting the Design-Builder
Ad

Recently uploaded (20)

PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
DOCX
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
Daniels 2024 Inclusive, Sustainable Development
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Booking.com The Global AI Sentiment Report 2025
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
Charisse Litchman: A Maverick Making Neurological Care More Accessible
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
CTG - Business Update 2Q2025 & 6M2025.pptx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Slide gioi thieu VietinBank Quy 2 - 2025
Daniels 2024 Inclusive, Sustainable Development
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Booking.com The Global AI Sentiment Report 2025
Principles of Marketing, Industrial, Consumers,
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)

Design-Build Procurement Approaches

  • 1. DESIGN-BUILD PROCUREMENT APPROACHES John D. Doller, P.E. Carollo Engineers, Inc.
  • 2. Agenda • Procurement Goals • Evaluation Options • Types of Procurement • Considerations for Selection of Procurement Type
  • 3. Procurement Goals • Attract the best competition from the qualified DB teams • Obtain an acceptable market price for DB services • Obtain acceptable contract terms to meet Owner’s project objectives with acceptable risk allocation
  • 5. Evaluation Options Qualifications Cost Qualifications Based Selection Price Based Selection Best Value Selection
  • 6. Design-Build Procurement Approaches Design-Builder is selected based on Qualifications alone. RFQ A price for the project is developed at a specified level of design and could be GMP or Lump Sum Qualifications Based Selection
  • 7. Design-Build Procurement Approaches Design-Builder is selected based on price alone (i.e. lowest responsive price) RFP (requires some level of design) Qualifications Based Selection Price Based Selection
  • 8. Design-Build Procurement Approaches Design-Builder is selected based on a combination of qualifications and price RFPor RFQ&RFP Qualifications Based Selection Price Based Selection Best Value Selection
  • 9. Qualifications Based Selection ADVANTAGES • Reduces procurement time and cost • Most qualified Design-Builder is selected • High degree of Owner control • Owner defines/negotiates scope, quality, price and schedule Project Definition Predesign Final Design Construction Startup
  • 10. Qualifications Based Selection DISADVANTAGES • May not be legally permissible • Is counter to “public low bid” psyche • Could be “tough sell” • May need to engage a procurement advisor Project Definition Predesign Final Design Construction Startup
  • 11. Qualifications Based Selection QUALITATIVE CONSIDERATIONS * Qualifications * Experience * Technical Approach * Management Approach * Risk Allocation * Key Personnel * Team Organization * Schedule Control * QA/QC Approach * Insurance / Bonding Project Definition Predesign Final Design Construction Startup
  • 12. Price Based Selection ADVANTAGES • Price certainty at time of proposal submission • Detailed technical information provided Project Definition Predesign Final Design Construction Startup
  • 13. Price Based Selection DISADVANTAGES • Large time investment in procurement • Greater effort to review proposals • Owner input only during procurement development • Life-cycle cost considerations limited Project Definition Predesign Final Design Construction Startup
  • 14. Price Based Selection Predesign Final Design Performance Based Prescriptive Based INNOVATION CONTROL
  • 15. Performance vs. Prescriptive Predesign Final Design Performance Based Prescriptive Based INNOVATION CONTROL Performance Based Prescriptive Based • Maximum potential for cost savings through innovation • Maximum transfer of design-related performance risk • Relatively low costs to prepare RFP / Proposal • Substantial control over project design and O&M costs • Proposal selection can emphasize project design build costs • High level of project definition at time contract is signed ADVANTAGES
  • 16. Performance vs. Prescriptive Predesign Final Design Performance Based Prescriptive Based INNOVATION CONTROL Performance Based Prescriptive Based • May result in higher O&M costs • Proposal evaluation and selection is more complex • Potential for decreased participation due to higher preparation costs • Limited Owner input into design after proposal is accepted • Procurement duration is longer • RFP preparation is more costly due to high level of design • Design risk not clearly assumed by the Design- Builder DISADVANTAGES
  • 17. Best Value Selection CostQualifications ADVANTAGES • Price certainty at time of proposal submission (maybe) • Detailed technical/qualifications information provided • Depending upon cost component – collaboration can still exist Best Value Selection
  • 18. Best Value Selection CostQualifications DISADVANTAGES • Large time investment in procurement • Greater effort to review proposals • Life-cycle cost considerations limited Best Value Selection
  • 19. Weighting Costs and Quals Progressive D-B
  • 20. Progressive Design-Build In a progressive design-build procurement, the design-builder is selected primarily based on qualifications before substantial design is completed. Together, the owner and the design-build team advance the design, incorporating the details desired by the owner and providing the owner with cost input regarding options the owner is considering. This open-book approach enables the owner to make well- informed decisions on the overall quality of the project. (Chapter 3, page 25)
  • 21. Progressive Design-Build Design/Builder Design Development and ConstructionDesign Definition Owner PM/OA 100% Guaranteed maximum price established at the right time: Risk and contingency reduced, schedule needs met Construction estimating can start very early in design, allowing comparison of specific technical solutions First fully detailed estimate can be used to establish a scope baseline. Estimating process is “open book” “Progressive” estimates keep owners informed and support- informed scope adjustment decisions Owners can use third-parties to verify cost . . . . . . and go to the hard-bid market if needed (the “off-ramp”)
  • 22. Progressive Design-Build Design/Builder Design Development and ConstructionDesign Definition Owner PM/OA 100% • Investment in projects, not procurements • Offers owners maximum flexibility/opportunity to collaborate on design/permitting • Minimizes overall schedule • Owners have an “off-ramp” in case of permitting issues or if GMP can’t be negotiated • Very successful evolving model
  • 23. Considerations for Selecting Procurement Approach • Project Goals and Objectives • Legal Feasibility • Level of Design Definition