English translation:
Table of Content:
1 Objective..........................................................................................................
2 Scopes...................................................................................................................
3 Referenced Documents.......................................................................................
4 Definitions and Abbreviations..............................................................................
5 Determination of inertia by load rejection............................................................
5.1 Conduction of test.............................................................................................
5.2 Evaluation of test...............................................................................................
6 Proceeding in case of deviations .........................................................................
1 Objective
Determination of moment of inertia J, stored energy constant H and acceleration time τJ
of the rotating parts of a machine set by the load drop test.
2 Scope
This procedure for the determination of inertia quantities is valid in the cross function GP
for all types of synchronous machines on site. For determination of inertia the load drop
test is preferred when separate losses for efficiency are not determined by the
retardation method.
Also, in any case load rejection tests are performed by "Protection and Excitation" during
putting into service of the generator.
3 Referenced Documents
IEC 34-4 (EN 60034-4), 70, 71
4 Definitions and Abbreviations
None
5 Determination of inertia by load rejection
5.1 Conduction of test
- The machine operates as a generator on the network.
- The turbine speed regulator is taken out of service
- The generator is regulated to supply active power P1 of 10 to 20 % of the rated load (i.e.
power factor close to cosϕ = 1,0).
- During the test the excitation of the generator remains unchanged
- The generator is suddenly disconnected from the network and the change of speed
with time (curve n = f (t) and/or dn/dt = f´(t)) is recorded with appropriate instruments
(e.g. by means of the ELIN Digital Speed Analyzer DAS).
- At about 10 % overspeed the turbine speed regulator is put back in service
5.2 Evaluation of test
- In the point of nominal speed of the measured speed-time curve n = f (t) the tangent
∆n/∆t resp. the differential quotient dn/dt is determined (Note: The measured curve
normally starts smoothly. dn/dt will be found by extrapolation from the point of inflection
8/25/2005 0:23 a8/p8 © Page 1 of 3
down to nN ). speed and/or its derivation starts smoothly it must be extrapolated down to
rated speed). For determination of the inertia quantities the following fundamental
equations are used (all quantities are here indicated in coherent international SI-units):
8/25/2005 0:23 a8/p8 © Page 2 of 3
6 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc given in an instruction
is intended to serve for quality control purposes only. In the case of deviations, a
nonconformity report has to be written according to PNG Power Standard
8/25/2005 0:23 a8/p8 © Page 3 of 3

More Related Content

DOC
Chuong 3 ton hao dien moi
PDF
50 mach dieu_khien_bang_cam_bien_7555
PDF
Myslide.es sepam 20
DOC
Đồ án thiết kế mô phỏng PVsyst hệ thống điện mặt trời nối lưới cho ...
DOCX
Đề tài: Thiết kế mạng điện 110kV, HAY, 9đ
PDF
Nghiên cứu các yêu cầu kỹ thuật khi kết nối nguồn điện phân tán với lưới điện...
PDF
dieu khien-thiet-bi-bu-tinh-svc-va-ung-dung-trong-viec-nang-cao-cho-on-dinh-c...
PDF
Đề tài: Thiết kế đường dây và trạm biến áp, HAY
Chuong 3 ton hao dien moi
50 mach dieu_khien_bang_cam_bien_7555
Myslide.es sepam 20
Đồ án thiết kế mô phỏng PVsyst hệ thống điện mặt trời nối lưới cho ...
Đề tài: Thiết kế mạng điện 110kV, HAY, 9đ
Nghiên cứu các yêu cầu kỹ thuật khi kết nối nguồn điện phân tán với lưới điện...
dieu khien-thiet-bi-bu-tinh-svc-va-ung-dung-trong-viec-nang-cao-cho-on-dinh-c...
Đề tài: Thiết kế đường dây và trạm biến áp, HAY

What's hot (20)

PDF
Thiết kế động cơ điện không đồng bộ ba pha rôto lồng sóc (Kèm file Autocad)
PDF
Các đặc tính cơ khi hãm động cơ đk
PDF
Thiết kế phần điện nhà máy điện và trạm biến áp.pdf
PDF
Vf p7 manual
PDF
Contoh Kartu USBN SMK Nahdlatul Ulama Balikpapan
PDF
CHƯƠNG 6 TRÀO LƯU CÔNG SUẤT
PPT
GIAI TICH HE THONG DIEN NANG CAO - CHƯƠNG 1 MA TRẬN TỔNG DẪN
PPTX
Dc pada komputer
PPTX
DOCX
ở đâY là những mạch ứng dụng tham khảo trong thiết kế mạch nguồn cho mạch như...
DOCX
Bao cao le trung phong
PDF
aplikasi PLC omron CP1L
PPTX
Pemeliharaan peralatan cubicle out going 20 k v gi
PDF
Giáo trình CAD trong kỹ thuật điện.pdf
PPTX
L3. perhitungan instalasi listrik
PDF
Thiết kế bảo vệ mạng điện phân phối có ứng dụng phần mềm ETAP
PDF
Ứng dụng phần mềm ETAP trong công nghệ lưới điện thông minh.pdf
PDF
Dasar pembangkit dan pengukuran teknik tegangan tinggi
PPTX
Pentanahan netral
PDF
Công thức Máy điện 1 - Chương 2 - Máy biến áp
Thiết kế động cơ điện không đồng bộ ba pha rôto lồng sóc (Kèm file Autocad)
Các đặc tính cơ khi hãm động cơ đk
Thiết kế phần điện nhà máy điện và trạm biến áp.pdf
Vf p7 manual
Contoh Kartu USBN SMK Nahdlatul Ulama Balikpapan
CHƯƠNG 6 TRÀO LƯU CÔNG SUẤT
GIAI TICH HE THONG DIEN NANG CAO - CHƯƠNG 1 MA TRẬN TỔNG DẪN
Dc pada komputer
ở đâY là những mạch ứng dụng tham khảo trong thiết kế mạch nguồn cho mạch như...
Bao cao le trung phong
aplikasi PLC omron CP1L
Pemeliharaan peralatan cubicle out going 20 k v gi
Giáo trình CAD trong kỹ thuật điện.pdf
L3. perhitungan instalasi listrik
Thiết kế bảo vệ mạng điện phân phối có ứng dụng phần mềm ETAP
Ứng dụng phần mềm ETAP trong công nghệ lưới điện thông minh.pdf
Dasar pembangkit dan pengukuran teknik tegangan tinggi
Pentanahan netral
Công thức Máy điện 1 - Chương 2 - Máy biến áp
Ad

Similar to Determination of inertia by load rejection (20)

DOC
Load test
DOC
Temperature rise test
PDF
PPG_FSK.pdf
DOC
Measurement of winding resistances
PDF
TIBU1_User Manaul_TabApp_Final_v2.0_10Jan13
PDF
Dkd r 5_7_e
PDF
Tf3600 tc3 condition_monitoring_en
PDF
epa_meteorological.pdf
PDF
Transport Assessment
DOCX
Scholarship database management database (1)
PDF
WP-1762-FR
PDF
Coulter manual de usos
PDF
Web Information Retrieval - Homework 1
PDF
Phase2 tutorial manual
PDF
PDF
M1 - Photoconductive Emitters
PDF
code-explanation-of-cnc-edm-machine.pdf
PDF
Cummins onan wbtpcd power generation transfer switch 150 1000 amperes service...
PDF
Cummins onan wbtpcd power generation transfer switch 150 1000 amperes service...
PDF
Cummins onan wbtpcb power generation transfer switch 150 1000 amperes service...
Load test
Temperature rise test
PPG_FSK.pdf
Measurement of winding resistances
TIBU1_User Manaul_TabApp_Final_v2.0_10Jan13
Dkd r 5_7_e
Tf3600 tc3 condition_monitoring_en
epa_meteorological.pdf
Transport Assessment
Scholarship database management database (1)
WP-1762-FR
Coulter manual de usos
Web Information Retrieval - Homework 1
Phase2 tutorial manual
M1 - Photoconductive Emitters
code-explanation-of-cnc-edm-machine.pdf
Cummins onan wbtpcd power generation transfer switch 150 1000 amperes service...
Cummins onan wbtpcd power generation transfer switch 150 1000 amperes service...
Cummins onan wbtpcb power generation transfer switch 150 1000 amperes service...
Ad

More from Donald Stephen (20)

DOC
Tangent delta test report form
DOC
Sustained three phase short-circuit test and overcurrent test
DOC
Sudden three phase short-circuit test
DOC
Stator insulation test setup
DOC
Stator core induction test
DOC
Stator core compr test
DOC
Open circuit saturation test
DOC
Rotor insul test setup
DOC
Noise measurement
DOC
Measurement of shaft voltage and shaft current on machines with sleeve bearings
DOC
Measurement of partial discharges
DOC
Loss tangent delta test
DOC
Line to-line sustained short-circuit test
DOC
Insulation resistance testing
DOC
Insulation resistance test
DOC
Impedance measurement of field windings
DOC
High potential test
DOC
Efficiency determination on hydrogenerators by calorimetric method
DOC
Determination of the transient open circuit time constant
DOC
Crack monitor
Tangent delta test report form
Sustained three phase short-circuit test and overcurrent test
Sudden three phase short-circuit test
Stator insulation test setup
Stator core induction test
Stator core compr test
Open circuit saturation test
Rotor insul test setup
Noise measurement
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of partial discharges
Loss tangent delta test
Line to-line sustained short-circuit test
Insulation resistance testing
Insulation resistance test
Impedance measurement of field windings
High potential test
Efficiency determination on hydrogenerators by calorimetric method
Determination of the transient open circuit time constant
Crack monitor

Recently uploaded (20)

PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Current and future trends in Computer Vision.pptx
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Design Guidelines and solutions for Plastics parts
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Software Engineering and software moduleing
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Information Storage and Retrieval Techniques Unit III
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Automation-in-Manufacturing-Chapter-Introduction.pdf
Current and future trends in Computer Vision.pptx
Abrasive, erosive and cavitation wear.pdf
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Categorization of Factors Affecting Classification Algorithms Selection
III.4.1.2_The_Space_Environment.p pdffdf
Design Guidelines and solutions for Plastics parts
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Fundamentals of Mechanical Engineering.pptx
Software Engineering and software moduleing
R24 SURVEYING LAB MANUAL for civil enggi
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Soil Improvement Techniques Note - Rabbi
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf

Determination of inertia by load rejection

  • 1. English translation: Table of Content: 1 Objective.......................................................................................................... 2 Scopes................................................................................................................... 3 Referenced Documents....................................................................................... 4 Definitions and Abbreviations.............................................................................. 5 Determination of inertia by load rejection............................................................ 5.1 Conduction of test............................................................................................. 5.2 Evaluation of test............................................................................................... 6 Proceeding in case of deviations ......................................................................... 1 Objective Determination of moment of inertia J, stored energy constant H and acceleration time τJ of the rotating parts of a machine set by the load drop test. 2 Scope This procedure for the determination of inertia quantities is valid in the cross function GP for all types of synchronous machines on site. For determination of inertia the load drop test is preferred when separate losses for efficiency are not determined by the retardation method. Also, in any case load rejection tests are performed by "Protection and Excitation" during putting into service of the generator. 3 Referenced Documents IEC 34-4 (EN 60034-4), 70, 71 4 Definitions and Abbreviations None 5 Determination of inertia by load rejection 5.1 Conduction of test - The machine operates as a generator on the network. - The turbine speed regulator is taken out of service - The generator is regulated to supply active power P1 of 10 to 20 % of the rated load (i.e. power factor close to cosϕ = 1,0). - During the test the excitation of the generator remains unchanged - The generator is suddenly disconnected from the network and the change of speed with time (curve n = f (t) and/or dn/dt = f´(t)) is recorded with appropriate instruments (e.g. by means of the ELIN Digital Speed Analyzer DAS). - At about 10 % overspeed the turbine speed regulator is put back in service 5.2 Evaluation of test - In the point of nominal speed of the measured speed-time curve n = f (t) the tangent ∆n/∆t resp. the differential quotient dn/dt is determined (Note: The measured curve normally starts smoothly. dn/dt will be found by extrapolation from the point of inflection 8/25/2005 0:23 a8/p8 © Page 1 of 3
  • 2. down to nN ). speed and/or its derivation starts smoothly it must be extrapolated down to rated speed). For determination of the inertia quantities the following fundamental equations are used (all quantities are here indicated in coherent international SI-units): 8/25/2005 0:23 a8/p8 © Page 2 of 3
  • 3. 6 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc given in an instruction is intended to serve for quality control purposes only. In the case of deviations, a nonconformity report has to be written according to PNG Power Standard 8/25/2005 0:23 a8/p8 © Page 3 of 3