Line to line sustained short circuit test
Table of Content:
1 Objective........................................................................................................
2 Scope.............................................................................................................
3 Referenced Documents.................................................................................
4 Definitions and abbreviations........................................................................
5 Line to line sustained short-circuit test..........................................................
5.1 Connection (see diagram) ......................................................................
5.2 Machine condition...................................................................................
5.3 Measured quantities ..............................................................................
5.4 Evaluation ..............................................................................................
5.5 Problems ................................................................................................
6 Proceeding in case of deviations..........................................................................
7 Copyright ...............................................................................................................
1 Objective
Determination of negative sequence reactance X2 and negative sequence resistance R2.
2 Scope
All synchronous machines of all kinds, tested in the work shop or at site.
3 Referenced Documents
IEC 34-4, 48-49
IEEE 115, 10.5.4 Method 3
EN 60034-4
4 Definitions and Abbreviations
None
5 Line to line sustained short-circuit test
5.1 Connection (see diagram)
Short-circuit any two line terminals by inserting ampere meter and wattmeter (current
circuit)
Note: It is recommendable to perform this test immediately after the three-phase sustained
short-circuit test, removing the short-circuit between two line terminals. Connect voltmeter
between open line terminal and one of the short-circuited terminals
5.2 Machine condition
Machine is driven at rated speed by turbine or motor resp.
Note: When a prime mover is not available, this test can also be performed by retardation
8/24/2005 7:36 a8/p8 Page 1 of 3
method, measuring when the decelerating machine passes through nominal speed. Set
excitation level to several values of the short-circuit current up to max. 0,3 In and take
readings.
5.3 Measured quantities
Short-circuit current (I) and field current (If) voltage between open line terminal and short
circuited terminals (U) active power of short-circuit (P)
Note: Measurement of reactive power (Q) is not considered necessary. A special VAr-
meter would be required for measuring Q.
5.4 Evaluation
5.5 Problems
- danger of overheating solid parts
should higher current levels than 0,3 In be stipulated in the contract restrict test duration
to time required for reading of instruments
- danger of excessive vibration
for non-salient pole machines limit armature current in any case to 0,5 In
6 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc given in an instruction
intended to serve for quality control purposes only. In the case of deviations, a
nonconformity report has to be written according to PNG Power Standard.
8/24/2005 7:36 a8/p8 Page 2 of 3
7 Χοπψριγητ
This Document is properly of PNG Power internal use only and must neither be copied.
Neither is it to be handed over nor in other way communicated to a third party.
Infringement will lead to prosecution.
8/24/2005 7:36 a8/p8 Page 3 of 3

More Related Content

PDF
Machine lab manual
PPT
Sc and oc test on transformer
PDF
Electrical machines 2 lab manual
PDF
Electrical Machines Notes
PPT
Electrical machines I (II-EEE)
DOC
Sustained three phase short-circuit test and overcurrent test
DOC
Determination of the transient open circuit time constant
Machine lab manual
Sc and oc test on transformer
Electrical machines 2 lab manual
Electrical Machines Notes
Electrical machines I (II-EEE)
Sustained three phase short-circuit test and overcurrent test
Determination of the transient open circuit time constant

Similar to Line to-line sustained short-circuit test (20)

DOC
Open circuit saturation test
DOC
Sudden three phase short-circuit test
DOC
Load test
PPTX
Short circuit test in brief
DOC
Measurement of winding resistances
PPTX
Synchronous Generator Loading Characteristics
PPTX
Iec 61000 4-11
PDF
Electrical power ecx3232 lab report
PPT
Electricmotor4
PDF
Eet3082 binod kumar sahu lecturer_10
PDF
Short circuit current calculations
PPTX
Open circuit and Short circuit test on transformer
PDF
Electronic Measurement - Power Factor Meter
PPTX
Slip test on Synchronous Machine
PDF
EEP303: Exp1
PPTX
SHORT-CIRCUIT-CALCULATIONS-ANSI-VS-IEC-F (1).pptx
PDF
Bus ele tech_lib_short_circuit_current_calculations (1)
PDF
DigSILENT PF - 06 (es) short circuit theory
PDF
DigSILENT PF - 05 short circuit theory
PDF
IRJET- Blended Learning Method for Medium Power Transmission Line Performance...
Open circuit saturation test
Sudden three phase short-circuit test
Load test
Short circuit test in brief
Measurement of winding resistances
Synchronous Generator Loading Characteristics
Iec 61000 4-11
Electrical power ecx3232 lab report
Electricmotor4
Eet3082 binod kumar sahu lecturer_10
Short circuit current calculations
Open circuit and Short circuit test on transformer
Electronic Measurement - Power Factor Meter
Slip test on Synchronous Machine
EEP303: Exp1
SHORT-CIRCUIT-CALCULATIONS-ANSI-VS-IEC-F (1).pptx
Bus ele tech_lib_short_circuit_current_calculations (1)
DigSILENT PF - 06 (es) short circuit theory
DigSILENT PF - 05 short circuit theory
IRJET- Blended Learning Method for Medium Power Transmission Line Performance...
Ad

More from Donald Stephen (20)

DOC
Tangent delta test report form
DOC
Stator insulation test setup
DOC
Stator core induction test
DOC
Stator core compr test
DOC
Rotor insul test setup
DOC
Noise measurement
DOC
Measurement of shaft voltage and shaft current on machines with sleeve bearings
DOC
Measurement of partial discharges
DOC
Loss tangent delta test
DOC
Insulation resistance testing
DOC
Insulation resistance test
DOC
Impedance measurement of field windings
DOC
High potential test
DOC
Efficiency determination on hydrogenerators by calorimetric method
DOC
Determination of inertia by load rejection
DOC
Crack monitor
DOC
Core deffect detector
DOC
Check pole connector
DOC
Temperature rise test
PDF
Future strategic-issues-and-warfare
Tangent delta test report form
Stator insulation test setup
Stator core induction test
Stator core compr test
Rotor insul test setup
Noise measurement
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of partial discharges
Loss tangent delta test
Insulation resistance testing
Insulation resistance test
Impedance measurement of field windings
High potential test
Efficiency determination on hydrogenerators by calorimetric method
Determination of inertia by load rejection
Crack monitor
Core deffect detector
Check pole connector
Temperature rise test
Future strategic-issues-and-warfare
Ad

Recently uploaded (20)

PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
communication and presentation skills 01
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Feature types and data preprocessing steps
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPT
Total quality management ppt for engineering students
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Abrasive, erosive and cavitation wear.pdf
Soil Improvement Techniques Note - Rabbi
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Module 8- Technological and Communication Skills.pptx
communication and presentation skills 01
Information Storage and Retrieval Techniques Unit III
Management Information system : MIS-e-Business Systems.pptx
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Categorization of Factors Affecting Classification Algorithms Selection
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Feature types and data preprocessing steps
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Total quality management ppt for engineering students
distributed database system" (DDBS) is often used to refer to both the distri...
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf

Line to-line sustained short-circuit test

  • 1. Line to line sustained short circuit test Table of Content: 1 Objective........................................................................................................ 2 Scope............................................................................................................. 3 Referenced Documents................................................................................. 4 Definitions and abbreviations........................................................................ 5 Line to line sustained short-circuit test.......................................................... 5.1 Connection (see diagram) ...................................................................... 5.2 Machine condition................................................................................... 5.3 Measured quantities .............................................................................. 5.4 Evaluation .............................................................................................. 5.5 Problems ................................................................................................ 6 Proceeding in case of deviations.......................................................................... 7 Copyright ............................................................................................................... 1 Objective Determination of negative sequence reactance X2 and negative sequence resistance R2. 2 Scope All synchronous machines of all kinds, tested in the work shop or at site. 3 Referenced Documents IEC 34-4, 48-49 IEEE 115, 10.5.4 Method 3 EN 60034-4 4 Definitions and Abbreviations None 5 Line to line sustained short-circuit test 5.1 Connection (see diagram) Short-circuit any two line terminals by inserting ampere meter and wattmeter (current circuit) Note: It is recommendable to perform this test immediately after the three-phase sustained short-circuit test, removing the short-circuit between two line terminals. Connect voltmeter between open line terminal and one of the short-circuited terminals 5.2 Machine condition Machine is driven at rated speed by turbine or motor resp. Note: When a prime mover is not available, this test can also be performed by retardation 8/24/2005 7:36 a8/p8 Page 1 of 3
  • 2. method, measuring when the decelerating machine passes through nominal speed. Set excitation level to several values of the short-circuit current up to max. 0,3 In and take readings. 5.3 Measured quantities Short-circuit current (I) and field current (If) voltage between open line terminal and short circuited terminals (U) active power of short-circuit (P) Note: Measurement of reactive power (Q) is not considered necessary. A special VAr- meter would be required for measuring Q. 5.4 Evaluation 5.5 Problems - danger of overheating solid parts should higher current levels than 0,3 In be stipulated in the contract restrict test duration to time required for reading of instruments - danger of excessive vibration for non-salient pole machines limit armature current in any case to 0,5 In 6 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc given in an instruction intended to serve for quality control purposes only. In the case of deviations, a nonconformity report has to be written according to PNG Power Standard. 8/24/2005 7:36 a8/p8 Page 2 of 3
  • 3. 7 Χοπψριγητ This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. 8/24/2005 7:36 a8/p8 Page 3 of 3