60694 © IEC:1996+A1:2000+A2:2001 – 173 –
d) tightness test in accordance with 7.4;
e) design and visual checks in accordance with 7.5.
Additional routine tests may be necessary and will be specified in the relevant IEC standards.
When switchgear and controlgear are not completely assembled before transport, separate
tests shall be made on all transport units. In this event, the manufacturer shall demonstrate
the validity of his test (example: leakage rate, test voltage, resistance of part of the main
circuit).
Test reports of the routine tests are normally not necessary unless otherwise agreed upon
between manufacturer and user.
7.1 Dielectric test on the main circuit
A dry, short-duration power-frequency voltage test shall be applied. The test shall be made
according to IEC 60060-1, and to 6.2 on complete apparatus or on separate poles, or on
transport units in new, clean and dry conditions.
The test voltage shall be that specified in column 2 of tables 1 or 2, according to the relevant
IEC standards, or the applicable part of it.
When the insulation of switchgear and controlgear is provided only by solid-core insulators
and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the
dimensions between the conductive parts – between phases, across open switching device
and between conductive parts and the frame – are checked by dimensional measurements.
Bases for the checking of dimensions are the dimensional (outline) drawings, which are part
of the type test report (or are referred to in it) of the particular switchgear and controlgear.
Therefore, in these drawings all information necessary for dimensional checking including the
permissible tolerances shall be given.
7.2 Tests on auxiliary and control circuits
7.2.1 Inspection of auxiliary and control circuits, and verification of conformity
to the circuit diagrams and wiring diagrams
The nature of the materials, the quality of assembly, the finish and, if necessary, the
protective coatings against corrosion shall be checked. A visual inspection is also necessary
to check the satisfactory installation of the thermal insulation.
A visual inspection of actuators, interlocks, locks, etc., shall be made.
Components for auxiliary and control circuits inside enclosures shall be checked for proper
mounting. The location of the means provided for connecting external wiring shall be checked
to ensure that there is sufficient wiring space for spreading of the cores of multi-core cables
and for the proper connection of the conductors.
The conductors and cables shall be checked for proper routing. Special attention shall be
given to ensure that no mechanical damage can occur to conductors and cables due to the
proximity of sharp edges or heating elements, or to the movement of moving parts.

More Related Content

PDF
SVC device optimal location for voltage stability enhancement based on a comb...
PDF
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
PDF
Always Switched on
DOCX
PDF
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
PPTX
Condition monitoring of rotating machines ppt
PDF
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
PPTX
Condition monitoring part 2
SVC device optimal location for voltage stability enhancement based on a comb...
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
Always Switched on
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
Condition monitoring of rotating machines ppt
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
Condition monitoring part 2

What's hot (17)

PDF
Fault diagnosis of rotating machines using vibration
PDF
Asce 7 10 presentation on seismic bracing for mep systems
PPTX
Planning for Substation Maintenance and Reliability
PDF
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
PDF
electrical plants & equipment's Condition Monitoring
PDF
Inspection and testing
PDF
Condition based monitoring of rotating machines using piezoelectric material
PPTX
Fulham Reach Block G Risk Review Presentation For review
PPTX
Condition monitoring
PDF
Challenges of Rebar Testing
PDF
Applying Condition Based Monitoring Approach in Engineering Management Services
PDF
Condition Monitoring Basics
PPT
Condition monitoring
PPTX
Challenges of Pipe & Tube Testing
PDF
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
PPTX
Condition monitoring
PPTX
Aceeptance testing and commisioning data measurement for photon beam
Fault diagnosis of rotating machines using vibration
Asce 7 10 presentation on seismic bracing for mep systems
Planning for Substation Maintenance and Reliability
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
electrical plants & equipment's Condition Monitoring
Inspection and testing
Condition based monitoring of rotating machines using piezoelectric material
Fulham Reach Block G Risk Review Presentation For review
Condition monitoring
Challenges of Rebar Testing
Applying Condition Based Monitoring Approach in Engineering Management Services
Condition Monitoring Basics
Condition monitoring
Challenges of Pipe & Tube Testing
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Condition monitoring
Aceeptance testing and commisioning data measurement for photon beam
Ad

Viewers also liked (18)

PDF
Armonicos Conceptos Basicos
PDF
Fallas transformadores
PDF
Transitorios al energizar un transformador
PDF
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
PDF
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
PDF
Armonicos en sistemas electricos
PDF
Operación de sistemas de transmisión en 500k
PDF
Analisis de sistemas_electricos_de_potencia
PDF
253690381 alta-tension-libro
PDF
Apunte de protección de transformadores
PPTX
Lineas de transmision
PDF
Lineas tecsup
PDF
E book sistemas electricos de potencia (grainger)
DOCX
Informe tecnico
PDF
Calculo de Corriente de cortocircuito
PDF
Electricidad tecnicas de_alta_tension
PDF
Introduccion a las Protecciones Electricas
PDF
Calculo de proteciones de transformadores
Armonicos Conceptos Basicos
Fallas transformadores
Transitorios al energizar un transformador
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Armonicos en sistemas electricos
Operación de sistemas de transmisión en 500k
Analisis de sistemas_electricos_de_potencia
253690381 alta-tension-libro
Apunte de protección de transformadores
Lineas de transmision
Lineas tecsup
E book sistemas electricos de potencia (grainger)
Informe tecnico
Calculo de Corriente de cortocircuito
Electricidad tecnicas de_alta_tension
Introduccion a las Protecciones Electricas
Calculo de proteciones de transformadores
Ad

Similar to Dialectirc tests (20)

PPTX
AC Circuit Breakers Routine Tests according to IEC 62271-100
DOC
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
PPT
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
PPTX
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
PDF
Siemens Sivacon S8 Info
DOCX
Electrical testing
PDF
iRTU F: The RTU with Fault Detection
PPTX
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
PDF
Product Safety Testing Reduces the Risk of Shock, Fire, Explosions
PDF
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
PDF
Portable Appliance Testing
PDF
Zx range datasheet_0611
PPT
TESCO Tuesday: Test Switch Operation & Accessories
PDF
3 vt 1..5
PDF
3 vt 1..5
PDF
Bam Nuttall Hv Test Report
PDF
Multimeter Safety Tests de acordo com a EN 61010
PDF
Iec standards
PDF
20120504 LISAT slides Dube
AC Circuit Breakers Routine Tests according to IEC 62271-100
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
Siemens Sivacon S8 Info
Electrical testing
iRTU F: The RTU with Fault Detection
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
Product Safety Testing Reduces the Risk of Shock, Fire, Explosions
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
Portable Appliance Testing
Zx range datasheet_0611
TESCO Tuesday: Test Switch Operation & Accessories
3 vt 1..5
3 vt 1..5
Bam Nuttall Hv Test Report
Multimeter Safety Tests de acordo com a EN 61010
Iec standards
20120504 LISAT slides Dube

Recently uploaded (20)

PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
PPT on Performance Review to get promotions
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Sustainable Sites - Green Building Construction
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
737-MAX_SRG.pdf student reference guides
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Foundation to blockchain - A guide to Blockchain Tech
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPT on Performance Review to get promotions
UNIT 4 Total Quality Management .pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Sustainable Sites - Green Building Construction
Embodied AI: Ushering in the Next Era of Intelligent Systems
additive manufacturing of ss316l using mig welding
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
III.4.1.2_The_Space_Environment.p pdffdf
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Safety Seminar civil to be ensured for safe working.
737-MAX_SRG.pdf student reference guides
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx

Dialectirc tests

  • 1. 60694 © IEC:1996+A1:2000+A2:2001 – 173 – d) tightness test in accordance with 7.4; e) design and visual checks in accordance with 7.5. Additional routine tests may be necessary and will be specified in the relevant IEC standards. When switchgear and controlgear are not completely assembled before transport, separate tests shall be made on all transport units. In this event, the manufacturer shall demonstrate the validity of his test (example: leakage rate, test voltage, resistance of part of the main circuit). Test reports of the routine tests are normally not necessary unless otherwise agreed upon between manufacturer and user. 7.1 Dielectric test on the main circuit A dry, short-duration power-frequency voltage test shall be applied. The test shall be made according to IEC 60060-1, and to 6.2 on complete apparatus or on separate poles, or on transport units in new, clean and dry conditions. The test voltage shall be that specified in column 2 of tables 1 or 2, according to the relevant IEC standards, or the applicable part of it. When the insulation of switchgear and controlgear is provided only by solid-core insulators and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the dimensions between the conductive parts – between phases, across open switching device and between conductive parts and the frame – are checked by dimensional measurements. Bases for the checking of dimensions are the dimensional (outline) drawings, which are part of the type test report (or are referred to in it) of the particular switchgear and controlgear. Therefore, in these drawings all information necessary for dimensional checking including the permissible tolerances shall be given. 7.2 Tests on auxiliary and control circuits 7.2.1 Inspection of auxiliary and control circuits, and verification of conformity to the circuit diagrams and wiring diagrams The nature of the materials, the quality of assembly, the finish and, if necessary, the protective coatings against corrosion shall be checked. A visual inspection is also necessary to check the satisfactory installation of the thermal insulation. A visual inspection of actuators, interlocks, locks, etc., shall be made. Components for auxiliary and control circuits inside enclosures shall be checked for proper mounting. The location of the means provided for connecting external wiring shall be checked to ensure that there is sufficient wiring space for spreading of the cores of multi-core cables and for the proper connection of the conductors. The conductors and cables shall be checked for proper routing. Special attention shall be given to ensure that no mechanical damage can occur to conductors and cables due to the proximity of sharp edges or heating elements, or to the movement of moving parts.