AC Circuit Breakers Routine Tests
according to IEC 62271-100
Article 10 (10.10.2018)
The routine tests for AC circuit breakers are performed for the purpose of
ensuring the quality and guaranteed performance of the material, design and
assembly of the circuit breaker and are made on each apparatus
manufactured.
When the circuit-breaker consists of more than one interrupter per phase, i.e.
V-, or T-shaped breaking units, the routine tests are performed on the circuit-
breaker assembled in transport units. The transport units (post insulators and
breaking units) are in this case mounted on special frames to enable
connection to the operating mechanism.
The following items are the routine testing items of AC High voltage circuit
breaker according to IEC 62271-1,IEC 62271-100 Standards:
1-Dielectric test on the main circuit:
A dry, short-duration power-
frequency voltage test shall be
applied. The test voltage shall be that
specified in column 2 of the following
tables , according to the relevant IEC
standards. In these values, the
altitude factor should be considered.
The power frequency voltage test is
performed with the circuit-breaker in
open position only. This is valid for
both single- and multi unit circuit-
breakers.
Dielectric power frequency test
A dry, short-duration power-frequency voltage test shall be applied. The test voltage shall be that specified in column 2 of
the following tables , according to the relevant IEC standards. In these values, the altitude factor should be considered.
The power frequency voltage test is performed with the circuit-breaker in open position only. This is valid for both single-
and multi unit circuit-breakers.
In the case of circuit breakers constructed by assembling identical breaking and making units in
series, the test voltage to be applied across each single unit, when open, shall be the higher
fraction of the total withstand voltage resulting from actual power-frequency voltage distribution
with the circuit-breaker fully open and one terminal earthed.
Connect the above test for Single interrupter circuit-breaker and Multi interrupter circuit-breaker
is according to below pic:
How to apply the Power frequency dielectric test on single
interrupter and multi interrupter circuit breakers
2-Dielectric test on auxiliary and control
circuits in operating mechanism:
A:Inspection of auxiliary and control circuits, and verification of conformity to the circuit
diagrams and wiring diagrams:
The nature of the materials, the quality of assembly, the finish and, if necessary, the protective
coatings against corrosion shall be checked. A visual inspection is also necessary to check the
satisfactory installation of the thermal insulation. The conductors and cables shall be checked for
proper routing.
B:Functional tests:
A functional test of all low-voltage circuits shall be made to verify the proper functioning of auxiliary and
control circuits in conjunction with the other parts of the disconnector switch . The test procedures
depend on the nature and the complexity of the low-voltage circuits of the device. Check to function of
Counter, Auxiliary contacts, Thermostat settings ,Local/Remote operation.
C:Verification of protection against electrical shock:
Protection against direct contact with the main circuit and safe accessibility to the auxiliary and control
equipment parts liable to be touched during normal operation shall be checked by visual inspection.
D:Dielectric tests:
Only power frequency tests shall be performed. The test voltage shall be 1 kV or 2 kv with a duration of 1 s
with 50 or 60 HZ frequency. This test perform on terminal and motor and auxiliary switch and control
circuits.
3-Measurement of the resistance of the main circuit:
For the routine test, the DC voltage drop or resistance of each pole of the main circuit shall be
measured under conditions as nearly as possible similar, with regard to ambient air temperature
and points of measurement, to those under which the corresponding type test was made. The
measured resistance shall not exceed 1,2 × Ru, where Ru is equal to the resistance measured
before the temperature-rise test.
4-Tightness test :
Routine tests shall be performed at normal ambient air temperature with the assembly filled at the pressure (or density)
corresponding to the manufacturer's test practice. For gas-filled systems sniffing may be used.
Tightness test for circuit breaker in factory
A:Controlled pressure systems for gas:
Find the relative leakage rate F re by measuring the pressure drop over a time period.
B:Closed pressure systems for gas:
The test may be performed at different stages of the manufacturing process or of assembling on site, on parts,
components and subassemblies. For gas-filled systems leakage detection by using a sniffing device may be
used.
Sf6 gas leakage detector
equipment used for
tightness test
• Vacuum switchgear:
Each vacuum tube shall be identified by its serial number. Its vacuum pressure level shall be tested by the manufacturer of
the vacuum interrupter. The test results shall be documented. After assembly of the switchgear device the vacuum pressure
level of the vacuum tubes shall be tested by a significant routine dielectric test across the open contacts. The test voltage
shall be stated by the manufacturer. The dielectric test shall be carried out after the mechanical routine test as required by
the relevant product standard.
5-Design and visual checks:
The switchgear and control gear shall be checked to verify its compliance with the purchase
specification. This items must be check :
– the language and data on the nameplates;
– identification of any auxiliary equipment;
– the color and quality of paint and corrosion protection of metallic surfaces;
– the values of the resistors and capacitors connected to the main circuit(if any).
6-Mechanical operating tests(Timing test run by semi-automatic test
program):
Mechanical operating tests should be made on the complete circuit-breaker. For all required operating
sequences the following shall be performed and records made of the closing and opening operations
measurement of operating times.
The mechanical travel characteristics can be recorded directly, using a travel transducer or
similar device on the circuit-breaker contact system or at other convenient locations on the drive
to the contact system where there is a direct connection, and a representative image of the
contact stroke can be achieved. Below Fig show mechanical contact curve:
The number of points recorded shall be sufficient to derive the time to, and contact speed at, contact
touch and contact separation, together with the total travel time.
Mechanical operating tests shall include the following:
a) at maximum supply voltage of operating devices and of auxiliary and control circuits :
− five closing operations;
− five opening operations.
b) at specified minimum supply voltage of operating devices and of auxiliary and control
circuits:
− five closing operations;
− five opening operations.
c) at rated supply voltage of operating devices and of auxiliary and control circuits :
− five close-open operating cycles with the tripping mechanism energised by the closing
of the main contacts;
− moreover, for circuit-breakers intended for rapid auto-reclosing ,five open-close
operating cycles O – t – C where t shall be not more than the time interval specified for the rated
operating sequence.
-Check the damping device.
- Check of overcurrent protection
After completion of the required operating sequences, the following tests and inspections shall be
performed (if applicable):
– connections shall be checked;
– the control and/or auxiliary switches shall correctly indicate the open and closed positions
of the circuit-breaker;
– all auxiliary equipment shall operate correctly at the limits of supply voltage of operating.
_devices and of auxiliary and control circuits and/or pressures for operation.
– measurement of the resistance of heaters (if fitted) and of the control coils.
– inspections of the wiring of the control, heater and auxiliary equipment circuits and checking of the
number of auxiliary contacts, in accordance with the order specification;
– inspection of control cubicle (electrical, mechanical, pneumatic and hydraulic systems).
– recharging duration(s);
– functional performance of pressure relief valve.
– operation of electrical, mechanical, pneumatic or hydraulic interlocks and signalling devices;
– operation of anti-pumping device.
– general performance of equipment within the required tolerance of the supply voltage.
– inspection of earthing terminals of the circuit-breaker.
For circuit-breakers fitted with under-voltage opening releases, it shall be shown that the circuit-
breaker opens and can be closed when voltages within the specified limits are applied to the
releases.
References:
*IEC 62271-1 High-voltage switchgear and controlgear –Part 1: Common specifications.
*IEC 62271-100 High-voltage switchgear and controlgear –Part 100: Alternating-current circuit-breakers.
*Live Tank Circuit Breakers Routine testing From ABB company.
*Testing High Voltage Breakers from Megger company.
*A Systematic Approach to High-Voltage Circuit Breaker Testing by Charles Sweetser Omicron company.
* The Optimum Tests For High Voltage SF6 Circuit Breaker In The New Substation Before Energize with the
national grid.A. Saravanan, Amer Nasr A. Elghaffar, Yehiasayedm. Ali, Adel A. Elbaset Mohamed.
Articles and posts also share in Switchgear Content Group: https://www.linkedin.com/groups/12123729/

More Related Content

PPTX
On load tap changer
PPTX
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
PPTX
132kV GSS ppt
PPT
Circuit breaker
PDF
Protection of transmission lines (distance)
PPTX
Cable Sizing Calculations
PPTX
132 kV uppcl
PPT
Fault level calculations
On load tap changer
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
132kV GSS ppt
Circuit breaker
Protection of transmission lines (distance)
Cable Sizing Calculations
132 kV uppcl
Fault level calculations

What's hot (20)

PPTX
Capacitive voltage transformer (1)
PPTX
Economic Loading of Distribution Transformer PPT
PPT
Installation, Testing and Troubleshooting of Transformers
PPTX
Switchgear presentation
PPT
Testing and Condition Monitoring of Substation Equipments
PPTX
Industrial training 220 KV moradabad
PPT
Transformer basic
PPT
Substation Training presentation
PDF
400kV GIS Substation
PPTX
Electrical Grid Substation
PPTX
Electrical distribution system
PPTX
Power cables
PDF
Chapter 06 - Generation of High Direct Current Voltages
PDF
Practical handbook-for-relay-protection-engineers
PPTX
Presentation on Power transformer
PPTX
Protection Of Generator
PDF
PPTX
Testing of transformer
PPT
Vacuum circuit breaker
PPTX
Capacitive voltage transformer (1)
Economic Loading of Distribution Transformer PPT
Installation, Testing and Troubleshooting of Transformers
Switchgear presentation
Testing and Condition Monitoring of Substation Equipments
Industrial training 220 KV moradabad
Transformer basic
Substation Training presentation
400kV GIS Substation
Electrical Grid Substation
Electrical distribution system
Power cables
Chapter 06 - Generation of High Direct Current Voltages
Practical handbook-for-relay-protection-engineers
Presentation on Power transformer
Protection Of Generator
Testing of transformer
Vacuum circuit breaker
Ad

Similar to AC Circuit Breakers Routine Tests according to IEC 62271-100 (20)

PPTX
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
PPTX
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
PDF
16950
PPTX
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
PPT
Testing of c.b.(hk & hr) nihal
PDF
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
PPT
Isolator and bushing
PDF
Dialectirc tests
PPT
Testing of cb
PPTX
Presentation OutDoorSwithGear(AIS) .pptx
PDF
REPORT -VALLUR THERMAL POWER PLANT
PPTX
ET 5 LESSON 2 TEST EQUIPMENT.pptx
PPTX
Electrical testing javid iqbal sodagar
PDF
Emc standards
PPT
'docslide.us_hv-testing.ppt
PPT
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
DOC
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
PDF
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
PDF
Power factor correction
DOC
High potential test
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
16950
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
Testing of c.b.(hk & hr) nihal
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
Isolator and bushing
Dialectirc tests
Testing of cb
Presentation OutDoorSwithGear(AIS) .pptx
REPORT -VALLUR THERMAL POWER PLANT
ET 5 LESSON 2 TEST EQUIPMENT.pptx
Electrical testing javid iqbal sodagar
Emc standards
'docslide.us_hv-testing.ppt
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
Power factor correction
High potential test
Ad

More from Ali Sepehri (8)

PDF
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
PDF
My CV with photo
PPTX
Technical information for high voltage disconnector & earthing switch in enqu...
PPTX
Out of phase current switching in High Voltage Circuit Breakers
PPTX
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
PPTX
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
PDF
Hybrid HVDC Circuit Breaker Definitions
PDF
Vacuum Circuit Breakers Testing Methods
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
My CV with photo
Technical information for high voltage disconnector & earthing switch in enqu...
Out of phase current switching in High Voltage Circuit Breakers
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
Hybrid HVDC Circuit Breaker Definitions
Vacuum Circuit Breakers Testing Methods

Recently uploaded (20)

PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
Sustainable Sites - Green Building Construction
PPTX
UNIT 4 Total Quality Management .pptx
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPT
Project quality management in manufacturing
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PPTX
Construction Project Organization Group 2.pptx
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
Welding lecture in detail for understanding
PPTX
Geodesy 1.pptx...............................................
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Operating System & Kernel Study Guide-1 - converted.pdf
Sustainable Sites - Green Building Construction
UNIT 4 Total Quality Management .pptx
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Lecture Notes Electrical Wiring System Components
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Project quality management in manufacturing
Foundation to blockchain - A guide to Blockchain Tech
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
Construction Project Organization Group 2.pptx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Internet of Things (IOT) - A guide to understanding
Welding lecture in detail for understanding
Geodesy 1.pptx...............................................
OOP with Java - Java Introduction (Basics)
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx

AC Circuit Breakers Routine Tests according to IEC 62271-100

  • 1. AC Circuit Breakers Routine Tests according to IEC 62271-100
  • 2. Article 10 (10.10.2018) The routine tests for AC circuit breakers are performed for the purpose of ensuring the quality and guaranteed performance of the material, design and assembly of the circuit breaker and are made on each apparatus manufactured. When the circuit-breaker consists of more than one interrupter per phase, i.e. V-, or T-shaped breaking units, the routine tests are performed on the circuit- breaker assembled in transport units. The transport units (post insulators and breaking units) are in this case mounted on special frames to enable connection to the operating mechanism.
  • 3. The following items are the routine testing items of AC High voltage circuit breaker according to IEC 62271-1,IEC 62271-100 Standards: 1-Dielectric test on the main circuit: A dry, short-duration power- frequency voltage test shall be applied. The test voltage shall be that specified in column 2 of the following tables , according to the relevant IEC standards. In these values, the altitude factor should be considered. The power frequency voltage test is performed with the circuit-breaker in open position only. This is valid for both single- and multi unit circuit- breakers. Dielectric power frequency test
  • 4. A dry, short-duration power-frequency voltage test shall be applied. The test voltage shall be that specified in column 2 of the following tables , according to the relevant IEC standards. In these values, the altitude factor should be considered. The power frequency voltage test is performed with the circuit-breaker in open position only. This is valid for both single- and multi unit circuit-breakers.
  • 5. In the case of circuit breakers constructed by assembling identical breaking and making units in series, the test voltage to be applied across each single unit, when open, shall be the higher fraction of the total withstand voltage resulting from actual power-frequency voltage distribution with the circuit-breaker fully open and one terminal earthed. Connect the above test for Single interrupter circuit-breaker and Multi interrupter circuit-breaker is according to below pic: How to apply the Power frequency dielectric test on single interrupter and multi interrupter circuit breakers
  • 6. 2-Dielectric test on auxiliary and control circuits in operating mechanism: A:Inspection of auxiliary and control circuits, and verification of conformity to the circuit diagrams and wiring diagrams: The nature of the materials, the quality of assembly, the finish and, if necessary, the protective coatings against corrosion shall be checked. A visual inspection is also necessary to check the satisfactory installation of the thermal insulation. The conductors and cables shall be checked for proper routing. B:Functional tests: A functional test of all low-voltage circuits shall be made to verify the proper functioning of auxiliary and control circuits in conjunction with the other parts of the disconnector switch . The test procedures depend on the nature and the complexity of the low-voltage circuits of the device. Check to function of Counter, Auxiliary contacts, Thermostat settings ,Local/Remote operation. C:Verification of protection against electrical shock: Protection against direct contact with the main circuit and safe accessibility to the auxiliary and control equipment parts liable to be touched during normal operation shall be checked by visual inspection.
  • 7. D:Dielectric tests: Only power frequency tests shall be performed. The test voltage shall be 1 kV or 2 kv with a duration of 1 s with 50 or 60 HZ frequency. This test perform on terminal and motor and auxiliary switch and control circuits. 3-Measurement of the resistance of the main circuit: For the routine test, the DC voltage drop or resistance of each pole of the main circuit shall be measured under conditions as nearly as possible similar, with regard to ambient air temperature and points of measurement, to those under which the corresponding type test was made. The measured resistance shall not exceed 1,2 × Ru, where Ru is equal to the resistance measured before the temperature-rise test.
  • 8. 4-Tightness test : Routine tests shall be performed at normal ambient air temperature with the assembly filled at the pressure (or density) corresponding to the manufacturer's test practice. For gas-filled systems sniffing may be used. Tightness test for circuit breaker in factory
  • 9. A:Controlled pressure systems for gas: Find the relative leakage rate F re by measuring the pressure drop over a time period. B:Closed pressure systems for gas: The test may be performed at different stages of the manufacturing process or of assembling on site, on parts, components and subassemblies. For gas-filled systems leakage detection by using a sniffing device may be used. Sf6 gas leakage detector equipment used for tightness test
  • 10. • Vacuum switchgear: Each vacuum tube shall be identified by its serial number. Its vacuum pressure level shall be tested by the manufacturer of the vacuum interrupter. The test results shall be documented. After assembly of the switchgear device the vacuum pressure level of the vacuum tubes shall be tested by a significant routine dielectric test across the open contacts. The test voltage shall be stated by the manufacturer. The dielectric test shall be carried out after the mechanical routine test as required by the relevant product standard. 5-Design and visual checks: The switchgear and control gear shall be checked to verify its compliance with the purchase specification. This items must be check : – the language and data on the nameplates; – identification of any auxiliary equipment; – the color and quality of paint and corrosion protection of metallic surfaces; – the values of the resistors and capacitors connected to the main circuit(if any). 6-Mechanical operating tests(Timing test run by semi-automatic test program): Mechanical operating tests should be made on the complete circuit-breaker. For all required operating sequences the following shall be performed and records made of the closing and opening operations measurement of operating times.
  • 11. The mechanical travel characteristics can be recorded directly, using a travel transducer or similar device on the circuit-breaker contact system or at other convenient locations on the drive to the contact system where there is a direct connection, and a representative image of the contact stroke can be achieved. Below Fig show mechanical contact curve:
  • 12. The number of points recorded shall be sufficient to derive the time to, and contact speed at, contact touch and contact separation, together with the total travel time. Mechanical operating tests shall include the following: a) at maximum supply voltage of operating devices and of auxiliary and control circuits : − five closing operations; − five opening operations. b) at specified minimum supply voltage of operating devices and of auxiliary and control circuits: − five closing operations; − five opening operations. c) at rated supply voltage of operating devices and of auxiliary and control circuits : − five close-open operating cycles with the tripping mechanism energised by the closing of the main contacts; − moreover, for circuit-breakers intended for rapid auto-reclosing ,five open-close operating cycles O – t – C where t shall be not more than the time interval specified for the rated operating sequence. -Check the damping device. - Check of overcurrent protection
  • 13. After completion of the required operating sequences, the following tests and inspections shall be performed (if applicable): – connections shall be checked; – the control and/or auxiliary switches shall correctly indicate the open and closed positions of the circuit-breaker; – all auxiliary equipment shall operate correctly at the limits of supply voltage of operating. _devices and of auxiliary and control circuits and/or pressures for operation. – measurement of the resistance of heaters (if fitted) and of the control coils. – inspections of the wiring of the control, heater and auxiliary equipment circuits and checking of the number of auxiliary contacts, in accordance with the order specification; – inspection of control cubicle (electrical, mechanical, pneumatic and hydraulic systems). – recharging duration(s); – functional performance of pressure relief valve. – operation of electrical, mechanical, pneumatic or hydraulic interlocks and signalling devices; – operation of anti-pumping device. – general performance of equipment within the required tolerance of the supply voltage. – inspection of earthing terminals of the circuit-breaker. For circuit-breakers fitted with under-voltage opening releases, it shall be shown that the circuit- breaker opens and can be closed when voltages within the specified limits are applied to the releases.
  • 14. References: *IEC 62271-1 High-voltage switchgear and controlgear –Part 1: Common specifications. *IEC 62271-100 High-voltage switchgear and controlgear –Part 100: Alternating-current circuit-breakers. *Live Tank Circuit Breakers Routine testing From ABB company. *Testing High Voltage Breakers from Megger company. *A Systematic Approach to High-Voltage Circuit Breaker Testing by Charles Sweetser Omicron company. * The Optimum Tests For High Voltage SF6 Circuit Breaker In The New Substation Before Energize with the national grid.A. Saravanan, Amer Nasr A. Elghaffar, Yehiasayedm. Ali, Adel A. Elbaset Mohamed. Articles and posts also share in Switchgear Content Group: https://www.linkedin.com/groups/12123729/