The document discusses establishing a Performance Measurement Baseline (PMB) which defines the schedule, budget, and organizational elements for all work to be performed. It notes that a PMB includes technical, schedule, and cost baselines needed for project success. The six steps to build a PMB are outlined: 1) decompose scope into a work breakdown structure (WBS) and work packages, 2) assign responsibility for work packages, 3) arrange work packages in a network, 4) develop a time-phased budget, 5) assign performance measures, and 6) establish the performance baseline. Critical success factors include ensuring deliverables represent required capabilities and value and that work package completion is represented by physical percent complete metrics.