SlideShare a Scribd company logo
Notes on European Project Design Attilio Orecchio  Alessandro Carbone
Il percorso di progettazione Planning procedure STEPS L.F.A. STEPS Environmental input Brain storming - analysis of scientific literature already available - possibly pre-field survey. Systematic analysis of the baseline Problem tree Identifying the objectives of change: construction frame design. Objective tree The frame is divided into several parts. Choosing strategies We identify the most appropriate and relevant programmes which can finance the various parts; point analysis of the constraints.   We build the first project idea. First draft. Laying the logical framework: the intervention logic and external factors. We seek the best partner: negotiation and preparation of project draft gradually more detailed. Start collecting all necessary data of partners and bureaucratic documentation We specify and complete the logical framework. Penultimate version of the complete form. Final inspection and latest changes.   Submission of the completed applicaton form  
What is a problem A situation or condition Of a group of people or of an organisation Which is due now and will exist in the future as well That is considered undesirable by the people or organisation themselves And which can be modified with and intervention within their reach If the last characteristic is missing, it represents and external element and thus it is not a problem issue;  e.g.: in the Sahara desert it rains very little (thus, we have dryness of the soil, therefore almost no agricultural production; or in Finland there is little sun, so frequent phenomena of depression and high suicide rate)‏
Key words (1)‏ General goals   general aim, general purpose, objectives  It describes the “policy horizon” of the project: it refers to the macro strategic goals of the Programme and of the Community policies. Thus, it defines the long term benefits for beneficiaries and for other target groups. Specific objectives / specific scopes / results   It describes the outcomes, the expected results, how practically the starting point will be changed due to the implementation of the project. It is expressed in terms of practical and sustainable benefits for the target groups. Output  Goods or services which the project will create and put at disposal to the direct beneficiaries and/or to the final beneficiaries.
Key words (2)‏ A ctivities   Things which have to be done so as to properly realise the products.   Dissemination   horizontal dissemination:   meant to address the actors on the same level of those who implement the project; vertical dissemination: meant to address policy makers at a higher level and to those who are scholars of the topic ... so as to obtain a large and consistent “FURTHER EXPLOIMENT”
Key words (3)‏ MAIN STREAM ING   The concept of mainstreaming refers to the process through which innovations tested in a limited area (social, economic and institutional) are transposed, widespread and institutionalized at the system level. This is a course of acquisition by the policies and relevant local, national and EU good practices tested at the individual pilot, or innovations that have proved their effectiveness. EM POWER MENT  Body of knowledge, skills and relational skills that enable the individual or group to set their own goals and develop strategies to achieve them using available resources. A multidimensional development process of actors which enables a local community to recognise their own problems, to identify their own resources and thus to increase own power. (power = capacity to solve ones own problems and to influence the solution of external problems)
Three types of actions so as to trigger  empowerment Actions directly aimed to people   (such as training, orienteering, consultancy, counsellings)‏ System actions ,  to qualify the institutional system responsible of the planning and implementation of policies and its initiatives (such as studies, pilot models, prototypes and instruments, tools and measures, etc.)‏ Accompanying measures ,  to eliminate obstacles related to space, infrastructural deficiencies, negative cultural elements, constraints in the organisation of life time and working time, etc.
Key words (4)‏ External factor   Assumption  It is a factor which can influence the project, however it is not directly in the power of those who implement the project. It shall be listed in the 4 th  column of the Logical Frame and  shall be written with positive statements . Is the external factor relevant? No:  if so, I do not consider it in the Logical Frame Yes:  if so, I shall ask myself if it will happen   Definitely (or almost definitely): I do not consider it in the Logical Frame Probably: I consider it in the Logical Frame Predictably not:  I shall modify or abandon the project.
Key words (5)‏ Indicator   A phenomenon which indicates if and at what extent another phenomenon has happened.  Standard = expected level of the indicator Objectively Verifiable Indicators (OVI) have to be  SMART: Specific  compared to the goals which have to be measured Measurable (observable and scalable)  Accessible  (obtainable) at reasonable costs Relevant  (significant) for the purposes of those who implement the project Time–bound   (time - framed) so as to know when we can expect the achievement of specific goals.
Key words (6)‏ Sustainability It refers to the fact that the project will continue to produce its effect even after the community grant and financing have ceased. Output:  will we be able to keep this product alive?   Outcomes:  (impact)  will we be able to make the impact of our project produce general and positive effects on a long run?   On a financial level:   are there any national, regional, local or private finances which will keep the effects going? Is the organisation budget able to keep the effects going......? On a policy level:   is there a consolidated attention and care on behalf of politicians and decision makers on the topic....? On a social level:   are there groups of interest, associations, stakeholders, needs and interests able to keep the attention alive on a long run......?
Key words (7)‏ European Added Value  Why do we put our project within a European dimension (and not on a national or local level)? Because we need to acquire advanced practices which do not exist in our country; Because due to the exchange among different countries new and more advanced models of intervention can be shaped and developed.   What shall Europe expect from our project? To what extent the project offers solutions to common problems? Through comparison among different countries new and more advanced models of intervention can be created; these models can be useful not only in our context but also in other and different European contexts.
Key words (8)… Partnership The calls for proposals define the minimum requisites in terms of: - eligible partners (public / private / no profit / other categories); - minimum required number of countries to involve; - minimum required number of partners.   A good partnership (consortium): Is broad enough; Involves countries with different traditions; Has been tested through previous transnational cooperation and/or is built on a deep exchange on the project to be submitted; As a whole it is competent and expert in the field of the intervention COMPETENCE, EXPERTISE; As a whole it is expert in networking as a group EXPERIENCE.
…  key words (8)‏ Where do you find partners? On internet; Partnerships relating to different Programmes; Contacts from previous experiences; Compendia (repertoires) of previous approved projects; Forum; Support from Regional organisations.

More Related Content

PPTX
GLOBAL FORESIGHT: LESSONS FROM SCENARIO AND ROADMAPPING EXERCISE ON MANUFACTU...
PPTX
Scanning for emerging s&t issues
PPT
WEB 2.0 FOR FORESIGHT: EXPERIENCES ON AN INNOVATION PLATFORM IN EUROPEAN AGEN...
PPT
Facing the future: Sense-making in Horizon Scanning
PPT
Proposal for NGO Capacity
DOCX
MaFI 2012 Workplan (short version)
PDF
Q1a mark scheme
PPS
Consolidating Experiences of ICCO's Programmatic Approach
GLOBAL FORESIGHT: LESSONS FROM SCENARIO AND ROADMAPPING EXERCISE ON MANUFACTU...
Scanning for emerging s&t issues
WEB 2.0 FOR FORESIGHT: EXPERIENCES ON AN INNOVATION PLATFORM IN EUROPEAN AGEN...
Facing the future: Sense-making in Horizon Scanning
Proposal for NGO Capacity
MaFI 2012 Workplan (short version)
Q1a mark scheme
Consolidating Experiences of ICCO's Programmatic Approach

What's hot (19)

PPT
Css class 4 css and project development 120309
PPTX
Understanding stakeholders
PPTX
590769 Software Testing To Be Or Not To Be
DOC
3 proj plan handouts
PPT
Writing a wining ict grant proposal in an hour
PDF
Introduction to project evaluations for SLOGA / Trialog
PDF
Planning Effective Linkages
DOC
3 proj plan notes
PPTX
Project formulation and appraisal
PDF
Film studies
PPT
Proposal Writing: EPICS-in-IEEE
PPTX
Project Formulation and Management - Project Scope Management
PPT
VoIP Project Request For Proposal Presentation
PDF
Kornelia Konrad-La empresa y las políticas de innovación transformadoras
PPTX
Requirements engineering in global environment 2.0
PPTX
Guideline for the Preparation of a Concept Note
PDF
Rptr4202 ppm unit 1 org pdf
PDF
Public Relations ROI: Definitions, Language & Change
DOC
Progress Reporting - notes
Css class 4 css and project development 120309
Understanding stakeholders
590769 Software Testing To Be Or Not To Be
3 proj plan handouts
Writing a wining ict grant proposal in an hour
Introduction to project evaluations for SLOGA / Trialog
Planning Effective Linkages
3 proj plan notes
Project formulation and appraisal
Film studies
Proposal Writing: EPICS-in-IEEE
Project Formulation and Management - Project Scope Management
VoIP Project Request For Proposal Presentation
Kornelia Konrad-La empresa y las políticas de innovación transformadoras
Requirements engineering in global environment 2.0
Guideline for the Preparation of a Concept Note
Rptr4202 ppm unit 1 org pdf
Public Relations ROI: Definitions, Language & Change
Progress Reporting - notes
Ad

Viewers also liked (9)

PPT
394 sigurniji internet petra i tena
PDF
Project Report, Design Project 3 - Studies in application of augmented realit...
PPTX
Presentation (truss) by imran khan.
PPTX
PDF
Welding basics1
PPTX
Civil engineering powerpoint
PPT
Civil Engineering
PDF
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
PPT
Design and analasys of a g+3 residential building using staad
394 sigurniji internet petra i tena
Project Report, Design Project 3 - Studies in application of augmented realit...
Presentation (truss) by imran khan.
Welding basics1
Civil engineering powerpoint
Civil Engineering
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design and analasys of a g+3 residential building using staad
Ad

Similar to European Project Design (20)

PPT
Masterclass on project building
PPTX
PPTX
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
DOCX
Writing evaluation report of a project
PPT
0. Foundations of project management (2).ppt
PDF
Logical framework analysis
PPT
Logical Framework And Project Proposal
PPT
PCM - Project Cycle Management, Training on Evaluation
PPTX
Lunchtime Talk: Evaluating design enabled innovations
PDF
DIN: Danish Design-driven Innovation
PPTX
Education policy aspects
PPT
Global Poverty Action Fund (GPAF) Funding Seminar
PPTX
Last day (in thailand)
PPT
9 ca programming session sept10 sd
PPTX
Trigger.eu: Cocteau game for policy making - introduction and demo
PDF
07 project conceptualiation_kirkman
PPT
JISC BCE: Evaluation Phase 1
PPT
Ictj Om Concepts Dp Rev
PPTX
Co-Create Project
PDF
Masterclass on project building
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Writing evaluation report of a project
0. Foundations of project management (2).ppt
Logical framework analysis
Logical Framework And Project Proposal
PCM - Project Cycle Management, Training on Evaluation
Lunchtime Talk: Evaluating design enabled innovations
DIN: Danish Design-driven Innovation
Education policy aspects
Global Poverty Action Fund (GPAF) Funding Seminar
Last day (in thailand)
9 ca programming session sept10 sd
Trigger.eu: Cocteau game for policy making - introduction and demo
07 project conceptualiation_kirkman
JISC BCE: Evaluation Phase 1
Ictj Om Concepts Dp Rev
Co-Create Project

More from Pogled kroz prozor (20)

PDF
Internet u nižim razredima, anketa
PDF
Internet u višim razredima PŠ Druškovec, anketa
PDF
Kviz Bookwidget, Bonton i sigurnost na internetu
PPTX
Dvije strane digitalnog novčića – rizici i prilike.pptx
DOCX
Prilog 4, George Orwell, smjernice za pisanje sastavka na temu ulomka iz romana
DOCX
Prilog 3. Projektni zadaci Orwell
DOCX
Prilog 5, Projektni zadaci Huxley
DOCX
Prilog 1, Ray Bradbury, Fahrenheit 451 (zadaci za izradu izlaganja).docx
DOCX
Prilog 2, 1. školska zadaća, Ray Bardbury, Fahrenheit 451.docx
PPTX
Prilog 6, Rezultati samovrednovanja (ankete)
PDF
Predstavljanje preliminarnih rezultata deSHAME istraživanja u Hrvatskoj
DOCX
Prilog 1. Upute za učenike
PDF
Influenceri: prodavači magle ili obrtnici 21.stoljeća?
PDF
Dan sigurnijeg interneta (prezentacija)
PDF
Komentari učenika o izazovima digitalne detoksikacije
PDF
Izazov digitalne detoksikacije - radni list
PDF
Rezultati ankete ovisnosti o internetu
PDF
Dabroučitelj - knjižica
PDF
Dabar 2020 - knjižica zadataka
PDF
Dabar 2020 - knjižica zadataka
Internet u nižim razredima, anketa
Internet u višim razredima PŠ Druškovec, anketa
Kviz Bookwidget, Bonton i sigurnost na internetu
Dvije strane digitalnog novčića – rizici i prilike.pptx
Prilog 4, George Orwell, smjernice za pisanje sastavka na temu ulomka iz romana
Prilog 3. Projektni zadaci Orwell
Prilog 5, Projektni zadaci Huxley
Prilog 1, Ray Bradbury, Fahrenheit 451 (zadaci za izradu izlaganja).docx
Prilog 2, 1. školska zadaća, Ray Bardbury, Fahrenheit 451.docx
Prilog 6, Rezultati samovrednovanja (ankete)
Predstavljanje preliminarnih rezultata deSHAME istraživanja u Hrvatskoj
Prilog 1. Upute za učenike
Influenceri: prodavači magle ili obrtnici 21.stoljeća?
Dan sigurnijeg interneta (prezentacija)
Komentari učenika o izazovima digitalne detoksikacije
Izazov digitalne detoksikacije - radni list
Rezultati ankete ovisnosti o internetu
Dabroučitelj - knjižica
Dabar 2020 - knjižica zadataka
Dabar 2020 - knjižica zadataka

Recently uploaded (20)

PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PPTX
Institutional Correction lecture only . . .
PPTX
Cell Types and Its function , kingdom of life
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PPTX
Pharma ospi slides which help in ospi learning
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
Business Ethics Teaching Materials for college
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
Basic Mud Logging Guide for educational purpose
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
TR - Agricultural Crops Production NC III.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Microbial diseases, their pathogenesis and prophylaxis
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Institutional Correction lecture only . . .
Cell Types and Its function , kingdom of life
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
Pharma ospi slides which help in ospi learning
O5-L3 Freight Transport Ops (International) V1.pdf
Business Ethics Teaching Materials for college
O7-L3 Supply Chain Operations - ICLT Program
Module 4: Burden of Disease Tutorial Slides S2 2025
Basic Mud Logging Guide for educational purpose
STATICS OF THE RIGID BODIES Hibbelers.pdf
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
TR - Agricultural Crops Production NC III.pdf
human mycosis Human fungal infections are called human mycosis..pptx
PPH.pptx obstetrics and gynecology in nursing
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...

European Project Design

  • 1. Notes on European Project Design Attilio Orecchio Alessandro Carbone
  • 2. Il percorso di progettazione Planning procedure STEPS L.F.A. STEPS Environmental input Brain storming - analysis of scientific literature already available - possibly pre-field survey. Systematic analysis of the baseline Problem tree Identifying the objectives of change: construction frame design. Objective tree The frame is divided into several parts. Choosing strategies We identify the most appropriate and relevant programmes which can finance the various parts; point analysis of the constraints.   We build the first project idea. First draft. Laying the logical framework: the intervention logic and external factors. We seek the best partner: negotiation and preparation of project draft gradually more detailed. Start collecting all necessary data of partners and bureaucratic documentation We specify and complete the logical framework. Penultimate version of the complete form. Final inspection and latest changes.   Submission of the completed applicaton form  
  • 3. What is a problem A situation or condition Of a group of people or of an organisation Which is due now and will exist in the future as well That is considered undesirable by the people or organisation themselves And which can be modified with and intervention within their reach If the last characteristic is missing, it represents and external element and thus it is not a problem issue; e.g.: in the Sahara desert it rains very little (thus, we have dryness of the soil, therefore almost no agricultural production; or in Finland there is little sun, so frequent phenomena of depression and high suicide rate)‏
  • 4. Key words (1)‏ General goals general aim, general purpose, objectives It describes the “policy horizon” of the project: it refers to the macro strategic goals of the Programme and of the Community policies. Thus, it defines the long term benefits for beneficiaries and for other target groups. Specific objectives / specific scopes / results It describes the outcomes, the expected results, how practically the starting point will be changed due to the implementation of the project. It is expressed in terms of practical and sustainable benefits for the target groups. Output Goods or services which the project will create and put at disposal to the direct beneficiaries and/or to the final beneficiaries.
  • 5. Key words (2)‏ A ctivities Things which have to be done so as to properly realise the products. Dissemination horizontal dissemination: meant to address the actors on the same level of those who implement the project; vertical dissemination: meant to address policy makers at a higher level and to those who are scholars of the topic ... so as to obtain a large and consistent “FURTHER EXPLOIMENT”
  • 6. Key words (3)‏ MAIN STREAM ING The concept of mainstreaming refers to the process through which innovations tested in a limited area (social, economic and institutional) are transposed, widespread and institutionalized at the system level. This is a course of acquisition by the policies and relevant local, national and EU good practices tested at the individual pilot, or innovations that have proved their effectiveness. EM POWER MENT Body of knowledge, skills and relational skills that enable the individual or group to set their own goals and develop strategies to achieve them using available resources. A multidimensional development process of actors which enables a local community to recognise their own problems, to identify their own resources and thus to increase own power. (power = capacity to solve ones own problems and to influence the solution of external problems)
  • 7. Three types of actions so as to trigger empowerment Actions directly aimed to people (such as training, orienteering, consultancy, counsellings)‏ System actions , to qualify the institutional system responsible of the planning and implementation of policies and its initiatives (such as studies, pilot models, prototypes and instruments, tools and measures, etc.)‏ Accompanying measures , to eliminate obstacles related to space, infrastructural deficiencies, negative cultural elements, constraints in the organisation of life time and working time, etc.
  • 8. Key words (4)‏ External factor Assumption It is a factor which can influence the project, however it is not directly in the power of those who implement the project. It shall be listed in the 4 th column of the Logical Frame and shall be written with positive statements . Is the external factor relevant? No: if so, I do not consider it in the Logical Frame Yes: if so, I shall ask myself if it will happen Definitely (or almost definitely): I do not consider it in the Logical Frame Probably: I consider it in the Logical Frame Predictably not: I shall modify or abandon the project.
  • 9. Key words (5)‏ Indicator A phenomenon which indicates if and at what extent another phenomenon has happened. Standard = expected level of the indicator Objectively Verifiable Indicators (OVI) have to be SMART: Specific compared to the goals which have to be measured Measurable (observable and scalable) Accessible (obtainable) at reasonable costs Relevant (significant) for the purposes of those who implement the project Time–bound (time - framed) so as to know when we can expect the achievement of specific goals.
  • 10. Key words (6)‏ Sustainability It refers to the fact that the project will continue to produce its effect even after the community grant and financing have ceased. Output: will we be able to keep this product alive? Outcomes: (impact) will we be able to make the impact of our project produce general and positive effects on a long run? On a financial level: are there any national, regional, local or private finances which will keep the effects going? Is the organisation budget able to keep the effects going......? On a policy level: is there a consolidated attention and care on behalf of politicians and decision makers on the topic....? On a social level: are there groups of interest, associations, stakeholders, needs and interests able to keep the attention alive on a long run......?
  • 11. Key words (7)‏ European Added Value Why do we put our project within a European dimension (and not on a national or local level)? Because we need to acquire advanced practices which do not exist in our country; Because due to the exchange among different countries new and more advanced models of intervention can be shaped and developed. What shall Europe expect from our project? To what extent the project offers solutions to common problems? Through comparison among different countries new and more advanced models of intervention can be created; these models can be useful not only in our context but also in other and different European contexts.
  • 12. Key words (8)… Partnership The calls for proposals define the minimum requisites in terms of: - eligible partners (public / private / no profit / other categories); - minimum required number of countries to involve; - minimum required number of partners. A good partnership (consortium): Is broad enough; Involves countries with different traditions; Has been tested through previous transnational cooperation and/or is built on a deep exchange on the project to be submitted; As a whole it is competent and expert in the field of the intervention COMPETENCE, EXPERTISE; As a whole it is expert in networking as a group EXPERIENCE.