By : Mr. Nirmal Maisuria (B.tech Civil)
(Highway Design Engineer)
Flexible Pavement condition survey
Type of Pavement :
•B- Bituminous
•R- Rigid
•E- Earthen
In Flexible pavement :
•Alligator Cracking /Longitudinal/Transverse Cracking/Block
Cracking
•Edge Cracking
•Patching
•Rutting
•Potholes
•Drainage
•Roughness
Flexible Pavement condition survey
Flexible Pavement condition survey
Flexible Pavement condition survey
• Good
• Poor
• Fair
GOOD
FAIR
POOR
• The roughness of a road is determined by the severity of
uneven surfaces, corrugations, sags, humps, frost heaves
and the previous survey conditions.
• Longitudinal / Transverse Cracking : N -
Narrow ; W - Wide
• Alligator / Block Cracking : L - Low ; M -
Medium; H - High
•Alligator cracks are interconnected cracks, forming a series of small
blocks resembling an alligator’s skin. This occurs when the sub-base
gravel fails to provide adequate support for the asphalt pavement. It is
also known as fatigue cracking, and repeated heavy loads and
moisture create excess flexing of the surface.
• Low
Longitudinal disconnected hairline cracks no greater than
1/8 inch wide running parallel to each other; initially may
be only a single crack in the wheel path but could also
look like an alligator pattern.
• Moderate
Longitudinal cracks in wheel path(s) forming an alligator
pattern; cracks may be lightly spalled and are about an
1/8 to 1/4 inch wide.
• High
Cracking has progressed so that pieces appear
loose with severely spalled edges; cracks are
probably ¼ inch wide or greater; pumping of
fines through the cracks may be visible on the
pavement surface; potholes may be present.
• The failure can be either in the surface,
base or sub base.
• Cracking usually first begins in the wheel
path, usually as longitudinal cracking
Further stress creates an alligator pattern.
SEVERITY:
•LOW
•MEDIUM
•HIGH
• Longitudinal cracks are individual and run parallel to the centerline.
Transverse cracks run perpendicular to the centerline. They are caused
by inadequate bonding between paving lanes or asphalt shrinkage
from low temperatures.
1) Low
2) Medium
3) High
located within 1-2 feet of the edge of the pavement.
Low:
Hairline cracks just beginning to show; cracks are random with no pattern;
cracks may be up to ¼ inch wide
Medium:
Cracks are wider, being from 1/4 inch to 1/2 inch in width or an alligator
pattern of cracks more than a foot in width measured from the pavement
edge.
High:
Cracks greater than 1/2 inch, or alligator sections which have failed; pieces
of pavement may be loose, or missing, or potholes may be present
 Pavement edge distress can result in worsening of wheel path condition,
allow moisture intrusion in the subgrade soils and base materials.
This cracking may occur in combination with other distresses.
• Rutting is the displacement of pavement material that
creates channels in the wheel path and is sometimes
referred to as channeling.
No visible
rutting (<1 in.)
Rutting visible
(>1 in.)
Length
Depth
• Severity of Ravelling : L - Low ;
M - Medium; H - High
• Length
• Width
• Potholes arise when the wearing surface disintegrates under traffic,
due to inadequate structural strength in one or more layers of the
pavement. They are bowl-shaped voids and are often located in areas
of poor drainage
Length
Dai
Width
Area
• . Patches are portions of pavement that have been
removed and replaced, usually to repair defects in the
pavement. Problems occur when the patches crack,
settle, or distort.
Length
Dai
Width
Area
• Good: The quality and condition of the patch is
excellent. Patches show no distress such as cracking or
raveling.
• Poor: Patches are showing some distress. Edges of
the patch are abrading. Hairline cracks are beginning to
show. Patches are failing showing multiple cracks and
distortion or the edges of patches are separating.
Good :
Poor:
• Inadequate drainage is important to document because of
the long-term affects of moisture on pavement. Rain falling
on pavement should be efficiently directed to drains and
catch basins. Poor drainage can damage the concrete,
weaken the sub-grade, etc.
• LOW / MEDIUM/ HIGH
• Length
• Width
• Area
Length in mt.
• Edge Drop in mm
• Length
Mr. Nirmal MaisuriaMr. Nirmal Maisuria
(B.tech Civil)(B.tech Civil)
Designation: Highway Design EngineerDesignation: Highway Design Engineer
Company: Translink Infrastructure Pvt. Ltd.Company: Translink Infrastructure Pvt. Ltd.
Contact: 9586703077Contact: 9586703077
Email id: nirmal.maisuria@gmail.comEmail id: nirmal.maisuria@gmail.com
Flexible Pavement condition survey

More Related Content

PDF
Distress in flexible pavement
PPTX
Superelevation
PPTX
Urban transportation system - methods of route assignment
PDF
Highway & transportation engineering pdf
PPTX
Design of rigid pavements
PPTX
Traffic volume survey
PPT
Joints in cc pavements
PPTX
Origin & destination survey
Distress in flexible pavement
Superelevation
Urban transportation system - methods of route assignment
Highway & transportation engineering pdf
Design of rigid pavements
Traffic volume survey
Joints in cc pavements
Origin & destination survey

What's hot (20)

PPTX
Dense Bituminous macadam
PPTX
pre consolidation pressure
PPT
Cross section of road
PDF
Project report file on construction of flexible pavement by Harshit Prakash Garg
PPT
Superpavemixdesign
PDF
Transition curve ppt (geetansh arora)
PPTX
Highway capacity and level of service.pptx
PPTX
Intersection,types
PPTX
PPTX
Case study on effect of water table on bearing capacity
PPTX
Origin and destination survey
PPTX
Rigid Pavement Design Part II
PPT
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
PPT
Granular subbase and equipments used for its construction
PPTX
Chapter 1 traffic characteristics
PPTX
Second 20 year road plan
PPTX
Pavement failures
PPTX
Highway route location
PPTX
Geometrical design of highways
PPT
Tunnelling methods
Dense Bituminous macadam
pre consolidation pressure
Cross section of road
Project report file on construction of flexible pavement by Harshit Prakash Garg
Superpavemixdesign
Transition curve ppt (geetansh arora)
Highway capacity and level of service.pptx
Intersection,types
Case study on effect of water table on bearing capacity
Origin and destination survey
Rigid Pavement Design Part II
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Granular subbase and equipments used for its construction
Chapter 1 traffic characteristics
Second 20 year road plan
Pavement failures
Highway route location
Geometrical design of highways
Tunnelling methods
Ad

Viewers also liked (20)

PPTX
Design of highway (Flexible pavement)
PPTX
Construction of flexible pavement
PPT
Design Of Flexible Pavements
PPTX
Flexible pavement presentation
PDF
Pavements PPT
PPTX
Design and construction of highway (flexible pavement
PPT
construction of flexible pavement
PPT
Flexible Pavement Design
PPTX
Construction of flexible pavement in brief.
PDF
DESIGN PROJECT FOR PAVEMENT
DOCX
" Design of Flexible Pavement "
PPT
Flexible and-rigid-pavements
PPTX
Final year project ppt - The Future of Pavement Design
PPT
Lect 6 pavement design
PDF
Green Fleet Education Session 6.1.16
PPTX
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
PDF
San Francisco-Oakland SAS Bay Bridge Epoxy Asphalt Concrete Paving
PPTX
ROADWAY CONDITION SURVEY
PPTX
Ground penetrating radar (nio)
PPT
Block 27 sp 13
Design of highway (Flexible pavement)
Construction of flexible pavement
Design Of Flexible Pavements
Flexible pavement presentation
Pavements PPT
Design and construction of highway (flexible pavement
construction of flexible pavement
Flexible Pavement Design
Construction of flexible pavement in brief.
DESIGN PROJECT FOR PAVEMENT
" Design of Flexible Pavement "
Flexible and-rigid-pavements
Final year project ppt - The Future of Pavement Design
Lect 6 pavement design
Green Fleet Education Session 6.1.16
RESTORATION OF EXISTING MAJOR BRIDGE ACROSS RIVER BHADAR ON NATIONAL HIGHWAY ...
San Francisco-Oakland SAS Bay Bridge Epoxy Asphalt Concrete Paving
ROADWAY CONDITION SURVEY
Ground penetrating radar (nio)
Block 27 sp 13
Ad

Similar to Flexible Pavement condition survey (20)

PPTX
Failures in flexible and rigid pavement
PDF
Flexible pavement failure
PPTX
Highway failure and their maintenance
PDF
Pavement Distress‐Causes & Remedial Measures.pdf
PPTX
Presentation distress of rigid pavement.pptx
PPTX
Highway Failure & their Maintenance Final Project.pptx
PPTX
Distress in Pavement Full.pptx
PPTX
Pavement failures and maintenance
PPT
12- Pavement Failures, Construction & Maintenance.ppt
PDF
Rigid pavement in Magallanes Interchange
PPTX
Trenching & Excavation
PPTX
DISTRESS AND DEFECTS ON ROAD PAVEMENT.pptx
PPTX
LECTURE-16 EARTHEN DAM - II.pptx it's uses
PPTX
DRAINAGE_DITCHES_CULVERTS_BRIDGES_forest engineering.pptx
PPTX
Types of Flexible Pavements
PPTX
rigid pavement distress
PDF
Rigid pavement
PPTX
Maintenence of road
PPTX
Failures in flexible pavements.pptx
PPTX
LOW LEVEL & HIGH LEVEL CAUSEWAY
Failures in flexible and rigid pavement
Flexible pavement failure
Highway failure and their maintenance
Pavement Distress‐Causes & Remedial Measures.pdf
Presentation distress of rigid pavement.pptx
Highway Failure & their Maintenance Final Project.pptx
Distress in Pavement Full.pptx
Pavement failures and maintenance
12- Pavement Failures, Construction & Maintenance.ppt
Rigid pavement in Magallanes Interchange
Trenching & Excavation
DISTRESS AND DEFECTS ON ROAD PAVEMENT.pptx
LECTURE-16 EARTHEN DAM - II.pptx it's uses
DRAINAGE_DITCHES_CULVERTS_BRIDGES_forest engineering.pptx
Types of Flexible Pavements
rigid pavement distress
Rigid pavement
Maintenence of road
Failures in flexible pavements.pptx
LOW LEVEL & HIGH LEVEL CAUSEWAY

Recently uploaded (20)

PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PDF
Unit1 - AIML Chapter 1 concept and ethics
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Design of Material Handling Equipment Lecture Note
PDF
Computer organization and architecuture Digital Notes....pdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
ai_satellite_crop_management_20250815030350.pptx
PDF
First part_B-Image Processing - 1 of 2).pdf
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PPTX
wireless networks, mobile computing.pptx
PPTX
Principal presentation for NAAC (1).pptx
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
PRASUNET_20240614003_231416_0000[1].pptx
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PDF
Soil Improvement Techniques Note - Rabbi
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Unit1 - AIML Chapter 1 concept and ethics
August -2025_Top10 Read_Articles_ijait.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
"Array and Linked List in Data Structures with Types, Operations, Implementat...
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Design of Material Handling Equipment Lecture Note
Computer organization and architecuture Digital Notes....pdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
ai_satellite_crop_management_20250815030350.pptx
First part_B-Image Processing - 1 of 2).pdf
20250617 - IR - Global Guide for HR - 51 pages.pdf
wireless networks, mobile computing.pptx
Principal presentation for NAAC (1).pptx
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Management Information system : MIS-e-Business Systems.pptx
PRASUNET_20240614003_231416_0000[1].pptx
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Soil Improvement Techniques Note - Rabbi

Flexible Pavement condition survey

  • 1. By : Mr. Nirmal Maisuria (B.tech Civil) (Highway Design Engineer)
  • 3. Type of Pavement : •B- Bituminous •R- Rigid •E- Earthen
  • 4. In Flexible pavement : •Alligator Cracking /Longitudinal/Transverse Cracking/Block Cracking •Edge Cracking •Patching •Rutting •Potholes •Drainage •Roughness
  • 8. • Good • Poor • Fair GOOD FAIR POOR • The roughness of a road is determined by the severity of uneven surfaces, corrugations, sags, humps, frost heaves and the previous survey conditions.
  • 9. • Longitudinal / Transverse Cracking : N - Narrow ; W - Wide • Alligator / Block Cracking : L - Low ; M - Medium; H - High
  • 10. •Alligator cracks are interconnected cracks, forming a series of small blocks resembling an alligator’s skin. This occurs when the sub-base gravel fails to provide adequate support for the asphalt pavement. It is also known as fatigue cracking, and repeated heavy loads and moisture create excess flexing of the surface.
  • 11. • Low Longitudinal disconnected hairline cracks no greater than 1/8 inch wide running parallel to each other; initially may be only a single crack in the wheel path but could also look like an alligator pattern. • Moderate Longitudinal cracks in wheel path(s) forming an alligator pattern; cracks may be lightly spalled and are about an 1/8 to 1/4 inch wide.
  • 12. • High Cracking has progressed so that pieces appear loose with severely spalled edges; cracks are probably ¼ inch wide or greater; pumping of fines through the cracks may be visible on the pavement surface; potholes may be present.
  • 13. • The failure can be either in the surface, base or sub base. • Cracking usually first begins in the wheel path, usually as longitudinal cracking Further stress creates an alligator pattern.
  • 15. • Longitudinal cracks are individual and run parallel to the centerline. Transverse cracks run perpendicular to the centerline. They are caused by inadequate bonding between paving lanes or asphalt shrinkage from low temperatures.
  • 16. 1) Low 2) Medium 3) High located within 1-2 feet of the edge of the pavement.
  • 17. Low: Hairline cracks just beginning to show; cracks are random with no pattern; cracks may be up to ¼ inch wide Medium: Cracks are wider, being from 1/4 inch to 1/2 inch in width or an alligator pattern of cracks more than a foot in width measured from the pavement edge. High: Cracks greater than 1/2 inch, or alligator sections which have failed; pieces of pavement may be loose, or missing, or potholes may be present  Pavement edge distress can result in worsening of wheel path condition, allow moisture intrusion in the subgrade soils and base materials. This cracking may occur in combination with other distresses.
  • 18. • Rutting is the displacement of pavement material that creates channels in the wheel path and is sometimes referred to as channeling. No visible rutting (<1 in.) Rutting visible (>1 in.) Length Depth
  • 19. • Severity of Ravelling : L - Low ; M - Medium; H - High • Length • Width
  • 20. • Potholes arise when the wearing surface disintegrates under traffic, due to inadequate structural strength in one or more layers of the pavement. They are bowl-shaped voids and are often located in areas of poor drainage Length Dai Width Area
  • 21. • . Patches are portions of pavement that have been removed and replaced, usually to repair defects in the pavement. Problems occur when the patches crack, settle, or distort. Length Dai Width Area
  • 22. • Good: The quality and condition of the patch is excellent. Patches show no distress such as cracking or raveling. • Poor: Patches are showing some distress. Edges of the patch are abrading. Hairline cracks are beginning to show. Patches are failing showing multiple cracks and distortion or the edges of patches are separating.
  • 24. • Inadequate drainage is important to document because of the long-term affects of moisture on pavement. Rain falling on pavement should be efficiently directed to drains and catch basins. Poor drainage can damage the concrete, weaken the sub-grade, etc.
  • 25. • LOW / MEDIUM/ HIGH • Length • Width • Area
  • 27. • Edge Drop in mm • Length
  • 28. Mr. Nirmal MaisuriaMr. Nirmal Maisuria (B.tech Civil)(B.tech Civil) Designation: Highway Design EngineerDesignation: Highway Design Engineer Company: Translink Infrastructure Pvt. Ltd.Company: Translink Infrastructure Pvt. Ltd. Contact: 9586703077Contact: 9586703077 Email id: nirmal.maisuria@gmail.comEmail id: nirmal.maisuria@gmail.com