A practical guide for site personnel
FORENORD

During the next few years, specifications   will change   An accompanying      publication   entitled 'Site sampling
from using the as 1881 test methods to those given in     and testing of concrete: a site managers guide' has
the series as 12350: Testing fresh concrete and the       also been produced to assist site engineers and
series as 12390: Testing hardened concrete.               managers to ensure that sampling and testing are
Fortunately the tests included on this poster are the     carried out correctly. The guide highlights some of the
same and the only difference is in the reporting of the   potential problems associated with using incorrect
slump and flow values. However on the test certificate,   procedures.
it is necessary to report the standard used.
                                                          Don't   forget   - The test results will be misleading if
                                                          these procedures are not carried out.


                                                          Get it right - Otherwise it's a waste of time and could
                                                          cost your company money.


                                                          For fulldetailsof equipment,testsandrecords
                                                                                                    see:as
                                                          1881: Testing concrete,
                                                          aSEN12350:Tesdngfreshconcret~and
                                                          as EN 12390: Testing hardened concrete.
Safety


When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to
the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body
involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without
delay and medical attention sought.




All advice or information in this publication is intended for those who will evaluate the significance and limitations
of its contents anCltake responsibility for its use and application. No liability (including that for negligence) for any
loss resulting from such advice or information is accepted. Readers should note that all publications     are subject to
revision from time to time and should therefore ensure that they are in possession of the latest version.
SAMPLING                                           BS1881:Part101or
                                                   BSEN 12350-1
The standard method
To ensure it is representative of the whole load a     Sample as the load is discharged.
standard sample consists of scoopfuls taken from       Scoopfuls must be taken through the moving stream,
four different parts of the load and collected in      sampling the whole width and depth - not just the
buckets.                                               top part.




                      let very first concrete go

                     Take a scoopful from part 1

                     Take a scoopful from part 2

                     Take a scoopful from part 3

                     Take a scoopful from part 4

                       let the last concrete go




Complete a Sampling certificate and record which sampling method was used.
Safety


When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to
the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body
involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without
delay and medical attention sought.




All advice or information in this publication is intended for those who will evaluate the significance and limitations
of its contents an'd take responsibility for its use and application. No liability (including thatfor negligence) for any
loss resulting from such advice or information is accepted. Readers should note that all publications     are subject to
revision from time to time and should therefore ensure that they are in possession of the latest version.
BS1881:Part 102or
BSEN206-1: 2000, clause5.4. 1
Thealternativemethod
For an early check on the workability of concrete          Sample as the load is discharged.
d€livered in a truckmixer this alternative method of       Scoopfuls must be taken through the moving stream,
sampling for the slump test may be used. Additional        sampling the whole width and depth - not just the
tolerances will be applicable for concrete sampled by      top part.
this alternative method.



                                                             Let very first concrete   go

                                                            Take six scoopfuls from the
                                                                     next 0.3 m3


               '''''-
                                                           Take six scoopfuls after the first 0.3m3 has
                                                           been discharged.




Do not use this sample to make cubes.
BS 1881: Part 101 requires two slump tests when concrete     is sampled by the alternative   method.
THE SLUMP                      TEST                 BS 1881: Part 102 or
                                                    BS EN 12350-2

    Empty the sampling           Flatten the final heap by repeatedly
    buckets onto the mixing      digging-in the shovel vertically
    tray                         Liftthe shovel clear each time
.   Scrape each bucket clean     Ifthe alternative method of
                                 sampling has been used,
                                 divide this heap into two
                                 and test each part




. Thoroughly     remix the        Ensure the slump cone is clean and
    sample shovelling into        damp
    a heap                        Place the metal plate on a solid level
.   Turn the heap over to         base away from vibration or other
                                  disturbance
    form another
.   Do this three times           Place the cone on the plate and
                                  stand on the foot-pieces
Fillthe cone in three equal depth        Carefullycleanoff spillage
    layers                                   from sideand baseplate
    Use the standard slump rod
    Rod each layer 2S times
    Spread the blows evenly over the
    area
    Make sure the rod just penetrates
    the layer below
.   Heap the concrete above the top of
    the cone before rodding the third
    layer




. Top up if necessary                      . Carefully lift the cone
    Usethe rod with a sawingand             straight up and clear,
    rolling motion to strikethe concrete    to a count of between 5
    levelwith the top of                    and 10 seconds
    the cone                                Complete steps 5 to 8
                                            within 150 seconds
Laythe rod across the upturned           There are three kinds of slump
    slump cone
    Measure the distance between the
    underside of the rod and the highest
                          -
    point of the concrete the true          Slump
                                                    i
    slump
    Recordthis distance to the nearest              T
    Smm if using BS1881: Part 102 or
    10 mm if using BSEN 123S0-2
    In all cases record the kind of slump
    Checkthe type of slump
    Ifthe slump isn't true, take a new
    sample and repeat the test
.   Ifthe second slump isn't true, get
    advice
                                                          1.True

.   Complete the Sampling and testing
    certificates




                                             2.Collapse             3.Shear
Youwill need thisequipment or the SlumpTest
                         f


Small scoop      cf   Sampling scoop
                                           cP   Steel rule

                                                                       /
Square-mouthed
shovel               Slump rod

                                       /        Slump cone and
                                                rigidmetalplate


                                                                       i}
Buckets   or

wheelbarrow
                 53   Mixing tray
                                       <>       Sampling and
                                                testing certificates   I!l ' '

                                                                           "


Cloth
THE FLON                                   TEST                              BS1881:Part 105or
                                                                              BSEN 12350-5
First, find a suitable location for the flow table. It   Sampling using the standard method is
must be placed on a firm flat surface. It may be         recommended
necessary to prepare an area for the table.




. Empty the sampling buckets                              Ensure the mould and table are clean
  onto the mixing tray                                    and damp
. Scrape each bucket clean                                Place the mould on the centre
                                                          of the table and stand on the
                                                          foot-pieces
                                                          Fillthe mould in two layers,
                                                          tamping each layer ten times with
                                                          the tamping bar
. Thoroughly     remix the sample                         Ifnecessary, add more concrete to
    as described for the slump test                       fill the top layer
                                                          Use the tamping bar to strike the
                                                          concrete level with the top of the
                                                          mould
'   Carefullyclean off spillage from       Carefully stand on the toe
     around the mould and table top         board at the front of the
                                            table




     Wait 30 seconds from striking off
     Carefully lift the mould straight up
     and clear, to a count of between 3
     and 6 seconds
Slowly lift the table top by the
    handle until it reaches the upper
    stop
.   Allow the table to fall freely
    Repeat this cycle to give a total of
    15 drops
    Each cycle should take about 4
    seconds




. Measure     the largest dimension of
    concrete spread in two directions,
    parallel to the table edges
.   Record the two diameters to
    nearest 5mm if using BS 1881: Part
    105 or 10mm if using BS EN
    12350-5
    If there is a ring of cement paste
    several mm beyond the coarse
    aggregate, report that segregation
    has occurred
    Complete the Sampling and testing
    certificates
You will need this equipment for the Flow Test
                 1 .....'r.""__.I   :.r.'8W:IU..-:i .........   (:.8::.l.L!1I818.1::.1..   i. ::.1_....,.




                 d                                                                      cJj
                                                                                                                                   !!l
Smallscoop                                        Sampling scoop                                             Sampling and           ,0:::......
                                                                                                                                        ,
                                                                                                             testingcertificates   '':
                                                                                                                                    "-

Square-mouthed
shovel                                           700mmrule                             /                    Mixing tray


                                                                                                                                   0
Buckets
     or                                                                                                      Flowtable
wheelbarrow
Mixing
     tray        53                               Mould
                                                                                            13
Cloth            rQ9                              Hardwood

                                                  tamping bar
MAKING                          CUBES                                                BS 1881: Part 108 or
                                                                                     BS EN 12390-2
Sample the concrete in the standard   manner.   Concrete    sampled       using the alternative   method   cannot
be used for making cubes.




  Check that the                                           . Fill the   mould with
  moulds are clean and                                       concrete in 50mm layers
 lightly oiled with all                                    . Using the special   tamping
 bolts tightened so                                          bar. compact
 that there will be no                                       the concrete with not less
                                                             than:
. leakage that the
  Ensure                                                        25 tamps for each of
  correct halves of the                                         the two layers in a
  mould are used and                                            100mm mould
  that the corner lining                                        35 tamps for each of
  pins are correctly                                            the three layers in a
  located                                                       150mm mould
. Thoroughly   remix the
 sample as described
 for the slump test
. and smooth overconcrete
  Removesurplus
                  with a
                             Cover each mould with a
                             damp cloth and plastic
 float                       sheet
. Wipe the mould edges
  clean
                             Store inside at normal
                             room temperature (15'C
. Number the moulds for      to 2S'C) e.g. on top of the
 identification and record   curing tank
 details                     Protect the cube moulds at
                             all times from high and
                             low temperatures
                             (especially frost) and
                             drying winds
                             Complete the Sampling
                             and cube making
                             certificates
Youwill need this equipment for Making Cubes


Smallscoop         Sampling scoop       Spanner




Square-mouthed     Damp cloth and       Hide hammer

shovel             plastic sheet

                                    8
                   Buckets or           Cloth

Tamping bar        wheelbarrow
Lightly re-oil the cube moulds with release oil



Cube moulds                                          Mixing tray   Sampling,      cube

                                                                   making and storage

                                                                   certificates




Maximuml                                             Steel float   Curing tank

minimum

thermometer                                                                              ;   .   -',




Felt tip pen or                                      Brush
                                                         and
                                I                    mouldoil
crayon
STORING                           CUBES                                         BS 1881: Part 111 or
                                                                                BS EN 12390-2
The cubes should be taken from the moulds the day after making, numbered        and put in a curing tank.




  Record the
  maximum/minimum
                                                      . Part the sides of the
                                                        mould, tapping gently with
  overnight storage                                     the hide hammer
  temperatures on the                                   lift off carefully
  certificate                  iMAX                   . Remember, new cubes
                                                        are easily damaged
                                                        unless handled carefully
                          MIN lMJ




. Slacken all nuts                                   . Mark each   cube with its
                                                       identification number on
                                                       two of its cast sides
I'
     . Place the cubes in the             For despatch to test
       curing tank                        laboratory, wrap the wet
     . Clean and reassemble the           cubes in damp cloths. and
         moulds                           then plastic bags and pack
                                          in trays
                                      .   Attach the sampling.
                                          testing. cube making and
                                          storage certificates, plus
                                          the order for testing. to
     .   Check that the water             the package
                                                                       ......

         temperature is
         controlled at 20.C :t 2.C
         and the cubes are covered
         by water
     . Make sure the power                        20.C
         supply is not switched off
         day or night
     .   Check the temperature
         range daily using the
         maximum/minimum
         thermometer
     . Keep a record of the
         readings
-
 -
 Ql1ARRY
 PRODUCTS
  ASSOCJ             AT ION



o Quarry Products Association
First published by the British Cement Association
for the Ready-mixed Concrete     Bureau
                                                     National Helpline
                                                      07004 500 500


Publication number 97. 334




                                                                  (~
First published 1993
Revised 2002.    2004
fS8N07210       14704

Produced by Rudkin Design
Telephone: (01327)      301770
                                                                                 )
                                                    The Concrete Centre™
  For further information contact:


                                                               The Concrete Centre
                                                     Riverside House, 4 Meadows Business Park
                                                           Station Approach, Blackwater
                                                           Camberley, Surrey GU17 9AB



                                                                                                I.

More Related Content

PPTX
Bituminous road construction
PDF
Vebe test for workability of fresh concrete
PPTX
Concrete cube casting and Testing.
PPTX
Slump test
PDF
Testing of hardened concrete
 
PDF
Flow test of concrete
PPTX
Dewatering
PPTX
Pavement Materials Bitumen
Bituminous road construction
Vebe test for workability of fresh concrete
Concrete cube casting and Testing.
Slump test
Testing of hardened concrete
 
Flow test of concrete
Dewatering
Pavement Materials Bitumen

What's hot (20)

PPTX
Proctor compaction test
PPTX
Standard test on fresh concrete
PDF
Bearing capacity of shallow foundations by abhishek sharma
PPT
Hardened Concrete
PPTX
Cube test for compressive strength of concrete
DOCX
Liquid limit &amp; plastic limit test
ODP
SLUMP TEST AND VEE-BEE TEST
PPTX
Special Concreting Techniques
PPTX
Soil stabilisation
PPTX
Concrete Technology
PDF
Normal consistency-Amit Payal
PPTX
Earth pressure( soil mechanics)
PDF
Sieve Analysis of Fine & Coarse Aggregate | Jameel Academy
PPSX
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
PPT
Properties of fresh and Hardened Concrete
PDF
Permeability of Soils & Seepage Analysis
PPTX
Standard Penetration Test for soils
PPTX
Concrete Mix Design
PPTX
Retaining wall - design of reinforced concrete structure
PPTX
introduction to soil stabilization and introduction to geo textiles and synth...
Proctor compaction test
Standard test on fresh concrete
Bearing capacity of shallow foundations by abhishek sharma
Hardened Concrete
Cube test for compressive strength of concrete
Liquid limit &amp; plastic limit test
SLUMP TEST AND VEE-BEE TEST
Special Concreting Techniques
Soil stabilisation
Concrete Technology
Normal consistency-Amit Payal
Earth pressure( soil mechanics)
Sieve Analysis of Fine & Coarse Aggregate | Jameel Academy
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Properties of fresh and Hardened Concrete
Permeability of Soils & Seepage Analysis
Standard Penetration Test for soils
Concrete Mix Design
Retaining wall - design of reinforced concrete structure
introduction to soil stabilization and introduction to geo textiles and synth...
Ad

Viewers also liked (20)

PPT
Fresh concrete properties & its standard tests
DOC
Machine Catalouge
PDF
Bs 1881 112 1983
DOC
Concrete lab s5
PPT
Self Consolidating Concrete-Designing & Tsting
PPTX
Slump cone test
PPTX
Mat Foundation-Nirvik-34-Sec-B
DOCX
Testing of dry/hardened concrete
PPT
Lecture 2 3 Compression, Condition Assess
PPTX
SOLAR CARS
PPTX
Inovasi makmal (1)
PPTX
Special concrete and concreting method
PPT
Hardened concrete 1
PDF
Compression test
PPTX
Sieve analysis test of sand (video version check https://www.youtube.com/watc...
PDF
Pervious Concrete
PDF
Summary of concrete workability test
PPTX
Material Testing Lab Equipments
PPTX
Concrete,batc,mix,trans,copaction etc
PPTX
Mat foundation
Fresh concrete properties & its standard tests
Machine Catalouge
Bs 1881 112 1983
Concrete lab s5
Self Consolidating Concrete-Designing & Tsting
Slump cone test
Mat Foundation-Nirvik-34-Sec-B
Testing of dry/hardened concrete
Lecture 2 3 Compression, Condition Assess
SOLAR CARS
Inovasi makmal (1)
Special concrete and concreting method
Hardened concrete 1
Compression test
Sieve analysis test of sand (video version check https://www.youtube.com/watc...
Pervious Concrete
Summary of concrete workability test
Material Testing Lab Equipments
Concrete,batc,mix,trans,copaction etc
Mat foundation
Ad

Similar to Guide to sampling concrete (20)

PDF
Bs 1881 121 1983
PPT
Split tensile strength in concrete
PDF
253651195 astm-c939
PPT
Concrete testing
PDF
Civil engineering lab tests pdf
PPTX
Presentation on seive analysis on coarse and fine aggregate.pptx
PPTX
concrete placement,testing, curing and compaction (1).pptx
PPTX
Triaxial shear test on soil drained ad untrained.pptx
PPTX
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
DOCX
Quality control lab
PPTX
Testing Of DF as Per IS and CCE testing methods.pptx
DOCX
Shear Strength of soil presentation and question answer
PPTX
Properties of concrete
PPT
presentation on the FieldTests carried .ppt
PPTX
TEST ON HARDENED CONCRETE
PDF
A triaxial test is a laboratory procedure
DOCX
Slump Test - Report
PDF
ALL PRACTICALS of construction material
PDF
Building materials lab_manual lab 01
PDF
Buildingmaterialslabmanuallab01 161125043012
Bs 1881 121 1983
Split tensile strength in concrete
253651195 astm-c939
Concrete testing
Civil engineering lab tests pdf
Presentation on seive analysis on coarse and fine aggregate.pptx
concrete placement,testing, curing and compaction (1).pptx
Triaxial shear test on soil drained ad untrained.pptx
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
Quality control lab
Testing Of DF as Per IS and CCE testing methods.pptx
Shear Strength of soil presentation and question answer
Properties of concrete
presentation on the FieldTests carried .ppt
TEST ON HARDENED CONCRETE
A triaxial test is a laboratory procedure
Slump Test - Report
ALL PRACTICALS of construction material
Building materials lab_manual lab 01
Buildingmaterialslabmanuallab01 161125043012

More from Lahmeyer International, UAE (20)

PDF
Techniquescontrolledblasting 091217003405-phpapp01
PDF
AP88 & AP91 shifting proposal
PDF
Design of transmission lines in india a review of multiple swing angle
PDF
Guide to sampling concrete
PDF
Use of bentonite
PDF
Ohl project risk register
PDF
Ohl project risk register
PDF
Counter mesaures aginst liquefaction induced settlemnt for ohl
PDF
Copy of stub setting
PDF
Copy of stub setting
PDF
Copy of prop setting calculations final
PDF
Copy of stub setting 2
PDF
Copy of stub setting
PDF
Copy of prop setting calculations final
PDF
Copy of stub setting 3
PDF
Copy of stub setting 1
PDF
Copy of prop setting calculations final
PDF
Copy of stub setting 1
PDF
Copy of stub setting
Techniquescontrolledblasting 091217003405-phpapp01
AP88 & AP91 shifting proposal
Design of transmission lines in india a review of multiple swing angle
Guide to sampling concrete
Use of bentonite
Ohl project risk register
Ohl project risk register
Counter mesaures aginst liquefaction induced settlemnt for ohl
Copy of stub setting
Copy of stub setting
Copy of prop setting calculations final
Copy of stub setting 2
Copy of stub setting
Copy of prop setting calculations final
Copy of stub setting 3
Copy of stub setting 1
Copy of prop setting calculations final
Copy of stub setting 1
Copy of stub setting

Recently uploaded (20)

PPT
Data mining for business intelligence ch04 sharda
PPTX
Principles of Marketing, Industrial, Consumers,
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PPT
Chapter four Project-Preparation material
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
COST SHEET- Tender and Quotation unit 2.pdf
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Data mining for business intelligence ch04 sharda
Principles of Marketing, Industrial, Consumers,
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Euro SEO Services 1st 3 General Updates.docx
Laughter Yoga Basic Learning Workshop Manual
DOC-20250806-WA0002._20250806_112011_0000.pdf
Chapter four Project-Preparation material
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Ôn tập tiếng anh trong kinh doanh nâng cao
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Nidhal Samdaie CV - International Business Consultant
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
340036916-American-Literature-Literary-Period-Overview.ppt
Power and position in leadershipDOC-20250808-WA0011..pdf
COST SHEET- Tender and Quotation unit 2.pdf
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement

Guide to sampling concrete

  • 1. & ite sampling testingof concrete A practical guide for site personnel
  • 2. FORENORD During the next few years, specifications will change An accompanying publication entitled 'Site sampling from using the as 1881 test methods to those given in and testing of concrete: a site managers guide' has the series as 12350: Testing fresh concrete and the also been produced to assist site engineers and series as 12390: Testing hardened concrete. managers to ensure that sampling and testing are Fortunately the tests included on this poster are the carried out correctly. The guide highlights some of the same and the only difference is in the reporting of the potential problems associated with using incorrect slump and flow values. However on the test certificate, procedures. it is necessary to report the standard used. Don't forget - The test results will be misleading if these procedures are not carried out. Get it right - Otherwise it's a waste of time and could cost your company money. For fulldetailsof equipment,testsandrecords see:as 1881: Testing concrete, aSEN12350:Tesdngfreshconcret~and as EN 12390: Testing hardened concrete.
  • 3. Safety When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without delay and medical attention sought. All advice or information in this publication is intended for those who will evaluate the significance and limitations of its contents anCltake responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted. Readers should note that all publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
  • 4. SAMPLING BS1881:Part101or BSEN 12350-1 The standard method To ensure it is representative of the whole load a Sample as the load is discharged. standard sample consists of scoopfuls taken from Scoopfuls must be taken through the moving stream, four different parts of the load and collected in sampling the whole width and depth - not just the buckets. top part. let very first concrete go Take a scoopful from part 1 Take a scoopful from part 2 Take a scoopful from part 3 Take a scoopful from part 4 let the last concrete go Complete a Sampling certificate and record which sampling method was used.
  • 5. Safety When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without delay and medical attention sought. All advice or information in this publication is intended for those who will evaluate the significance and limitations of its contents an'd take responsibility for its use and application. No liability (including thatfor negligence) for any loss resulting from such advice or information is accepted. Readers should note that all publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
  • 6. BS1881:Part 102or BSEN206-1: 2000, clause5.4. 1 Thealternativemethod For an early check on the workability of concrete Sample as the load is discharged. d€livered in a truckmixer this alternative method of Scoopfuls must be taken through the moving stream, sampling for the slump test may be used. Additional sampling the whole width and depth - not just the tolerances will be applicable for concrete sampled by top part. this alternative method. Let very first concrete go Take six scoopfuls from the next 0.3 m3 '''''- Take six scoopfuls after the first 0.3m3 has been discharged. Do not use this sample to make cubes. BS 1881: Part 101 requires two slump tests when concrete is sampled by the alternative method.
  • 7. THE SLUMP TEST BS 1881: Part 102 or BS EN 12350-2 Empty the sampling Flatten the final heap by repeatedly buckets onto the mixing digging-in the shovel vertically tray Liftthe shovel clear each time . Scrape each bucket clean Ifthe alternative method of sampling has been used, divide this heap into two and test each part . Thoroughly remix the Ensure the slump cone is clean and sample shovelling into damp a heap Place the metal plate on a solid level . Turn the heap over to base away from vibration or other disturbance form another . Do this three times Place the cone on the plate and stand on the foot-pieces
  • 8. Fillthe cone in three equal depth Carefullycleanoff spillage layers from sideand baseplate Use the standard slump rod Rod each layer 2S times Spread the blows evenly over the area Make sure the rod just penetrates the layer below . Heap the concrete above the top of the cone before rodding the third layer . Top up if necessary . Carefully lift the cone Usethe rod with a sawingand straight up and clear, rolling motion to strikethe concrete to a count of between 5 levelwith the top of and 10 seconds the cone Complete steps 5 to 8 within 150 seconds
  • 9. Laythe rod across the upturned There are three kinds of slump slump cone Measure the distance between the underside of the rod and the highest - point of the concrete the true Slump i slump Recordthis distance to the nearest T Smm if using BS1881: Part 102 or 10 mm if using BSEN 123S0-2 In all cases record the kind of slump Checkthe type of slump Ifthe slump isn't true, take a new sample and repeat the test . Ifthe second slump isn't true, get advice 1.True . Complete the Sampling and testing certificates 2.Collapse 3.Shear
  • 10. Youwill need thisequipment or the SlumpTest f Small scoop cf Sampling scoop cP Steel rule / Square-mouthed shovel Slump rod / Slump cone and rigidmetalplate i} Buckets or wheelbarrow 53 Mixing tray <> Sampling and testing certificates I!l ' ' " Cloth
  • 11. THE FLON TEST BS1881:Part 105or BSEN 12350-5 First, find a suitable location for the flow table. It Sampling using the standard method is must be placed on a firm flat surface. It may be recommended necessary to prepare an area for the table. . Empty the sampling buckets Ensure the mould and table are clean onto the mixing tray and damp . Scrape each bucket clean Place the mould on the centre of the table and stand on the foot-pieces Fillthe mould in two layers, tamping each layer ten times with the tamping bar . Thoroughly remix the sample Ifnecessary, add more concrete to as described for the slump test fill the top layer Use the tamping bar to strike the concrete level with the top of the mould
  • 12. ' Carefullyclean off spillage from Carefully stand on the toe around the mould and table top board at the front of the table Wait 30 seconds from striking off Carefully lift the mould straight up and clear, to a count of between 3 and 6 seconds
  • 13. Slowly lift the table top by the handle until it reaches the upper stop . Allow the table to fall freely Repeat this cycle to give a total of 15 drops Each cycle should take about 4 seconds . Measure the largest dimension of concrete spread in two directions, parallel to the table edges . Record the two diameters to nearest 5mm if using BS 1881: Part 105 or 10mm if using BS EN 12350-5 If there is a ring of cement paste several mm beyond the coarse aggregate, report that segregation has occurred Complete the Sampling and testing certificates
  • 14. You will need this equipment for the Flow Test 1 .....'r.""__.I :.r.'8W:IU..-:i ......... (:.8::.l.L!1I818.1::.1.. i. ::.1_....,. d cJj !!l Smallscoop Sampling scoop Sampling and ,0:::...... , testingcertificates '': "- Square-mouthed shovel 700mmrule / Mixing tray 0 Buckets or Flowtable wheelbarrow Mixing tray 53 Mould 13 Cloth rQ9 Hardwood tamping bar
  • 15. MAKING CUBES BS 1881: Part 108 or BS EN 12390-2 Sample the concrete in the standard manner. Concrete sampled using the alternative method cannot be used for making cubes. Check that the . Fill the mould with moulds are clean and concrete in 50mm layers lightly oiled with all . Using the special tamping bolts tightened so bar. compact that there will be no the concrete with not less than: . leakage that the Ensure 25 tamps for each of correct halves of the the two layers in a mould are used and 100mm mould that the corner lining 35 tamps for each of pins are correctly the three layers in a located 150mm mould . Thoroughly remix the sample as described for the slump test
  • 16. . and smooth overconcrete Removesurplus with a Cover each mould with a damp cloth and plastic float sheet . Wipe the mould edges clean Store inside at normal room temperature (15'C . Number the moulds for to 2S'C) e.g. on top of the identification and record curing tank details Protect the cube moulds at all times from high and low temperatures (especially frost) and drying winds Complete the Sampling and cube making certificates
  • 17. Youwill need this equipment for Making Cubes Smallscoop Sampling scoop Spanner Square-mouthed Damp cloth and Hide hammer shovel plastic sheet 8 Buckets or Cloth Tamping bar wheelbarrow
  • 18. Lightly re-oil the cube moulds with release oil Cube moulds Mixing tray Sampling, cube making and storage certificates Maximuml Steel float Curing tank minimum thermometer ; . -', Felt tip pen or Brush and I mouldoil crayon
  • 19. STORING CUBES BS 1881: Part 111 or BS EN 12390-2 The cubes should be taken from the moulds the day after making, numbered and put in a curing tank. Record the maximum/minimum . Part the sides of the mould, tapping gently with overnight storage the hide hammer temperatures on the lift off carefully certificate iMAX . Remember, new cubes are easily damaged unless handled carefully MIN lMJ . Slacken all nuts . Mark each cube with its identification number on two of its cast sides
  • 20. I' . Place the cubes in the For despatch to test curing tank laboratory, wrap the wet . Clean and reassemble the cubes in damp cloths. and moulds then plastic bags and pack in trays . Attach the sampling. testing. cube making and storage certificates, plus the order for testing. to . Check that the water the package ...... temperature is controlled at 20.C :t 2.C and the cubes are covered by water . Make sure the power 20.C supply is not switched off day or night . Check the temperature range daily using the maximum/minimum thermometer . Keep a record of the readings
  • 21. - - Ql1ARRY PRODUCTS ASSOCJ AT ION o Quarry Products Association First published by the British Cement Association for the Ready-mixed Concrete Bureau National Helpline 07004 500 500 Publication number 97. 334 (~ First published 1993 Revised 2002. 2004 fS8N07210 14704 Produced by Rudkin Design Telephone: (01327) 301770 ) The Concrete Centre™ For further information contact: The Concrete Centre Riverside House, 4 Meadows Business Park Station Approach, Blackwater Camberley, Surrey GU17 9AB I.