MANUFACTURING PROCESS OF 500 MW TURBO GENERTOR STATOR
WINDING BAR
HARSHIT AGARWAL
08070105022
AT BHEL HARIDWAR
INTRODUCTIONINTRODUCTION
In 1956 India took a major step towards the establishment of its heavy engineering industry when BHEL, the
first heavy electrical Manufacturing unit of the country was set up at Bhopal.
BHEL's Heavy Electrical Equipment Plant (HEEP) was set up in technical collaboration with USSR, for the
manufacturing of power plantequipment.
In 1976, BHEL entered into a collaboration agreement with M/sKraftwerkUnion, AG of Germany for
design, manufacturing, erection and commissioning of large size steam turbines.
More than 40 percent of the country's electrical energy is generated from the power equipment
supplied by BHEL,Haridwar.
MANUFACTURING BLOCKS:
.
BLOCK I:ELECTRICAL MACHINE BLOCK, IS DESIGNED TO
MANUFACTURING OF TURBOGENERATORS
BLOCK II: FABRICATION BLOCK
BLOCK III: TURBINE BLADE BLOCK
BLOCK IV: COIL & INSULATION MANUFACTURING &
APPARATUS & CONTROL GEAR MANUFACTURING BLOCK
BLOCK V: FEEDER BLOCK AND KNOWN AS FABRICATION AND FORGE BLOCK
BLOCK VI: STAMPING AND DIES MANUFACTURING BLOCK
BLOCK VII: WOODWORKING BLOCK
BLOCK VIII: HEAT EXCHANGER BLOCK, IS DESIGNED TO MANUFACTURE HEAT EXCHANGER
UNIT FOR STEAM TURBINES.
COIL & INSULATION MANUFACTURING SHOP (BLOCK-IV)
Block-4 is a feeder block for insulating items, winding with class-B Bituminous insulation
and sheet metal components for all the products of Block-1 i.e. Turbo-generators, Hydro-
generators, A.C. and D.C. machines
There are three BAYS in this block each bay manufactures stator bars and coils for
different machines
BAY-I: Bar winding shop:manufacturing of stator winding bars of generator
BAY-II:Manufacturing of heavy duty generator stator bars with New CNC M/c
BAY-III: Insulation detail shop:Manufacturing of hard insulation & machining of hares insulation part
(GlassTextolite) such as packing, washer, insulation box, wedges etc
Bar Shop:This shop is meant for manufacturing of stator winding coils of turbo-generator and hydro
generator
Layout of CIM, Block-IV
Sections in Block IV
1) Assembly Section
It is equipped with small size
• Drilling machines
• Welding sets
• Hydraulic testing equipment for manufacturing turbo-
generator mechanical assemblies.
2) Stator Bar Winding Section
It is equipped with
• Conductor cutting, insulation and transposition section.
• Stack consolidation section, forming and lug brazing
sections.
• Insulation taping sections with automatic taping facilities
in air-conditioned
3) Impregnation Section
It is equipped with
• Impregnation tank
• Ovens for impregnation of DC pole coils.
4) Armature Winding, Rotor coil and Stator bar Section
It is equipped with
• Conductors cutting.
• U- bending and terminal conductor cutting machines.
• Semi-automatic winding machine.
• Planking, boat pulling and diamond pulling machine.
• Insulation and pressing of AC coils.
5) Insulation Section
It is equipped with
• Small size lathes.
• Milling and radial drilling machines.
• Jet cutting saw.
• Electrical ovens & Hydraulic presses.
• Plastic Molding Section
Types of Generators
The generator may be classified based upon the cooling system used in the generators such as:THRI, TARI,
THDI, THDD, THDF, THFF, and THW
Stands for type of
generator
• T- Turbo Generator
• H- Hydro Generator
Stands for the cooling
media for Rotor
• H- Hydrogen gas
• A- Air
Stands for the type of
cooling for Rotor
• R- Radial
• D- Direct
• F- Forced
• I- Indirect
Stands for type of cooling
for Stator
• I- Indirect
• D- Direct
• F- Forced
Stands for cooling media
used for Stator coil
• W- Water
It is quite difficult (rather impossible) to manufacture, handle and wind in the stator slot of generator of
higher generation capacity because of its bigger size and heavy weight. That is why we make coil in two
parts. One part its bottom part of coil called bottom or lower bar and other part of coil is called top bar or
upper bar.
Why do we call it bar?
Set Type Upper Ordinary Upper Terminal Lower Ordinary Lower Terminal Total Bars No. of Bus
Bars
500MW THDF 42 6 42 6 96 6
210MW THW 54 6 54 6 120 9
250MW THRI 48 12 48 12 120 9
No. of Bars in current products
Poor Resin orMicalasticinsulation system
In this type of insulation the bond content in the resin is 5 – 7% and insulating material is prepared with
accelerator treatment. The temperature control need is not required. The insulating material is applied on
job and then same is impregnated (fully dipped) in the resin.
Resin System:
Rich Resin or Thermo-reactive insulation system:
In this type of insulation system the bond content in resin is 35 – 37 %. The raw materials are ready to use
and require preservation and working on temperature 20 – 25
0
C. Its shelf life is one year when kept at a
temperature of 20
0
C which could be increased when kept at temperature of 5
0
C.
INSULATION CLASSIFICATION:
Class YClass Y
• Upto90 °C
• Cotton, Silk, or Paper.
Class AClass A
• Upto105 °C
• ReinforcedClass-Y materials with impregnated varnish.
Class EClass E
• Upto120 °C
• Cotton lamination & Paper lamination.
Class BClass B
• Upto130 °C
• Inorganic material is hardened with adhesives.
Class FClass F
• Upto150 °C
• Class-B materials that are upgraded with adhesives.
Class HClass H
• Upto180 °C
• Made of inorganic material glued with silicone resin.
Class CClass C
• > 180 °CUpto220 °C
• Made of 100% inorganic material
Transposition
Transposition means changing/shifting of position of each conductor in active core (slot) part.
• After cutting the required number of conductors
• The conductors are arranged on the comb in staggered manner and then bends are given to the
conductors with the help of bending die at required distance.
• Then the conductors are taken out from the comb and die and placed with their ends in a line and
transposition is carried out.
• This process is repeated for making another half of the bar which would be mirror image of the first half.
• The two halves of the bar are overlapped over each other and a spacer is placed between the two halves.
Need of transposition.
1. To reduce eddy current losses.
2. Equalize the voltage generator.
3. To minimize skin effect of ac current.
Transposition is done in two ways:
Half Pitch Transposition:In this transposition, the first conductor at one end of the bar becomes the last
conductor at the other end of the bar.
Full Pitch Transposition:In this method of transposition, the first conductor at one end of the bar becomes
the last conductor in the mid of the bar and then again becomes the first conductor at the other end of the
bar.
Testing
Tan δ test:
• This test is carried out to ensure the healthiness of dielectric (Insulation) i.e. dense or rare & measured the
capacitance loss.
• Bar will act as capacitor when it is laid in the stator of the generator.
• SchearingBridge which works on the principle of wheat-stone bridge is used to find the unknown capacitance of
the bar.
• For good efficiency, capacitance of the bar should be high but we never approach pure capacitance.
• Bar is wrapped with aluminum to make the bar conductive throughout the outer surface of the bar. The two
conducting material i.e. the aluminum sheet and the conductors of the bar act as two plates of the capacitor
and the insulation on the bar act as dielectric medium for the capacitor thus the capacitance is found.
• Of angle of deviation due to impurity in the insulation is obtained from the formula:C4 * R4 * 10^-4 = tan δ
H.V. Test:
• Each bar is tested momentary at high voltage increased gradually to three times higher than rated voltage.
• This test is also known as insulation test because this test is performed to check the insulation of the bar.
• For 500 MW the working voltage of the bar is 64.5 KV & for 210 MW the working voltage of the bar is 63 KV.
• In this test the bar which is already wrapped with aluminum is used.
• High voltage is applied to the bar using auto-transformer and it is increased in steps according to the working
voltage of the generator. If the insulation is weak the bar will puncture at the place of weaker insulation.
• If any of the bar fails this test i.e. bar is punctured at any point then the bar is sent back for re-insulation and all
the processes are repeated again
2-Pole machine with the following features:
Direct cooling of stator winding with water.
Direct hydrogen cooling for rotor.
Micalasticinsulation system.
Spring mounted core housing for effective transmission of vibrations.
Brushless Excitation system.
Vertical hydrogen coolers
500 MW Turbo generators at a glance
Important dimensions & weights:
Heaviest lift of generator stator : 255 Tons
Rotor weight : 68 Tons
Overall stator dimensions [L*B*H] : 8.83m*4.lm*4.02m
Rotor dimensions(Dia. and length) : 1.15m and 12.11m
Total weight of turbo generator : 428 Tons
Salient technical data:
Rated output: 588 MVA , 500 MW
Terminal voltage: 21 KV
Rated stator current: 16 KA
Rated frequency: 50 Hz
Rated power factor: 0.85 Lag
Efficiency: 98.55%
Picture Of Bars
THANK YOUTHANK YOU

More Related Content

PPSX
Harshit agarwal
PPSX
PPT ON CIM ,BHEL HARIDWAR
PPTX
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
PDF
BHEL Trainning Report
PPTX
Lokesh Training report from BHEL
PPTX
Design of wind generator
PPTX
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
PPTX
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM
Harshit agarwal
PPT ON CIM ,BHEL HARIDWAR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
BHEL Trainning Report
Lokesh Training report from BHEL
Design of wind generator
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEM

What's hot (20)

DOCX
500 MW synchronous generator rotor construction report
PPTX
Manfacturing of turbo generators at BHEL
PPTX
Fluxtrol AlphaForm Moldable Magnetic Flux Concentrators
PPTX
Shashi
RTF
Gurtej bhel electrical report-at-bhel-haridwar-1
PDF
Lance carriage & guiding system
PPTX
Complete Rolling Mill & Equipment Manufacturer ---Hani Tech
PPTX
PPTX
Sharjah exhibition tube mill ppt
PDF
Pneumatic Feeder Air Feeder
PPTX
Wire rod rolling mill
PDF
Transpower Switchgear Industries, Mumbai, Electrical Products
PDF
Auger Monster (JWC Environmental) - Modular Headworks System _ Ingles
DOCX
Industrial training report
PDF
Innovative Technology for Steel Melt Shop
PDF
Smaw welding machine -adorwelding-supergen-320
PPTX
Longwall mining[1]
PPTX
Rolling mills
PDF
Siemens Steam Turbines 2MW-250MW
500 MW synchronous generator rotor construction report
Manfacturing of turbo generators at BHEL
Fluxtrol AlphaForm Moldable Magnetic Flux Concentrators
Shashi
Gurtej bhel electrical report-at-bhel-haridwar-1
Lance carriage & guiding system
Complete Rolling Mill & Equipment Manufacturer ---Hani Tech
Sharjah exhibition tube mill ppt
Pneumatic Feeder Air Feeder
Wire rod rolling mill
Transpower Switchgear Industries, Mumbai, Electrical Products
Auger Monster (JWC Environmental) - Modular Headworks System _ Ingles
Industrial training report
Innovative Technology for Steel Melt Shop
Smaw welding machine -adorwelding-supergen-320
Longwall mining[1]
Rolling mills
Siemens Steam Turbines 2MW-250MW
Ad

Viewers also liked (9)

PPTX
Generator protection
PPTX
A.C GENERATOR
PPTX
F:\Ac Generator Ppt
PPT
Generators
PPSX
dc Generator Ppt
DOCX
12th CBSE Physics Project AC Generator
PPTX
Protection Of Generator
PDF
Physics Investigatory Project Class 12
PDF
LinkedIn SlideShare: Knowledge, Well-Presented
Generator protection
A.C GENERATOR
F:\Ac Generator Ppt
Generators
dc Generator Ppt
12th CBSE Physics Project AC Generator
Protection Of Generator
Physics Investigatory Project Class 12
LinkedIn SlideShare: Knowledge, Well-Presented
Ad

Similar to Harshitagarwal 111109034529-phpapp02 (20)

PPTX
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
PPTX
Manufacturing process of 500/600MW stator winding bar
PDF
Bhel report block 4
DOC
Gurtej bhel report
DOCX
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
PPTX
ALTERNATOR DESIGN
PPTX
Summer Training BHEL, Haridwar, BLK-IV
PPTX
Generator Baisc Construction.pptx
PDF
Study of turbo generators
DOCX
Study of Turbo Generators
PPT
BHEL-Generator BHEL-Generator BHEL-Generator.ppt
PDF
Summer Training BHEL, Haridwar, BLK-I
PPTX
Presentation (BHEL)
PPTX
BHEL, Block 4, Haridwar
PPTX
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PDF
TURBO GENERATOR
PDF
01. betagard mcb
PDF
G.r.s. 02 04-01-12
PPTX
Manufacturing of Large Electrical Machine
PPT
Equipments of power transmission
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
Manufacturing process of 500/600MW stator winding bar
Bhel report block 4
Gurtej bhel report
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
ALTERNATOR DESIGN
Summer Training BHEL, Haridwar, BLK-IV
Generator Baisc Construction.pptx
Study of turbo generators
Study of Turbo Generators
BHEL-Generator BHEL-Generator BHEL-Generator.ppt
Summer Training BHEL, Haridwar, BLK-I
Presentation (BHEL)
BHEL, Block 4, Haridwar
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
TURBO GENERATOR
01. betagard mcb
G.r.s. 02 04-01-12
Manufacturing of Large Electrical Machine
Equipments of power transmission

More from k,l polytechnic roorkee (12)

PDF
33/11 KV SUBSTATION
PDF
Ntpc 131113070238-phpapp02
PDF
220kV Grid Transmission Substation vt report
PDF
33 kv substation vt report
PDF
Bhel turbine_shop_block-3
PDF
electronic communication
PDF
BHEL HARIDWAR VOCATIONAL TRAINING REPORT
PDF
Summer traNING
PDF
Bhelparamjeet 121106032837-phpapp02 1-
PDF
Apresentationonturbogeneratorandexcitor 1312012333
PDF
Acelectricalgeneratorsasope 120408063101-phpapp01 (1)
DOCX
Bhel training report
33/11 KV SUBSTATION
Ntpc 131113070238-phpapp02
220kV Grid Transmission Substation vt report
33 kv substation vt report
Bhel turbine_shop_block-3
electronic communication
BHEL HARIDWAR VOCATIONAL TRAINING REPORT
Summer traNING
Bhelparamjeet 121106032837-phpapp02 1-
Apresentationonturbogeneratorandexcitor 1312012333
Acelectricalgeneratorsasope 120408063101-phpapp01 (1)
Bhel training report

Recently uploaded (20)

PDF
International_Financial_Reporting_Standa.pdf
PDF
LIFE & LIVING TRILOGY - PART (3) REALITY & MYSTERY.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
HVAC Specification 2024 according to central public works department
PDF
English Textual Question & Ans (12th Class).pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Computer Architecture Input Output Memory.pptx
PPTX
Module on health assessment of CHN. pptx
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Empowerment Technology for Senior High School Guide
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
PDF
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
PPTX
Core Concepts of Personalized Learning and Virtual Learning Environments
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Journal of Dental Science - UDMY (2021).pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
International_Financial_Reporting_Standa.pdf
LIFE & LIVING TRILOGY - PART (3) REALITY & MYSTERY.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
HVAC Specification 2024 according to central public works department
English Textual Question & Ans (12th Class).pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Hazard Identification & Risk Assessment .pdf
Computer Architecture Input Output Memory.pptx
Module on health assessment of CHN. pptx
What if we spent less time fighting change, and more time building what’s rig...
Empowerment Technology for Senior High School Guide
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
Core Concepts of Personalized Learning and Virtual Learning Environments
My India Quiz Book_20210205121199924.pdf
Journal of Dental Science - UDMY (2021).pdf
AI-driven educational solutions for real-life interventions in the Philippine...

Harshitagarwal 111109034529-phpapp02

  • 1. MANUFACTURING PROCESS OF 500 MW TURBO GENERTOR STATOR WINDING BAR HARSHIT AGARWAL 08070105022 AT BHEL HARIDWAR
  • 2. INTRODUCTIONINTRODUCTION In 1956 India took a major step towards the establishment of its heavy engineering industry when BHEL, the first heavy electrical Manufacturing unit of the country was set up at Bhopal. BHEL's Heavy Electrical Equipment Plant (HEEP) was set up in technical collaboration with USSR, for the manufacturing of power plantequipment. In 1976, BHEL entered into a collaboration agreement with M/sKraftwerkUnion, AG of Germany for design, manufacturing, erection and commissioning of large size steam turbines. More than 40 percent of the country's electrical energy is generated from the power equipment supplied by BHEL,Haridwar.
  • 3. MANUFACTURING BLOCKS: . BLOCK I:ELECTRICAL MACHINE BLOCK, IS DESIGNED TO MANUFACTURING OF TURBOGENERATORS BLOCK II: FABRICATION BLOCK BLOCK III: TURBINE BLADE BLOCK BLOCK IV: COIL & INSULATION MANUFACTURING & APPARATUS & CONTROL GEAR MANUFACTURING BLOCK BLOCK V: FEEDER BLOCK AND KNOWN AS FABRICATION AND FORGE BLOCK BLOCK VI: STAMPING AND DIES MANUFACTURING BLOCK BLOCK VII: WOODWORKING BLOCK BLOCK VIII: HEAT EXCHANGER BLOCK, IS DESIGNED TO MANUFACTURE HEAT EXCHANGER UNIT FOR STEAM TURBINES.
  • 4. COIL & INSULATION MANUFACTURING SHOP (BLOCK-IV) Block-4 is a feeder block for insulating items, winding with class-B Bituminous insulation and sheet metal components for all the products of Block-1 i.e. Turbo-generators, Hydro- generators, A.C. and D.C. machines There are three BAYS in this block each bay manufactures stator bars and coils for different machines
  • 5. BAY-I: Bar winding shop:manufacturing of stator winding bars of generator BAY-II:Manufacturing of heavy duty generator stator bars with New CNC M/c BAY-III: Insulation detail shop:Manufacturing of hard insulation & machining of hares insulation part (GlassTextolite) such as packing, washer, insulation box, wedges etc Bar Shop:This shop is meant for manufacturing of stator winding coils of turbo-generator and hydro generator
  • 6. Layout of CIM, Block-IV
  • 7. Sections in Block IV 1) Assembly Section It is equipped with small size • Drilling machines • Welding sets • Hydraulic testing equipment for manufacturing turbo- generator mechanical assemblies. 2) Stator Bar Winding Section It is equipped with • Conductor cutting, insulation and transposition section. • Stack consolidation section, forming and lug brazing sections. • Insulation taping sections with automatic taping facilities in air-conditioned 3) Impregnation Section It is equipped with • Impregnation tank • Ovens for impregnation of DC pole coils.
  • 8. 4) Armature Winding, Rotor coil and Stator bar Section It is equipped with • Conductors cutting. • U- bending and terminal conductor cutting machines. • Semi-automatic winding machine. • Planking, boat pulling and diamond pulling machine. • Insulation and pressing of AC coils. 5) Insulation Section It is equipped with • Small size lathes. • Milling and radial drilling machines. • Jet cutting saw. • Electrical ovens & Hydraulic presses. • Plastic Molding Section
  • 9. Types of Generators The generator may be classified based upon the cooling system used in the generators such as:THRI, TARI, THDI, THDD, THDF, THFF, and THW Stands for type of generator • T- Turbo Generator • H- Hydro Generator Stands for the cooling media for Rotor • H- Hydrogen gas • A- Air Stands for the type of cooling for Rotor • R- Radial • D- Direct • F- Forced • I- Indirect Stands for type of cooling for Stator • I- Indirect • D- Direct • F- Forced Stands for cooling media used for Stator coil • W- Water
  • 10. It is quite difficult (rather impossible) to manufacture, handle and wind in the stator slot of generator of higher generation capacity because of its bigger size and heavy weight. That is why we make coil in two parts. One part its bottom part of coil called bottom or lower bar and other part of coil is called top bar or upper bar. Why do we call it bar?
  • 11. Set Type Upper Ordinary Upper Terminal Lower Ordinary Lower Terminal Total Bars No. of Bus Bars 500MW THDF 42 6 42 6 96 6 210MW THW 54 6 54 6 120 9 250MW THRI 48 12 48 12 120 9 No. of Bars in current products
  • 12. Poor Resin orMicalasticinsulation system In this type of insulation the bond content in the resin is 5 – 7% and insulating material is prepared with accelerator treatment. The temperature control need is not required. The insulating material is applied on job and then same is impregnated (fully dipped) in the resin. Resin System: Rich Resin or Thermo-reactive insulation system: In this type of insulation system the bond content in resin is 35 – 37 %. The raw materials are ready to use and require preservation and working on temperature 20 – 25 0 C. Its shelf life is one year when kept at a temperature of 20 0 C which could be increased when kept at temperature of 5 0 C.
  • 13. INSULATION CLASSIFICATION: Class YClass Y • Upto90 °C • Cotton, Silk, or Paper. Class AClass A • Upto105 °C • ReinforcedClass-Y materials with impregnated varnish. Class EClass E • Upto120 °C • Cotton lamination & Paper lamination. Class BClass B • Upto130 °C • Inorganic material is hardened with adhesives. Class FClass F • Upto150 °C • Class-B materials that are upgraded with adhesives. Class HClass H • Upto180 °C • Made of inorganic material glued with silicone resin. Class CClass C • > 180 °CUpto220 °C • Made of 100% inorganic material
  • 14. Transposition Transposition means changing/shifting of position of each conductor in active core (slot) part. • After cutting the required number of conductors • The conductors are arranged on the comb in staggered manner and then bends are given to the conductors with the help of bending die at required distance. • Then the conductors are taken out from the comb and die and placed with their ends in a line and transposition is carried out. • This process is repeated for making another half of the bar which would be mirror image of the first half. • The two halves of the bar are overlapped over each other and a spacer is placed between the two halves.
  • 15. Need of transposition. 1. To reduce eddy current losses. 2. Equalize the voltage generator. 3. To minimize skin effect of ac current. Transposition is done in two ways: Half Pitch Transposition:In this transposition, the first conductor at one end of the bar becomes the last conductor at the other end of the bar. Full Pitch Transposition:In this method of transposition, the first conductor at one end of the bar becomes the last conductor in the mid of the bar and then again becomes the first conductor at the other end of the bar.
  • 16. Testing Tan δ test: • This test is carried out to ensure the healthiness of dielectric (Insulation) i.e. dense or rare & measured the capacitance loss. • Bar will act as capacitor when it is laid in the stator of the generator. • SchearingBridge which works on the principle of wheat-stone bridge is used to find the unknown capacitance of the bar. • For good efficiency, capacitance of the bar should be high but we never approach pure capacitance. • Bar is wrapped with aluminum to make the bar conductive throughout the outer surface of the bar. The two conducting material i.e. the aluminum sheet and the conductors of the bar act as two plates of the capacitor and the insulation on the bar act as dielectric medium for the capacitor thus the capacitance is found. • Of angle of deviation due to impurity in the insulation is obtained from the formula:C4 * R4 * 10^-4 = tan δ
  • 17. H.V. Test: • Each bar is tested momentary at high voltage increased gradually to three times higher than rated voltage. • This test is also known as insulation test because this test is performed to check the insulation of the bar. • For 500 MW the working voltage of the bar is 64.5 KV & for 210 MW the working voltage of the bar is 63 KV. • In this test the bar which is already wrapped with aluminum is used. • High voltage is applied to the bar using auto-transformer and it is increased in steps according to the working voltage of the generator. If the insulation is weak the bar will puncture at the place of weaker insulation. • If any of the bar fails this test i.e. bar is punctured at any point then the bar is sent back for re-insulation and all the processes are repeated again
  • 18. 2-Pole machine with the following features: Direct cooling of stator winding with water. Direct hydrogen cooling for rotor. Micalasticinsulation system. Spring mounted core housing for effective transmission of vibrations. Brushless Excitation system. Vertical hydrogen coolers 500 MW Turbo generators at a glance
  • 19. Important dimensions & weights: Heaviest lift of generator stator : 255 Tons Rotor weight : 68 Tons Overall stator dimensions [L*B*H] : 8.83m*4.lm*4.02m Rotor dimensions(Dia. and length) : 1.15m and 12.11m Total weight of turbo generator : 428 Tons Salient technical data: Rated output: 588 MVA , 500 MW Terminal voltage: 21 KV Rated stator current: 16 KA Rated frequency: 50 Hz Rated power factor: 0.85 Lag Efficiency: 98.55%