Highway Maintenance Project 
 
 
Mohamad Asha (201311012) 
Anas Daghmash (201410022) 
Mohmmad Abdulrahman (201510921) 
Mahmoud Odeh (201511139) 
Mohammad Sulaiman (201410532) 
 
Dr. Akram Suleiman 
Highway Maintenance Project
1.1 Introduction:
This report is a maintenance report that
contains photos for distresses, PCI calculation,
and suggested repairs and maintenance for the
selected road
To do any maintenance project we must work and
identify some things as follows:
a) Network: Amman ( Capital of Jordan )
b) Zone: Nazzal Area
c) Branch: Around Al-Hayat Hospital
d) Section: is selected by:
- Pavement Structure
- Traffic
- Construction History
- Pavement Rank
- Drainage facilities and shoulders
- Condition
e) Sample: For an area of (2500±100) Ft² or (139~325)
m²
The roads were divided into several sections and every
section will contain several samples…Therefore, samples
were selected by calculating areas and measuring length
and width for each road. A twenty-three sections were
assigned, and thirty-seven samples were divided by
calculation of areas or length of each section.
1.2 Problem Decision
After the samples were separately divided to the
students, each distress will be identified by its degree and
treatment method for each sample.
In the samples that we discovered, we have the
following Distresses:
 Long & Transverse Crack
 Block Cracking
 Patching & Utility Cut Patching
 Alligator Cracking
 Potholes
 Depression
 Edge Cracking
 Lane & Shoulder drop off
The Figures below show pavement condition based on
PCI ratings…
1.3 Definition of Repair Options for Asphalt
Pavements
1- Cold Milling - Carbide teeth cutting bits are
used to chip off the surface of the pavement to
remove material.
2- Heater Scarify - 3/4 inch of the pavement is
heated and scarified to provide a smooth,
crack-free surface. Can be used before
overlaying to slow reflective cracking.
3- Overlay - An application of asphalt concrete
over the existing surface to correct surface
deficiencies and / or increase the load
carrying capacity of the pavement.
4- Patching
Shallow - A stable, compacted leveling course
is placed in depressions to level off the
surface.
Partial depth - the deteriorated area of the
asphalt surface course is removed and
replaced.
Full depth - the deteriorated area of the
asphalt surface course and the base course are
removed and replaced. The sub-grade is re-
compacted.
5- Reconstruction - complete replacement of the
pavement
6- Recycle - the reworking of a pavement
structure or its component material to improve
their performance and correct noted
deficiencies.
7- Seal Cracks - cracks are often routed to
remove debris before sealing.
8- Surface Seal - an application of bituminous
spray, such as for seals and rejuvenators.
9- Surface Treatment - an application of
bituminous binder with aggregate, such as
sand seals, slurry seals, and chip seals.
Calculations Graphs & Excel tables are attached in
this report…
1.4 Distress Definitions
We would like to tell you about each distress,
description, how to measure, photos that we
captured.
1-Long & Transverse Crack: Longitudinal
cracks are parallel to the pavement's
centerline or lay down direction.
Transverse cracks extend across the pavement
at approximately right angles to the pavement
centerline or direction of lay down. These
types of cracks are not usually load-
associated. Measured in linear ft or m.
2-Block Cracking: are interconnected cracks
that divide the pavement into approximately
rectangular pieces. The blocks may range in
size from approximately 1 by 1 ft (0.3 by 0.3)
m to 10 by 10 ft (3 by 3) m. Block cracking is
caused by shrinkage of the asphalt concrete
and daily temperature cycling. Measured in
squared meter.
3-Patching: A patch is an area of pavement that
has been replaced with new material to repair
the existing pavement. Measured in squared
meter.
4- Alligator Crack: is a series of interconnecting
cracks caused by fatigue failure of the asphalt
concrete surface under repeated traffic
loading. Alligator cracking is considered a
major structural distress and is usually
accompanied by rutting. Measured in squared
meter.
5-Potholes: are small-usually less than (0.9m ) in
diameter-bowl shaped depressions in the
pavement surface. They generally have sharp
edges and vertical sides near the top of the
hole. Potholes are counted in numbers
6-Depression: are localized pavement surface
areas with elevations slightly lower than those
of surrounding pavement. They are created by
settlement of the foundation soil or are a result
of improper construction. Measured in
squared meter.
7- Edge Cracking: are parallel to and usually
within 0.3 to 0.6 m of the outer edge of the
pavement. This distress is accelerated by
traffic loading and can be caused by frost
weakened base or sub grade. Measured in
squared meter.
8-Lane & Shoulder Drop Off: is a difference in
elevation between the pavement edge and the
shoulder. This distress is caused by shoulder
erosion, shoulder settlement, or by building up
the roadway without adjusting the shoulder
level.
1.6 Discussion & Conclusion:
The branch is a local branch… so it is not
exposed to heavy traffic. Hence the abundance of
block cracking, block cracks occur in low traffic or
no traffic area. The main reason for block cracking
is shrinkage and not load associated.
The majority of sections have a PCI value over 80 .
some sections are new…
For example: section 2 has a PCI value 57. So it
need to seal crack and overlay. It depends on the
highest deduct value for repairing.
Section No. Length (m)width (m) SamplesSelected Type Severity Measure
Potholes L 1
M (1.5*4) m²
M (1*8) m²
H (1.7*6) m²
Alligator Crack M (2.9*1.9) m²
Depression M (0.64*0.56) m²
L& TCracking H 27 m
Edge Crack M (1*1.5) m²
Patching L (3*4) m²
L& TCracking L 5 m
Depression M (0.25*0.56) m²
Potholes H 1
Alligator Crack M (3*1.5) m²
Depression H (0.51*0.4) m²
Block Cracking M (2.5*2) m²
L& TCracking L 8 m
Depression M (0.19*0.42) m²
Block Cracking H (2*3) m²
Patching L (1*1.5) m²
Alligator Crack L (1.2*1.7) m²
Edge Crack L 0.7 m
Lane Drop Off L 0.13 m
Potholes M 1
L& TCracking M 38 m
Depression H (0.23*0.35) m²
10 31,93 13 1 L& TCracking M 8 m
11 46 13 1 Block Cracking M (4.9*1.3) m²
12 82,82 13 2 L& TCracking L 6.18 m
13 77,89 13 2 Block Cracking M (3.1*1.4) m²
14 49,1 13 1 L& TCracking M 6 m
M 7 m
L 2 m
16 50,94 13 1 Patching M (0.7*10) m
H 3 m
L 1.6 m
18 45,26 13 1 Alligator Crack H (6.5*0.9) m²
Alligator Crack M (7.2*0.9) m²
Block Cracking M (7*1.9) m²
L& TCracking M 13 m
Block Cracking M (2.72*2) m²
21 155,9526 13 3 L& TCracking M 10 m
Depression M (0.5*0.6) m²
L& TCracking H 20 m
Pothle M 3
patching M (2*1.9) m²
Block Cracking H (1.9*2.5) m²
Edge Crack M 1 m
Patching L (1.5*0.85) m²
Distress
Block Cracking
1 2
2 1
Section
107,7718 13
30,09 13
225,6927 13 36
3 2
14
25
96,2029 13
42,0233 13
93,7211 13
7 1
8 1
33,679 13
44,3247 13
9 1
15 1
23 2
46,2487 13
19,77 13
57,75 13
41,56 13
87,72 13
L& TCracking
17 1 L& TCracking
19 1
20 72,24 13 2
22 209,4782 13 4
section no.  section pci   rating 
1  89  excellent 
2  57  good 
3  84  very good 
4  65  good 
5  65  good 
6  95  excellent 
7  84  very good 
8  98 excellent 
9  81  very good 
10  93  excellent 
11  82  very good 
12  81  very good 
13  89  excellent 
14  85 very good 
15  92  excellent 
16 
85 
B17  very good 
17  88 excellent 
18  62  good 
19  72  very good 
20  89  excellent 
21  70  good 
22  77  very good 
23  80 very good 
Highway Maintenance Project

More Related Content

PPT
Railway track construction, drainage & maintenence
PPTX
Railway track:An Introduction
PPTX
Rail fastenings and joints
PPT
highway engineering/ transportation engineering-I
PPTX
Points and crossings
PPTX
Railway points, crossings and components
Railway track construction, drainage & maintenence
Railway track:An Introduction
Rail fastenings and joints
highway engineering/ transportation engineering-I
Points and crossings
Railway points, crossings and components

What's hot (20)

PPTX
Highway Materials Unit-III
PPTX
Seal coat,prime coat and tack coat
PPTX
Chapter 4 Drainge and maintenance of road
PDF
Benkelman beam
PPTX
Introduction to railway engineering
PPT
Granular subbase and equipments used for its construction
PPTX
Highway failure and their maintenance
PPT
Bituminous pavement
PDF
Highway failure & their maintenance seminar report
PPTX
Embankment
PPTX
Dewatering.pptx
PPT
Design Considerations for AASHTO Flexible pavement design
PPTX
Highway drainage
PPTX
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
PPTX
Bituminous road construction
PPTX
Types of failure in rigid pavements
PDF
Flexible pavement failure
PPTX
Grouting
PPTX
Rigid Pavement Design Part II
PPTX
classification of indian railway
Highway Materials Unit-III
Seal coat,prime coat and tack coat
Chapter 4 Drainge and maintenance of road
Benkelman beam
Introduction to railway engineering
Granular subbase and equipments used for its construction
Highway failure and their maintenance
Bituminous pavement
Highway failure & their maintenance seminar report
Embankment
Dewatering.pptx
Design Considerations for AASHTO Flexible pavement design
Highway drainage
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Bituminous road construction
Types of failure in rigid pavements
Flexible pavement failure
Grouting
Rigid Pavement Design Part II
classification of indian railway
Ad

Similar to Highway Maintenance Project (20)

PDF
chapter 2 part 1-Pavement Distresxxs.pdf
PPTX
chapter 2 part 1-Pavement Distress.pptx
PDF
Highway Maintenance مشروع الصيانة
PPTX
Common-Road-Defects.pptx on whar and how
PPT
Flexible Pavement condition survey
PPTX
Pavement failures and maintenance
PPTX
Highway Failure & their Maintenance Final Project.pptx
PDF
Geometry condition survey from panthapath to russel square report submited by...
PDF
9. Highway Maintenance.pdf
PPTX
Road way condition survey presentation final
PPTX
Project presenting on ordinary Portland cement.pptx
PDF
"Pavement failures and their Maintenance" Technical Seminar report
PDF
road-asset-management-survey-services.pdf
PPTX
Case study on flexible pavement failures
PPT
maintenance and rehabilitation of pavements by Roshan .ppt
PPTX
Pavement Maintenance Manageme an nt.pptx
PPTX
Distresses in the pavement
PPTX
Highway failure & their maintenance ppt
PDF
highway maintenance and evaluation
PPTX
Maintenence of road
chapter 2 part 1-Pavement Distresxxs.pdf
chapter 2 part 1-Pavement Distress.pptx
Highway Maintenance مشروع الصيانة
Common-Road-Defects.pptx on whar and how
Flexible Pavement condition survey
Pavement failures and maintenance
Highway Failure & their Maintenance Final Project.pptx
Geometry condition survey from panthapath to russel square report submited by...
9. Highway Maintenance.pdf
Road way condition survey presentation final
Project presenting on ordinary Portland cement.pptx
"Pavement failures and their Maintenance" Technical Seminar report
road-asset-management-survey-services.pdf
Case study on flexible pavement failures
maintenance and rehabilitation of pavements by Roshan .ppt
Pavement Maintenance Manageme an nt.pptx
Distresses in the pavement
Highway failure & their maintenance ppt
highway maintenance and evaluation
Maintenence of road
Ad

More from Akram Suleiman (20)

PDF
Flixible Pavement Layers
PPTX
Earth Structure
PPTX
Groundwater
PPTX
Structural Geology
PPTX
Engineering Geology
PPTX
CHEMICAL WEATHERING
PPTX
Structural geology
PDF
Igneous rocks
PPTX
Weathering
PPTX
Earthquakes
PPTX
Metamorphic Rocks
PPTX
Earth Structure, Minerals In Earth, Physical Properties Of Minerals
PDF
Soil formation and Types
PPTX
Earthquakes
PPTX
Metamorphic Rocks geology
PPTX
Site subsurface Investigation
PPTX
Paver 5.2.3 A Quick Start
PDF
أعمال الواح الجبصين
PDF
أعمال عزل الاسطح
PDF
أعمال القصارة
Flixible Pavement Layers
Earth Structure
Groundwater
Structural Geology
Engineering Geology
CHEMICAL WEATHERING
Structural geology
Igneous rocks
Weathering
Earthquakes
Metamorphic Rocks
Earth Structure, Minerals In Earth, Physical Properties Of Minerals
Soil formation and Types
Earthquakes
Metamorphic Rocks geology
Site subsurface Investigation
Paver 5.2.3 A Quick Start
أعمال الواح الجبصين
أعمال عزل الاسطح
أعمال القصارة

Recently uploaded (20)

PPTX
Current and future trends in Computer Vision.pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
Design Guidelines and solutions for Plastics parts
PPTX
Module 8- Technological and Communication Skills.pptx
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
introduction to high performance computing
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Current and future trends in Computer Vision.pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Design Guidelines and solutions for Plastics parts
Module 8- Technological and Communication Skills.pptx
Abrasive, erosive and cavitation wear.pdf
Exploratory_Data_Analysis_Fundamentals.pdf
III.4.1.2_The_Space_Environment.p pdffdf
Amdahl’s law is explained in the above power point presentations
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Fundamentals of Mechanical Engineering.pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
introduction to high performance computing
Categorization of Factors Affecting Classification Algorithms Selection
August -2025_Top10 Read_Articles_ijait.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx

Highway Maintenance Project

  • 3. 1.1 Introduction: This report is a maintenance report that contains photos for distresses, PCI calculation, and suggested repairs and maintenance for the selected road To do any maintenance project we must work and identify some things as follows: a) Network: Amman ( Capital of Jordan ) b) Zone: Nazzal Area c) Branch: Around Al-Hayat Hospital d) Section: is selected by: - Pavement Structure - Traffic - Construction History - Pavement Rank - Drainage facilities and shoulders - Condition e) Sample: For an area of (2500±100) Ft² or (139~325) m²
  • 4. The roads were divided into several sections and every section will contain several samples…Therefore, samples were selected by calculating areas and measuring length and width for each road. A twenty-three sections were assigned, and thirty-seven samples were divided by calculation of areas or length of each section. 1.2 Problem Decision After the samples were separately divided to the students, each distress will be identified by its degree and treatment method for each sample. In the samples that we discovered, we have the following Distresses:  Long & Transverse Crack  Block Cracking  Patching & Utility Cut Patching  Alligator Cracking  Potholes  Depression  Edge Cracking  Lane & Shoulder drop off The Figures below show pavement condition based on PCI ratings…
  • 5. 1.3 Definition of Repair Options for Asphalt Pavements 1- Cold Milling - Carbide teeth cutting bits are used to chip off the surface of the pavement to remove material. 2- Heater Scarify - 3/4 inch of the pavement is heated and scarified to provide a smooth, crack-free surface. Can be used before overlaying to slow reflective cracking.
  • 6. 3- Overlay - An application of asphalt concrete over the existing surface to correct surface deficiencies and / or increase the load carrying capacity of the pavement. 4- Patching Shallow - A stable, compacted leveling course is placed in depressions to level off the surface. Partial depth - the deteriorated area of the asphalt surface course is removed and replaced. Full depth - the deteriorated area of the asphalt surface course and the base course are removed and replaced. The sub-grade is re- compacted. 5- Reconstruction - complete replacement of the pavement 6- Recycle - the reworking of a pavement structure or its component material to improve their performance and correct noted deficiencies. 7- Seal Cracks - cracks are often routed to remove debris before sealing. 8- Surface Seal - an application of bituminous spray, such as for seals and rejuvenators.
  • 7. 9- Surface Treatment - an application of bituminous binder with aggregate, such as sand seals, slurry seals, and chip seals. Calculations Graphs & Excel tables are attached in this report… 1.4 Distress Definitions We would like to tell you about each distress, description, how to measure, photos that we captured. 1-Long & Transverse Crack: Longitudinal cracks are parallel to the pavement's centerline or lay down direction. Transverse cracks extend across the pavement at approximately right angles to the pavement centerline or direction of lay down. These types of cracks are not usually load- associated. Measured in linear ft or m. 2-Block Cracking: are interconnected cracks that divide the pavement into approximately rectangular pieces. The blocks may range in size from approximately 1 by 1 ft (0.3 by 0.3) m to 10 by 10 ft (3 by 3) m. Block cracking is
  • 8. caused by shrinkage of the asphalt concrete and daily temperature cycling. Measured in squared meter. 3-Patching: A patch is an area of pavement that has been replaced with new material to repair the existing pavement. Measured in squared meter. 4- Alligator Crack: is a series of interconnecting cracks caused by fatigue failure of the asphalt concrete surface under repeated traffic loading. Alligator cracking is considered a major structural distress and is usually accompanied by rutting. Measured in squared meter. 5-Potholes: are small-usually less than (0.9m ) in diameter-bowl shaped depressions in the pavement surface. They generally have sharp edges and vertical sides near the top of the hole. Potholes are counted in numbers 6-Depression: are localized pavement surface areas with elevations slightly lower than those of surrounding pavement. They are created by
  • 9. settlement of the foundation soil or are a result of improper construction. Measured in squared meter. 7- Edge Cracking: are parallel to and usually within 0.3 to 0.6 m of the outer edge of the pavement. This distress is accelerated by traffic loading and can be caused by frost weakened base or sub grade. Measured in squared meter. 8-Lane & Shoulder Drop Off: is a difference in elevation between the pavement edge and the shoulder. This distress is caused by shoulder erosion, shoulder settlement, or by building up the roadway without adjusting the shoulder level.
  • 10. 1.6 Discussion & Conclusion: The branch is a local branch… so it is not exposed to heavy traffic. Hence the abundance of block cracking, block cracks occur in low traffic or no traffic area. The main reason for block cracking is shrinkage and not load associated. The majority of sections have a PCI value over 80 . some sections are new… For example: section 2 has a PCI value 57. So it need to seal crack and overlay. It depends on the highest deduct value for repairing.
  • 11. Section No. Length (m)width (m) SamplesSelected Type Severity Measure Potholes L 1 M (1.5*4) m² M (1*8) m² H (1.7*6) m² Alligator Crack M (2.9*1.9) m² Depression M (0.64*0.56) m² L& TCracking H 27 m Edge Crack M (1*1.5) m² Patching L (3*4) m² L& TCracking L 5 m Depression M (0.25*0.56) m² Potholes H 1 Alligator Crack M (3*1.5) m² Depression H (0.51*0.4) m² Block Cracking M (2.5*2) m² L& TCracking L 8 m Depression M (0.19*0.42) m² Block Cracking H (2*3) m² Patching L (1*1.5) m² Alligator Crack L (1.2*1.7) m² Edge Crack L 0.7 m Lane Drop Off L 0.13 m Potholes M 1 L& TCracking M 38 m Depression H (0.23*0.35) m² 10 31,93 13 1 L& TCracking M 8 m 11 46 13 1 Block Cracking M (4.9*1.3) m² 12 82,82 13 2 L& TCracking L 6.18 m 13 77,89 13 2 Block Cracking M (3.1*1.4) m² 14 49,1 13 1 L& TCracking M 6 m M 7 m L 2 m 16 50,94 13 1 Patching M (0.7*10) m H 3 m L 1.6 m 18 45,26 13 1 Alligator Crack H (6.5*0.9) m² Alligator Crack M (7.2*0.9) m² Block Cracking M (7*1.9) m² L& TCracking M 13 m Block Cracking M (2.72*2) m² 21 155,9526 13 3 L& TCracking M 10 m Depression M (0.5*0.6) m² L& TCracking H 20 m Pothle M 3 patching M (2*1.9) m² Block Cracking H (1.9*2.5) m² Edge Crack M 1 m Patching L (1.5*0.85) m² Distress Block Cracking 1 2 2 1 Section 107,7718 13 30,09 13 225,6927 13 36 3 2 14 25 96,2029 13 42,0233 13 93,7211 13 7 1 8 1 33,679 13 44,3247 13 9 1 15 1 23 2 46,2487 13 19,77 13 57,75 13 41,56 13 87,72 13 L& TCracking 17 1 L& TCracking 19 1 20 72,24 13 2 22 209,4782 13 4
  • 12. section no.  section pci   rating  1  89  excellent  2  57  good  3  84  very good  4  65  good  5  65  good  6  95  excellent  7  84  very good  8  98 excellent  9  81  very good  10  93  excellent  11  82  very good  12  81  very good  13  89  excellent  14  85 very good  15  92  excellent  16  85  B17  very good  17  88 excellent  18  62  good  19  72  very good  20  89  excellent  21  70  good  22  77  very good  23  80 very good