The paper discusses the implementation of a computer-based automation system for electrical power distribution, emphasizing the role of SCADA (Supervisory Control and Data Acquisition) and PLC (Programmable Logic Controller) in enhancing reliability and efficiency. It presents a setup that includes generator panels, transmission line panels, and a PLC system to simulate and monitor power distribution networks. The study concludes that such systems are critical for modern power systems, ensuring uninterrupted service and improved customer satisfaction.