Objectives:-
1.To learn the backfill to existing structures.
2.To relate the backfilling as per clauses in
SMM2
3.To determine the various clauses applied to
the backfilling
Outcomes:-
1.Able to differentiate the different clauses
used for backfilling
2.Able to write down the dimensions clearly.
BackfillingBackfilling
 It is an activity immediately afterIt is an activity immediately after
excavation work.excavation work.
 This activity needs a lot of thinkingThis activity needs a lot of thinking
and imagination.and imagination.
Once we have excavated the soilOnce we have excavated the soil
what next?what next?
Fig. 1 Excavated pit Fig 2. Excavated pit with
footing and stump
Then what ?Then what ?
Fig.1 Plan of a
footing
Fig.2 Section of a footing
We need to backfill
After backfill what next?After backfill what next?
A
B
Total excavated material( A + B = C) so A is the backfill
quantity while C – A = B ( Qty. to be removed)
Lets look at a simple structureLets look at a simple structure
F1
(1.00m x
1.00m )
Ground beam 150mm x 450mm
Stump 150mm
x 150mm
Plan of a Guard house
Testing your eye sightTesting your eye sight
View A
View B
View A
View B
GB1
GB2 GB3
GB4
GB1
GB4GB3
Before excavation we need to knowBefore excavation we need to know
the different activities involvedthe different activities involved
11stst
. Measure the oversite. Measure the oversite
excavation with average depth ofexcavation with average depth of
150mm150mm5.00m
5.00m
Area of oversite excavationArea of oversite excavation
5.00m
5.00m
Excavate for footingExcavate for footing
Section of excavationSection of excavation
Ground level
Base of footing level
Lets put in the structureLets put in the structure
Oversite excavation averageOversite excavation average
150mm thick150mm thick
Lets add in a ground floor slabLets add in a ground floor slab
Slab 100mm
thick
Lets look at the isometric view ofLets look at the isometric view of
the structurethe structure
Grd. Beam
Grd. Floor slab
Stump
Footing
Look at the sequence carefullyLook at the sequence carefully
A B C D
So when you measure backfill youSo when you measure backfill you
shall consider carefully the differentshall consider carefully the different
depth for the different areadepth for the different area
Area 1
Area 2
Area 3 Area 4
Plan view
of footing
Description for excavation, backfill andDescription for excavation, backfill and
removal.removal.
 Excavate pit for footingExcavate pit for footing
commencing from ground levelcommencing from ground level
with plan dimension less thanwith plan dimension less than
1.25m and with depth not1.25m and with depth not
exceeding 2.00m (5 nos.)exceeding 2.00m (5 nos.)
 Selected backfill to requiredSelected backfill to required
formation level, spread, levelledformation level, spread, levelled
and well rammed andand well rammed and
consolidated.consolidated.
 Removing surplus excavatedRemoving surplus excavated
material from site includingmaterial from site including
transporting to contractor’s owntransporting to contractor’s own
Description for oversiteDescription for oversite
excavationexcavation
 Oversite excavation average 200mmOversite excavation average 200mm
thick including transporting top soilthick including transporting top soil
to site to be determined by theto site to be determined by the
architect for re-use.architect for re-use.
 Oversite excavation commencingOversite excavation commencing
from ground level to a depth notfrom ground level to a depth not
exceeding 250mm.exceeding 250mm.
Exercise no. 1: measure the backfillExercise no. 1: measure the backfill
quantity using the descriptionquantity using the description
providedprovided
Footing F1 ( 12 nos.)
1000mm
1000mm
1.85m
650mm
Stump 300mm x
300mm
Exercise no. 2- Measure the backfillExercise no. 2- Measure the backfill
to footing F2to footing F2
900mm
900mm
F2 ( 20 nos.)
1.65m
450mm
Stump 150mm
x 150mm
Grd.
Beam
125mm x
450mm
125mm
450mm
Section of ground beam
Exercise no. 3 – Measure theExercise no. 3 – Measure the
following:following:
 1. Oversite excavation to footing F1.1. Oversite excavation to footing F1.
 2. Excavation to Footing F1.2. Excavation to Footing F1.
 3. Backfilling to Footing F1.3. Backfilling to Footing F1.
 4. Removing surplus earth of footing4. Removing surplus earth of footing
F1.F1.
 5. Write down your answer in the5. Write down your answer in the
correct format with correctcorrect format with correct
description.description.
Footing F1 ( 25 nos.)Footing F1 ( 25 nos.)
950mm
950mm
GL
Oversite excavation
150mm depth
2.00m
50mm lean concrete
Stump 250mm x
250mm
450mm
GB
250mm x
600mm
Plan
Section

More Related Content

PPTX
Dewatering by well point system
PPTX
Study of Prefabricated Vertical Drains
PPTX
Soil Nailing
PPTX
Dewatering techniques
PPTX
Soil stabilisation
PPTX
Site investigation
PPTX
Pipe Jacking
PPTX
Hot Weather Concrete (Presentation)
Dewatering by well point system
Study of Prefabricated Vertical Drains
Soil Nailing
Dewatering techniques
Soil stabilisation
Site investigation
Pipe Jacking
Hot Weather Concrete (Presentation)

What's hot (20)

PDF
Load carrying capacity of piles
PPSX
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
PDF
Wash boring
PPTX
Reinforced earth structures
PPSX
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
PPTX
Pile load test ppt
PPTX
Dewatering.pptx
PPT
Dynamic pile testing
PPT
07 101+ ground improvement techniques
PPTX
Grouting in Soils
PPTX
Coffer dam and its type
PPTX
Pile and pile driving equipments
PPSX
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
PPT
Durability of concrete
PPSX
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
PPSX
Geotechnical Engineering-I [Lec #28: Soil Exploration]
PPTX
Braced cut in deep excavation
PDF
Ground improvement technique
PPTX
1)methods of exploration
PPT
Subsurface Investigation
Load carrying capacity of piles
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Wash boring
Reinforced earth structures
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Pile load test ppt
Dewatering.pptx
Dynamic pile testing
07 101+ ground improvement techniques
Grouting in Soils
Coffer dam and its type
Pile and pile driving equipments
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Durability of concrete
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-I [Lec #28: Soil Exploration]
Braced cut in deep excavation
Ground improvement technique
1)methods of exploration
Subsurface Investigation
Ad

Viewers also liked (20)

PPTX
Excavation work
PPT
Excavation 2014a-Lecture3
PPTX
Excavation 2014a-Lecture2
PPTX
Mining ppt 2014
PDF
Valgma backfilling
PDF
Vaizene selective mining
PDF
Structural excavation and backfill
PPTX
Picture Presentaion of Foundation construction
PDF
Foundations
PPTX
02 Proof of a Global Flood from consideration of South African Gold Mine Geology
PPT
Bord Pillar
PDF
Valgma backfilling technologies for estonian oil shale mines(2)
PPTX
Mine fill
PPTX
10 Summing up regarding Proof of a Global Flood
PPT
VDF (Vaccum Dewatered Flooring) & back filling
PPTX
Transportation in underground mines
PPTX
Specifications of excavation and foundation
DOCX
Mining Machinery Learning Material
PDF
Introductory mining
Excavation work
Excavation 2014a-Lecture3
Excavation 2014a-Lecture2
Mining ppt 2014
Valgma backfilling
Vaizene selective mining
Structural excavation and backfill
Picture Presentaion of Foundation construction
Foundations
02 Proof of a Global Flood from consideration of South African Gold Mine Geology
Bord Pillar
Valgma backfilling technologies for estonian oil shale mines(2)
Mine fill
10 Summing up regarding Proof of a Global Flood
VDF (Vaccum Dewatered Flooring) & back filling
Transportation in underground mines
Specifications of excavation and foundation
Mining Machinery Learning Material
Introductory mining
Ad

Similar to Backfilling 2014a-Lecture4 (7)

PPTX
Excavation2014a-Lecture1
PPT
Assignment-Lecture5
PDF
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
PPTX
Soil Bearing Capacity of soil and foundationSBC.pptx
PPT
lecture_Exploration.ppt shear strength ppt soil mechanics and ppts
PPT
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
PPT
Trapezium Rule Practical Substructure And Excavation Presentation1
Excavation2014a-Lecture1
Assignment-Lecture5
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
Soil Bearing Capacity of soil and foundationSBC.pptx
lecture_Exploration.ppt shear strength ppt soil mechanics and ppts
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Trapezium Rule Practical Substructure And Excavation Presentation1

Recently uploaded (20)

PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Well-logging-methods_new................
PPTX
Artificial Intelligence
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
UNIT 4 Total Quality Management .pptx
DOCX
573137875-Attendance-Management-System-original
PPTX
additive manufacturing of ss316l using mig welding
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
Sustainable Sites - Green Building Construction
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
web development for engineering and engineering
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Internet of Things (IOT) - A guide to understanding
Model Code of Practice - Construction Work - 21102022 .pdf
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Well-logging-methods_new................
Artificial Intelligence
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
UNIT 4 Total Quality Management .pptx
573137875-Attendance-Management-System-original
additive manufacturing of ss316l using mig welding
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Safety Seminar civil to be ensured for safe working.
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Sustainable Sites - Green Building Construction
Foundation to blockchain - A guide to Blockchain Tech
Fundamentals of safety and accident prevention -final (1).pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
web development for engineering and engineering

Backfilling 2014a-Lecture4

  • 1. Lecture 4 – BackfillingLecture 4 – Backfilling Objectives:- 1.To learn the backfill to existing structures. 2.To relate the backfilling as per clauses in SMM2 3.To determine the various clauses applied to the backfilling Outcomes:- 1.Able to differentiate the different clauses used for backfilling 2.Able to write down the dimensions clearly.
  • 2. BackfillingBackfilling  It is an activity immediately afterIt is an activity immediately after excavation work.excavation work.  This activity needs a lot of thinkingThis activity needs a lot of thinking and imagination.and imagination.
  • 3. Once we have excavated the soilOnce we have excavated the soil what next?what next? Fig. 1 Excavated pit Fig 2. Excavated pit with footing and stump
  • 4. Then what ?Then what ? Fig.1 Plan of a footing Fig.2 Section of a footing We need to backfill
  • 5. After backfill what next?After backfill what next? A B Total excavated material( A + B = C) so A is the backfill quantity while C – A = B ( Qty. to be removed)
  • 6. Lets look at a simple structureLets look at a simple structure F1 (1.00m x 1.00m ) Ground beam 150mm x 450mm Stump 150mm x 150mm Plan of a Guard house
  • 7. Testing your eye sightTesting your eye sight View A View B View A View B GB1 GB2 GB3 GB4 GB1 GB4GB3
  • 8. Before excavation we need to knowBefore excavation we need to know the different activities involvedthe different activities involved
  • 9. 11stst . Measure the oversite. Measure the oversite excavation with average depth ofexcavation with average depth of 150mm150mm5.00m 5.00m
  • 10. Area of oversite excavationArea of oversite excavation 5.00m 5.00m
  • 12. Section of excavationSection of excavation Ground level Base of footing level
  • 13. Lets put in the structureLets put in the structure
  • 14. Oversite excavation averageOversite excavation average 150mm thick150mm thick
  • 15. Lets add in a ground floor slabLets add in a ground floor slab Slab 100mm thick
  • 16. Lets look at the isometric view ofLets look at the isometric view of the structurethe structure Grd. Beam Grd. Floor slab Stump Footing
  • 17. Look at the sequence carefullyLook at the sequence carefully A B C D
  • 18. So when you measure backfill youSo when you measure backfill you shall consider carefully the differentshall consider carefully the different depth for the different areadepth for the different area Area 1 Area 2 Area 3 Area 4 Plan view of footing
  • 19. Description for excavation, backfill andDescription for excavation, backfill and removal.removal.  Excavate pit for footingExcavate pit for footing commencing from ground levelcommencing from ground level with plan dimension less thanwith plan dimension less than 1.25m and with depth not1.25m and with depth not exceeding 2.00m (5 nos.)exceeding 2.00m (5 nos.)  Selected backfill to requiredSelected backfill to required formation level, spread, levelledformation level, spread, levelled and well rammed andand well rammed and consolidated.consolidated.  Removing surplus excavatedRemoving surplus excavated material from site includingmaterial from site including transporting to contractor’s owntransporting to contractor’s own
  • 20. Description for oversiteDescription for oversite excavationexcavation  Oversite excavation average 200mmOversite excavation average 200mm thick including transporting top soilthick including transporting top soil to site to be determined by theto site to be determined by the architect for re-use.architect for re-use.  Oversite excavation commencingOversite excavation commencing from ground level to a depth notfrom ground level to a depth not exceeding 250mm.exceeding 250mm.
  • 21. Exercise no. 1: measure the backfillExercise no. 1: measure the backfill quantity using the descriptionquantity using the description providedprovided Footing F1 ( 12 nos.) 1000mm 1000mm 1.85m 650mm Stump 300mm x 300mm
  • 22. Exercise no. 2- Measure the backfillExercise no. 2- Measure the backfill to footing F2to footing F2 900mm 900mm F2 ( 20 nos.) 1.65m 450mm Stump 150mm x 150mm Grd. Beam 125mm x 450mm 125mm 450mm Section of ground beam
  • 23. Exercise no. 3 – Measure theExercise no. 3 – Measure the following:following:  1. Oversite excavation to footing F1.1. Oversite excavation to footing F1.  2. Excavation to Footing F1.2. Excavation to Footing F1.  3. Backfilling to Footing F1.3. Backfilling to Footing F1.  4. Removing surplus earth of footing4. Removing surplus earth of footing F1.F1.  5. Write down your answer in the5. Write down your answer in the correct format with correctcorrect format with correct description.description.
  • 24. Footing F1 ( 25 nos.)Footing F1 ( 25 nos.) 950mm 950mm GL Oversite excavation 150mm depth 2.00m 50mm lean concrete Stump 250mm x 250mm 450mm GB 250mm x 600mm Plan Section