SlideShare a Scribd company logo
LOSS MINIMISATION INLOSS MINIMISATION IN
POWER SYSTEMPOWER SYSTEM
Submitted bySubmitted by
BIBHU PRASAD GANTHIABIBHU PRASAD GANTHIA
09/21/15 1DEPT OF ELECTRICAL ENGG.
CONTENTSCONTENTS
 Electricity lossesElectricity losses
 Causes in loss reductionCauses in loss reduction
 Useful solutionsUseful solutions
 ConclusionConclusion09/21/15 2DEPT OF ELECTRICAL ENGG.
ELECTRICITY LOSSESELECTRICITY LOSSES
POWER
LOSSES
TRANSMISSION
LOSSES
DISTRIBUTION
LOSSES
TECHNICAL
LOSSES
TECHNICAL
LOSSES
ADMINISTRATIVE
LOSSES
09/21/15 3DEPT OF ELECTRICAL ENGG.
TRANSMISSION LOSSESTRANSMISSION LOSSES
 Losses due to the phenomenon ofLosses due to the phenomenon of
corona.corona.
 Due to copper losses in conductors.Due to copper losses in conductors.
 Due to skin effect.Due to skin effect.
 Due to proximity effect.Due to proximity effect.
09/21/15 4DEPT OF ELECTRICAL ENGG.
CORONA LOSSESCORONA LOSSES
Factors affectingFactors affecting
coronacorona
:- atmosphere:- atmosphere
:-conductor size:-conductor size
:-spacing between:-spacing between
conductorsconductors
:- line voltage:- line voltage
Power loss due to coronaPower loss due to corona
P=242.2{(f+25)/d}[(r/D)^.5]P=242.2{(f+25)/d}[(r/D)^.5]
(V-Vc)^2*10^-5(V-Vc)^2*10^-5
09/21/15 5DEPT OF ELECTRICAL ENGG.
COPPER LOSSESCOPPER LOSSES
 Method of reducing copper lossesMethod of reducing copper losses
:- By using conductors of large diameters.:- By using conductors of large diameters.
:-By using multiple insulated conductors.:-By using multiple insulated conductors.
:-By using hollow conductors:-By using hollow conductors
09/21/15 6DEPT OF ELECTRICAL ENGG.
SKIN EFFECTSKIN EFFECT
 It depends uponIt depends upon
:- type of material:- type of material
:- frequency:- frequency
:- diameter of the:- diameter of the
conductorconductor
:- shape of the:- shape of the
conductorconductor
Outer (Ground) conductor
Inner (signal) conductor
Areas of high
current density
09/21/15 7DEPT OF ELECTRICAL ENGG.
SKIN EFFECTSKIN EFFECT
Skin Depth In Copper
0
1
2
3
4
5
6
7
8
9
10
0.E+00 1.E+09 2.E+09 3.E+09 4.E+09 5.E+09 6.E+09
Frequency, Hz
SkinDepth,microns
µπ
ρ
δ
f
=
µπ
ρ
δ
f
=
09/21/15 8DEPT OF ELECTRICAL ENGG.
PROXIMITY EFFECTPROXIMITY EFFECT
J
x
B-Field
xxx
xxx
xxx
xx
xxoo
ooo
ooo
ooo
oo
Current
Density
Induced
Current
Main
Current
09/21/15 9DEPT OF ELECTRICAL ENGG.
TECHNICAL LOSSESTECHNICAL LOSSES
 Transformer and Transmission line lossesTransformer and Transmission line losses
due to poor maintenance.due to poor maintenance.
 Due to unbalance loadingDue to unbalance loading
 Due to overloading and low voltage.Due to overloading and low voltage.
 Due to poor standard of equipments.Due to poor standard of equipments.
 Due to low power factor at off-peak hours.Due to low power factor at off-peak hours.
 Due to harmonic distortion.Due to harmonic distortion.
 Due to improper Earthings at consumerDue to improper Earthings at consumer
end.end.
 Due to long transmission lines.Due to long transmission lines.09/21/15 10DEPT OF ELECTRICAL ENGG.
COMMERCIAL LOSSESCOMMERCIAL LOSSES
 Tapping(Hooking)Tapping(Hooking)
in LT lines.in LT lines.
 Faulty energyFaulty energy
meters unmeteredmeters unmetered
supply.supply.
 Errors and delay inErrors and delay in
meter reading andmeter reading and
billing.billing.
 Uneven revenueUneven revenue
collection.collection.09/21/15 11DEPT OF ELECTRICAL ENGG.
CAUSES IN LOSSCAUSES IN LOSS
REDUCTIONREDUCTION
 No energy audit.No energy audit.
 No segregation of losses into technical andNo segregation of losses into technical and
commercial losses.commercial losses.
 Political issues.Political issues.
 Lack of regular patrolling for checking theLack of regular patrolling for checking the
theft and tempering of metering.theft and tempering of metering.
 No transparency in meter reading andNo transparency in meter reading and
billing.billing.
 Lack of adequate investment for systemLack of adequate investment for system
modernization.modernization.09/21/15 12DEPT OF ELECTRICAL ENGG.
USEFUL SOLUTIONSUSEFUL SOLUTIONS
 Renewable energy sources.Renewable energy sources.
 Distributed local generation.Distributed local generation.
 Availability Based Tariff.Availability Based Tariff.
 Improved Power Quality.Improved Power Quality.
 Demand side management.Demand side management.
 IT applications.IT applications.
 Benchmarking.Benchmarking.
 Employee & Consumer Training.Employee & Consumer Training.
09/21/15 13DEPT OF ELECTRICAL ENGG.
RENEWABLE SOURCESRENEWABLE SOURCES
09/21/15 14DEPT OF ELECTRICAL ENGG.
DISTRIBUTEDDISTRIBUTED
GENERATIONGENERATION
 Distributed generation is very useful to supplyDistributed generation is very useful to supply
power in rural and remote places where the longpower in rural and remote places where the long
distribution lines result in high losses.distribution lines result in high losses.
 It can help to reduce congestion on the powerIt can help to reduce congestion on the power
lines and strengthen local area transmission andlines and strengthen local area transmission and
distribution network.distribution network.
09/21/15 15DEPT OF ELECTRICAL ENGG.
AVAILABILITY BASEDAVAILABILITY BASED
TARIFFTARIFF
 It controls the frequency variations byIt controls the frequency variations by
penalty/reward mechanism for anypenalty/reward mechanism for any
deviations from the schedule.deviations from the schedule.
 It helps to reduce gap between supply andIt helps to reduce gap between supply and
demand by scheduling of every 15 minutesdemand by scheduling of every 15 minutes
blockblock
09/21/15 16DEPT OF ELECTRICAL ENGG.
POWER QUALITY PROBLEMSPOWER QUALITY PROBLEMS
 A Perfect power supply would be one that isA Perfect power supply would be one that is
always available, always within voltage andalways available, always within voltage and
frequency tolerances( i.e.frequency tolerances( i.e. ++10 % and10 % and ++0.50.5
Hz respectively) , and has a pure noise freeHz respectively) , and has a pure noise free
sinusoidal wave shape.sinusoidal wave shape.
 “Any problem manifested in voltage, current
or frequency deviations that results in failure
or mal-operation of customer equipment is
defined as power quality.”
09/21/15 17DEPT OF ELECTRICAL ENGG.
HARMONICSHARMONICS
REDUCTION OFREDUCTION OF
HARMONICSHARMONICS
 Preventive solution
 Remedial solutions
09/21/15 18DEPT OF ELECTRICAL ENGG.
DEMAND SIDEDEMAND SIDE
MANAGEMENTMANAGEMENT
 Systematic utilization of energy
 Maximizing efficiency
 Balancing supply and demand at consumer level
 Improve economic development
 Involve environment friendly power and reduce
energy bills
 Energy conservation
 Energy audit
09/21/15 19DEPT OF ELECTRICAL ENGG.
IT APPLICATIONSIT APPLICATIONS
 Integrated inventory and billing system
 Customers profiling
 Data mining
 Load survey data and network analysis of
HT systems
 Geographical Information System (GIS) and
Customer Relationship Management
09/21/15 20DEPT OF ELECTRICAL ENGG.
BENCHMARKINGBENCHMARKING
 Benefits of Benchmarking
:- Promoting competition
:- Performance evaluation
:- Coordinated tariff
:-Improving power quality and productivity
:- Maximizing efficiency
09/21/15 21DEPT OF ELECTRICAL ENGG.
EMPLOYEE TRAININGEMPLOYEE TRAINING
 Employees training should be conducted on
a regular basis to upgrade their knowledge.
 Employees also have much interest in IT
applications in power sector.
09/21/15 22DEPT OF ELECTRICAL ENGG.
GOVERNMENT INITIATIVESGOVERNMENT INITIATIVES
APDRP
:- Full metering, energy audit and MIS, control
of theft.
:- Increase in transformation capacity.
:- Increase in HT/LT ratio. Systems analysis
and reconfiguration.
:- Reduction of technical losses
09/21/15 23DEPT OF ELECTRICAL ENGG.
CONCLUSIONCONCLUSION
 Further development are done for reduction ofFurther development are done for reduction of
power or energy losses for example energypower or energy losses for example energy
losses can be minimized by reconductoring,losses can be minimized by reconductoring,
bifurcation of feeders, installation of shuntbifurcation of feeders, installation of shunt
capacitors, addition of new grid station and areacapacitors, addition of new grid station and area
planning, extensive energy loss reductionplanning, extensive energy loss reduction
programme,conversion of LT line TO 11 KVprogramme,conversion of LT line TO 11 KV
line and providing additional transformers,line and providing additional transformers,
adopting distribution system, balancing ofadopting distribution system, balancing of
transformers, adequate preventive maintenancetransformers, adequate preventive maintenance
etc.etc.09/21/15 24DEPT OF ELECTRICAL ENGG.
REFERENCESREFERENCES
 M. E. Baran and F. F. Wu, “NetworkM. E. Baran and F. F. Wu, “Network
reconfiguration in distribution systems for lossreconfiguration in distribution systems for loss
reduction and load balancing,”reduction and load balancing,” IEEE Trans.IEEE Trans.
Power Del.Power Del., vol. 4, no. 2, pp. 1401-1407, Apr., vol. 4, no. 2, pp. 1401-1407, Apr.
1989.1989.
 D. Shirmohammadi and H. W. Hong,D. Shirmohammadi and H. W. Hong,
“Reconfiguration of electric distribution“Reconfiguration of electric distribution
networks for resistive line loss reduction,”networks for resistive line loss reduction,”
IEEE Trans. Power Del.IEEE Trans. Power Del., vol. 4, no. 2, pp. 1492-, vol. 4, no. 2, pp. 1492-
1498, Apr. 1989.1498, Apr. 1989.09/21/15 25DEPT OF ELECTRICAL ENGG.
09/21/15 26DEPT OF ELECTRICAL ENGG.

More Related Content

PPTX
Minimizing losses in power distribution system
PDF
1. power system losses introduction
PPTX
EMBEDDED SYSTEMS IN AUTOMOBILES .PPT.pptx
PPTX
Disaster Risk Reduction
PPT
Disadvantages of corona, radio interference, inductive interference between p...
PDF
Synthesis of nanomaterials
PPTX
Chapter 5 : The Production Process and Costs
PPTX
Environmental Impacts of Electricity Production
Minimizing losses in power distribution system
1. power system losses introduction
EMBEDDED SYSTEMS IN AUTOMOBILES .PPT.pptx
Disaster Risk Reduction
Disadvantages of corona, radio interference, inductive interference between p...
Synthesis of nanomaterials
Chapter 5 : The Production Process and Costs
Environmental Impacts of Electricity Production

What's hot (20)

PPSX
Load Forecasting
PPT
Congestion management
PPTX
demand side management
PPTX
POWER SYSTEM PLANNING AND DESIGN
PPTX
Interconnection issue in microgrid
PPTX
Unit 4
PPTX
State estimation
PPTX
Distributed generation b 3
PPT
AT & C LOSSES
PPTX
Transmission & distribution of electrical power
PPT
Resistance,bundled conductor,skin effect,proximity effect
PDF
INSULATORS AND ITS TYPES
PPT
Distributed Generation
PDF
Base Load Plants and Peak Load Plant
PPTX
Series & shunt compensation and FACTs Devices
PPTX
Economic load dispatch
PPTX
PPTX
Facts lectures-2014
PPTX
POWER QUALITY IMPROVEMENT
PDF
Load Forecasting
Congestion management
demand side management
POWER SYSTEM PLANNING AND DESIGN
Interconnection issue in microgrid
Unit 4
State estimation
Distributed generation b 3
AT & C LOSSES
Transmission & distribution of electrical power
Resistance,bundled conductor,skin effect,proximity effect
INSULATORS AND ITS TYPES
Distributed Generation
Base Load Plants and Peak Load Plant
Series & shunt compensation and FACTs Devices
Economic load dispatch
Facts lectures-2014
POWER QUALITY IMPROVEMENT
Ad

Similar to Loss minimisation in power system (20)

PDF
IMPROVING POWER QUALITY AND FAST ENERGY SAVING METHODS IN POWER DISTRIBUTION ...
PDF
High level explanation of smart grids and battery energy storage systems
PDF
IRJET- Electric Power Distribution Network Performance Assessment based o...
PDF
Simulation of DVR by using Ultra Capacitor to Analysis of THD with and withou...
PDF
IRJET- Optimization of Loss Reduction using FACTS Device (SVC & STATCOM) ...
PDF
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
PDF
IRJET- Review of Power Quality Problem Improvement by Integration of Solar PV...
PDF
Controlled sine wave front end ac drives
PDF
IRJET- Improving Power Quality by using MC-UPQC
PPT
NEI Underground Presentation 06-09-09.ppt
PDF
Analysis of Fault Detection and its Location using Microcontroller for Underg...
PDF
Improved Controller for the Dual Topology of the Unified Power Quality Condit...
PDF
Minimization of Overall Losses of a Distribution System under Contingency Con...
PDF
Minimization of Overall Losses of a Distribution System under Contingency Con...
PDF
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
PPTX
pptfinal05.pptxjajajajkakakakakkwoqoqbwbevwg
PDF
report on the Techno india network
PDF
IRJET- A Systematic Approach to Design Single Phase Transformer Less Inve...
PDF
POWER QUALITY AND THD MITIGATION IN ELECTRIC VEHICLE CHARGING STATION BY THE ...
PDF
Influence choice of the injection nodes of energy source on on-line losses of...
IMPROVING POWER QUALITY AND FAST ENERGY SAVING METHODS IN POWER DISTRIBUTION ...
High level explanation of smart grids and battery energy storage systems
IRJET- Electric Power Distribution Network Performance Assessment based o...
Simulation of DVR by using Ultra Capacitor to Analysis of THD with and withou...
IRJET- Optimization of Loss Reduction using FACTS Device (SVC & STATCOM) ...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
IRJET- Review of Power Quality Problem Improvement by Integration of Solar PV...
Controlled sine wave front end ac drives
IRJET- Improving Power Quality by using MC-UPQC
NEI Underground Presentation 06-09-09.ppt
Analysis of Fault Detection and its Location using Microcontroller for Underg...
Improved Controller for the Dual Topology of the Unified Power Quality Condit...
Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
pptfinal05.pptxjajajajkakakakakkwoqoqbwbevwg
report on the Techno india network
IRJET- A Systematic Approach to Design Single Phase Transformer Less Inve...
POWER QUALITY AND THD MITIGATION IN ELECTRIC VEHICLE CHARGING STATION BY THE ...
Influence choice of the injection nodes of energy source on on-line losses of...
Ad

More from Dr. Bibhu Prasad Ganthia (10)

PDF
Dr Bibhu Prasad Ganthia_SAG & TENSION.pdf
PPTX
Pid controller bp ganthia
PPTX
Pid controller bp ganthia
PDF
Introduction to dsp by bibhu prasad ganthia
PPTX
MODELLING OF PMSM
DOCX
PPTX
Variabe voltage and variable frequency drives
PPT
Problems in overhead transmission line
PPTX
Wind power existing & recent trends
PPTX
INTERLEAVED BOOST CONVERTER FOR PV APPLICATION
Dr Bibhu Prasad Ganthia_SAG & TENSION.pdf
Pid controller bp ganthia
Pid controller bp ganthia
Introduction to dsp by bibhu prasad ganthia
MODELLING OF PMSM
Variabe voltage and variable frequency drives
Problems in overhead transmission line
Wind power existing & recent trends
INTERLEAVED BOOST CONVERTER FOR PV APPLICATION

Recently uploaded (20)

PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
communication and presentation skills 01
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
Design Guidelines and solutions for Plastics parts
PPTX
Feature types and data preprocessing steps
PDF
Soil Improvement Techniques Note - Rabbi
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
Current and future trends in Computer Vision.pptx
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
introduction to high performance computing
PPT
Occupational Health and Safety Management System
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Artificial Intelligence
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Abrasive, erosive and cavitation wear.pdf
communication and presentation skills 01
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Automation-in-Manufacturing-Chapter-Introduction.pdf
Design Guidelines and solutions for Plastics parts
Feature types and data preprocessing steps
Soil Improvement Techniques Note - Rabbi
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Information Storage and Retrieval Techniques Unit III
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Current and future trends in Computer Vision.pptx
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
introduction to high performance computing
Occupational Health and Safety Management System
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Exploratory_Data_Analysis_Fundamentals.pdf
Artificial Intelligence
August 2025 - Top 10 Read Articles in Network Security & Its Applications

Loss minimisation in power system

  • 1. LOSS MINIMISATION INLOSS MINIMISATION IN POWER SYSTEMPOWER SYSTEM Submitted bySubmitted by BIBHU PRASAD GANTHIABIBHU PRASAD GANTHIA 09/21/15 1DEPT OF ELECTRICAL ENGG.
  • 2. CONTENTSCONTENTS  Electricity lossesElectricity losses  Causes in loss reductionCauses in loss reduction  Useful solutionsUseful solutions  ConclusionConclusion09/21/15 2DEPT OF ELECTRICAL ENGG.
  • 4. TRANSMISSION LOSSESTRANSMISSION LOSSES  Losses due to the phenomenon ofLosses due to the phenomenon of corona.corona.  Due to copper losses in conductors.Due to copper losses in conductors.  Due to skin effect.Due to skin effect.  Due to proximity effect.Due to proximity effect. 09/21/15 4DEPT OF ELECTRICAL ENGG.
  • 5. CORONA LOSSESCORONA LOSSES Factors affectingFactors affecting coronacorona :- atmosphere:- atmosphere :-conductor size:-conductor size :-spacing between:-spacing between conductorsconductors :- line voltage:- line voltage Power loss due to coronaPower loss due to corona P=242.2{(f+25)/d}[(r/D)^.5]P=242.2{(f+25)/d}[(r/D)^.5] (V-Vc)^2*10^-5(V-Vc)^2*10^-5 09/21/15 5DEPT OF ELECTRICAL ENGG.
  • 6. COPPER LOSSESCOPPER LOSSES  Method of reducing copper lossesMethod of reducing copper losses :- By using conductors of large diameters.:- By using conductors of large diameters. :-By using multiple insulated conductors.:-By using multiple insulated conductors. :-By using hollow conductors:-By using hollow conductors 09/21/15 6DEPT OF ELECTRICAL ENGG.
  • 7. SKIN EFFECTSKIN EFFECT  It depends uponIt depends upon :- type of material:- type of material :- frequency:- frequency :- diameter of the:- diameter of the conductorconductor :- shape of the:- shape of the conductorconductor Outer (Ground) conductor Inner (signal) conductor Areas of high current density 09/21/15 7DEPT OF ELECTRICAL ENGG.
  • 8. SKIN EFFECTSKIN EFFECT Skin Depth In Copper 0 1 2 3 4 5 6 7 8 9 10 0.E+00 1.E+09 2.E+09 3.E+09 4.E+09 5.E+09 6.E+09 Frequency, Hz SkinDepth,microns µπ ρ δ f = µπ ρ δ f = 09/21/15 8DEPT OF ELECTRICAL ENGG.
  • 10. TECHNICAL LOSSESTECHNICAL LOSSES  Transformer and Transmission line lossesTransformer and Transmission line losses due to poor maintenance.due to poor maintenance.  Due to unbalance loadingDue to unbalance loading  Due to overloading and low voltage.Due to overloading and low voltage.  Due to poor standard of equipments.Due to poor standard of equipments.  Due to low power factor at off-peak hours.Due to low power factor at off-peak hours.  Due to harmonic distortion.Due to harmonic distortion.  Due to improper Earthings at consumerDue to improper Earthings at consumer end.end.  Due to long transmission lines.Due to long transmission lines.09/21/15 10DEPT OF ELECTRICAL ENGG.
  • 11. COMMERCIAL LOSSESCOMMERCIAL LOSSES  Tapping(Hooking)Tapping(Hooking) in LT lines.in LT lines.  Faulty energyFaulty energy meters unmeteredmeters unmetered supply.supply.  Errors and delay inErrors and delay in meter reading andmeter reading and billing.billing.  Uneven revenueUneven revenue collection.collection.09/21/15 11DEPT OF ELECTRICAL ENGG.
  • 12. CAUSES IN LOSSCAUSES IN LOSS REDUCTIONREDUCTION  No energy audit.No energy audit.  No segregation of losses into technical andNo segregation of losses into technical and commercial losses.commercial losses.  Political issues.Political issues.  Lack of regular patrolling for checking theLack of regular patrolling for checking the theft and tempering of metering.theft and tempering of metering.  No transparency in meter reading andNo transparency in meter reading and billing.billing.  Lack of adequate investment for systemLack of adequate investment for system modernization.modernization.09/21/15 12DEPT OF ELECTRICAL ENGG.
  • 13. USEFUL SOLUTIONSUSEFUL SOLUTIONS  Renewable energy sources.Renewable energy sources.  Distributed local generation.Distributed local generation.  Availability Based Tariff.Availability Based Tariff.  Improved Power Quality.Improved Power Quality.  Demand side management.Demand side management.  IT applications.IT applications.  Benchmarking.Benchmarking.  Employee & Consumer Training.Employee & Consumer Training. 09/21/15 13DEPT OF ELECTRICAL ENGG.
  • 14. RENEWABLE SOURCESRENEWABLE SOURCES 09/21/15 14DEPT OF ELECTRICAL ENGG.
  • 15. DISTRIBUTEDDISTRIBUTED GENERATIONGENERATION  Distributed generation is very useful to supplyDistributed generation is very useful to supply power in rural and remote places where the longpower in rural and remote places where the long distribution lines result in high losses.distribution lines result in high losses.  It can help to reduce congestion on the powerIt can help to reduce congestion on the power lines and strengthen local area transmission andlines and strengthen local area transmission and distribution network.distribution network. 09/21/15 15DEPT OF ELECTRICAL ENGG.
  • 16. AVAILABILITY BASEDAVAILABILITY BASED TARIFFTARIFF  It controls the frequency variations byIt controls the frequency variations by penalty/reward mechanism for anypenalty/reward mechanism for any deviations from the schedule.deviations from the schedule.  It helps to reduce gap between supply andIt helps to reduce gap between supply and demand by scheduling of every 15 minutesdemand by scheduling of every 15 minutes blockblock 09/21/15 16DEPT OF ELECTRICAL ENGG.
  • 17. POWER QUALITY PROBLEMSPOWER QUALITY PROBLEMS  A Perfect power supply would be one that isA Perfect power supply would be one that is always available, always within voltage andalways available, always within voltage and frequency tolerances( i.e.frequency tolerances( i.e. ++10 % and10 % and ++0.50.5 Hz respectively) , and has a pure noise freeHz respectively) , and has a pure noise free sinusoidal wave shape.sinusoidal wave shape.  “Any problem manifested in voltage, current or frequency deviations that results in failure or mal-operation of customer equipment is defined as power quality.” 09/21/15 17DEPT OF ELECTRICAL ENGG.
  • 18. HARMONICSHARMONICS REDUCTION OFREDUCTION OF HARMONICSHARMONICS  Preventive solution  Remedial solutions 09/21/15 18DEPT OF ELECTRICAL ENGG.
  • 19. DEMAND SIDEDEMAND SIDE MANAGEMENTMANAGEMENT  Systematic utilization of energy  Maximizing efficiency  Balancing supply and demand at consumer level  Improve economic development  Involve environment friendly power and reduce energy bills  Energy conservation  Energy audit 09/21/15 19DEPT OF ELECTRICAL ENGG.
  • 20. IT APPLICATIONSIT APPLICATIONS  Integrated inventory and billing system  Customers profiling  Data mining  Load survey data and network analysis of HT systems  Geographical Information System (GIS) and Customer Relationship Management 09/21/15 20DEPT OF ELECTRICAL ENGG.
  • 21. BENCHMARKINGBENCHMARKING  Benefits of Benchmarking :- Promoting competition :- Performance evaluation :- Coordinated tariff :-Improving power quality and productivity :- Maximizing efficiency 09/21/15 21DEPT OF ELECTRICAL ENGG.
  • 22. EMPLOYEE TRAININGEMPLOYEE TRAINING  Employees training should be conducted on a regular basis to upgrade their knowledge.  Employees also have much interest in IT applications in power sector. 09/21/15 22DEPT OF ELECTRICAL ENGG.
  • 23. GOVERNMENT INITIATIVESGOVERNMENT INITIATIVES APDRP :- Full metering, energy audit and MIS, control of theft. :- Increase in transformation capacity. :- Increase in HT/LT ratio. Systems analysis and reconfiguration. :- Reduction of technical losses 09/21/15 23DEPT OF ELECTRICAL ENGG.
  • 24. CONCLUSIONCONCLUSION  Further development are done for reduction ofFurther development are done for reduction of power or energy losses for example energypower or energy losses for example energy losses can be minimized by reconductoring,losses can be minimized by reconductoring, bifurcation of feeders, installation of shuntbifurcation of feeders, installation of shunt capacitors, addition of new grid station and areacapacitors, addition of new grid station and area planning, extensive energy loss reductionplanning, extensive energy loss reduction programme,conversion of LT line TO 11 KVprogramme,conversion of LT line TO 11 KV line and providing additional transformers,line and providing additional transformers, adopting distribution system, balancing ofadopting distribution system, balancing of transformers, adequate preventive maintenancetransformers, adequate preventive maintenance etc.etc.09/21/15 24DEPT OF ELECTRICAL ENGG.
  • 25. REFERENCESREFERENCES  M. E. Baran and F. F. Wu, “NetworkM. E. Baran and F. F. Wu, “Network reconfiguration in distribution systems for lossreconfiguration in distribution systems for loss reduction and load balancing,”reduction and load balancing,” IEEE Trans.IEEE Trans. Power Del.Power Del., vol. 4, no. 2, pp. 1401-1407, Apr., vol. 4, no. 2, pp. 1401-1407, Apr. 1989.1989.  D. Shirmohammadi and H. W. Hong,D. Shirmohammadi and H. W. Hong, “Reconfiguration of electric distribution“Reconfiguration of electric distribution networks for resistive line loss reduction,”networks for resistive line loss reduction,” IEEE Trans. Power Del.IEEE Trans. Power Del., vol. 4, no. 2, pp. 1492-, vol. 4, no. 2, pp. 1492- 1498, Apr. 1989.1498, Apr. 1989.09/21/15 25DEPT OF ELECTRICAL ENGG.
  • 26. 09/21/15 26DEPT OF ELECTRICAL ENGG.