LPG LOADING / UNLOADING
LPG LOADING / UNLOADING
OPERATIONS
OPERATIONS
2
LPG TANK TRUCKS: REQUIREMENTS OF SAFETY
FOR DESIGN/FABRICATION AND FITTINGS
All LPG tank trucks should meet the
requirements of the Motor Vehicle Acts and
Regulations and Static & Mobile Pressure
Vessels (Unfired) Rules, 1981 as amended from
time to time.
3
Fittings:
LPG tank truck is provided with the following
openings/nozzles:
• Safety Relief valves (Two Nos).
• Excess flow check valves in the liquid and vapour lines.
• Pressure gauge (Provided in the vapour space of the vessel)
• Temperature gauge (Provided in the liquid space)
• Rotogauge (to measure the percentage of liquid in the vessel.
• Manhole with cover.
• Drain point at the bottom.
• Liquid/Vapour manifold.
4
Safety Relief Valve:
Safety Relief Valve:
There shall be minimum two safety relief valves
with each one sized to suit the full relieving
capacity of the vessel. The design and operation
of Safety Relief Valves shall conform to the
provision of SMPV rules as amended from time
to time.
SRV shall be so installed that it does not project
out of the top surface of the vessel. If necessary,
recessed cup formation on vessel shall be made
to house the SRV.
The safety relief valves shall be installed at the top
surface around the central portion of the vessel
5
Liquid / Vapour Connections:
Liquid / Vapour Connections:
1 no. 50 mm size liquid inlet / outlet and 1
no. 40 mm size vapour connection shall
be provided at the bottom of the vessel.
The vapour line shall extend internally
with a clearance of 50 mm from the top of
the vessel surface.
6
Internal Valve with Excess Flow Check
Internal Valve with Excess Flow Check
Valve
Valve
Internal valves with EFCV of appropriate
ratings shall be installed on LPG liquid
and vapour line
7
Liquid Level Gauging Device - Roto Gauge
Liquid Level Gauging Device - Roto Gauge
The vessel shall be equipped with a liquid level
gauging device for ready determination of liquid
level in the vessel at any time. The liquid level
gauging device shall be of the direct level gauge type
with zero leakage of product to atmosphere. The
design shall be such that the unit encompasses a
tough, durable steel shock absorber to prevent
transfer of any vibrations sustained in transit.
This liquid level gauging device shall be located on
the shell near the midpoint /top upper half of the
vessel in a recessed cup formation.
To avoid damage to this liquid level gauging device, a
suitable hinged cover shall be provided.
8
Pressure Gauge
Pressure Gauge &
& Temperature Gauge
Temperature Gauge
1 No. dial type (100 MM) glycerine filled pressure
gauge with EFCV shall be provided on the rear
dished end in the vapour space. This shall be
protected by 10 mm thickness U-type shield metal
plate.
The range of the pressure gauge shall be from
zero to 21 kg/sq. cm (min.) gauge.
1 No. Dial type temperature gauge to be provided.
9
VEHICLES
VEHICLES
GENERAL SAFETY CONSIDERATIONS
GENERAL SAFETY CONSIDERATIONS
4. The fuel tank to be protected from external
blows by stout steel guards.
5. Safety Equipments:
The vehicles shall carry the following:
a) A First Aid box.
b) 2 nos. 10 Kg DCP (ISI marked fire extinguishers (ISI
marked).
c) Leather hand gloves and heat resistant hand gloves.
d) Safety Goggles
e) 2 nos. red flags
f) Emergency kit approved by CCOE.
g) TREM card.
In addition, each vehicle must carry non-metallic tools, wooden plugs of
appropriate size and sealing compound for any emergency.
10
PURGING
PURGING
After completion of hydro and pneumatic
tests, the bullet shall be purged safely by
authorised persons, and only then it
should be taken for Loading.
11
12
UNLOADING OF BULK LPG
UNLOADING OF BULK LPG
TANK TRUCKS
TANK TRUCKS
Unloading of LPG from tank truck is carried out
with vapour compressors using pressure
differential method of liquid transfer. The
compressor shall be placed at the unloading
point with the following facilities:
(i) Vapour line with isolation valves
(ii) Product transfer line with isolation valves
(iii) Weigh bridge of suitable capacity
13
• All electrical equipment/ lighting are of flameproof type
• Vapour vent line should be for individual bay at 1.5 M
height above the eaves of the shed fitted with flame cap
• Fire Extinguishers, shall be positioned as an immediate
aid to fight fire.
• No hot work/ cold work is carried out in the vicinity of
unloading operation.
• Checks shall be carried out for each T/T and T/W prior to
unloading of LPG as per check list .
SAFETY PRECAUTIONS DURING UNLOADING OF
SAFETY PRECAUTIONS DURING UNLOADING OF
LPG
LPG
14
PROCEDURE FOR UNLOADING TANK
PROCEDURE FOR UNLOADING TANK
TRUCKS
TRUCKS
1. Checks essential for plant safety shall be carried out for
each Tank Truck Before its entry to the licensed area .
2. Tank pressure, temperature and weight of filled tank
truck shall be recorded before Unloading.
3. Tank shall be placed in drive out position with entire
tank truck consisting of bullet and engine covered by
sprinklers.
4. After placement, engine as well as master control switch
shall be switched off and minimum four wooden chokes
shall be placed under wheels.
15
PROCEDURE FOR UNLOADING TANK
PROCEDURE FOR UNLOADING TANK
TRUCKS
TRUCKS
5. Following shall be connected -
• Chassis and bullets both are to be earthed independently
for which bare metal cleats to be provided.
• Earth pits should meet IS:3043, Earth Resistant should be
<1 ohm.
• Liquid and vapour hoses to tank trucks after examining the
integrity of gaskets and using proper studs. Bolts and nuts
are not be used.
• Earthing lines to tank bare metal or earthing point to tank.
16
PROCEDURE FOR UNLOADING TANK
PROCEDURE FOR UNLOADING TANK
TRUCKS
TRUCKS
6. The tank truck valves shall be crack opened and ensured
there are no leaks. The working of EFCV to be tested by
opening valve at once to give sudden flow.
7. After the above, unloading should be done with LPG
compressor by differential pressure method.
8. Pressure and level in the tank truck shall be monitored
at regular intervals so that it does not exceed safe limits.
After decanting all liquid LPG, close the valve of liquid
line of the bay. Thereafter, LPG vapour should be
recovered such that vapour pressure in the tank truck is
brought down to 1.5 kg/cm2
minimum but not below
atmospheric pressure.
17
18
PROCEDURE FOR UNLOADING TANK
PROCEDURE FOR UNLOADING TANK
TRUCKS
TRUCKS
9. On completion of unloading, following operations shall be
done in sequence:
 Isolate rigid liquid and vapour lines of bay by closing the
valves and stop LPG compressor.
 Close the valves of liquid/ vapour lines of the tank truck.
Depressurise the hose through high vent - close vent
valve.
 Remove hose connections, electrical bonding wires.
 Cap the vapour/ liquid outlet lines of tank trucks.
 Remove chokes placed under wheels.
10. Record the weight of empty tank truck along with
rotogauge, pressure gauge and temperature gauge
readings.
19
IMPORTANT NOTES
IMPORTANT NOTES
1. HMV LICENSE DULY ENDORSED BY RTO.
2. TREM CARD
3. FITNESS CERTIFICATE
4. EXPLOSIVE LICENSE
5. VENTING PROCEDURE
6. EMERGENCY KIT
7. 10/9 KG DCP FIRE EXTINGUSHERS
8. CLEANER
9. TRAINING ON SAFE TPT OF LPG
20
Safety during lightening
Safety during lightening
1. Do not vent LPG in case of lightening
2. Individual vent line for each line
3. Structural earthing – 2 points
4. No Lightening arrestor
5. Earthing to Vent pipe line
6. Vent P/L terminating at T point, with bend
arm projecting downward with copper mesh.
7. Close Trees should be away from the shed.
21
NEW
NEW design
design LOADING ARM
LOADING ARM
Loading arm used for
loading/unloading of
LPG in Tank Trucks.
ERC is main component
of loading arm to
decouple the arm from
tank truck with out
any leakage of LPG in
case of emergency
22
Thank You

More Related Content

PPT
OISD.ppt
PPT
Lpg safety
PPTX
Basic H2S training
DOC
Height work permit
PPSX
Fire fighting
PPT
Fire protection in thermal power station
PPT
Fire safety presentation
PPTX
Fundamentals of Fire Alarm System
OISD.ppt
Lpg safety
Basic H2S training
Height work permit
Fire fighting
Fire protection in thermal power station
Fire safety presentation
Fundamentals of Fire Alarm System

What's hot (20)

PPS
PPT
Fire Pump Engines Overview
PPT
NGI-H2S Awareness
PPTX
H2S - Hydrogen Sulfide
PPTX
Steering (closed loop communication) SMCP
PPT
Compressed+gas+safety
PPTX
Safety guidelines for (lpg) cylinders.
PPTX
WORKING AT HEIGHT pptx
PDF
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
PPT
Hand and power tool safety power point
DOCX
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
PPT
Intro to basic safety and seamanship2
PPT
Jaipur Fire
PDF
ISPS_Code_Basic_Course.pdf
PPTX
Fire Fighting system on ship
DOCX
AIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docx
PPTX
Hazardous Area Classification
PDF
Fire Fighting "A Complete Handbook"
Fire Pump Engines Overview
NGI-H2S Awareness
H2S - Hydrogen Sulfide
Steering (closed loop communication) SMCP
Compressed+gas+safety
Safety guidelines for (lpg) cylinders.
WORKING AT HEIGHT pptx
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Hand and power tool safety power point
PRESSURE TESTING PERMIT Form # HSEQ - PTP Rev 2 -.docx
Intro to basic safety and seamanship2
Jaipur Fire
ISPS_Code_Basic_Course.pdf
Fire Fighting system on ship
AIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docx
Hazardous Area Classification
Fire Fighting "A Complete Handbook"
Ad

Similar to lpg@12 bulk loading unloading opreration (20)

PPTX
Smpv(u) rules 2016-18
PDF
A guide for firetube boiler testes
PPT
Testing_of_transformers_adjusted.ppt
PDF
WAGON TEST EQUIPMENTS.pdf
PPTX
lpg safety.pptx
PPTX
Presentation chapter 5
PPTX
Presentation chapter 5
PPTX
Beige Minimalist Casual Fashion Collection Presentation.pptx
PDF
Boiler Mountings
PDF
Catalyst unloading details
PPT
Boiler Operation and Maintenance (Objective)
PPT
Thermal power plants START UP AND SD.ppt
PPT
171839416-commissioning-of-hydro-ppt.ppt
PPTX
ISO/FDIS 20519
PDF
Pamphlet on rake testing procedure for freight stock
PDF
API 682 Seal piping plans.pdf
PDF
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
PPT
Ig system & equipment oil tankers
PPT
Standard practices r9
PDF
8013 _0
Smpv(u) rules 2016-18
A guide for firetube boiler testes
Testing_of_transformers_adjusted.ppt
WAGON TEST EQUIPMENTS.pdf
lpg safety.pptx
Presentation chapter 5
Presentation chapter 5
Beige Minimalist Casual Fashion Collection Presentation.pptx
Boiler Mountings
Catalyst unloading details
Boiler Operation and Maintenance (Objective)
Thermal power plants START UP AND SD.ppt
171839416-commissioning-of-hydro-ppt.ppt
ISO/FDIS 20519
Pamphlet on rake testing procedure for freight stock
API 682 Seal piping plans.pdf
API682 Mechanical Seal Plan and Requirements of Mechanical Seals
Ig system & equipment oil tankers
Standard practices r9
8013 _0
Ad

Recently uploaded (20)

PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Approach and Philosophy of On baking technology
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PPTX
A Presentation on Touch Screen Technology
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PPTX
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PDF
Heart disease approach using modified random forest and particle swarm optimi...
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
A comparative analysis of optical character recognition models for extracting...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Hybrid model detection and classification of lung cancer
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Web App vs Mobile App What Should You Build First.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
Digital-Transformation-Roadmap-for-Companies.pptx
Approach and Philosophy of On baking technology
DP Operators-handbook-extract for the Mautical Institute
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
A Presentation on Touch Screen Technology
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Group 1 Presentation -Planning and Decision Making .pptx
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
Assigned Numbers - 2025 - Bluetooth® Document
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
Heart disease approach using modified random forest and particle swarm optimi...
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Hindi spoken digit analysis for native and non-native speakers
A comparative analysis of optical character recognition models for extracting...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Hybrid model detection and classification of lung cancer
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Building Integrated photovoltaic BIPV_UPV.pdf
Web App vs Mobile App What Should You Build First.pdf
Programs and apps: productivity, graphics, security and other tools

lpg@12 bulk loading unloading opreration

  • 1. 1 LPG LOADING / UNLOADING LPG LOADING / UNLOADING OPERATIONS OPERATIONS
  • 2. 2 LPG TANK TRUCKS: REQUIREMENTS OF SAFETY FOR DESIGN/FABRICATION AND FITTINGS All LPG tank trucks should meet the requirements of the Motor Vehicle Acts and Regulations and Static & Mobile Pressure Vessels (Unfired) Rules, 1981 as amended from time to time.
  • 3. 3 Fittings: LPG tank truck is provided with the following openings/nozzles: • Safety Relief valves (Two Nos). • Excess flow check valves in the liquid and vapour lines. • Pressure gauge (Provided in the vapour space of the vessel) • Temperature gauge (Provided in the liquid space) • Rotogauge (to measure the percentage of liquid in the vessel. • Manhole with cover. • Drain point at the bottom. • Liquid/Vapour manifold.
  • 4. 4 Safety Relief Valve: Safety Relief Valve: There shall be minimum two safety relief valves with each one sized to suit the full relieving capacity of the vessel. The design and operation of Safety Relief Valves shall conform to the provision of SMPV rules as amended from time to time. SRV shall be so installed that it does not project out of the top surface of the vessel. If necessary, recessed cup formation on vessel shall be made to house the SRV. The safety relief valves shall be installed at the top surface around the central portion of the vessel
  • 5. 5 Liquid / Vapour Connections: Liquid / Vapour Connections: 1 no. 50 mm size liquid inlet / outlet and 1 no. 40 mm size vapour connection shall be provided at the bottom of the vessel. The vapour line shall extend internally with a clearance of 50 mm from the top of the vessel surface.
  • 6. 6 Internal Valve with Excess Flow Check Internal Valve with Excess Flow Check Valve Valve Internal valves with EFCV of appropriate ratings shall be installed on LPG liquid and vapour line
  • 7. 7 Liquid Level Gauging Device - Roto Gauge Liquid Level Gauging Device - Roto Gauge The vessel shall be equipped with a liquid level gauging device for ready determination of liquid level in the vessel at any time. The liquid level gauging device shall be of the direct level gauge type with zero leakage of product to atmosphere. The design shall be such that the unit encompasses a tough, durable steel shock absorber to prevent transfer of any vibrations sustained in transit. This liquid level gauging device shall be located on the shell near the midpoint /top upper half of the vessel in a recessed cup formation. To avoid damage to this liquid level gauging device, a suitable hinged cover shall be provided.
  • 8. 8 Pressure Gauge Pressure Gauge & & Temperature Gauge Temperature Gauge 1 No. dial type (100 MM) glycerine filled pressure gauge with EFCV shall be provided on the rear dished end in the vapour space. This shall be protected by 10 mm thickness U-type shield metal plate. The range of the pressure gauge shall be from zero to 21 kg/sq. cm (min.) gauge. 1 No. Dial type temperature gauge to be provided.
  • 9. 9 VEHICLES VEHICLES GENERAL SAFETY CONSIDERATIONS GENERAL SAFETY CONSIDERATIONS 4. The fuel tank to be protected from external blows by stout steel guards. 5. Safety Equipments: The vehicles shall carry the following: a) A First Aid box. b) 2 nos. 10 Kg DCP (ISI marked fire extinguishers (ISI marked). c) Leather hand gloves and heat resistant hand gloves. d) Safety Goggles e) 2 nos. red flags f) Emergency kit approved by CCOE. g) TREM card. In addition, each vehicle must carry non-metallic tools, wooden plugs of appropriate size and sealing compound for any emergency.
  • 10. 10 PURGING PURGING After completion of hydro and pneumatic tests, the bullet shall be purged safely by authorised persons, and only then it should be taken for Loading.
  • 11. 11
  • 12. 12 UNLOADING OF BULK LPG UNLOADING OF BULK LPG TANK TRUCKS TANK TRUCKS Unloading of LPG from tank truck is carried out with vapour compressors using pressure differential method of liquid transfer. The compressor shall be placed at the unloading point with the following facilities: (i) Vapour line with isolation valves (ii) Product transfer line with isolation valves (iii) Weigh bridge of suitable capacity
  • 13. 13 • All electrical equipment/ lighting are of flameproof type • Vapour vent line should be for individual bay at 1.5 M height above the eaves of the shed fitted with flame cap • Fire Extinguishers, shall be positioned as an immediate aid to fight fire. • No hot work/ cold work is carried out in the vicinity of unloading operation. • Checks shall be carried out for each T/T and T/W prior to unloading of LPG as per check list . SAFETY PRECAUTIONS DURING UNLOADING OF SAFETY PRECAUTIONS DURING UNLOADING OF LPG LPG
  • 14. 14 PROCEDURE FOR UNLOADING TANK PROCEDURE FOR UNLOADING TANK TRUCKS TRUCKS 1. Checks essential for plant safety shall be carried out for each Tank Truck Before its entry to the licensed area . 2. Tank pressure, temperature and weight of filled tank truck shall be recorded before Unloading. 3. Tank shall be placed in drive out position with entire tank truck consisting of bullet and engine covered by sprinklers. 4. After placement, engine as well as master control switch shall be switched off and minimum four wooden chokes shall be placed under wheels.
  • 15. 15 PROCEDURE FOR UNLOADING TANK PROCEDURE FOR UNLOADING TANK TRUCKS TRUCKS 5. Following shall be connected - • Chassis and bullets both are to be earthed independently for which bare metal cleats to be provided. • Earth pits should meet IS:3043, Earth Resistant should be <1 ohm. • Liquid and vapour hoses to tank trucks after examining the integrity of gaskets and using proper studs. Bolts and nuts are not be used. • Earthing lines to tank bare metal or earthing point to tank.
  • 16. 16 PROCEDURE FOR UNLOADING TANK PROCEDURE FOR UNLOADING TANK TRUCKS TRUCKS 6. The tank truck valves shall be crack opened and ensured there are no leaks. The working of EFCV to be tested by opening valve at once to give sudden flow. 7. After the above, unloading should be done with LPG compressor by differential pressure method. 8. Pressure and level in the tank truck shall be monitored at regular intervals so that it does not exceed safe limits. After decanting all liquid LPG, close the valve of liquid line of the bay. Thereafter, LPG vapour should be recovered such that vapour pressure in the tank truck is brought down to 1.5 kg/cm2 minimum but not below atmospheric pressure.
  • 17. 17
  • 18. 18 PROCEDURE FOR UNLOADING TANK PROCEDURE FOR UNLOADING TANK TRUCKS TRUCKS 9. On completion of unloading, following operations shall be done in sequence:  Isolate rigid liquid and vapour lines of bay by closing the valves and stop LPG compressor.  Close the valves of liquid/ vapour lines of the tank truck. Depressurise the hose through high vent - close vent valve.  Remove hose connections, electrical bonding wires.  Cap the vapour/ liquid outlet lines of tank trucks.  Remove chokes placed under wheels. 10. Record the weight of empty tank truck along with rotogauge, pressure gauge and temperature gauge readings.
  • 19. 19 IMPORTANT NOTES IMPORTANT NOTES 1. HMV LICENSE DULY ENDORSED BY RTO. 2. TREM CARD 3. FITNESS CERTIFICATE 4. EXPLOSIVE LICENSE 5. VENTING PROCEDURE 6. EMERGENCY KIT 7. 10/9 KG DCP FIRE EXTINGUSHERS 8. CLEANER 9. TRAINING ON SAFE TPT OF LPG
  • 20. 20 Safety during lightening Safety during lightening 1. Do not vent LPG in case of lightening 2. Individual vent line for each line 3. Structural earthing – 2 points 4. No Lightening arrestor 5. Earthing to Vent pipe line 6. Vent P/L terminating at T point, with bend arm projecting downward with copper mesh. 7. Close Trees should be away from the shed.
  • 21. 21 NEW NEW design design LOADING ARM LOADING ARM Loading arm used for loading/unloading of LPG in Tank Trucks. ERC is main component of loading arm to decouple the arm from tank truck with out any leakage of LPG in case of emergency