Managing projects by data Version:  3.0   Author:   Le The Hung Sep  05, 2005 Instructor:  Thai Nguyen ©  2001   FPT-SOFT 04e-BM/NS/HDCV/FSOFT
Introduction Course duration: 1 hour 45’ Purpose: Practical use of data for managing projects Targeted attendees: Team leaders, SEPG, SQA, project managers Tests/quiz: Quiz in 15’ for new attendants
Objectives After the course, student will: Understand Fsoft metric system. Know about Fsoft PCBs and norms. Be able to use data for managing projects.
Fsoft metric system  –  45’ Fsoft PCBs and Norms – 45’  Quiz – 15’ Table of contents
Why it’s needed? Metric set Analysis tools Fsoft SLC in quantitative management Fsoft metric system
Why: Fsoft quality objective “ FPT-SOFT is committed to deliver products that  fully meet  customer’s requirements  on schedule   defined in the project plan”
Why: International standards ISO 9001:2000 8.2.3 Monitoring and measurement of the processes 8.4 Analysis of data CMM/SEI 1.1: PA.G1: The quantitative process management activities are planned PA.G2: The process performance of the project's defined software process is controlled quantitatively PA.G3: The process capability of the organization's standard software process is known in quantitative terms
Why: International standards CMMI/SEI 1.1: Measurement and Analysis Quantitative project management Organizational Process Performance
Why: Production improvements
Metric set: Collected data Effort  (Project, work product, process, type of activity): Weekly Schedule  (Start-date, expected end-date, actual end-date, delivery): At milestones Defect  (Project, work product, stage detected, QC activities, stage injected, process origin, severity, classification type, priority): Weekly Size   (Total, work product, activity): At milestones Requirement   (Total, size, status): Weekly Customer  complaints, customer satisfaction survey point, NC Tools : Fsoft management suite (Timesheet, DMS, NCMS, Dashboard, Fsoft Insight)
Metric set: Calculated indicators Effort  (Effectiveness, deviation): Weekly Schedule  (Timeliness, deviation): At milestones Defect  (Defect rate, leakage): Weekly Size   (Deviation): At milestones Requirement   (Requirement Completeness): Weekly Productivity, customer satisfaction, process compliance, distribution  (Effort, defects): At the end of project Status   (Effort, Schedule, Defect): Weekly Tools : Fsoft management suite (Timesheet, DMS, NCMS, Dashboard, Fsoft Insight)
Metric set: Work Flow
Fsoft SLC models: Manage by data
Initiation stage: Norms for WO Overview The Initiation stage is the start of the SLC, in which: Project's software scope and boundary conditions, including the operational vision and proposed products, are established. Overall cost and schedule of the project are estimated. Potential risks are defined.  Metrics Estimated size, estimated effort and planned schedule for the project. Target value of the quality goals for the project:  Timeliness, Requirement Completeness, Leakage, Correct Cost, Customer Satisfaction, Process Compliance, Response Time. Actual data of the stage: Actual effort and actual schedule for the stage. Help Use Fsoft norms for overall estimating and setting goals. Record in the WO, Estimation sheets, Fsoft Insight
Definition stage: PCB for Planning Overview Studying and clarifying user requirements. Preparing and releasing SRS. Negotiating Acceptance Criteria with customer. Updating and releasing complete project plan. Metrics Estimated size for the project, estimated effort and planned schedule for the stage. Progress values of the quality goals: Timeliness, Requirement Completeness, Correct Cost. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the project plan, URD and SRS. Help Use Fsoft norms for detail estimating and planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
Solution stage: Review metrics Overview The main purpose of this stage is to define an effective solution to meet customer requirements. Analyzing and creating a good design for the software package are the main activities. Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals : Timeliness, Completeness, Correct Cost, Process Compliance. Actual data of the stage:  Actual effort and actual schedule for the stage, actual size and defects of the ADD and Test Plan. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
Construction stage: Data analysis Overview The goal of the construction stage is to develop the system. Coding and testing for the software package are the main activities. Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals : Timeliness, Completeness, Correct Cost, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the DDD, Test case and Test Data, modules and unit programs. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
Transition stage: Leakage Overview The focus of the Transition stage is to ensure that software is available for its end users. Delivering software to customer, implementing software systems on customer site and conducting test activities for acceptance are main activities of this stage.  Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals: Timeliness, Completeness, Leakage, Correct Cost, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the software package. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
Termination stage: Fsoft Data Overview The project closes at this stage when customer accepts the whole project and signs off the contract. Project assets must be collected and transferred to Fsoft process asset library. The goal of this stage is to summarize the results of the project and to provide the project knowledge and experiences for other projects. Metrics Estimated effort and planned schedule for the stage. Final values of the quality goals: Timeliness, Completeness, Leakage, Correct Cost, Customer Satisfaction, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, customer satisfaction point. Help Compare Actual metrics with Fsoft norms and Project norms Analyse in post mortem report
ETC: Estimated To Complete Purpose It helps to monitor project progress and predict complete project metrics. Metrics Effort ETC (= Effort spent/Actual requirement completeness - Effort spent) is used to forecast the effort needed to complete project. Time ETC (= Current day + Actual duration/Actual requirement completeness – Actual duration) is used to forecast the finished day of the project. Possible leakage (=Project size * Norm of weighted defect rate – Actual weighted defects found) is used to forecast the quality of deliverables. Help Change WO if the metric deviation >=30% Re-plan if the metric deviation >=20%.
PPM: Process Performance Models Purpose A description of the relationship among attributes of a process and its work products that are developed from historical process performance data and calibrated using collected process and product measures from the project and that are used to predict results to be achieved by following a process. Flow Select Measurement Parameters based on objective Collect Data Define Model Training Implementation of Model Collect Data Calibrate Model Select Process & Sub Process
PPM: Effort Purpose Effort PPM is used to forecast the effort needed for each process in each stage. Metrics Forecasted Engineering Effort (EE) = (1- Average (EE Deviation/Requirement Completeness (RCR) deviation)*Planned EE + Average(EE deviation/RCR deviation)*Planned EE/Planned RCR*Re-planned RCR. Forecasted Management Effort = Planned ME/Planned EE*Re-planned EE Help In planning: The Fsoft norms + Project characteristics -> Planned values At the end of each stage:  Actual values of metrics + Change requests -> Issues + Forecasted -> Re-planned value of metrics At the end of the project: Actual values of metric deviation -> Practices + Lessons.
PPM: Defect Purpose Defect PPM is used to forecast the defect to be moved by a QC activity in each stage. Product Defect PPM is used to forecast the defect to be moved by a QC activity for each product. Metrics Project Replanned Defect Rate = Previous Project Planned Defect Rate * (1+ Average Project Defect found Deviation in previuos stages). Product Replanned Defect Rate = Previous Product Planned Defect Rate * (1+ Average Defect found Deviation in released products). Help At the end of each stage for Project Defect. After the releasing of each product for Product Defect.
Analysis tools: Cause-Effect Purpose It help to accurately identify causes (or results) of a problem. Help Brainstorming. Test Code Design Analysis SQA Technology Team Time Defect rate is high
Analysis tools: Pareto Chart Purpose It helps identify most important issues by data. Help The rule 80:20.
Analysis tools: Control Chart Purpose It helps to define and forecast uncontrolled cases. Help Average, Stdev, UCL, LCL of series of data Color statuses of metrics (RED, YELLOW, BLUE)
Fsoft PCBs: PCB: Process capability baseline Based on data of post mortem projects and support activities 1.0: June 30, 2001 Release Period: Quarterly, 6 months, Annually Prepared by SEPG, reviewed and approved by BOM Fsoft norms Based on PCBs and Fsoft business goals Established for 6 months Suggested by SEPG, reviewed and approved by BOD Fsoft PCBs and Norms
All projects have postmortem in the reporting period Methodology: Average, Sigma, UCL, LCL Causal analysis of out of control limits Extraordinary cases are excluded Summary: The PCB of the period before the last period, the last PCB Last norms, suggested norm Improvement, issues Software PCB: Overview
Planned actions for last period Collect customer related metrics To use data effectively Results of these actions All mandatory software metrics are calculated Metrics have been used for setting project norms Issues in last period: Schedule deviation is high Review efficiency is low Suggested actions for next period Schedule estimation, customer communication, milestone control Effort for review, review workshops, review guru Software PCB: Conclusions
Software PCB: Requirement Accepted deliverable (%) 90|95| 94.4 Requirement completeness (%) 90|95| 93.83 Requirement stability (%) 7.5|5| 11.3
Software PCB: Schedule Schedule control is the most serious problem Timeliness (%) 84.9|95| 58.6 Project Schedule Deviation (%) Development: 23.5|10| 62.5 Maintenance: 5|10| 30.6 Delivery Schedule Deviation (%) Development: 13|10| 25.0 Maintenance: 5|10| 6.0
Software PCB: Effort Effort Deviation (%) Development: 29.8|10| 40.48 Maintenance: 4.9|10| 32.97 Project management effort (%) Development: 4.5|7.5| 6.33 Maintenance: 3.8|7.5| 6.78 Quality Cost (%) Development: 39|30| 34.49 Maintenance: 34.8|30| 47.66 Correction Cost (%) Development: 16.3|12| 11.65 Maintenance: 18.4|12| 12.49
Software PCB: Quality Review efficiency is too low Defect Rate (WDef/UCP): 9.5|8.5| 9.0 Leakage (WDef/UCP) 0.5|0.3| 0.4 Defect Removal Efficiency (%) Review 35|40| 36.4 Test 52|55| 57.9 Customer Satisfaction (Point) 80|85| 73.5
Software PCB: Productivity Productivity (UCP/pd) 0.43|0.4| 0.53 Review Effectiveness (WDef/pd) 13.2|15| 16.1 Test Effectiveness (WDef/pd) 8.3|10| 12.4
Fsoft norms For a period of 6 months Improvement requirements based on last PCB To use data effectively Using PCB for plan: All processes Re-estimate size: After SRS completion and at the end of the project Analysis in progress: All milestones Verification: SEPG
Fsoft norms Requirement Accepted deliverable: 95% Requirement completeness: 95% Schedule Timeliness: 85% Schedule Deviation: 10% Delivery Schedule Deviation: 10% Effort Effort Deviation: 10% Management Effort: 7.5% Quality Cost: 30% Correction Cost: 9%
Fsoft norms Quality Defect Rate: 7WDef/UCP Leakage: 0.2WDef/UCP Customer Satisfaction: 90 points Process Compliance: 3NCs Productivity Coding: 0.5UCP/pd Review: 15WDef/pd Test: 12WDef/pd
S ources & references S ources Fsoft manual Fsoft standard life cycle models and tailoring guidelines Fsoft metric guidelines Assessment and analysis tools guidelines Project database and PPM templates Fsoft process databases Fsoft PCB reports Fsoft norms Recommended readings TTVN/SYS/Fsoft QMS/document/master list TTVN/SYS/ Fsoft QMS/Data/ TTVN/SYS/ Fsoft QMS/PCB&Norm/
Questions and Answers
Conclusion Pls. give your assessment
Quiz Total 100 points = 20 questions x 5 points/question Duration: 15’ Pass criteria: 75 points Feel free to use any available material Don’t brainstorm.

More Related Content

PPTX
SOFTWARE MEASUREMENT ESTABLISHING A SOFTWARE MEASUREMENT PROCESS
PPTX
Rals freedom project management methodologies training
PDF
Pmp quality chapter 8
PDF
Process certification
PPT
Project Matrix and Measuring S/W
PPTX
Software Metrics
SOFTWARE MEASUREMENT ESTABLISHING A SOFTWARE MEASUREMENT PROCESS
Rals freedom project management methodologies training
Pmp quality chapter 8
Process certification
Project Matrix and Measuring S/W
Software Metrics

What's hot (20)

PPTX
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
PPTX
Project Cost Management
PPTX
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
PPTX
Project quality management
PPTX
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
PDF
08 project quality management
PPT
Establishing a Software Measurement Process
PPTX
Quality contamination in agile scrum teams and the remedies - The QA Strategy
PPTX
Unit3 software review control software
PDF
Pmbok 5th planning process group part two
PPTX
PMP Training - 08 project quality management
PPTX
Introduction to DMAIC Training
DOCX
Quality management procedures
PDF
Monitor and Control Process Group - Part One
PPT
Software process and project metrics
PPT
Lecture3
DOCX
DMAIC addressed Bearnson S-N tracking for all product.
PPT
Data Collection Points And Gqm
PPTX
Bca 5th sem seminar(software measurements)
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Project Cost Management
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project quality management
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
08 project quality management
Establishing a Software Measurement Process
Quality contamination in agile scrum teams and the remedies - The QA Strategy
Unit3 software review control software
Pmbok 5th planning process group part two
PMP Training - 08 project quality management
Introduction to DMAIC Training
Quality management procedures
Monitor and Control Process Group - Part One
Software process and project metrics
Lecture3
DMAIC addressed Bearnson S-N tracking for all product.
Data Collection Points And Gqm
Bca 5th sem seminar(software measurements)
Ad

Viewers also liked (11)

PPTX
University fund cuts - issue management
PPTX
Progress your PLM: Stop Using Excel for Issue Management
PDF
Kri Library Proposal India
PDF
Risk and issue management
PDF
Governance Culture & Incentives- Fundamentals of Operational Risk
PPTX
Key risk indicators shareslide
PDF
Managing with KPI's and KRI's
PPTX
KRI (Key Risk Indicators) & IT
PDF
Operational risk management and measurement
PPT
Problem Management
PPT
Building a Strategic Framework
University fund cuts - issue management
Progress your PLM: Stop Using Excel for Issue Management
Kri Library Proposal India
Risk and issue management
Governance Culture & Incentives- Fundamentals of Operational Risk
Key risk indicators shareslide
Managing with KPI's and KRI's
KRI (Key Risk Indicators) & IT
Operational risk management and measurement
Problem Management
Building a Strategic Framework
Ad

Similar to Managing projects by data (20)

PPT
Metrics Sirisha
PPT
Metrics Sirisha
PPT
Metrics Sirisha
PPTX
Software Engineering
PPTX
Software Engineering
PPT
Managing project with the Fsoft Insight
PPT
Software Metrics
PPTX
software metrics(process,project,product)
PPTX
Software metrics
PDF
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PPT
Reporting On The Testing Process
PPT
Managing IT Projects
PPT
Chapter 11 Metrics for process and projects.ppt
PPT
8 project planning
PPTX
Unit2 - Metrics.pptx
PDF
Spm project planning
PPT
Pressman ch-22-process-and-project-metrics
PPTX
Software Project Management Unit 2 chapters
PPT
Estimation maturity model using function points
PPT
An overview of software development methodologies.
Metrics Sirisha
Metrics Sirisha
Metrics Sirisha
Software Engineering
Software Engineering
Managing project with the Fsoft Insight
Software Metrics
software metrics(process,project,product)
Software metrics
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
Reporting On The Testing Process
Managing IT Projects
Chapter 11 Metrics for process and projects.ppt
8 project planning
Unit2 - Metrics.pptx
Spm project planning
Pressman ch-22-process-and-project-metrics
Software Project Management Unit 2 chapters
Estimation maturity model using function points
An overview of software development methodologies.

More from Mobi Marketing (20)

PPTX
Catelog Phào chỉ vàng, Phào chỉ PU, Phào chỉ thạch cao
PDF
Thống kê hành vi người dùng Internet Việt Nam quý I/2016
PPTX
[honglamherbs.com] Thao Duoc Hong Lam
PPT
Nanoled company
PDF
Ky yeu-35-truong-nguyen-van-troi-nhatrang
PDF
Bieu gia tap chi duyen dang vn IFM Media
PDF
Bieu gia quang cao heritage 2011 - IFM Media
PPTX
Navigating Vietnam's Digital Media 2011
PPTX
Những kỳ tích của truyền thông mới - EXPLOITS OF NEW MEDIA
PPTX
Xu hướng Internet Marketing từ năm 2011 - www.vietglobalcorp.com
PPTX
Groundbreaking ceremony for pointe91 - www.philandranch.com - PHI Land Ranch
PPT
Asia Reforestation Group Inc. - Paulownia planting - www.asiaforests.com
PPTX
CĐ Quốc tế Kent - Hỏi đáp nhập học - www.kent.edu.vn
PPTX
Hình ảnh lễ tốt nghiệp SV CĐ Quốc tế Kent - Kent Graduation Ceremony 2011 :::...
PPTX
eCommerce Marketing trực tuyến Kent International College
PPT
Pm training (planning and tracking) - Project Leader Ramp-Up
PPT
Timesheet trainingfor Project Leader FSOFT
PPT
Program Check List (PCL) FSOFT
PPTX
Kent.edu.vn - Học thiết kế nội thất
PPTX
Kent.edu.vn - CHUYÊN VIÊN THIẾT KẾ KIẾN TRÚC NỘI THẤT
Catelog Phào chỉ vàng, Phào chỉ PU, Phào chỉ thạch cao
Thống kê hành vi người dùng Internet Việt Nam quý I/2016
[honglamherbs.com] Thao Duoc Hong Lam
Nanoled company
Ky yeu-35-truong-nguyen-van-troi-nhatrang
Bieu gia tap chi duyen dang vn IFM Media
Bieu gia quang cao heritage 2011 - IFM Media
Navigating Vietnam's Digital Media 2011
Những kỳ tích của truyền thông mới - EXPLOITS OF NEW MEDIA
Xu hướng Internet Marketing từ năm 2011 - www.vietglobalcorp.com
Groundbreaking ceremony for pointe91 - www.philandranch.com - PHI Land Ranch
Asia Reforestation Group Inc. - Paulownia planting - www.asiaforests.com
CĐ Quốc tế Kent - Hỏi đáp nhập học - www.kent.edu.vn
Hình ảnh lễ tốt nghiệp SV CĐ Quốc tế Kent - Kent Graduation Ceremony 2011 :::...
eCommerce Marketing trực tuyến Kent International College
Pm training (planning and tracking) - Project Leader Ramp-Up
Timesheet trainingfor Project Leader FSOFT
Program Check List (PCL) FSOFT
Kent.edu.vn - Học thiết kế nội thất
Kent.edu.vn - CHUYÊN VIÊN THIẾT KẾ KIẾN TRÚC NỘI THẤT

Recently uploaded (20)

PPTX
Understanding_Digital_Forensics_Presentation.pptx
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Electronic commerce courselecture one. Pdf
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Spectroscopy.pptx food analysis technology
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
KodekX | Application Modernization Development
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPTX
Big Data Technologies - Introduction.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PPTX
sap open course for s4hana steps from ECC to s4
Understanding_Digital_Forensics_Presentation.pptx
MYSQL Presentation for SQL database connectivity
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
20250228 LYD VKU AI Blended-Learning.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Electronic commerce courselecture one. Pdf
Mobile App Security Testing_ A Comprehensive Guide.pdf
Spectroscopy.pptx food analysis technology
The Rise and Fall of 3GPP – Time for a Sabbatical?
Dropbox Q2 2025 Financial Results & Investor Presentation
“AI and Expert System Decision Support & Business Intelligence Systems”
Unlocking AI with Model Context Protocol (MCP)
KodekX | Application Modernization Development
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Digital-Transformation-Roadmap-for-Companies.pptx
Big Data Technologies - Introduction.pptx
Spectral efficient network and resource selection model in 5G networks
sap open course for s4hana steps from ECC to s4

Managing projects by data

  • 1. Managing projects by data Version: 3.0 Author: Le The Hung Sep 05, 2005 Instructor: Thai Nguyen © 2001 FPT-SOFT 04e-BM/NS/HDCV/FSOFT
  • 2. Introduction Course duration: 1 hour 45’ Purpose: Practical use of data for managing projects Targeted attendees: Team leaders, SEPG, SQA, project managers Tests/quiz: Quiz in 15’ for new attendants
  • 3. Objectives After the course, student will: Understand Fsoft metric system. Know about Fsoft PCBs and norms. Be able to use data for managing projects.
  • 4. Fsoft metric system – 45’ Fsoft PCBs and Norms – 45’ Quiz – 15’ Table of contents
  • 5. Why it’s needed? Metric set Analysis tools Fsoft SLC in quantitative management Fsoft metric system
  • 6. Why: Fsoft quality objective “ FPT-SOFT is committed to deliver products that fully meet customer’s requirements on schedule defined in the project plan”
  • 7. Why: International standards ISO 9001:2000 8.2.3 Monitoring and measurement of the processes 8.4 Analysis of data CMM/SEI 1.1: PA.G1: The quantitative process management activities are planned PA.G2: The process performance of the project's defined software process is controlled quantitatively PA.G3: The process capability of the organization's standard software process is known in quantitative terms
  • 8. Why: International standards CMMI/SEI 1.1: Measurement and Analysis Quantitative project management Organizational Process Performance
  • 10. Metric set: Collected data Effort (Project, work product, process, type of activity): Weekly Schedule (Start-date, expected end-date, actual end-date, delivery): At milestones Defect (Project, work product, stage detected, QC activities, stage injected, process origin, severity, classification type, priority): Weekly Size (Total, work product, activity): At milestones Requirement (Total, size, status): Weekly Customer complaints, customer satisfaction survey point, NC Tools : Fsoft management suite (Timesheet, DMS, NCMS, Dashboard, Fsoft Insight)
  • 11. Metric set: Calculated indicators Effort (Effectiveness, deviation): Weekly Schedule (Timeliness, deviation): At milestones Defect (Defect rate, leakage): Weekly Size (Deviation): At milestones Requirement (Requirement Completeness): Weekly Productivity, customer satisfaction, process compliance, distribution (Effort, defects): At the end of project Status (Effort, Schedule, Defect): Weekly Tools : Fsoft management suite (Timesheet, DMS, NCMS, Dashboard, Fsoft Insight)
  • 13. Fsoft SLC models: Manage by data
  • 14. Initiation stage: Norms for WO Overview The Initiation stage is the start of the SLC, in which: Project's software scope and boundary conditions, including the operational vision and proposed products, are established. Overall cost and schedule of the project are estimated. Potential risks are defined. Metrics Estimated size, estimated effort and planned schedule for the project. Target value of the quality goals for the project: Timeliness, Requirement Completeness, Leakage, Correct Cost, Customer Satisfaction, Process Compliance, Response Time. Actual data of the stage: Actual effort and actual schedule for the stage. Help Use Fsoft norms for overall estimating and setting goals. Record in the WO, Estimation sheets, Fsoft Insight
  • 15. Definition stage: PCB for Planning Overview Studying and clarifying user requirements. Preparing and releasing SRS. Negotiating Acceptance Criteria with customer. Updating and releasing complete project plan. Metrics Estimated size for the project, estimated effort and planned schedule for the stage. Progress values of the quality goals: Timeliness, Requirement Completeness, Correct Cost. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the project plan, URD and SRS. Help Use Fsoft norms for detail estimating and planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
  • 16. Solution stage: Review metrics Overview The main purpose of this stage is to define an effective solution to meet customer requirements. Analyzing and creating a good design for the software package are the main activities. Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals : Timeliness, Completeness, Correct Cost, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the ADD and Test Plan. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
  • 17. Construction stage: Data analysis Overview The goal of the construction stage is to develop the system. Coding and testing for the software package are the main activities. Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals : Timeliness, Completeness, Correct Cost, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the DDD, Test case and Test Data, modules and unit programs. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
  • 18. Transition stage: Leakage Overview The focus of the Transition stage is to ensure that software is available for its end users. Delivering software to customer, implementing software systems on customer site and conducting test activities for acceptance are main activities of this stage. Metrics Estimated effort and planned schedule for the stage. Progress values of the quality goals: Timeliness, Completeness, Leakage, Correct Cost, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, actual size and defects of the software package. Help Use Fsoft norms for re-estimating and re-planning. Fill data in the Fsoft Insight Analyse by viewing the Charts/Status and log issue in the Issue table
  • 19. Termination stage: Fsoft Data Overview The project closes at this stage when customer accepts the whole project and signs off the contract. Project assets must be collected and transferred to Fsoft process asset library. The goal of this stage is to summarize the results of the project and to provide the project knowledge and experiences for other projects. Metrics Estimated effort and planned schedule for the stage. Final values of the quality goals: Timeliness, Completeness, Leakage, Correct Cost, Customer Satisfaction, Process Compliance. Actual data of the stage: Actual effort and actual schedule for the stage, customer satisfaction point. Help Compare Actual metrics with Fsoft norms and Project norms Analyse in post mortem report
  • 20. ETC: Estimated To Complete Purpose It helps to monitor project progress and predict complete project metrics. Metrics Effort ETC (= Effort spent/Actual requirement completeness - Effort spent) is used to forecast the effort needed to complete project. Time ETC (= Current day + Actual duration/Actual requirement completeness – Actual duration) is used to forecast the finished day of the project. Possible leakage (=Project size * Norm of weighted defect rate – Actual weighted defects found) is used to forecast the quality of deliverables. Help Change WO if the metric deviation >=30% Re-plan if the metric deviation >=20%.
  • 21. PPM: Process Performance Models Purpose A description of the relationship among attributes of a process and its work products that are developed from historical process performance data and calibrated using collected process and product measures from the project and that are used to predict results to be achieved by following a process. Flow Select Measurement Parameters based on objective Collect Data Define Model Training Implementation of Model Collect Data Calibrate Model Select Process & Sub Process
  • 22. PPM: Effort Purpose Effort PPM is used to forecast the effort needed for each process in each stage. Metrics Forecasted Engineering Effort (EE) = (1- Average (EE Deviation/Requirement Completeness (RCR) deviation)*Planned EE + Average(EE deviation/RCR deviation)*Planned EE/Planned RCR*Re-planned RCR. Forecasted Management Effort = Planned ME/Planned EE*Re-planned EE Help In planning: The Fsoft norms + Project characteristics -> Planned values At the end of each stage: Actual values of metrics + Change requests -> Issues + Forecasted -> Re-planned value of metrics At the end of the project: Actual values of metric deviation -> Practices + Lessons.
  • 23. PPM: Defect Purpose Defect PPM is used to forecast the defect to be moved by a QC activity in each stage. Product Defect PPM is used to forecast the defect to be moved by a QC activity for each product. Metrics Project Replanned Defect Rate = Previous Project Planned Defect Rate * (1+ Average Project Defect found Deviation in previuos stages). Product Replanned Defect Rate = Previous Product Planned Defect Rate * (1+ Average Defect found Deviation in released products). Help At the end of each stage for Project Defect. After the releasing of each product for Product Defect.
  • 24. Analysis tools: Cause-Effect Purpose It help to accurately identify causes (or results) of a problem. Help Brainstorming. Test Code Design Analysis SQA Technology Team Time Defect rate is high
  • 25. Analysis tools: Pareto Chart Purpose It helps identify most important issues by data. Help The rule 80:20.
  • 26. Analysis tools: Control Chart Purpose It helps to define and forecast uncontrolled cases. Help Average, Stdev, UCL, LCL of series of data Color statuses of metrics (RED, YELLOW, BLUE)
  • 27. Fsoft PCBs: PCB: Process capability baseline Based on data of post mortem projects and support activities 1.0: June 30, 2001 Release Period: Quarterly, 6 months, Annually Prepared by SEPG, reviewed and approved by BOM Fsoft norms Based on PCBs and Fsoft business goals Established for 6 months Suggested by SEPG, reviewed and approved by BOD Fsoft PCBs and Norms
  • 28. All projects have postmortem in the reporting period Methodology: Average, Sigma, UCL, LCL Causal analysis of out of control limits Extraordinary cases are excluded Summary: The PCB of the period before the last period, the last PCB Last norms, suggested norm Improvement, issues Software PCB: Overview
  • 29. Planned actions for last period Collect customer related metrics To use data effectively Results of these actions All mandatory software metrics are calculated Metrics have been used for setting project norms Issues in last period: Schedule deviation is high Review efficiency is low Suggested actions for next period Schedule estimation, customer communication, milestone control Effort for review, review workshops, review guru Software PCB: Conclusions
  • 30. Software PCB: Requirement Accepted deliverable (%) 90|95| 94.4 Requirement completeness (%) 90|95| 93.83 Requirement stability (%) 7.5|5| 11.3
  • 31. Software PCB: Schedule Schedule control is the most serious problem Timeliness (%) 84.9|95| 58.6 Project Schedule Deviation (%) Development: 23.5|10| 62.5 Maintenance: 5|10| 30.6 Delivery Schedule Deviation (%) Development: 13|10| 25.0 Maintenance: 5|10| 6.0
  • 32. Software PCB: Effort Effort Deviation (%) Development: 29.8|10| 40.48 Maintenance: 4.9|10| 32.97 Project management effort (%) Development: 4.5|7.5| 6.33 Maintenance: 3.8|7.5| 6.78 Quality Cost (%) Development: 39|30| 34.49 Maintenance: 34.8|30| 47.66 Correction Cost (%) Development: 16.3|12| 11.65 Maintenance: 18.4|12| 12.49
  • 33. Software PCB: Quality Review efficiency is too low Defect Rate (WDef/UCP): 9.5|8.5| 9.0 Leakage (WDef/UCP) 0.5|0.3| 0.4 Defect Removal Efficiency (%) Review 35|40| 36.4 Test 52|55| 57.9 Customer Satisfaction (Point) 80|85| 73.5
  • 34. Software PCB: Productivity Productivity (UCP/pd) 0.43|0.4| 0.53 Review Effectiveness (WDef/pd) 13.2|15| 16.1 Test Effectiveness (WDef/pd) 8.3|10| 12.4
  • 35. Fsoft norms For a period of 6 months Improvement requirements based on last PCB To use data effectively Using PCB for plan: All processes Re-estimate size: After SRS completion and at the end of the project Analysis in progress: All milestones Verification: SEPG
  • 36. Fsoft norms Requirement Accepted deliverable: 95% Requirement completeness: 95% Schedule Timeliness: 85% Schedule Deviation: 10% Delivery Schedule Deviation: 10% Effort Effort Deviation: 10% Management Effort: 7.5% Quality Cost: 30% Correction Cost: 9%
  • 37. Fsoft norms Quality Defect Rate: 7WDef/UCP Leakage: 0.2WDef/UCP Customer Satisfaction: 90 points Process Compliance: 3NCs Productivity Coding: 0.5UCP/pd Review: 15WDef/pd Test: 12WDef/pd
  • 38. S ources & references S ources Fsoft manual Fsoft standard life cycle models and tailoring guidelines Fsoft metric guidelines Assessment and analysis tools guidelines Project database and PPM templates Fsoft process databases Fsoft PCB reports Fsoft norms Recommended readings TTVN/SYS/Fsoft QMS/document/master list TTVN/SYS/ Fsoft QMS/Data/ TTVN/SYS/ Fsoft QMS/PCB&Norm/
  • 40. Conclusion Pls. give your assessment
  • 41. Quiz Total 100 points = 20 questions x 5 points/question Duration: 15’ Pass criteria: 75 points Feel free to use any available material Don’t brainstorm.