Manual Plastering
What is Plaster?
Plaster is a building material used for coating walls and
ceilings. Sand-cement plaster is used extensively in building
work as a decorative or protective coating for concrete and
masonry walls .
Plaster is one of the oldest building materials, the most
primitive form was mud plaster, used to hold together
structures made of branches or wood for example. Today
internal plastering is used more as a way of smoothing out
surfaces and preparing them for decoration, it also adds
strength to the wall or ceiling and helps seal together building
materials.
Materials Required
 Cement
 Sand
 Water
 Masonry Trowel
 Smoothening Trowel
 Metal Float
 Measuring Tape
 Plumb Bob
 Mud Pan
 Chicken Mesh
 Hairs
 Recron Fibre6/9/2014
Know your Materials!
6/9/2014
Cement Sand Recron Fibre
Final Mortar mix (made from
mixing Cement,sand,water and
recron fibre) present in a Mudpan
Procedure
1. After the masonry wall made of bricks or aerated blocks is ready, it is
first cleaned properly before starting the plastering wall using brushes
and trowels.
6/9/2014
Brick wall Aerated Block wall
2. The scaffold is prepared for provide the labour a platform to stand and
materials required for plastering are transported at the site of plastering.
3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For
ex-In our case the ratio specified is 1:4.So we use
1 unit volume of cement for 4 unit volume of
sand. The normal cement bag is 50 kg in mass
0.035 m3. So we prepare a container of volume
0.035 m3 and pour 4 containers of cement.
6/9/2014
Scaffolding
Container
for
measuring
sand
4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125
gm fibre for 1 bag of cement.
5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of
cement, but at site it is subjected to the workability requirements.
Note: The mortar mix should be used within it’s initial setting time = 45 min
6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at
the joint in future.
6/9/2014
Chicken Mesh Labour putting Chicken Mesh
7. Making of Level Pads : Level pads are used for maintaining the thickness of
plaster coat required.They act as a reference for checking thickness of plaster.
- First we lay a reference line using rope and nails
- We check the distance of wall from this reference line and note it(say D1)
- Now we put the mortar of wall and smoothen it. We now calculate the
distance between the reference line and level pad’s surface(say D2)
D1-D2= Thickness of coat required
- If the thickness doesn’t matches then adjust the thickness of level pad
- Now make one level pad above the first level pad and check if it’s in line
with the help of plumb bob.It might happen the wall is not exactly vertical
either inwards or outwards which can be checked with help of plumb bob
hence thickness of level pad can be adjusted accordingly.
6/9/2014
6/9/2014
Labourers checking the distance of wall from reference
line
Making of level pad
6/9/2014
Level Pad
Labourers checking distance of level pad from reference
line
6/9/2014
Plumb Bob
No gap between wall and plumb
bob, signifying that wall is straight
Gap between wall and plumb
bob indicating that wall is
“Inwards”
- After checking for vertical alignment of level pads, check for horizontal
alignment with the help of a rope( pin a rope parallel to the first level pad
also vertical with adjacent wall).Adjust the level pads in thickness if the wall
is tilted sideways.
6/9/2014
Checking for vertical alignment of pads
Horizontally laid level pads
8. After making the level pads, wet the wall with help of diluted cement water slurry
to provide better adhesion with mortar.
9. The mason then applies the mortar on the walls
with the help of trowel.
6/9/2014
Masonry Trowel
10. With the help of metal float the mason creates a smooth reference plain of
required thickness by pressing the float against two vertical level pads.The
additional mortar is scrapped of with the help of float.
6/9/2014Metal Float
Reference Plain
11. The finishing of the plaster is done with the help of finishing trowel.
6/9/2014
Removing excess material with
float
Finishing Trowel
12. After smoothening, the plaster is roughened up for providing better adhesion in
case of a second coat. A hair is used for it or sometimes labour also uses chicken
mesh only.
6/9/2014
Hair used for roughening
surface
Rough Plaster coat
Challenges in Manual Plastering
1. A proper hierarchical system is not present on site. Ideally the engineer should
teach the supervisor as in what he requires and the supervisor should convey it to
the labour.But due to lack of number and agility of supervisors the engineer has
to do that part.
2. Due to above point, the engineer is not able to perform his main task efficiently
which is Quality Checks .Two examples in this regard are:-
(a) Amount of water is not as per as standards and the labour puts water
according to his will. This in turn degrades the quality of the mix.
(b) Checking of the thickness and alignment of level pads is not proper which
leads to lack of uniformity of plaster. Plumb checking is not also proper.
3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes
used beyond 4 hours. This again degrades the quality.
4. The floor is not cleaned properly before starting plaster and sacks are not always
laid down to collect the fallen mortar. So the mortar gets mixed with the mud and
is then used again which has serious implications on the quality.
6/9/2014
5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of
loosing labour the supervisor also doesn’t say much to them as his performance is
judged by the way he handles the labourers.This leads to slow pace of work.
6/9/2014
Fallen Mortar getting mixed
with mud

More Related Content

PPTX
Pipe Jacking
PPTX
Special concrete
PPTX
Dewatering techniques
PPT
blockwork
PPTX
Sheet pile presentation
PPT
Introduction to Blockwork
PPTX
CONSTRUCTION OF CEMENT CONCRETE ROAD
DOCX
Analysis of rates for labour and material
Pipe Jacking
Special concrete
Dewatering techniques
blockwork
Sheet pile presentation
Introduction to Blockwork
CONSTRUCTION OF CEMENT CONCRETE ROAD
Analysis of rates for labour and material

What's hot (20)

PPTX
Diaphragm wall
PPT
1.1 box jacking
PPTX
Cube test for compressive strength of concrete
PPTX
Soil Nailing
PPTX
Diaphragm wall construction
PDF
Equipments used for aggregate production_Advanced Construction Technology (Se...
PDF
Plaster
PPTX
Plastering Process (Cement/Masonry/Finishing Layer)
PPTX
Chapter 10 wall finishes ( plastering,pointing & painting)
PPTX
Chapter 3 materials & techniques for repairs
PPTX
WATERPROOFING.pptx
PDF
Testing of hardened concrete
 
PPTX
Manufacturing of concrete
PPTX
Sheet piles; advantages, types and methods
PPT
Curing of concrete
PPTX
Formwork
PPT
Module 3 Properties of Concrete.ppt
PPTX
Grouting
PPTX
Compaction of concrete
PPTX
Formwork
Diaphragm wall
1.1 box jacking
Cube test for compressive strength of concrete
Soil Nailing
Diaphragm wall construction
Equipments used for aggregate production_Advanced Construction Technology (Se...
Plaster
Plastering Process (Cement/Masonry/Finishing Layer)
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 3 materials & techniques for repairs
WATERPROOFING.pptx
Testing of hardened concrete
 
Manufacturing of concrete
Sheet piles; advantages, types and methods
Curing of concrete
Formwork
Module 3 Properties of Concrete.ppt
Grouting
Compaction of concrete
Formwork
Ad

Similar to Manual plastering (20)

PPTX
Coat and finishes c3
PDF
Brickwork & Plaster 26.02.22.pdf
PPSX
Presentation on how to do AAC Blockwork
PPTX
Copy of Plastering.pptx
PPTX
Cement Plastering procedure
PPTX
Brickwork and plastering
PDF
PDF
Plastering mortar insulation and bonding material
PPTX
construction management site visit ppt
DOCX
Ms ct-bm
PPTX
Plastering ppt
PPTX
Plastering and pointing
PPTX
Protective coating
PPTX
Unit III Finishes in building use .pptx
PPTX
Unit III Finishes and its uses for building.pptx
PPTX
building construction plastering pointing final.pptx
PDF
Artex and plaster
PPTX
Finishing works (Building Construction)
PDF
AAC Block work ppt.pdf
PDF
Good construction practices - Part 2 - ACC
Coat and finishes c3
Brickwork & Plaster 26.02.22.pdf
Presentation on how to do AAC Blockwork
Copy of Plastering.pptx
Cement Plastering procedure
Brickwork and plastering
Plastering mortar insulation and bonding material
construction management site visit ppt
Ms ct-bm
Plastering ppt
Plastering and pointing
Protective coating
Unit III Finishes in building use .pptx
Unit III Finishes and its uses for building.pptx
building construction plastering pointing final.pptx
Artex and plaster
Finishing works (Building Construction)
AAC Block work ppt.pdf
Good construction practices - Part 2 - ACC
Ad

Recently uploaded (20)

PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Current and future trends in Computer Vision.pptx
PPTX
communication and presentation skills 01
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Design Guidelines and solutions for Plastics parts
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Current and future trends in Computer Vision.pptx
communication and presentation skills 01
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Management Information system : MIS-e-Business Systems.pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
Visual Aids for Exploratory Data Analysis.pdf
Exploratory_Data_Analysis_Fundamentals.pdf
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
CyberSecurity Mobile and Wireless Devices
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Design Guidelines and solutions for Plastics parts
August -2025_Top10 Read_Articles_ijait.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx

Manual plastering

  • 2. What is Plaster? Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls . Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.
  • 3. Materials Required  Cement  Sand  Water  Masonry Trowel  Smoothening Trowel  Metal Float  Measuring Tape  Plumb Bob  Mud Pan  Chicken Mesh  Hairs  Recron Fibre6/9/2014
  • 4. Know your Materials! 6/9/2014 Cement Sand Recron Fibre Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan
  • 5. Procedure 1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels. 6/9/2014 Brick wall Aerated Block wall
  • 6. 2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering. 3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use 1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement. 6/9/2014 Scaffolding Container for measuring sand
  • 7. 4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement. 5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements. Note: The mortar mix should be used within it’s initial setting time = 45 min 6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at the joint in future. 6/9/2014 Chicken Mesh Labour putting Chicken Mesh
  • 8. 7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster. - First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad - Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly. 6/9/2014
  • 9. 6/9/2014 Labourers checking the distance of wall from reference line Making of level pad
  • 10. 6/9/2014 Level Pad Labourers checking distance of level pad from reference line
  • 11. 6/9/2014 Plumb Bob No gap between wall and plumb bob, signifying that wall is straight Gap between wall and plumb bob indicating that wall is “Inwards”
  • 12. - After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways. 6/9/2014 Checking for vertical alignment of pads Horizontally laid level pads
  • 13. 8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar. 9. The mason then applies the mortar on the walls with the help of trowel. 6/9/2014 Masonry Trowel
  • 14. 10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float. 6/9/2014Metal Float Reference Plain
  • 15. 11. The finishing of the plaster is done with the help of finishing trowel. 6/9/2014 Removing excess material with float Finishing Trowel
  • 16. 12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only. 6/9/2014 Hair used for roughening surface Rough Plaster coat
  • 17. Challenges in Manual Plastering 1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part. 2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:- (a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper. 3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes used beyond 4 hours. This again degrades the quality. 4. The floor is not cleaned properly before starting plaster and sacks are not always laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality. 6/9/2014
  • 18. 5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work. 6/9/2014 Fallen Mortar getting mixed with mud