Neelum Jehlum
HYDROPOWER PROJECT
Presented By
MUHAMMAD AQEEL
Why we build A DAM
The concept of a dam and its potential benefits,
which include water supply, electricity generation,
flood control, recreation and irrigation.
A barrier constructed to hold back water and raise
its level, forming a reservoir used to generate
electricity or as a water supply.
purpose of dam
Therefore, dams are constructed for a specific purpose such as
water supply, flood control, irrigation, navigation, sedimentation
control, and hydropower. A dam is the cornerstone in
the development and management of water resources
development of a river basin.
Advantages
1. Once a dam is constructed, electricity can be produced at a constant rate.
2. If electricity is not needed, the sluice gates can be shut, stopping electricity generation. The water
can be saved for use another time when electricity demand is high.
3. Dams are designed to last many decades and so can contribute to the generation of electricity for
many years / decades.
4. The lake that forms behind the dam can be used for water sports and leisure / pleasure activities.
Often large dams become tourist attractions in their own right.
5. The lake's water can be used for irrigation purposes.
6. The build up of water in the lake means that energy can be stored until needed, when the water is
released to produce electricity.
7. When in use, electricity produced by dam systems do not produce green house gases. They do not
pollute the atmosphere
Disadvantages
1. Dams are extremely expensive to build and must be built to a very high standard.
2. The high cost of dam construction means that they must operate for many decades to become profitable.
3. The flooding of large areas of land means that the natural environment is destroyed.
4. People living in villages and towns that are in the valley to be flooded, must move out. This means that they lose their
farms and businesses. In some countries, people are forcibly removed so that hydro-power schemes can go ahead.
5. The building of large dams can cause serious geological damage. For example, the building of the Hoover Dam in the
USA triggered a number of earth quakes and has depressed the earths surface at its location.
6. Although modern planning and design of dams is good, in the past old dams have been known to be breached (the
dam gives under the weight of water in the lake). This has led to deaths and flooding.
7. Dams built blocking the progress of a river in one country usually means that the water supply from the same river in
the following country is out of their control. This can lead to serious problems between neighbouring countries.
8. Building a large dam alters the natural water table level. For example, the building of the Aswan Dam in Egypt has
altered the level of the water table. This is slowly leading to damage of many of its ancient monuments as salts and
destructive minerals are deposited in the stone work from rising damp caused by the changing water table level
About Neelum Jehlum hydrop project
A composite Dam (Gravity + Rock fill) 160m long and 60m high will be constructed on Neelum
River at Nauseri. It is a Gated Diversion Dam.
The dam will create a head pond of 10 million cubic meters which will allow a peaking
reservoir (A natural or artificial pond or lake used for the storage and regulation of water)of 3.8
million cubic meters to meet daily peaking of power for more than 4 hours.
A six gate tunnel intake structure of 280 cumecs (a unit of flow equal to one cubic meter of
water per second) capacity will be connected three conventional flushing surface basins
installed at their end for taking sediment back into river.
The total length of headrace tunnel is almost 48 Km. A 19.54 Km stretch of the tunnel from the
Nauseri site will be constructed as a twin tunnel system each with cross sectional area ranging
from 52-58m2.
The remaining headrace tunnel down to the surge chamber will be a single tunnel having cross
sectional area 100m2 approximately.
The remaining headrace tunnel down to the surge chamber will be a single tunnel having cross
sectional area 100m2 approximately.
The tunnel portion to be excavated with TBM will be shortcrete lined with a concrete invert while
the drill and blast portion of the tunnel will have full face concrete lining.
The tunnel crosses under the Jhelum River at EI. 602.0, m asl, approximately 180m below
Riverbed.
The tunnel is accessed by 8 construction Adits(a horizontal passage leading into a mine for the purposes of
access or drainage) for removal of excavated spoil.
The Surge Chamber consist of 341m high riser shaft and 820m long surge tunnel, four steel
lined Penstock tunnels 118 m long and having 3.8 m internal diameter will also be constructed.
The underground power Station will have four units with a total capacity of 969 MW. The
Power Station will be connected with Gakhar Grid station through 500KV double circuit
transmission line.
Neelum jehlum hydropower project
Location
Neelum Jhelum Hydroelectric Project (NJHEP) is located in the vicinity
Muzaffarabad (AJ&K). It envisages the diversion of Neelum river water through a
tunnel out -falling into Jhelum River. The intake Neelum Jhelum is at Nauseri 41
Km East of Muzaffarabad. The Powerhouse will be constructed at Chatter Kalas,
22 Km South of Muzaffarabad. After passing through the turbines the water will
be released into Jhelum River about 4 Km South of Chatter Kalas. Neelum Jhelum
Hydroelectric Project has installed capacity of 969 MW. The Project will produce
5.15 Billion units of electricity annually
Project Key Data
• Installed capacity : 5x211Mw
• Annual generation : 5254 GWh
• Maximum gross head : 420 m
• Maximum discharge : 280 m3/s
• Concrete intake weir height : 42 m
• Catchment area : 6682 km2
• Mean flow at intake site : 335 m3/s
• PMF - 14 000 - 16 000 m3/s
• Reservoir volume : 8.0 Mm3
Funding:
NORAD/Mixed Credit
Value of Services:
USD 10.0 mill
Professional Staff:
270 expatriate man-months
Year:
1994 - 1997
SALIENT FEATURES
Overall Project Cost Rs. 274.882 Billions
Installed Capacity 969 MW, Four Units @ 242.25 MW each
Dam Type Composite Dam (Gravity + Rock fill)
Height / Length 60 / 160 Meters
Average Annual Energy 5.150 Billion electricity Units Annually
Average Head 420 Meters
Design Discharge 280 Cumecs
Tunneling Twin Tunnel ,Single Tunnel ,Tailrace Tunnel
Length 19.54 km each, Length 8.94 km, Length 3.54 km
EIRR 25.46 %
Date of Commencement 30-01-2008
Expected Completion date November 2016
Implementation Period About 9 years (106 months)
Old KEY FACTS
Project Duration Proposed: July 2002 – June 2010
Gross Head: 420 metres (original plan of 213 metres)
Dam Height: 148 feet
Water Diverted: 280 m3/sec
Length of Headrace Tunnel: 32.5 km (original plan of 28.49 km)
Power Generation Capacity: 963 MW (original plan of 500 MW)
Annual Energy Production: 5,150 GWh
Generation Cost: Rs 1.82 per KWh
By Print Media !!
about international Funding
Location of Neelum–Jhelum Dam
Country Pakistan
Location Muzaffarabad
Coordinates 34°23′34″N 73°43′08″ECoordinates: 34°23′34″N 73°
43′08″E
Status Under construction
Construction began 2008
Opening date 2016 est.
Construction cost Rs. 274.9 Billion ($2.89 billion USD)
Owner(s) Water and Power Development Authority
Type of dam Concrete gravity
Impounds Neelum River
Height 47 m (154 ft)
Length 125 m (410 ft)
Dam volume 156,000 m
3
(204,040 cu yd)
[1]
Total capacity 8,000,000 m
3
(6,486 acre·ft
Name Neelum-Jhelum Hydropower Plant
Coordinates 34°11′54″N 73°30′41″E
Commission date 2015-2016 (est.)
Type Conventional, diversion
Hydraulic head 420 m (1,378 ft)
Turbines 4 x 242 MW Francis-type
Installed capacity 969 MW
Annual generation 5,150 GWh
Neelum jehlum hydropower project

More Related Content

PPTX
Neelum jhelum hydroelectric project ( NJHEP)
PPTX
internship report on NJHPP
DOCX
Neelum Jhelum hydroelectric power project Lot. C2
PDF
Neelum Jhelum Hydropower Internship Report
PPTX
The five biggest dams in india
PDF
PPTX
Dams and Hydropower Projects of Pakistan
Neelum jhelum hydroelectric project ( NJHEP)
internship report on NJHPP
Neelum Jhelum hydroelectric power project Lot. C2
Neelum Jhelum Hydropower Internship Report
The five biggest dams in india
Dams and Hydropower Projects of Pakistan

What's hot (20)

PPTX
Tarbela dam
PPTX
DAMS & HYDROPOWER PROJECTS OF PAKISTAN
PPTX
PPTX
Nagarjuna sagar dam
PPTX
KOYNA HYDROELECTRIC POWER PLANT
PDF
HYDRO POWER PLANT
PPTX
Introduction of dams
PPT
Mangla Dam
PPT
Tarbela dam project97 2003
PPTX
Ppt on tehri dam by shubham dobhal
PDF
MAITHON DAM
PPTX
Dam presentation
PDF
Mini projects for_civil_engineering_(3)_(1) (1) (1)
PPTX
Chichoki power plant
PPT
Presentation=sardar sarovar hydro power plant
PPTX
PPTX
Water crisis in pakistan A presentation By Mr Allah Dad Khan
DOCX
Powerful parbati
PPTX
Water reservoirs
Tarbela dam
DAMS & HYDROPOWER PROJECTS OF PAKISTAN
Nagarjuna sagar dam
KOYNA HYDROELECTRIC POWER PLANT
HYDRO POWER PLANT
Introduction of dams
Mangla Dam
Tarbela dam project97 2003
Ppt on tehri dam by shubham dobhal
MAITHON DAM
Dam presentation
Mini projects for_civil_engineering_(3)_(1) (1) (1)
Chichoki power plant
Presentation=sardar sarovar hydro power plant
Water crisis in pakistan A presentation By Mr Allah Dad Khan
Powerful parbati
Water reservoirs
Ad

Viewers also liked (8)

PDF
Cv_Usman_Majeed_Geological_g
PDF
Structural survey, inspection and evaluation using LS technology
PDF
Sustainability and Safety in Tunnels
PPT
Internship Progress Report Spring 2013
PDF
Hydro Power In Pakistan
PPT
Application of Remote Sensing in Civil Engineering
PPT
Submerged tunnel ppt
PPTX
Internship power point
Cv_Usman_Majeed_Geological_g
Structural survey, inspection and evaluation using LS technology
Sustainability and Safety in Tunnels
Internship Progress Report Spring 2013
Hydro Power In Pakistan
Application of Remote Sensing in Civil Engineering
Submerged tunnel ppt
Internship power point
Ad

Similar to Neelum jehlum hydropower project (20)

PPT
The Three Gorges Dam Ahmed Hussain
PDF
Complete Report Of Nelum Jehlum Hydro Electric Project
PDF
Report on Neelum Jhelum Hyrdoelectic project
PDF
Project report
PPT
Hydro power-plant
PPT
Hydro power-plant
PDF
The Hoover Dam And Its Construction Essay
PDF
PPTX
Three gorges dam pptx
PPTX
Hydro electric power plant
DOCX
Three gorges dam project
PPTX
Dams and Hydraulic Structures
PPTX
F-Gravity dam.pptx engineering agricultural
DOCX
Mullaperiyar dam voice of 3.5 million
PPT
Three Gorges Dam Liam Horler
PPTX
Sustanability
PPTX
Dam types
PPTX
PDF
DAMS
The Three Gorges Dam Ahmed Hussain
Complete Report Of Nelum Jehlum Hydro Electric Project
Report on Neelum Jhelum Hyrdoelectic project
Project report
Hydro power-plant
Hydro power-plant
The Hoover Dam And Its Construction Essay
Three gorges dam pptx
Hydro electric power plant
Three gorges dam project
Dams and Hydraulic Structures
F-Gravity dam.pptx engineering agricultural
Mullaperiyar dam voice of 3.5 million
Three Gorges Dam Liam Horler
Sustanability
Dam types
DAMS

Recently uploaded (20)

PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Empowerment Technology for Senior High School Guide
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PPTX
Computer Architecture Input Output Memory.pptx
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
IGGE1 Understanding the Self1234567891011
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
My India Quiz Book_20210205121199924.pdf
PPTX
20th Century Theater, Methods, History.pptx
Practical Manual AGRO-233 Principles and Practices of Natural Farming
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Paper A Mock Exam 9_ Attempt review.pdf.
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Weekly quiz Compilation Jan -July 25.pdf
Cambridge-Practice-Tests-for-IELTS-12.docx
AI-driven educational solutions for real-life interventions in the Philippine...
Empowerment Technology for Senior High School Guide
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
Computer Architecture Input Output Memory.pptx
Unit 4 Computer Architecture Multicore Processor.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
IGGE1 Understanding the Self1234567891011
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
My India Quiz Book_20210205121199924.pdf
20th Century Theater, Methods, History.pptx

Neelum jehlum hydropower project

  • 3. Why we build A DAM The concept of a dam and its potential benefits, which include water supply, electricity generation, flood control, recreation and irrigation. A barrier constructed to hold back water and raise its level, forming a reservoir used to generate electricity or as a water supply.
  • 4. purpose of dam Therefore, dams are constructed for a specific purpose such as water supply, flood control, irrigation, navigation, sedimentation control, and hydropower. A dam is the cornerstone in the development and management of water resources development of a river basin.
  • 5. Advantages 1. Once a dam is constructed, electricity can be produced at a constant rate. 2. If electricity is not needed, the sluice gates can be shut, stopping electricity generation. The water can be saved for use another time when electricity demand is high. 3. Dams are designed to last many decades and so can contribute to the generation of electricity for many years / decades. 4. The lake that forms behind the dam can be used for water sports and leisure / pleasure activities. Often large dams become tourist attractions in their own right. 5. The lake's water can be used for irrigation purposes. 6. The build up of water in the lake means that energy can be stored until needed, when the water is released to produce electricity. 7. When in use, electricity produced by dam systems do not produce green house gases. They do not pollute the atmosphere
  • 6. Disadvantages 1. Dams are extremely expensive to build and must be built to a very high standard. 2. The high cost of dam construction means that they must operate for many decades to become profitable. 3. The flooding of large areas of land means that the natural environment is destroyed. 4. People living in villages and towns that are in the valley to be flooded, must move out. This means that they lose their farms and businesses. In some countries, people are forcibly removed so that hydro-power schemes can go ahead. 5. The building of large dams can cause serious geological damage. For example, the building of the Hoover Dam in the USA triggered a number of earth quakes and has depressed the earths surface at its location. 6. Although modern planning and design of dams is good, in the past old dams have been known to be breached (the dam gives under the weight of water in the lake). This has led to deaths and flooding. 7. Dams built blocking the progress of a river in one country usually means that the water supply from the same river in the following country is out of their control. This can lead to serious problems between neighbouring countries. 8. Building a large dam alters the natural water table level. For example, the building of the Aswan Dam in Egypt has altered the level of the water table. This is slowly leading to damage of many of its ancient monuments as salts and destructive minerals are deposited in the stone work from rising damp caused by the changing water table level
  • 7. About Neelum Jehlum hydrop project A composite Dam (Gravity + Rock fill) 160m long and 60m high will be constructed on Neelum River at Nauseri. It is a Gated Diversion Dam. The dam will create a head pond of 10 million cubic meters which will allow a peaking reservoir (A natural or artificial pond or lake used for the storage and regulation of water)of 3.8 million cubic meters to meet daily peaking of power for more than 4 hours. A six gate tunnel intake structure of 280 cumecs (a unit of flow equal to one cubic meter of water per second) capacity will be connected three conventional flushing surface basins installed at their end for taking sediment back into river. The total length of headrace tunnel is almost 48 Km. A 19.54 Km stretch of the tunnel from the Nauseri site will be constructed as a twin tunnel system each with cross sectional area ranging from 52-58m2. The remaining headrace tunnel down to the surge chamber will be a single tunnel having cross sectional area 100m2 approximately.
  • 8. The remaining headrace tunnel down to the surge chamber will be a single tunnel having cross sectional area 100m2 approximately. The tunnel portion to be excavated with TBM will be shortcrete lined with a concrete invert while the drill and blast portion of the tunnel will have full face concrete lining. The tunnel crosses under the Jhelum River at EI. 602.0, m asl, approximately 180m below Riverbed. The tunnel is accessed by 8 construction Adits(a horizontal passage leading into a mine for the purposes of access or drainage) for removal of excavated spoil.
  • 9. The Surge Chamber consist of 341m high riser shaft and 820m long surge tunnel, four steel lined Penstock tunnels 118 m long and having 3.8 m internal diameter will also be constructed. The underground power Station will have four units with a total capacity of 969 MW. The Power Station will be connected with Gakhar Grid station through 500KV double circuit transmission line.
  • 11. Location Neelum Jhelum Hydroelectric Project (NJHEP) is located in the vicinity Muzaffarabad (AJ&K). It envisages the diversion of Neelum river water through a tunnel out -falling into Jhelum River. The intake Neelum Jhelum is at Nauseri 41 Km East of Muzaffarabad. The Powerhouse will be constructed at Chatter Kalas, 22 Km South of Muzaffarabad. After passing through the turbines the water will be released into Jhelum River about 4 Km South of Chatter Kalas. Neelum Jhelum Hydroelectric Project has installed capacity of 969 MW. The Project will produce 5.15 Billion units of electricity annually
  • 12. Project Key Data • Installed capacity : 5x211Mw • Annual generation : 5254 GWh • Maximum gross head : 420 m • Maximum discharge : 280 m3/s • Concrete intake weir height : 42 m • Catchment area : 6682 km2 • Mean flow at intake site : 335 m3/s • PMF - 14 000 - 16 000 m3/s • Reservoir volume : 8.0 Mm3
  • 13. Funding: NORAD/Mixed Credit Value of Services: USD 10.0 mill Professional Staff: 270 expatriate man-months Year: 1994 - 1997
  • 14. SALIENT FEATURES Overall Project Cost Rs. 274.882 Billions Installed Capacity 969 MW, Four Units @ 242.25 MW each Dam Type Composite Dam (Gravity + Rock fill) Height / Length 60 / 160 Meters Average Annual Energy 5.150 Billion electricity Units Annually Average Head 420 Meters Design Discharge 280 Cumecs Tunneling Twin Tunnel ,Single Tunnel ,Tailrace Tunnel Length 19.54 km each, Length 8.94 km, Length 3.54 km EIRR 25.46 % Date of Commencement 30-01-2008 Expected Completion date November 2016 Implementation Period About 9 years (106 months)
  • 15. Old KEY FACTS Project Duration Proposed: July 2002 – June 2010 Gross Head: 420 metres (original plan of 213 metres) Dam Height: 148 feet Water Diverted: 280 m3/sec Length of Headrace Tunnel: 32.5 km (original plan of 28.49 km) Power Generation Capacity: 963 MW (original plan of 500 MW) Annual Energy Production: 5,150 GWh Generation Cost: Rs 1.82 per KWh
  • 16. By Print Media !! about international Funding
  • 17. Location of Neelum–Jhelum Dam Country Pakistan Location Muzaffarabad Coordinates 34°23′34″N 73°43′08″ECoordinates: 34°23′34″N 73° 43′08″E Status Under construction Construction began 2008 Opening date 2016 est. Construction cost Rs. 274.9 Billion ($2.89 billion USD) Owner(s) Water and Power Development Authority
  • 18. Type of dam Concrete gravity Impounds Neelum River Height 47 m (154 ft) Length 125 m (410 ft) Dam volume 156,000 m 3 (204,040 cu yd) [1] Total capacity 8,000,000 m 3 (6,486 acre·ft Name Neelum-Jhelum Hydropower Plant Coordinates 34°11′54″N 73°30′41″E Commission date 2015-2016 (est.) Type Conventional, diversion Hydraulic head 420 m (1,378 ft) Turbines 4 x 242 MW Francis-type Installed capacity 969 MW Annual generation 5,150 GWh