4. 4
Layout
Function
test
Schematic
preparation
PCB
fabrication
MFG
test
Certification/LAB
/customer samples
Product quality
test and analysis
Mass
Product
SW MR
RMA
devices
Layout
Internal
test
Schematic
preparation
Revision Revision Placement discuss
PCB
fabrication
Material preparation Settings and NV
Internal
test
Function
test
Revisions on spec and test items
MFG
test
EE to merge
system schematic
1. Vendor review
2. BOM check
1. Bring up by SW
2. Discuss with vendor
3. Matching tuning
4. Calibration
Chip limitation
test
Certification/LAB
/customer samples
Clarify issues and modify
setting or layout
Sample scan and
preparation
Product quality
test and analysis
Ensure board level
performances to pass each tests
Discuss the validness
of each tests
Mass
Product
Remove test items
with good CPK
SW MR
RMA
devices
Arc
Vendor
review
Ant/Pwr/
EE/MFG
Arc/ME/PM and
other team
PE team/
vendor
SW team
Carriers and
customers
SW/MPM/PM
and other teams
SW/Certification teams
and chip vendor
Coordinate with SW
/Ant and other teams
Basically functional
test on RF items
Debug/analysis
Suggestions
1. BOM change
2. Solve board level issues
3. Ensure better CPK
4. Cable loss compensation
RF Design Flow
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11. 12.
1. Study customer requirement and feature sheet.
2. Evaluate new RF key parts.
3. Design RF front-end architecture and file a case for QTI’s review (make sure all
designs are QTI’s PoR).
4. Design RF schematic and file a case for QTI’s review. Make sure all RF-BB interface
connections are correct. Keep all RF parts in RF page.
5. Do RF placement (follow QTI and RF layout guidelines).
6. Check RF layout (follow QTI and RF layout guidelines).
7. Prepare RF BOM.
8. Do RF match tuning.
9. Do RF char.
10. Verify RF calibration.
11. Debug, Certifications.
12. Watch pilot run Cpk.
6. LNA Matching Design Challenges
Matching networks are used on both
sides of the transistor to transform the
input and output impedance Z0 to the
source and load impedances ZS and ZL.
1.
GS GL const. gain circle
2.
Const. NF circle for GS
3.
LNA matching conclusion: ZS按照NF circle調到最小圈, 不過也要
兼顧GS Gain circle; ZL就conjugate matching用把Gain調到最大.
6
7. GNSS Basic
GPS
• 2.046 MHz BW NB GPS (centered on 1575.42 MHz)
• Satellites transmit different codes at the same frequency (CDMA)
Glonass (GLO)
• ~8.3 MHz BW (1597–1606 MHz), 14 channels (-7 to +6)
• Satellites transmit the same code on different frequencies (FDMA)
BeiDou Systems (BDS)
• 4.092 MHz BW (1559.05 –1563.14 MHz)
• Satellites transmit different codes at the same frequency (CDMA)
Galileo (GAL)
• 4.092 MHz BW (centered on 1575.42 MHz)
• Satellites transmit at the same frequency using Binary Offset Carrier (BOC) modulation (CDMA/BOC)
freq
7
GNSS GLO(WBIQ) GPS(WBIQ) BDS/GAL(WBIQ) GPS(NBIQ)
BW 1.023 MHz 2.046 MHz 4.092 MHz 1 kHz
9. 9
LTE Tx noise in the GPS band
• Must meet the -184 dBm/Hz spec in the GPS band at the GPS antenna 0.1dB desense.
Total RXBN @ PA output (dBm/Hz):
(SDR GPS RBN + PA GPS Rx band gain) + PA B13 2H RBN
10*log10(10^((-137 - 12)/10) + 10^(-143/10)) = -142 dBm/Hz
P.S. PA = SKY77660 LTE B13 data sheet
Loss from Rx DPx to antenna (dB):
~Loss before SDR
RXBN due to Tx @ antenna (dBm/Hz):
Total RXBN @ PA output (dBm/Hz) - B13 DPx Tx-Rx isolation @ GPS Rx frequency (dB) + Loss from Rx DPx to antenna (dB)
-142 - 45 + 5 = -182 dBm/Hz
ANT iso = 10 dB
LTE Tx noise@GPS ANT = -182 - 10 = -192 dBm/Hz
最好 = -192 dBm/Hz.
解釋-184 dBm/Hz怎麼來…
13. 13
之後有可能面臨的問題之後有可能面臨的問題之後有可能面臨的問題之後有可能面臨的問題 Part1
• 生了小孩買了生了小孩買了生了小孩買了生了小孩買了房買房買房買房買了了了了車車車車,,,,一個月小孩兩萬房貸四萬一個月小孩兩萬房貸四萬一個月小孩兩萬房貸四萬一個月小孩兩萬房貸四萬車子五千車子五千車子五千車子五千,,,,人生人生人生人生被鎖被鎖被鎖被鎖死死死死????
• 人力便宜人力便宜人力便宜人力便宜,,,,對對對對人才不重視人才不重視人才不重視人才不重視,,,,誰來做都誰來做都誰來做都誰來做都一樣一樣一樣一樣,,,,還有還有還有還有很多根本很多根本很多根本很多根本不尊重人的私人生活不尊重人的私人生活不尊重人的私人生活不尊重人的私人生活
• 情境情境情境情境1
“明天明天明天明天再看就好再看就好再看就好再看就好了了了了",,,,"下週一再回覆下週一再回覆下週一再回覆下週一再回覆人家人家人家人家” ,,,,
“辛苦辛苦辛苦辛苦了了了了,,,,這是長期抗戰這是長期抗戰這是長期抗戰這是長期抗戰,,,,不用現在不用現在不用現在不用現在burn out”,,,,
“那那那那你先去接小孩沒關係你先去接小孩沒關係你先去接小孩沒關係你先去接小孩沒關係,,,,大家互相大家互相大家互相大家互相cover”,,,,“管管管管他他他他的的的的~他們他們他們他們這兩天也不上班這兩天也不上班這兩天也不上班這兩天也不上班,,,,下週再回下週再回下週再回下週再回吧吧吧吧”
• 情境情境情境情境2結果變成結果變成結果變成結果變成
”這個這個這個這個明天明天明天明天就要就要就要就要”,,,,
“If we can come out something by tonight, that would be great”
“你你你你能能能能現在馬上幫現在馬上幫現在馬上幫現在馬上幫我看一下我看一下我看一下我看一下嗎嗎嗎嗎”
“上面上面上面上面時間就排這樣時間就排這樣時間就排這樣時間就排這樣啊啊啊啊…跟跟跟跟他們講就他們講就他們講就他們講就沒用沒用沒用沒用”
“如果如果如果如果覺得時間來不及覺得時間來不及覺得時間來不及覺得時間來不及,,,,我幫你反應我幫你反應我幫你反應我幫你反應...但是我們還是先做但是我們還是先做但是我們還是先做但是我們還是先做吧吧吧吧”
“我我我我是這樣覺得啦是這樣覺得啦是這樣覺得啦是這樣覺得啦,,,,我們現在不做我們現在不做我們現在不做我們現在不做,,,,等到上面要等到上面要等到上面要等到上面要,,,,時間一定沒這麼多時間一定沒這麼多時間一定沒這麼多時間一定沒這麼多,,,,就來不及就來不及就來不及就來不及了了了了”
15. 15
人生沒有過不去的坎人生沒有過不去的坎人生沒有過不去的坎人生沒有過不去的坎
• 想想想想想想想想Bode plot (波德圖波德圖波德圖波德圖): 人生橫軸轉成分貝人生橫軸轉成分貝人生橫軸轉成分貝人生橫軸轉成分貝,,,,也不過短短數十載也不過短短數十載也不過短短數十載也不過短短數十載,,,,做人灑脫坦然一做人灑脫坦然一做人灑脫坦然一做人灑脫坦然一點點點點
• 人生沒有一條路是白走的人生沒有一條路是白走的人生沒有一條路是白走的人生沒有一條路是白走的,,,,沒有什麼選擇一定是錯的沒有什麼選擇一定是錯的沒有什麼選擇一定是錯的沒有什麼選擇一定是錯的,,,,砍掉重練的代價沒有你想像的這砍掉重練的代價沒有你想像的這砍掉重練的代價沒有你想像的這砍掉重練的代價沒有你想像的這
麼高麼高麼高麼高,,,,無論你想要做什麼只要你有興趣有熱情你就應該要嘗試看看無論你想要做什麼只要你有興趣有熱情你就應該要嘗試看看無論你想要做什麼只要你有興趣有熱情你就應該要嘗試看看無論你想要做什麼只要你有興趣有熱情你就應該要嘗試看看,,,,因為不論何時你都因為不論何時你都因為不論何時你都因為不論何時你都
有機會重來有機會重來有機會重來有機會重來,,,,而且這些重來的事情都會在你意想不到的時候給你重要的而且這些重來的事情都會在你意想不到的時候給你重要的而且這些重來的事情都會在你意想不到的時候給你重要的而且這些重來的事情都會在你意想不到的時候給你重要的幫助幫助幫助幫助 by呱吉呱吉呱吉呱吉
• 如果你的人生如果你的人生如果你的人生如果你的人生 現在也在低潮現在也在低潮現在也在低潮現在也在低潮當中當中當中當中,,,,如果如果如果如果你的球隊你的球隊你的球隊你的球隊 現在遭遇了一些現在遭遇了一些現在遭遇了一些現在遭遇了一些挫折挫折挫折挫折,,,,想想想想想想想想2019年的年的年的年的
華盛頓國民華盛頓國民華盛頓國民華盛頓國民隊隊隊隊,,,,我們我們我們我們都會受到激勵的都會受到激勵的都會受到激勵的都會受到激勵的!!!!
• We're all shaped by our past Be thankful for everything that happens in our life.
16. 16
Five Pillars Of The Mamba Mentality:
1. Be Passionate.
2. Be Obsessive.
3. Be Relentless.
4. Be Resilient.
5. Be Fearless.
“Obsessiveness is having the attention to detail for the action you are performing at the time
you’re performing it.”
“Success is the ability to use your passion to help someone else discover their passion.”
https://www.youtube.com/watch?v=NLElzEJPceA
self-discipline