WHY to become a PMP
    « I prefer to work with People rather than machines »
    I learnt Progamming language to work with machines and PMP principles to work with people.


To become a successful project management professional(I did not say Project
   manager), you need to be aware of best practices and more importantly bad
   practices so that you don’t fall prey to them.PMP guidelines preaches these
   fundamentals.

Following are the additional points for which people become PMP.

–   PMP principles and methodologies are applicable to cross domain industries.
–   PMP is recognized across multiple industry verticals.
–   There are less than 10 lac PMPs across the globe.
–   PMP are comparatively paid higher than their non PMP counterparts (if
    financial benefits interest you!)
PMP-Quick Facts
PMP exam is conducted by PMI(http://www.pmi.org).

PMI conducts PMP exam across many global centers, in collaboration with
  Prometric test centers. You can apply anytime round the year, after fulfilling the
  PMP exam pre-requisites.

Exam consists of 200 MCQs, with time limit of 4 hours, out of which 25 questions
   are not considered for evaluation. These questions are part of the Research
   work that PMI conducts through candidates (Bad thing..You don’t know which
   these questions are).

PMP exam costs $555 for a single attempt.

Alternatively, if you purchase PMI membership for $129, the exam fee is reduced
    to $405.

There is a limit of 3 attempts in a year(provided you qualify PMP pre-requisites).

Post these 3 attempts you’ll need to wait for one year, before re-taking the exam.
Am I Eligible for PMP
    You need to fulfill some requirements laid down by PMI before applying for PMP
      examination.


If You are a Diploma Holder
•     Minimum 5 years/7,500 hours project management work experience(not
      necessarily Project manager role)
•     35 Contact hours of formal project management training.

If you are a Graduate
•     Minimum 3 years/4,500 hours project management work experience(not
      necessarily Project manager role)
•     35 Contact hours of formal project management training.

    You need to have experience in all Process Groups(Discussed later) across all project
       management experience, submitted in application.
    However on a single project you don’t need to have experience in all 5 process groups
What is PMBOK
•   PMBOK stands for Project Mangement Body of Knowledge
•   This is a book published and maintained by PMI( currently Fourth edition is
    available)
•   PMI publishes its principles and methodologies in this book and is the main
    reference material for PMP exam.
•   PMBOK classifies the project management phases into Process Groups,
    Knowledge Areas and Processes.
•   It has 5 Process Groups
•   There are 9 Knowledge Areas
•   There are 42 processes spanning across Process Groups and Knowledge
    Areas.
Process Groups, Knowledge Area, Processes

                 Process Groups




                Knowledge Areas




                   Processes
Process Groups
.

      Integration      Scope         Time
     Management      Management   Management


                                    Human
        Cost           Quality
                                   Resources
     Management      Management
                                  Management


    Communications      Risk      Procurement
     Management      Management   Management
Initiating        Planning                            Executing                Monitoring &                Closing
                                                                                                 Control
                  Develop Project   Develop Project Management          Direct &Manage Project   Monitor & Control Project   Close Project or
Integration       Charter           Plan                                Execution                Work                        Phase
                                                                                                 Perform Integrated Change
                                                                                                 Control

                                    Collect Requirements                                         Verify scope
Scope                               Defines Scope                                                Control Scope
                                    Create WBS

                                    Define Activities                                            Control Schedule
Time                                Sequence Activities
                                    Estimate Activity Resources
                                    Estimate Activity Duration
                                    Define Scope

                                    Estimate Costs                                               Control Costs
Cost                                Determine Budget

                                    Plan Quality                        Perform Quality          Perform Quality Control
Quality                                                                 Assurance

                                    Develop Human Resources Plan        Acquire Project Team
Human Resources                                                         Develop Project Team
                                                                        Manage Project Team



                  Identify          Plan Communications                 Distribute Information   Report Performance
Communications    Stakeholders                                          Manage Stakeholder
                                                                        Expectation


                                    Plan Risk Management                                         Monitor & Control Risk
Risk                                Identify Risk
                                    Perform Qualitative Risk Analysis
                                    Perform Quantitative Risk
                                    Analysis
                                    Plan Risk Response

                                    Plan Procurements                   Conduct Procurements     Administer Procurements     Close
Procurement                                                                                                                  Procurements
How is Exam Structured
Exam consists of 200 questions, out of which only 175 are taken into
  consideration for exam score.25 questions are survey questions. Domain wise
  distribution of questions is summarized in the table-1

    PMP Process Group                        Percentage of Questions
    Initiating                               11
    Planning                                 23
    Executing                                27
    Monitoring &Control                      21
    Closing                                  9
    Professional and Social Responsibility   9

                                      Table-1
Professional and Social Responsibility

Professional and Social Responsibility is set of guidelines laid down by PMI(code
   of Ethics and Professional Conduct), that should be followed by every
   recognized PMP.
These guidelines are the critical points that distinguishes PMP professionals
   among others.
These guidelines are downloadable from PMI.org

Four Pillars of these guidelines are
– Responsibility
– Respect
– Fairness
– Honesty

There are two aspects of these guidelines, one is what is expected (Aspirational)
   and the other one is Mandatory.
IF Mandatory guidelines are voilated and reported to PMI, it can lead to
   cancellation of your PMP certification.
Complete 35 Contact hours Training
                                  (Valid for One Year )


                          Application Submission
  (Once started on PMI site, the application should be completed within 90 days)




                 Application Completeness Review
It takes 5 days, after which you get an email from PMI, to proceed with scheduling Exam
This form is valid for 1 year and you can schedule your Exam within 1 year of the
confirmation by PMI.
If You do not get the mail within 1 week(7 days) from the date of form Submission, BAD
NEWS…..your Application has fallen in AUDIT Process
Within 90 days of the intimation by PMI, you need to submit Audit material as indicated by
PMI .It takes 5-7 days for PMI to process the audit material. If found satisfactory, the
approval is given and the validity of Approval starts(1 Year)
Thank You!
            For Any Queries/Suggestions
                 Please mail me at :
            pradeeppatelpmp@gmail.com
        The explanation of the topics covered in the webinar are available at
http://trainwithpradeep.webs.com/apps/blog/show/8626492-pmp-an-introduction

More Related Content

PDF
Oracle product mdm pim data hub
PPTX
The role of enterprise architecture in digital transformation
PDF
Integrated Supply Chain
PPTX
tourism projects of inda
PPT
Financial Supply Chain Management
PPT
Implementing An Integrated Sales And Operations Planning Process
PDF
Design Science and Solution Architecture
PPTX
Supply Chain Integration Strategies
Oracle product mdm pim data hub
The role of enterprise architecture in digital transformation
Integrated Supply Chain
tourism projects of inda
Financial Supply Chain Management
Implementing An Integrated Sales And Operations Planning Process
Design Science and Solution Architecture
Supply Chain Integration Strategies

Viewers also liked (18)

PPTX
Pmp basics you need to know
ODP
Pmp slide share
PDF
Pmp introduction
PPT
What course of action should you follow to qualify for pmp certification
PPT
Microsoft project 2010
PDF
Pmp Course Outline
PPTX
Pmp inititating process group
PDF
PMP COURSE OUTLINE PMBOK 5TH ED MODIFIED- OCT 2015
PPTX
PMP Session 3
PDF
Project Management 09
PPTX
Introduction to PMP
PDF
Project Management Introduction for PMP Certification Aspirants in Indonesia
PDF
Project Management Framework - PMBOK 5
PPTX
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
PDF
Project quality management - PMI PMBOK Knowledge Area
PDF
Backup als Dienstleistung verkaufen Henning Meyer
PPT
Meine Freizeit, Fani Michou
PDF
Job analysis-bharat-employment
Pmp basics you need to know
Pmp slide share
Pmp introduction
What course of action should you follow to qualify for pmp certification
Microsoft project 2010
Pmp Course Outline
Pmp inititating process group
PMP COURSE OUTLINE PMBOK 5TH ED MODIFIED- OCT 2015
PMP Session 3
Project Management 09
Introduction to PMP
Project Management Introduction for PMP Certification Aspirants in Indonesia
Project Management Framework - PMBOK 5
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project quality management - PMI PMBOK Knowledge Area
Backup als Dienstleistung verkaufen Henning Meyer
Meine Freizeit, Fani Michou
Job analysis-bharat-employment
Ad

Similar to Pmp an introduction (20)

PDF
Pmbok 4th edition chapter 8 - Project Quality Management
KEY
Agile Project Management for elearning development
KEY
Fr205 are you_agile_tk2012
PDF
Pmbok 4th edition chapter 5 - Project Scope Management
PDF
Pmbok 4th edition chapter 4 - Project Integration Management
PDF
Safak Ebesek RiskSimple
PDF
Pmp prep v4
PDF
ERP Implementation Methodology
PDF
Pmbok 4th edition chapter 11 - Project Risk Management
PDF
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
PDF
PMBOK 2008 Map of Processes
PDF
Pmbok 4th edition chapter 7 - Project Cost Management
PDF
Killing the Myth: Agile & CMMI
PDF
Pmbok 4th edition chapter 6 - Project Time Management
PDF
Pmbok 4th edition chapter 10 - Project Communication Management
PPTX
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
PPS
Standard Business Framework
PDF
01 Ts A Pmg Product Write Up
PPT
Project management office value
PDF
NG BB 54 Sustain the Gain
Pmbok 4th edition chapter 8 - Project Quality Management
Agile Project Management for elearning development
Fr205 are you_agile_tk2012
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition chapter 4 - Project Integration Management
Safak Ebesek RiskSimple
Pmp prep v4
ERP Implementation Methodology
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
PMBOK 2008 Map of Processes
Pmbok 4th edition chapter 7 - Project Cost Management
Killing the Myth: Agile & CMMI
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition chapter 10 - Project Communication Management
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Standard Business Framework
01 Ts A Pmg Product Write Up
Project management office value
NG BB 54 Sustain the Gain
Ad

More from Pradeep Patel, PMP® (15)

PDF
5 fundamental Aspect of Effective Leadership
PPTX
Design thinking lean startup and agile pradeep
PPTX
Pre mortem-pradeeep patel
PPTX
Change management-Process and Challenges
PPTX
Manager vs-leader
PPTX
Effective Team Leadership
PPTX
Denison Model-Organizational Effectivness
PPTX
Agile Software Development Methodologies
PDF
Enneagram Personality Model
PDF
Design Thinking-Solution based approach to problem solving
PPTX
Digital transfomation-it's not all about Digital Technologies
PDF
DevOps for beginners
PPTX
PWA demystified
PDF
Project management information system
PPTX
Pmp an introduction
5 fundamental Aspect of Effective Leadership
Design thinking lean startup and agile pradeep
Pre mortem-pradeeep patel
Change management-Process and Challenges
Manager vs-leader
Effective Team Leadership
Denison Model-Organizational Effectivness
Agile Software Development Methodologies
Enneagram Personality Model
Design Thinking-Solution based approach to problem solving
Digital transfomation-it's not all about Digital Technologies
DevOps for beginners
PWA demystified
Project management information system
Pmp an introduction

Recently uploaded (20)

PPTX
2018-HIPAA-Renewal-Training for executives
PDF
Abstractive summarization using multilingual text-to-text transfer transforme...
PDF
UiPath Agentic Automation session 1: RPA to Agents
PDF
Developing a website for English-speaking practice to English as a foreign la...
PPT
What is a Computer? Input Devices /output devices
PDF
Five Habits of High-Impact Board Members
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PPTX
Microsoft Excel 365/2024 Beginner's training
PDF
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
PPT
Geologic Time for studying geology for geologist
PDF
Getting started with AI Agents and Multi-Agent Systems
PPTX
Modernising the Digital Integration Hub
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
OpenACC and Open Hackathons Monthly Highlights July 2025
PDF
Credit Without Borders: AI and Financial Inclusion in Bangladesh
PPTX
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
PPT
Module 1.ppt Iot fundamentals and Architecture
PDF
A comparative study of natural language inference in Swahili using monolingua...
2018-HIPAA-Renewal-Training for executives
Abstractive summarization using multilingual text-to-text transfer transforme...
UiPath Agentic Automation session 1: RPA to Agents
Developing a website for English-speaking practice to English as a foreign la...
What is a Computer? Input Devices /output devices
Five Habits of High-Impact Board Members
Enhancing emotion recognition model for a student engagement use case through...
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Microsoft Excel 365/2024 Beginner's training
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
Geologic Time for studying geology for geologist
Getting started with AI Agents and Multi-Agent Systems
Modernising the Digital Integration Hub
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
Hindi spoken digit analysis for native and non-native speakers
OpenACC and Open Hackathons Monthly Highlights July 2025
Credit Without Borders: AI and Financial Inclusion in Bangladesh
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
Module 1.ppt Iot fundamentals and Architecture
A comparative study of natural language inference in Swahili using monolingua...

Pmp an introduction

  • 1. PMP-An Introduction By: Pradeep Patel PMP Webinar Session on:18-Dec-2011
  • 2. WHY to become a PMP « I prefer to work with People rather than machines » I learnt Progamming language to work with machines and PMP principles to work with people. To become a successful project management professional(I did not say Project manager), you need to be aware of best practices and more importantly bad practices so that you don’t fall prey to them.PMP guidelines preaches these fundamentals. Following are the additional points for which people become PMP. – PMP principles and methodologies are applicable to cross domain industries. – PMP is recognized across multiple industry verticals. – There are less than 10 lac PMPs across the globe. – PMP are comparatively paid higher than their non PMP counterparts (if financial benefits interest you!)
  • 3. PMP-Quick Facts PMP exam is conducted by PMI(http://www.pmi.org). PMI conducts PMP exam across many global centers, in collaboration with Prometric test centers. You can apply anytime round the year, after fulfilling the PMP exam pre-requisites. Exam consists of 200 MCQs, with time limit of 4 hours, out of which 25 questions are not considered for evaluation. These questions are part of the Research work that PMI conducts through candidates (Bad thing..You don’t know which these questions are). PMP exam costs $555 for a single attempt. Alternatively, if you purchase PMI membership for $129, the exam fee is reduced to $405. There is a limit of 3 attempts in a year(provided you qualify PMP pre-requisites). Post these 3 attempts you’ll need to wait for one year, before re-taking the exam.
  • 4. Am I Eligible for PMP You need to fulfill some requirements laid down by PMI before applying for PMP examination. If You are a Diploma Holder • Minimum 5 years/7,500 hours project management work experience(not necessarily Project manager role) • 35 Contact hours of formal project management training. If you are a Graduate • Minimum 3 years/4,500 hours project management work experience(not necessarily Project manager role) • 35 Contact hours of formal project management training. You need to have experience in all Process Groups(Discussed later) across all project management experience, submitted in application. However on a single project you don’t need to have experience in all 5 process groups
  • 5. What is PMBOK • PMBOK stands for Project Mangement Body of Knowledge • This is a book published and maintained by PMI( currently Fourth edition is available) • PMI publishes its principles and methodologies in this book and is the main reference material for PMP exam. • PMBOK classifies the project management phases into Process Groups, Knowledge Areas and Processes. • It has 5 Process Groups • There are 9 Knowledge Areas • There are 42 processes spanning across Process Groups and Knowledge Areas.
  • 6. Process Groups, Knowledge Area, Processes Process Groups Knowledge Areas Processes
  • 8. . Integration Scope Time Management Management Management Human Cost Quality Resources Management Management Management Communications Risk Procurement Management Management Management
  • 9. Initiating Planning Executing Monitoring & Closing Control Develop Project Develop Project Management Direct &Manage Project Monitor & Control Project Close Project or Integration Charter Plan Execution Work Phase Perform Integrated Change Control Collect Requirements Verify scope Scope Defines Scope Control Scope Create WBS Define Activities Control Schedule Time Sequence Activities Estimate Activity Resources Estimate Activity Duration Define Scope Estimate Costs Control Costs Cost Determine Budget Plan Quality Perform Quality Perform Quality Control Quality Assurance Develop Human Resources Plan Acquire Project Team Human Resources Develop Project Team Manage Project Team Identify Plan Communications Distribute Information Report Performance Communications Stakeholders Manage Stakeholder Expectation Plan Risk Management Monitor & Control Risk Risk Identify Risk Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Response Plan Procurements Conduct Procurements Administer Procurements Close Procurement Procurements
  • 10. How is Exam Structured Exam consists of 200 questions, out of which only 175 are taken into consideration for exam score.25 questions are survey questions. Domain wise distribution of questions is summarized in the table-1 PMP Process Group Percentage of Questions Initiating 11 Planning 23 Executing 27 Monitoring &Control 21 Closing 9 Professional and Social Responsibility 9 Table-1
  • 11. Professional and Social Responsibility Professional and Social Responsibility is set of guidelines laid down by PMI(code of Ethics and Professional Conduct), that should be followed by every recognized PMP. These guidelines are the critical points that distinguishes PMP professionals among others. These guidelines are downloadable from PMI.org Four Pillars of these guidelines are – Responsibility – Respect – Fairness – Honesty There are two aspects of these guidelines, one is what is expected (Aspirational) and the other one is Mandatory. IF Mandatory guidelines are voilated and reported to PMI, it can lead to cancellation of your PMP certification.
  • 12. Complete 35 Contact hours Training (Valid for One Year ) Application Submission (Once started on PMI site, the application should be completed within 90 days) Application Completeness Review It takes 5 days, after which you get an email from PMI, to proceed with scheduling Exam This form is valid for 1 year and you can schedule your Exam within 1 year of the confirmation by PMI. If You do not get the mail within 1 week(7 days) from the date of form Submission, BAD NEWS…..your Application has fallen in AUDIT Process Within 90 days of the intimation by PMI, you need to submit Audit material as indicated by PMI .It takes 5-7 days for PMI to process the audit material. If found satisfactory, the approval is given and the validity of Approval starts(1 Year)
  • 13. Thank You! For Any Queries/Suggestions Please mail me at : pradeeppatelpmp@gmail.com The explanation of the topics covered in the webinar are available at http://trainwithpradeep.webs.com/apps/blog/show/8626492-pmp-an-introduction