Project process
A process is a series of actions bringing about a
result
Project management
processes
Describing and
organizing the work of
the project
Product-oriented
processes
Specifying and creating
the project product
What is planning?
Planning is the process of stating objectives
and then determining the most effective
activities or accomplishments necessary to
reach the objectives
Who makes the plans?
Everybody must plan
Project manager initiate the
planning process
Project manager coordinates
planning activities into the
overall project master plan
Characteristics of a project planner
Flexible Creative Responsive
Communicative Analytic
Planning process
Devising and
maintaining a
workable scheme to
accomplish the
business need that the
project was
undertaken to address
Project integration management
Project integration management
This involves coordinating
all of the other project
management knowledge
areas throughout the
project’s life cycle. This
integration ensures that
all the elements of a
project come together at
the right times to
complete a project
successfully.
Project integration management
Project Integration
Management
Project plan
development
Project plan
execution
Overall change
control
Project integration management
Initiating
Planning
Executing
Monitoring &
Controlling
Closing
Develop project charter
Develop primary project scope statement
 Develop project management plan
Direct and manage project
execution
Monitor and control project
work
Integrate change control
Close project
Core processes
Facilitating processes
Planning process
Core processes
• Scope planning
• Scope definition
• Activity definition
• Activity sequencing
• Activity duration estimating
• Schedule development
• Resource planning
• Cost estimating
• Cost budgeting
• Project plan development
Facilitating processes
• Quality planning
• Organizational planning
• Staff acquisition
• Communication planning
• Risk identification
• Risk quantification
• Risk response development
• Procurement planning
• Solicitation planning
Core processes
• Scope planning –
developing a written scope
statement as a basis for
future project decisions
• Scope definition –
subdividing the major
project deliverables into
smaller and more
manageable components
Core processes
• Activity definition –
identifying the specific
activities that must be
performed to produce the
various project deliverables
• Activity sequencing –
identifying and
documenting interactivity
dependencies
Core processes
• Activity duration estimating –
estimating the number of work
period which will be needed to
complete individual activities
• Schedule development –
analyzing activity sequences,
activity durations and resource
requirements to create the
project schedule
Core processes
• Resource planning – determining what
resources and what quantities
• Cost estimating – developing an
approximation of the costs of
the resources
• Cost budgeting –
allocating the overall cost
estimate to individual
work items
Core processes
• Project plan
development –
taking the results of
other planning
processes and
putting them into a
consistent and
coherent document
Facilitating processes
• Quality planning – identifying
which quality standards are
relevant to the project and
determining how to satisfy
them
• Organizational planning – identifying,
documenting and assigning project
roles, responsibilities and reporting
relationships
Facilitating processes
• Staff acquisition – getting the
human resources needed
assigned to and working on the
project
• Communication planning – determining the
information and communication
needs of the stakeholders; who
needs what information, when
will they need it, and how it will
be given to them
Facilitating processes
• Risk identification – determining which risks are
likely to affect the project and documenting the
characteristics of each
• Risk quantification – evaluating risks and risks
interactions to assess the range of possible
project outcome
• Risk response development – defining
enhancement steps for opportunities and
responses to threat
Facilitating processes
• Procurement planning – determining what to
procure and when
• Solicitation planning – documenting product
requirements and identifying potential
sources
Dimensions of project plan
development
Project plan
development
Inputs
Tools and
techniques
Output
• Other planning
outputs
• Historical
information
• Organizational
policies
• Constraints
• Assumptions
• Project planning
methodology
• Stakeholder skills
and knowledge
• Project
management
information
system
• Project plan
• Supporting
detail
Inputs to project plan development
• Other planning outputs –
includes all of the outputs
derived from the core and
facilitating processes as well as
the work breakdown structure
and supporting details
• Historical information – includes all available
historical information to assist in verifying
assumptions and assessing alternatives that
are identified as part of this process
Inputs to project plan development
• Organizational policies – formal and informal
policies that includes but are not limited to:
– Quality management
– Personnel administration
– Financial controls
• Constraints – factors that will limit the project
management team’s options
• Assumptions – factors that are considered as
true, real or certain but involves risk
Tools and techniques for project plan
development
Project planning
methodology
• Structured
approach used
to guide the
project team
during
development
of the project
plan
Stakeholder
skills and
knowledge
• Tapping
stakeholders
or other
professionals
for their
contributions
in the project
PMIS
• Gather,
integrate, and
disseminate
inputs of the
other project
management
projects
Project plan and project planning
A formal, approved
documents used to guide both
project execution and project
control
The processes involved in the
development of a project plan
Uses of project plan
 Guide project execution
 Document project planning
assumptions
 Document project planning
decisions
 Facilitate communication
 Define key management reviews
 Provide a baseline for progress
measurement and control
Purpose of project planning
Directing
Objectives
Goals
Special
influences
Constraints
on the
project scope
Purpose of project planning
Identifying
Actions
Risks
Responsibilities
Purpose of project planning
Guiding
Identification
of required
activities
Establishing
workable
procedures
Purpose of project planning
Preparing
Flexibility to
adapt to
changes
Retain the
qualities of
integrity and
durability
Elements of a project plan
Project summary An executive summary
that can be easily
absorbed by high-level
executives within a few
minutes that typically
identifies:
– Objectives
– Goals
– Constraints
Elements of a project plan
Specifications
Work Statement
Define the
characteristics and the
performance goals for
the final end product
Tells the contractor
what is desired, or
what exactly the
contractor proposes to
do
Elements of a project plan
Interrelates all tasks on a
common time scale
including:
– Names of the tasks and
work packages listed in
the WBS
– Names of the persons
responsible for each task
– Expected duration of each
task
– Due date of each task
Master Schedule
Elements of a project plan
Covers the rules and
practices to be
observed during the
project
Provides the project
manager with cost,
schedule and
performance status
Procedures Guide
Budgets and Cost
Control System
Elements of a project plan
Activity / Event /
Network Plan
Materials and Equipment
Forecast
Representation of how
the project activities and
events progress
Includes procurement
and management of
materials and equipment
that starts with the
documentation of what
materials and
equipments are needed
Elements of a project plan
Indicates which
organizational units
and which key
personnel are involved
in the process of
completing each task
of the project
Cross-Impact Matrix
Elements of a project plan
Project Organizational
Plan
• Indicates breakdown
of major project
responsibilities
• Who is specifically
responsible for each
project subsystem
and task
• Establish key
responsibilities
Elements of a project plan
Management Plan It should describe how
management will
conduct and monitor the
project that includes:
– Corporate organizational
charts
– Statements of authority
and responsibility
– Information and control
systems
– Top management plan
of attack
Elements of a project plan
This includes the labor
resource requirements
and organization that
will establish key
responsibilities,
numbers and
qualifications
Project Plan Personnel
Elements of a project plan
Reporting and Review
Procedure
It includes an early
assessment of required
reports, meetings,
presentations and
project documents to
determine those
contributing to the
overall or individual
activity performance
Other elements of a project plan
• Financial plan
• Contingency
analysis
• Logistics support
plan
• Facilities
requirement plan
• Market intelligence
plan
• Quality assurance
plan
• Configuration
management plan
• Security plan
• Test plan
• Production plan
• Make or buy plan
• Procurement plan
• Training plan
References:
Cleland, D. I., Ireland, L. P. (2007). Project Management:
Strategic Design and Implementation (5th edition).
McGraw Hill.
Michael, S. B. (1980). Project Planning. In L. C. Stuckenbruck
(Ed.) The Implementation of Project Management: The
Professional Handbook. (pp. 95 – 117). Addison-Wesley
Publishing Company.
PMI Standards Committee (1987). A Guide to the Project
Management Body of Knowledge (1996). Project
Management Institute.
Schwalbe, K. (2007). Information Technology Project
Management (5th edition). Cengage Learning Asia, Pte Ltd.

More Related Content

PPTX
Workplan
PPT
Project Planning
DOC
Project Management Plan Template
PDF
Project Management Office (PMO) for Management Consultants
PDF
Hospital Design Guide: How to Get Started
PDF
Project Management Steps And Process PowerPoint Presentation Slides
PDF
The role and responsibilities of the project manager
PPTX
History of of Ethiopia and the Horn (Hist.1012)
Workplan
Project Planning
Project Management Plan Template
Project Management Office (PMO) for Management Consultants
Hospital Design Guide: How to Get Started
Project Management Steps And Process PowerPoint Presentation Slides
The role and responsibilities of the project manager
History of of Ethiopia and the Horn (Hist.1012)

What's hot (20)

PDF
Project Management Concepts
PPTX
project management
PDF
Fundamentals of project management
PPT
Project manager
PPTX
Project management
PPTX
project management
PPS
An Introduction To Project Management
PDF
Introduction to Project Management
PPTX
Project management
PPTX
Project management process and Project Management Knowledge areas
PPT
Project management tools and techniques
PDF
Project Risk Management
PPTX
Project planning
PPTX
Project management and project life cycle
PPTX
Project Planning & Management
PPTX
Project Management
PPTX
Project management PPT
PPTX
Introduction to Project Management (workshop) - v.1
PPT
project management concepts
PPTX
Evolution of project management
Project Management Concepts
project management
Fundamentals of project management
Project manager
Project management
project management
An Introduction To Project Management
Introduction to Project Management
Project management
Project management process and Project Management Knowledge areas
Project management tools and techniques
Project Risk Management
Project planning
Project management and project life cycle
Project Planning & Management
Project Management
Project management PPT
Introduction to Project Management (workshop) - v.1
project management concepts
Evolution of project management
Ad

Viewers also liked (20)

PPSX
Project management
PPT
Project planning and control
PPT
Fundamentals of Project Management
PPTX
Agricultural project planning
PDF
Strategic Mobile App Project Management for Events
PPT
Project Management PowerPoint PPT Content Modern Sample
PPTX
Software engineering project management
PPT
Project Planning Basics - Everything you need to start managing a project
PPT
Business model vs Business plan
PPT
Business Model vs Business Strategy
PPT
4 Project Pre-Planning & Stakeholder Analysis
PPTX
Construction Project Management Class Project Presentation
PPT
Project Planning
PPT
3 Project Cycle and Planning (4-6 hours)
PPT
Planning And Controlling
PPT
5 The Logical Framework - a short course for NGOs
PDF
Software project management
PPT
Introduction to project management
PPT
Project Management PPT
PPTX
Introduction to Agile Project Planning and Project Management
Project management
Project planning and control
Fundamentals of Project Management
Agricultural project planning
Strategic Mobile App Project Management for Events
Project Management PowerPoint PPT Content Modern Sample
Software engineering project management
Project Planning Basics - Everything you need to start managing a project
Business model vs Business plan
Business Model vs Business Strategy
4 Project Pre-Planning & Stakeholder Analysis
Construction Project Management Class Project Presentation
Project Planning
3 Project Cycle and Planning (4-6 hours)
Planning And Controlling
5 The Logical Framework - a short course for NGOs
Software project management
Introduction to project management
Project Management PPT
Introduction to Agile Project Planning and Project Management
Ad

Similar to Project planning and project work plan (20)

PPTX
projectplanningandprojectworkplan-130828212658-phpapp02-converted.pptx
PPTX
Projectplanningandprojectworkplan Amit Payal
PPTX
Contemporary management
PPTX
Project management lecture 33.pptx
PPSX
DISE - Introduction to Project Management
PPTX
Lecture 07: Project Management Fundamentals Project Organization and Integr...
PPT
06. Project Management Process Groups
PPTX
Project planning.pptx
PPTX
Project planning.pptx
PPTX
Lecture 2.pptx
PPT
Wk 3 Proj Processes.ppt about different project processes 5 step pyramind
PDF
Topic 6 - Project Integration Management.pdf
PPTX
Project Management
PPSX
Projectmanagement 130721095616-phpapp01
PPT
Project Cycle Management WG5.ppt
PPTX
Project management
PPTX
PME- CH 1.pptx
PPTX
Project time management
PPTX
Project Execution and Project management (GT IV batch) 2.pptx
PPT
6396901
projectplanningandprojectworkplan-130828212658-phpapp02-converted.pptx
Projectplanningandprojectworkplan Amit Payal
Contemporary management
Project management lecture 33.pptx
DISE - Introduction to Project Management
Lecture 07: Project Management Fundamentals Project Organization and Integr...
06. Project Management Process Groups
Project planning.pptx
Project planning.pptx
Lecture 2.pptx
Wk 3 Proj Processes.ppt about different project processes 5 step pyramind
Topic 6 - Project Integration Management.pdf
Project Management
Projectmanagement 130721095616-phpapp01
Project Cycle Management WG5.ppt
Project management
PME- CH 1.pptx
Project time management
Project Execution and Project management (GT IV batch) 2.pptx
6396901

More from Ferdinand Importado, CPA, MBA (19)

PPTX
Challenges in the accountancy profession
PPTX
Revisions in the Philippine CPA Board Examinations
PPTX
Abstract of a Research
PPTX
Proposed Revisions in the Philippine CPA Exams
PPTX
Basic concepts and issues on human development
PPTX
Non verbal communications
PPTX
Management of confidence and anxieties
PPTX
Effective listening skills
PPTX
General principles of taxation
PPTX
General principles of taxation
PPTX
Tax law in the Philippines
PPTX
World top billionaires 2013
PPTX
Global capital market and international lending
PPTX
Forms of business organization
PPTX
Foreign loans and investments
PPTX
Gorbachev, Glasnost and Perestroika
PPTX
Strategic Leveraging
PPTX
Starbucks Competitive Profile Matrix
Challenges in the accountancy profession
Revisions in the Philippine CPA Board Examinations
Abstract of a Research
Proposed Revisions in the Philippine CPA Exams
Basic concepts and issues on human development
Non verbal communications
Management of confidence and anxieties
Effective listening skills
General principles of taxation
General principles of taxation
Tax law in the Philippines
World top billionaires 2013
Global capital market and international lending
Forms of business organization
Foreign loans and investments
Gorbachev, Glasnost and Perestroika
Strategic Leveraging
Starbucks Competitive Profile Matrix

Recently uploaded (20)

DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
DOCX
Business Management - unit 1 and 2
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
5 Stages of group development guide.pptx
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
How to Get Funding for Your Trucking Business
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
MSPs in 10 Words - Created by US MSP Network
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PPT
Data mining for business intelligence ch04 sharda
PDF
IFRS Notes in your pocket for study all the time
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Types of control:Qualitative vs Quantitative
Euro SEO Services 1st 3 General Updates.docx
DOC-20250806-WA0002._20250806_112011_0000.pdf
Business Management - unit 1 and 2
Chapter 5_Foreign Exchange Market in .pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
unit 1 COST ACCOUNTING AND COST SHEET
Probability Distribution, binomial distribution, poisson distribution
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
5 Stages of group development guide.pptx
Nidhal Samdaie CV - International Business Consultant
How to Get Funding for Your Trucking Business
Unit 1 Cost Accounting - Cost sheet
MSPs in 10 Words - Created by US MSP Network
HR Introduction Slide (1).pptx on hr intro
COST SHEET- Tender and Quotation unit 2.pdf
Data mining for business intelligence ch04 sharda
IFRS Notes in your pocket for study all the time
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Ôn tập tiếng anh trong kinh doanh nâng cao
Types of control:Qualitative vs Quantitative

Project planning and project work plan

  • 1. Project Planning and Project Work Plan Presented by: Ferdinand C. Importado DBA 744 – Project Planning, Development and Evaluation October 7, 2012
  • 2. Project process A process is a series of actions bringing about a result Project management processes Describing and organizing the work of the project Product-oriented processes Specifying and creating the project product
  • 3. What is planning? Planning is the process of stating objectives and then determining the most effective activities or accomplishments necessary to reach the objectives
  • 4. Who makes the plans? Everybody must plan Project manager initiate the planning process Project manager coordinates planning activities into the overall project master plan
  • 5. Characteristics of a project planner Flexible Creative Responsive Communicative Analytic
  • 6. Planning process Devising and maintaining a workable scheme to accomplish the business need that the project was undertaken to address
  • 8. Project integration management This involves coordinating all of the other project management knowledge areas throughout the project’s life cycle. This integration ensures that all the elements of a project come together at the right times to complete a project successfully.
  • 9. Project integration management Project Integration Management Project plan development Project plan execution Overall change control
  • 10. Project integration management Initiating Planning Executing Monitoring & Controlling Closing Develop project charter Develop primary project scope statement  Develop project management plan Direct and manage project execution Monitor and control project work Integrate change control Close project
  • 13. Planning process Core processes • Scope planning • Scope definition • Activity definition • Activity sequencing • Activity duration estimating • Schedule development • Resource planning • Cost estimating • Cost budgeting • Project plan development Facilitating processes • Quality planning • Organizational planning • Staff acquisition • Communication planning • Risk identification • Risk quantification • Risk response development • Procurement planning • Solicitation planning
  • 14. Core processes • Scope planning – developing a written scope statement as a basis for future project decisions • Scope definition – subdividing the major project deliverables into smaller and more manageable components
  • 15. Core processes • Activity definition – identifying the specific activities that must be performed to produce the various project deliverables • Activity sequencing – identifying and documenting interactivity dependencies
  • 16. Core processes • Activity duration estimating – estimating the number of work period which will be needed to complete individual activities • Schedule development – analyzing activity sequences, activity durations and resource requirements to create the project schedule
  • 17. Core processes • Resource planning – determining what resources and what quantities • Cost estimating – developing an approximation of the costs of the resources • Cost budgeting – allocating the overall cost estimate to individual work items
  • 18. Core processes • Project plan development – taking the results of other planning processes and putting them into a consistent and coherent document
  • 19. Facilitating processes • Quality planning – identifying which quality standards are relevant to the project and determining how to satisfy them • Organizational planning – identifying, documenting and assigning project roles, responsibilities and reporting relationships
  • 20. Facilitating processes • Staff acquisition – getting the human resources needed assigned to and working on the project • Communication planning – determining the information and communication needs of the stakeholders; who needs what information, when will they need it, and how it will be given to them
  • 21. Facilitating processes • Risk identification – determining which risks are likely to affect the project and documenting the characteristics of each • Risk quantification – evaluating risks and risks interactions to assess the range of possible project outcome • Risk response development – defining enhancement steps for opportunities and responses to threat
  • 22. Facilitating processes • Procurement planning – determining what to procure and when • Solicitation planning – documenting product requirements and identifying potential sources
  • 23. Dimensions of project plan development Project plan development Inputs Tools and techniques Output • Other planning outputs • Historical information • Organizational policies • Constraints • Assumptions • Project planning methodology • Stakeholder skills and knowledge • Project management information system • Project plan • Supporting detail
  • 24. Inputs to project plan development • Other planning outputs – includes all of the outputs derived from the core and facilitating processes as well as the work breakdown structure and supporting details • Historical information – includes all available historical information to assist in verifying assumptions and assessing alternatives that are identified as part of this process
  • 25. Inputs to project plan development • Organizational policies – formal and informal policies that includes but are not limited to: – Quality management – Personnel administration – Financial controls • Constraints – factors that will limit the project management team’s options • Assumptions – factors that are considered as true, real or certain but involves risk
  • 26. Tools and techniques for project plan development Project planning methodology • Structured approach used to guide the project team during development of the project plan Stakeholder skills and knowledge • Tapping stakeholders or other professionals for their contributions in the project PMIS • Gather, integrate, and disseminate inputs of the other project management projects
  • 27. Project plan and project planning A formal, approved documents used to guide both project execution and project control The processes involved in the development of a project plan
  • 28. Uses of project plan  Guide project execution  Document project planning assumptions  Document project planning decisions  Facilitate communication  Define key management reviews  Provide a baseline for progress measurement and control
  • 29. Purpose of project planning Directing Objectives Goals Special influences Constraints on the project scope
  • 30. Purpose of project planning Identifying Actions Risks Responsibilities
  • 31. Purpose of project planning Guiding Identification of required activities Establishing workable procedures
  • 32. Purpose of project planning Preparing Flexibility to adapt to changes Retain the qualities of integrity and durability
  • 33. Elements of a project plan Project summary An executive summary that can be easily absorbed by high-level executives within a few minutes that typically identifies: – Objectives – Goals – Constraints
  • 34. Elements of a project plan Specifications Work Statement Define the characteristics and the performance goals for the final end product Tells the contractor what is desired, or what exactly the contractor proposes to do
  • 35. Elements of a project plan Interrelates all tasks on a common time scale including: – Names of the tasks and work packages listed in the WBS – Names of the persons responsible for each task – Expected duration of each task – Due date of each task Master Schedule
  • 36. Elements of a project plan Covers the rules and practices to be observed during the project Provides the project manager with cost, schedule and performance status Procedures Guide Budgets and Cost Control System
  • 37. Elements of a project plan Activity / Event / Network Plan Materials and Equipment Forecast Representation of how the project activities and events progress Includes procurement and management of materials and equipment that starts with the documentation of what materials and equipments are needed
  • 38. Elements of a project plan Indicates which organizational units and which key personnel are involved in the process of completing each task of the project Cross-Impact Matrix
  • 39. Elements of a project plan Project Organizational Plan • Indicates breakdown of major project responsibilities • Who is specifically responsible for each project subsystem and task • Establish key responsibilities
  • 40. Elements of a project plan Management Plan It should describe how management will conduct and monitor the project that includes: – Corporate organizational charts – Statements of authority and responsibility – Information and control systems – Top management plan of attack
  • 41. Elements of a project plan This includes the labor resource requirements and organization that will establish key responsibilities, numbers and qualifications Project Plan Personnel
  • 42. Elements of a project plan Reporting and Review Procedure It includes an early assessment of required reports, meetings, presentations and project documents to determine those contributing to the overall or individual activity performance
  • 43. Other elements of a project plan • Financial plan • Contingency analysis • Logistics support plan • Facilities requirement plan • Market intelligence plan • Quality assurance plan • Configuration management plan • Security plan • Test plan • Production plan • Make or buy plan • Procurement plan • Training plan
  • 44. References: Cleland, D. I., Ireland, L. P. (2007). Project Management: Strategic Design and Implementation (5th edition). McGraw Hill. Michael, S. B. (1980). Project Planning. In L. C. Stuckenbruck (Ed.) The Implementation of Project Management: The Professional Handbook. (pp. 95 – 117). Addison-Wesley Publishing Company. PMI Standards Committee (1987). A Guide to the Project Management Body of Knowledge (1996). Project Management Institute. Schwalbe, K. (2007). Information Technology Project Management (5th edition). Cengage Learning Asia, Pte Ltd.

Editor's Notes

  • #3: Before we define the planning process, let me first provide an overview of what process and planning is all about within the context of project management. Project management is an integrated endeavor, an action, or failure to take an action in one area usually affect other areas. These interactions often require trade-offs among project objectives meaning a performance in one area can be greatly enhanced or improved by sacrificing performance in another area.Projects are composed of processes. A process is a series of actions bringing about a result. Project processes are performed by people and generally fall into one of two major categories: Project management processes are concerned with describing and organizing the work of the project. Product-oriented processes are concerned with specifying and creating the project productProject management processes and product-oriented processes overlap and interact throughout the project. The scope of the project cannot be defined in the absence of some basic understanding of how to create the product.
  • #4: Planning can be defined as the process of stating project objectives and then determining the most effective activities or accomplishments necessary to reach the objectives. Planning is somewhat similar or related with the decision-making process, that consists of different steps, starting with:The definition or identification of the problemIdentification of the alternative courses of actionCollection and analysis of data Choosing the best alternative The end product of a project planning process is the project plan whereas in general the end product of the planning process as related to a business enterprise is a plan or a budget.
  • #5: Everybody involved with the project must plan. Planning is not done by the project manager alone. Rather, the project manager is the heart of the planning effort. The project manager must initiate the planning process and coordinate all subordinate planning activities into the overall project master plan.
  • #6: Flexibility is the ability to adjust to change and see the impact of changeCreativity means imaginative in developing tools or applying tools to match project needsResponsiveness is the ability to be time conscious in identifying potential problems and providing plan alternativesCommunicative creates a two-way rapport within project and the reporting networkAnalytic is the ability to explore all internal-external factors to identify uncertainties and variables
  • #7: Planning process is devising and maintaining a workable scheme to accomplish the business need that the project was undertaken to address.It is a rational determination of how to initiate, sustain and terminate a project. The planning process also includes: Developing the plan in the required level of detail with accompanying milestones And the use of available tools for preparing and monitoring the plan.
  • #8: The planning process is part of a continuum of processes known as project integration management within the project management framework that includes:Initiating processesPlanning processesExecuting processesControlling processesClosing processesThe process groups are linked by the results they produce meaning the result of the prior process becomes the input of the other process.
  • #9: Project integration management involves coordinating all of the other project management knowledge areas throughout the project’s life cycle. This integration ensures that all the elements of a project come together at the right times to complete a project successfully.
  • #10: This means that the processes are required to ensure that the various elements of the project are properly coordinated. Project plan development means taking the results of other planning processes and putting them into a consistent, coherent document known as project planProject plan execution means carrying out the project plan by performing the activities includedOverall change control means coordinating changes across the entire project
  • #12: The planning process is of major importance to a project because the project involves doing something which has not yet been done before. The core processes have clear dependencies that require them to be performed in essentially the same order on most projects. Example activities must first be defined before schedules or costed.
  • #13: Facilitating processes are processes that are generally independent among each other and can be performed intermittently but this does not necessarily mean that they are mostly optional.
  • #30: Project planning is of critical important in the project environment. The extent of planning is dictated by the objectives of the project and the resources to be applied to it. In directing the intent of the project, the plan must clearly identify the project objectives, goals and any special influences or constraints on the project scope.
  • #31: The identification of actions, risks and responsibilities provides the substance of the project plan. These requirements are translated into the determination of activities and the allocation of the resources of the project. It is also responsible for breaking the project in controllable segments understandable to those responsible for the project’s successful execution.
  • #32: The guiding of the activities is performed through the proper identification of all required activities for meeting the goals and objecnamicstives and in establishing workable procedures to generate project dyanamics.
  • #33: A final purpose in project planning is preparing for project changes. The plan must have enough flexibility to adapt to changes but still retain the qualities of integrity and durability. The plan must be alert to danger signals and be responsive in a positive manner.
  • #34: The project summary should be essentially an executive summary that can be easily read by high level executives in a few minutes. It should identify the objectives, goals and constraints of the project. An objective is the stated result of and the purpose for the project which can be a general statement of purpose. A statement of goals gives the size and shape of the project from which the technical work requirements may be devised. The goal applies to some quantitative factors to the results to be achieved in the project. Finally the constraints represents certain environment in which the project objectives are to exist, financial resources available, time limitations, local customs and government restrictions. The constraints further shape the project and set the parameters for procedures, location of project staff, type of project personnel, technical requirements, budgets and schedules
  • #35: Specification is the element of the project should define the characteristics and the performance goals for the final end product. This may be an extensive document or it may be small, depending on the needs of the project and the customer. Work statement this is part of the proposal request that tells the contractor what is desired, or the part of the proposal that tells the customer what exactly the contractor proposes to do. It specifies the path by which the project goals and objectives will be reached.
  • #36: The master schedule may consist of a simple bar or Gantt chart, while a complex project may necessitate the use of elaborate critical path or PERT to fix details of the schedule.
  • #37: The procedures guide covers the rules and practices to be observed during the project. Care should be taken so as not to violate existing company procedures. The purpose of this guide is to set down project guidelines and standards for the conduct of the project that includes mostly of administrative practices. Budgets and cost control system is inherent in any planning process that provides the project manager with cost, schedule and performance status.
  • #38: Activity / Event / Network Plan is a representation of how the project activities and events progress
  • #39: It is important that the matrix identify not only the person responsible for the completion of the task but also what key personnel are involved and who has to be consulted or who should give approval
  • #42: It should contain the individual listing of every position in the project, regardless of the classification and its period of assignment.
  • #43: The key word in an managerial effort is communication. Good communications give the motivation and control required for a smoothly functional operation. It doe not normally refer to telephone or fax communication, but the manner by which the entire group is kept informed. This includes early assessment of required reports, meetings, presentations and project documents that will aid in contributing to performance.