BIRLA INSTITUTE OF TECHNOLOGY, MESRA
JAIPUR CAMPUS
TOPIC : PROJECT TRACKING /& SPC
BY :
TARUN TIWARI (MCA/25007/18)
MEGHAJ KUMAR MALLICK (MCA/25017/18)
2ND YEAR, 4TH SEMESTER
PROJECT TRACKING BY TARUN TIWARI
PROJECT TRACKING
• Let us examine the basic project tracking at Infosys.
• Once a detailed project plan is made which consist of all
details of project such as start date & end date, and people
assign for project.
• At least project manager must track the execution of these
task.
• That endeavour constitutes activity tracking.
• The project manager must track the unresolved issues that
crop up & the defect that are detected.
• The outcome is captured in a status report, which is also
distributed to the senior management.
ACTIVITIES TRACKING
• The basic task in project tracking is to ensure that planned
activities are done on time.
• At Infosys the activities are scheduled using Microsoft
Project(MSP). It is also used for project tracking.
• The project manger checks the status of the schedule task and
updates the status in MSP.
• When the activity is finished it is marked 100% in MSP.
• MSP provide the feature to track the status of individual task .
• A project manger can determine which higher level task are
lagging behind, what percentage of task has been done.
• Based on the activities completed ,actual time they took, the
project manager reschedule the remaining task.
DEFECT TRACKING
• Infosys uses a defect control system for tracking control.
• Once information is entered in this system, it remains open
until it has been fixed.
• The defect is marked as close when its removal has been
verified.
• In this way each defect is logged and tracked to closure.
• Sometimes, project managers track the state of a defect by
recording the date of submission & the date of closure for
each defect.
• The project manager can check the overall defect injection &
defect closure, information about gap between the defects
submitted and the number of defect is in control.
Project Tracking & SPC
ISSUE TRACKING
• Inevitably, many small jobs or clarification come up during a
project. These problem are called issues.
• Managing issue is an important task for any project manager
because they can be numerous & can potentially delay a
project.
• To solve such kind of problem there is a provision of using a
issue log.
• All the issues are recorded as they arise, along with related
information.
• When the issue are closed they are marked as close.
• The project manger use a spreadsheet, maintain document,
use issue tracker utility, or use the defect tracking system.
Project Tracking & SPC
STATUS REPORT
• Status report are the main mechanism for regularly communicating
the state of project to senior management and the customer.
• The party who receive status report are specified in the project
management plan.
• Status report are generated weekly & contain these items.
• Customer complain.
• Milestone achieve this week.
• Milestone missed this week and the reason for them.
• Milestone planned for the next week.
• Issues requiring clarification or attention.
• Escalation, if any
• Estimated work versus available time by milestone.
SPC BY MEGHAJ KR. MALLICK
ACTIVITY LEVEL ANALYSIS USING SPC
• To provide finer control, activity-level analysis is also done at
Infosys.
• In activity-level analysis, some metrics are analyzed
immediately after a task is performed.
• The analysis is used to evaluate the effectiveness of the task
performance.
• If the task has not been performed satisfactorily, immediate
action can be taken to correct it and to prevent a repetition.
• Activity-level analysis is usually done using statistical process
control (SPC).
SPC ANALYSIS
• At Infosys, reviews and unit testing have been identified as
the two tasks for which SPC is applied.
• Using control charts, the project manager immediately
evaluates the effectiveness of a review or a unit test.
• If the performance is not satisfactory, necessary action can be
taken.
• The focus of activity-level monitoring is on the coding-related
activities of reviews and unit testing.
• Activity-level monitoring and control of unit testing the other
activity for which SPC is applied.
CONTINUED
• The guidelines given earlier for testing can be used to decide
which actions are needed (for analysis, project managers can
use supporting information about effort spent on the task,
effort expended on previous tasks, and defects found).
• Figure shows the control chart for defect density for unit
testing of one programming language.
• The defect density can be plotted in terms of the number of
defects per LOC or the number of defects per person-hour.
CONTROL CHART FOR SPC
CAPABILITY BASELINE FOR UNIT TESTING
CONCLUSION
• As with reviews, project managers can use the SPC tool to
implement activity-level control of unit testing.
• This tool contains relevant past performance data such as the
defect injection rate, the defect removal percentage, and so
on.
• Using this data, it determines the control limits as well as
expected limits.
• When the performance data of a unit test is entered, the tool
immediately tells whether or not the performance is outside
the limits.
Project Tracking & SPC

More Related Content

PPTX
Project scheduling and tracking
PPTX
Software engineering 11 project scheduling
PPTX
Project scheduling and tracking
PPTX
Project planning and scheduling techniques
PPTX
Project Scheduling
PPTX
PROJECT SCHEDULE
PPTX
Critical Path Analysis
PPTX
Project scheduling and tracking
Project scheduling and tracking
Software engineering 11 project scheduling
Project scheduling and tracking
Project planning and scheduling techniques
Project Scheduling
PROJECT SCHEDULE
Critical Path Analysis
Project scheduling and tracking

What's hot (19)

PPT
Critical Path Analysis Notes
PDF
Cpa & pert charts
PDF
PPTX
Primavera presentation
PPTX
project monitoring and control
PPTX
Project management
PDF
construction project planing
PPT
Mkcl Project Management Session 3
PPT
09 lecture project scheduling 1
PPTX
Project scheduling
PPTX
CPM/PERT and Gantt charts
PDF
Benefits of implementing primavera p6 r8.1 and integration to oracle ppt
PPT
Project Control - Software Project Management
PPTX
Software project management tools
PPTX
Seven Basic Steps to Build Realistic Schedule in Project 2010
PDF
Project Scheduling
PPTX
Approaches to project control
PPT
A guide to create a quality project schedule
PPTX
Understanding Constraints and Relationships in Primavera P6 8.2
Critical Path Analysis Notes
Cpa & pert charts
Primavera presentation
project monitoring and control
Project management
construction project planing
Mkcl Project Management Session 3
09 lecture project scheduling 1
Project scheduling
CPM/PERT and Gantt charts
Benefits of implementing primavera p6 r8.1 and integration to oracle ppt
Project Control - Software Project Management
Software project management tools
Seven Basic Steps to Build Realistic Schedule in Project 2010
Project Scheduling
Approaches to project control
A guide to create a quality project schedule
Understanding Constraints and Relationships in Primavera P6 8.2
Ad

Similar to Project Tracking & SPC (20)

PPT
Spm lecture-1
PPT
Spm lecture 1
PPTX
Risk Management in Software Projects: Identifying, Analyzing, and Controlling...
PPTX
Prativa biswas
PPTX
Prativa biswas
PPTX
Introduction to Software Project Management
PPTX
Tracking and Controlling Technical Documentation Projects
PPTX
Sofware project managementtt UNIT 4.pptx
PDF
Software project management is an art and discipline of planning and supervis...
PDF
Southeast Michigan AUG - April 24 2018
PPTX
E-content -SPM.pptx
PPT
223417 Diploma_Sem4_software_engg-chap-05.ppt
PPT
Introduction to Project Management
PDF
Project Assessment PowerPoint Presentation Slides
DOCX
Smu mba sem 3 pm spring 2016 assignments
PDF
Does Better Scheduling Drive Execution Success?
PDF
Software Project Management
PPTX
Unit 1 spm
PPTX
Unit 1 spm
PPTX
098f3a_SPM Lecture 01ba95e6_SPM Lecture 03 for bachelors.pptx.pptx
Spm lecture-1
Spm lecture 1
Risk Management in Software Projects: Identifying, Analyzing, and Controlling...
Prativa biswas
Prativa biswas
Introduction to Software Project Management
Tracking and Controlling Technical Documentation Projects
Sofware project managementtt UNIT 4.pptx
Software project management is an art and discipline of planning and supervis...
Southeast Michigan AUG - April 24 2018
E-content -SPM.pptx
223417 Diploma_Sem4_software_engg-chap-05.ppt
Introduction to Project Management
Project Assessment PowerPoint Presentation Slides
Smu mba sem 3 pm spring 2016 assignments
Does Better Scheduling Drive Execution Success?
Software Project Management
Unit 1 spm
Unit 1 spm
098f3a_SPM Lecture 01ba95e6_SPM Lecture 03 for bachelors.pptx.pptx
Ad

More from Meghaj Mallick (20)

PPT
24 partial-orderings
PPTX
PORTFOLIO BY USING HTML & CSS
PPTX
Introduction to Software Testing
PPTX
Introduction to System Programming
PPTX
MACRO ASSEBLER
PPTX
Icons, Image & Multimedia
PPTX
Peephole Optimization
PPTX
Routing in MANET
PPTX
Macro assembler
PPTX
Architecture and security in Vanet PPT
PPTX
Design Model & User Interface Design in Software Engineering
PPTX
Text Mining of Twitter in Data Mining
PPTX
DFS & BFS in Computer Algorithm
PPTX
Software Development Method
PPTX
Secant method in Numerical & Statistical Method
PPTX
Motivation in Organization
PPTX
Communication Skill
PPT
Partial-Orderings in Discrete Mathematics
PPTX
Hashing In Data Structure
PPTX
Complexity Analysis of Recursive Function
24 partial-orderings
PORTFOLIO BY USING HTML & CSS
Introduction to Software Testing
Introduction to System Programming
MACRO ASSEBLER
Icons, Image & Multimedia
Peephole Optimization
Routing in MANET
Macro assembler
Architecture and security in Vanet PPT
Design Model & User Interface Design in Software Engineering
Text Mining of Twitter in Data Mining
DFS & BFS in Computer Algorithm
Software Development Method
Secant method in Numerical & Statistical Method
Motivation in Organization
Communication Skill
Partial-Orderings in Discrete Mathematics
Hashing In Data Structure
Complexity Analysis of Recursive Function

Recently uploaded (20)

PPTX
Sustainable Forest Management ..SFM.pptx
PPTX
An Unlikely Response 08 10 2025.pptx
PDF
Presentation1 [Autosaved].pdf diagnosiss
PPTX
NORMAN_RESEARCH_PRESENTATION.in education
PPTX
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
PDF
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
PDF
Yusen Logistics Group Sustainability Report 2024.pdf
PDF
_Nature and dynamics of communities and community development .pdf
PPTX
MERISTEMATIC TISSUES (MERISTEMS) PPT PUBLIC
PPTX
Lesson-7-Gas. -Exchange_074636.pptx
PDF
natwest.pdf company description and business model
PPTX
Introduction-to-Food-Packaging-and-packaging -materials.pptx
PPTX
ANICK 6 BIRTHDAY....................................................
PDF
IKS PPT.....................................
DOCX
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
PPTX
lesson6-211001025531lesson plan ppt.pptx
PPTX
Shizophrnia ppt for clinical psychology students of AS
PPTX
Human Mind & its character Characteristics
DOC
LSTM毕业证学历认证,利物浦大学毕业证学历认证怎么认证
PPTX
Tour Presentation Educational Activity.pptx
Sustainable Forest Management ..SFM.pptx
An Unlikely Response 08 10 2025.pptx
Presentation1 [Autosaved].pdf diagnosiss
NORMAN_RESEARCH_PRESENTATION.in education
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
Yusen Logistics Group Sustainability Report 2024.pdf
_Nature and dynamics of communities and community development .pdf
MERISTEMATIC TISSUES (MERISTEMS) PPT PUBLIC
Lesson-7-Gas. -Exchange_074636.pptx
natwest.pdf company description and business model
Introduction-to-Food-Packaging-and-packaging -materials.pptx
ANICK 6 BIRTHDAY....................................................
IKS PPT.....................................
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
lesson6-211001025531lesson plan ppt.pptx
Shizophrnia ppt for clinical psychology students of AS
Human Mind & its character Characteristics
LSTM毕业证学历认证,利物浦大学毕业证学历认证怎么认证
Tour Presentation Educational Activity.pptx

Project Tracking & SPC

  • 1. BIRLA INSTITUTE OF TECHNOLOGY, MESRA JAIPUR CAMPUS TOPIC : PROJECT TRACKING /& SPC BY : TARUN TIWARI (MCA/25007/18) MEGHAJ KUMAR MALLICK (MCA/25017/18) 2ND YEAR, 4TH SEMESTER
  • 2. PROJECT TRACKING BY TARUN TIWARI
  • 3. PROJECT TRACKING • Let us examine the basic project tracking at Infosys. • Once a detailed project plan is made which consist of all details of project such as start date & end date, and people assign for project. • At least project manager must track the execution of these task. • That endeavour constitutes activity tracking. • The project manager must track the unresolved issues that crop up & the defect that are detected. • The outcome is captured in a status report, which is also distributed to the senior management.
  • 4. ACTIVITIES TRACKING • The basic task in project tracking is to ensure that planned activities are done on time. • At Infosys the activities are scheduled using Microsoft Project(MSP). It is also used for project tracking. • The project manger checks the status of the schedule task and updates the status in MSP. • When the activity is finished it is marked 100% in MSP. • MSP provide the feature to track the status of individual task . • A project manger can determine which higher level task are lagging behind, what percentage of task has been done. • Based on the activities completed ,actual time they took, the project manager reschedule the remaining task.
  • 5. DEFECT TRACKING • Infosys uses a defect control system for tracking control. • Once information is entered in this system, it remains open until it has been fixed. • The defect is marked as close when its removal has been verified. • In this way each defect is logged and tracked to closure. • Sometimes, project managers track the state of a defect by recording the date of submission & the date of closure for each defect. • The project manager can check the overall defect injection & defect closure, information about gap between the defects submitted and the number of defect is in control.
  • 7. ISSUE TRACKING • Inevitably, many small jobs or clarification come up during a project. These problem are called issues. • Managing issue is an important task for any project manager because they can be numerous & can potentially delay a project. • To solve such kind of problem there is a provision of using a issue log. • All the issues are recorded as they arise, along with related information. • When the issue are closed they are marked as close. • The project manger use a spreadsheet, maintain document, use issue tracker utility, or use the defect tracking system.
  • 9. STATUS REPORT • Status report are the main mechanism for regularly communicating the state of project to senior management and the customer. • The party who receive status report are specified in the project management plan. • Status report are generated weekly & contain these items. • Customer complain. • Milestone achieve this week. • Milestone missed this week and the reason for them. • Milestone planned for the next week. • Issues requiring clarification or attention. • Escalation, if any • Estimated work versus available time by milestone.
  • 10. SPC BY MEGHAJ KR. MALLICK
  • 11. ACTIVITY LEVEL ANALYSIS USING SPC • To provide finer control, activity-level analysis is also done at Infosys. • In activity-level analysis, some metrics are analyzed immediately after a task is performed. • The analysis is used to evaluate the effectiveness of the task performance. • If the task has not been performed satisfactorily, immediate action can be taken to correct it and to prevent a repetition. • Activity-level analysis is usually done using statistical process control (SPC).
  • 12. SPC ANALYSIS • At Infosys, reviews and unit testing have been identified as the two tasks for which SPC is applied. • Using control charts, the project manager immediately evaluates the effectiveness of a review or a unit test. • If the performance is not satisfactory, necessary action can be taken. • The focus of activity-level monitoring is on the coding-related activities of reviews and unit testing. • Activity-level monitoring and control of unit testing the other activity for which SPC is applied.
  • 13. CONTINUED • The guidelines given earlier for testing can be used to decide which actions are needed (for analysis, project managers can use supporting information about effort spent on the task, effort expended on previous tasks, and defects found). • Figure shows the control chart for defect density for unit testing of one programming language. • The defect density can be plotted in terms of the number of defects per LOC or the number of defects per person-hour.
  • 15. CAPABILITY BASELINE FOR UNIT TESTING
  • 16. CONCLUSION • As with reviews, project managers can use the SPC tool to implement activity-level control of unit testing. • This tool contains relevant past performance data such as the defect injection rate, the defect removal percentage, and so on. • Using this data, it determines the control limits as well as expected limits. • When the performance data of a unit test is entered, the tool immediately tells whether or not the performance is outside the limits.