The following is a brief guide for conducting an Internal Audit of a PCI-Certified plant’s 
conformance with its QSM. Included is an explanation of the planning, performing, documenting, 
and change implementation phases of the audit. Further, we have provided checklists, sample 
forms, or sample procedure outlines to aid producers in formalizing their own internal audit 
process. Above all, it is important to understand and keep in mind that the purpose of the QSM 
and the QSM audit is to make a better product. 
INTERNAL AUDIT OVERVIEW 
Auditing your plant for compliance with your company’s QSM can be a very time-consuming job. 
In order to keep the audit effective and timely it is recommended that the auditor not go into 
intense depth on every item. Rather, the auditor should do a quick overview of the operation 
being audited and look for procedures that do not comply with company policies that you can 
focus on. Another good idea is to review past audits and look for weaknesses in those audits so 
you can specifically review that item in your audit. Remember, an audit is a snapshot in time so 
no one can expect you to check and/or catch everything. 
Illustration A is a sample form that can be modified to reflect your plant’s information and be used 
to conduct and document an audit of each chapter of your QSM on an annual basis. This should be 
a general review of the processes covered in the chapter to see that they are still current and 
should provide the intended output or results. 
FOCUSED AUDIT 
To conduct a more in-depth audit of suspected problem areas, we suggest the following procedure 
outline, checklists, and sample forms. The targeted processes should be chosen from the general 
or “overview” audit or problems that have surfaced. For this, we provide an explanation of the 
planning, performing, documentation, and change implementation phases of the audit. 
1. PLANNING 
 Decide who will manage the audit. Often it will be the quality manager but 
someone needs to handle the administrative details. Uncovering potential 
problems is one reason why internal auditors need to be intelligent and creative 
thinkers. 
 Define the audit objectives. One will likely be trying to comply with standards 
or special specifications, or in some cases, we may be looking for improvement 
opportunities. 
 Define the scope of the audit. Determine what specific activities or processes 
will be audited and what departments will be involved. 
 Define the audit criteria to be considered. This would typically include SOPs 
or policies defined by the QSM, such as compliance with MNL-116. 
 Obtain and understand the objectives. 
 Gather and understand product and process data and information for the 
area to be audited. 
 Prepare the work papers. 
 Prepare and distribute the audit plan.
3 
2. PERFORMING THE AUDIT 
There is no single right way to do an audit. Auditing is about understanding requirements, 
looking for opportunities for improvement, looking for best practices, asking questions, 
gathering information, analyzing what’s seen and heard, forming opinions, and reaching 
conclusions. This effort requires that auditors be prepared, fair, objective, impartial, and, 
above all, exercise good judgment. Remember that audits are not only to find what 
procedures need improvement, but an auditor also should recognize outstanding efforts 
and practices by individuals and note them in their report. 
The following is a list of activities that should be considered for each audit: 
 Hold an opening meeting with the person in charge of the area to be audited. 
Things to be done at this meeting include introducing all parties and reviewing 
the audit objectives and scope, as well as putting the audited party at ease with 
the whole process. This meeting can be short and held anywhere. 
 Carefully observe the process and final output. Here the auditor probes to assess 
the degree to which the processes are operating in conformance with the 
requirements of the company’s QSM. 
 Ask questions. It is important to ask open-ended questions since the answers are 
rich in information about process performance and personnel competence. An 
open-ended question is one that requires more than a yes or no answer. 
 Gather objective evidence of the extent to which requirements are or are not 
being met. For example, a QC lab technician breaking cylinders is required to 
document these breaks. Ask to see this documentation to ensure that it is being 
done and done properly. 
 Keep great notes. Good notes will minimize the struggles to remember what was 
observed at various auditing points. 
 Analyze objective evidence looking for opportunities for improvement. Auditors 
should ask themselves questions such as, Is the process operating under 
controlled conditions? Is there an opportunity for improving the process? Are the 
requirements outlined in the company QSM being met or exceeded? 
 Take all aspects of the audit into account prior to reaching a conclusion. Is a 
failure observed to be an isolated event or is it systemic? Are there any areas 
that should be noted for consideration of action to improve performance, such as 
lowering cost, reducing rework, or improving output? Are there any individuals or 
crews who displayed uncommon diligence, professionalism, or attitude that 
merits special recognition? 
 Hold a closing meeting with the person in charge of the audited area. It would 
also be a good idea to have the plant manager at this meeting. At this closing 
meeting, auditors should share their overall opinion on what they have observed, 
outlining the negative and positive observations. Explain the process for 
corrective action on any significant adverse findings. To the best of their abilities, 
auditors at this time should also try to resolve any disagreements the person in 
charge may have with the auditor’s conclusions.
4 
3. DOCUMENTATION 
Documentation can be the most difficult part of the audit. This is where auditors write 
down their findings in a clear, concise, and brief summary of facts. As it was stated 
before, it is important to document both the good and bad observations. Documenting 
positive findings can be an effective tool in reinforcing good performance. 
These documented facts must be truthful, objective, apply to the scope of the audit, and 
must be written in a way that all parties involved can understand them. The findings must 
simply show that they comply with the requirements of the QSM or they do not. 
The audit report is the official record of the audit and should contain: 
 Scope and criteria of audit 
 Listed objectives of audit 
 Auditor’s name and area being audited (remember not to use names except 
that of the auditor) 
 Date and location of audit 
 Findings and positive practices 
 An overall closing statement, which could include action items for area 
reviewed. 
Illustration B is a sample Internal Audit Form that can be modified to reflect your plants 
information and needs, and Illustration C is a sample of this form filled out. 
4. CHANGE IMPLEMENTATION 
During the course of performing an internal audit for compliance with the Quality System 
Manual, non-conformances should be documented as would occur during the PCI audit. 
The purpose of the internal audit being both preparation for the PCI audit and self 
regulation for conforming to the published QSM, documented non-conformances should 
be handled in the same manner and with the same degree of seriousness as any found 
during the PCI audit. A log of non-conformances and intended corrective action should 
be established. 
The Quality Committee should be convened to hear the internal auditor’s report with each 
non-conforming item or area being thoroughly identified and explained. It would be a 
function of this committee to ascertain whether or not the noted item is, in fact, not in 
conformance with the QSM. Beyond that, the committee might want to consider whether 
the QSM accurately reflects good, standard practice with respect to the item in question 
and, if not, consider taking the appropriate steps to update the manual. 
Upon agreement that the item is non-conforming and needs correction, it would be the 
responsibility of the committee to assign responsibility for making the necessary changes 
to a specific individual or group of individuals with a target date for completion. A clear 
outcome of the intended correction should be available. 
The Quality Committee and/or the QC manager should monitor the items with respect to 
agreed upon completion date. Once the responsible party has so informed the 
committee and/or the QC manager, it will be the responsibility of the QC manager to 
verify that the item is now within conformance or the committee should request that the 
individual performing the initial audit review the item and verify conformance. The non-conformance 
log for the audit should be so noted that the item has been satisfactorily 
addressed as of that date. The report and the non-conformance log should be kept on 
file for future reference.
5 
QSM AUDIT GUIDE 
ILLUSTRATION “A” 
SAMPLE FORM 
Company Name 
Address 
Phone & Fax Numbers 
MNL-116 & 117 Quality System Manual – 
Internal Audit Overview 
Date: ____________________________________________________________ 
Location: _________________________________________________________ 
Auditor: __________________________________________________________ 
Products Produced: ________________________________________________ 
__________________________________________________________________ 
Distribution: _______________________________________________________ 
__________________________________________________________________ 
Section of Manual Audit Information 
Title Page ______________________________________ 
Table of Contents ______________________________________ 
Introduction ______________________________________ 
1 Management Responsibility ______________________________________ 
A.1 Quality Policy Statement ______________________________________ 
A.2 Quality System Awareness ______________________________________ 
______________________________________ 
______________________________________ 
13 Quality Records ______________________________________ 
______________________________________ 
14 Internal Quality Reviews ______________________________________ 
______________________________________ 
15 Training ______________________________________ 
______________________________________
6 
Appendix A 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________ 
____________________________________________________________________________
7 
QSM AUDIT GUIDE 
ILLUSTRATION “B” 
INTERNAL AUDIT FORM 
Area for Audit 
Personnel for Audit = Date for Audit 
Plan of Action for Audit (use reverse side if necessary) 
Audit Notes (use reverse side if necessary) 
Review of Audit Results with QSM Committee (use reverse side if 
necessary) 
Action Items for Area Reviewed (use reverse side if necessary) 
Implementation Dates Signed By Title Date
8 
QSM AUDIT GUIDE 
ILLUSTRATION “C” 
SAMPLE INTERNAL AUDIT FORM 
Area for Audit 
Stud Weld Shop 
Personnel for Audit = Date for Audit 
Carl Smith, Plant Drafting October 1, 2005 
Plan of Action for Audit (use reverse side if necessary) 
1. Be at weld shop for start of 10/1/05 shift. 
2. Review WPS (Welding Procedure Specification) with Welder to confirm he 
has correct one and understands settings. 
3. Observe welding of initial studs and testing of same. 
4. Did studs pass test? 
5. Did welder check length of stud and change from pre-weld? 
6. Did welder correct test welds? 
7. Is testing record completed for previous months? 
Audit Notes (use reverse side if necessary) 
10/1/05 – Arrived at weld shop site. Welder sick and out for the day. 
Rescheduled for 10/8/05. 
10/8/05 – Arrived at weld shop site and found the following: WPS for studs not on 
hand; first two studs tested with hammer since no pipe available for testing; 
second stud failed; two more welded and welds passed; weld record only 
recorded in September; no record in June, July, or August; stud length before 
and after weld not checked 
Review of Audit Results with QSM Committee (use reverse side if 
necessary) 
Committee Meeting 10/15/05 with Plant Manager, Chief Engineer, and QC 
Manager 
1. WPS for stud weld needs to be developed. 
2. Pipe for bend testing needs to be obtained. 
3. Training session to be set up for welder. 
4. Records should be checked for confirmation by QC weekly and signed off on 
a record sheet. 
Action Items for Area Reviewed (use reverse side if necessary) 
• Weld Shop Foreman – set up WPS, obtained pipe for testing, and set training 
time for welder.
9 
• QC Manager – Attend training session and monitor weld test records. 
Implementation Dat e s S i g n Date 
Carl Smith Plant Draftsman 
Welder 
Weld Shop Foreman 
QC Manager

More Related Content

PDF
7 Questions to Ask When Auditing Your Customer Success Processes
PPTX
Audits in pharma industries
PPSX
QMS Audit Process June 2015
PPT
Performance Based Internal Quality Audit Guide
PPTX
Quality audit
PPTX
Tqm quality audit
PPT
Quality Course 3, Including Iso9001
PPTX
Audits and Regulatory Compliance
7 Questions to Ask When Auditing Your Customer Success Processes
Audits in pharma industries
QMS Audit Process June 2015
Performance Based Internal Quality Audit Guide
Quality audit
Tqm quality audit
Quality Course 3, Including Iso9001
Audits and Regulatory Compliance

What's hot (18)

PPT
Quality audits
PPT
Iso Process Audit Training
PPTX
Protecting The Global Supply Chain Through An Effective Audit Program Rev B
PPTX
Audit and Regulatory compliance
PPT
Internal Process Audit
PPTX
planning process in audit ppt
PPTX
quality assurance audits
PPT
Quality audit- Quality audit is the process of systematic examination of a qu...
PPT
Quality Control
PDF
How to Perform a Successful Internal Quality Audit
PPTX
Quality Audit in pharmaceutical industry
PPTX
Quality control and auditing
PPTX
Auditing for Sterile Production Area
PPTX
Audit Report Writing
PPSX
DOC
Risk minor major critical
PDF
owens & minor audit
PPT
Quality Audit
Quality audits
Iso Process Audit Training
Protecting The Global Supply Chain Through An Effective Audit Program Rev B
Audit and Regulatory compliance
Internal Process Audit
planning process in audit ppt
quality assurance audits
Quality audit- Quality audit is the process of systematic examination of a qu...
Quality Control
How to Perform a Successful Internal Quality Audit
Quality Audit in pharmaceutical industry
Quality control and auditing
Auditing for Sterile Production Area
Audit Report Writing
Risk minor major critical
owens & minor audit
Quality Audit
Ad

Similar to Qsm guidelines (20)

PPTX
Internal audit of ISO 9001 Quality management system.pptx
PPTX
735994164735994164-Internal-Audit-Presentation.pptx
PPTX
Internal_Audit_Presentation.pptx
PPTX
ISO 9001 Internal Auditor PPT.pptx Quality management system
PPTX
Audit Technique
PPTX
PPTX
Internal Audits ((Self Inspection)).pptx
PDF
How to prepare for an audit and maintain oversight within your e qms
PPTX
Auditing in QA and Engineering department.pptx
PPTX
Internal Audit 03-03-16
PPTX
audits and regulatory compliance m.pharm .pptx
PPT
Iqa training -manufacturing[1]
PDF
MPHARM_QA_1Y_2S_203T_Audit&Regul.Compliance.pdf
PPT
Fundamentals of Auditing PTC
PPTX
Quality audit plan
DOC
Introduction to Internal Auditing FSMS
PPTX
Internal Quality Auditing for a Management System
PPTX
Training module on facing audits
PDF
Auditing.pdf
PPTX
Auditing in pharmacutical industries
Internal audit of ISO 9001 Quality management system.pptx
735994164735994164-Internal-Audit-Presentation.pptx
Internal_Audit_Presentation.pptx
ISO 9001 Internal Auditor PPT.pptx Quality management system
Audit Technique
Internal Audits ((Self Inspection)).pptx
How to prepare for an audit and maintain oversight within your e qms
Auditing in QA and Engineering department.pptx
Internal Audit 03-03-16
audits and regulatory compliance m.pharm .pptx
Iqa training -manufacturing[1]
MPHARM_QA_1Y_2S_203T_Audit&Regul.Compliance.pdf
Fundamentals of Auditing PTC
Quality audit plan
Introduction to Internal Auditing FSMS
Internal Quality Auditing for a Management System
Training module on facing audits
Auditing.pdf
Auditing in pharmacutical industries
Ad

Recently uploaded (20)

PDF
Structure Composition and Mechanical Properties of Australian O.pdf
PDF
DAY-6. Summer class. Ppt. Cultural Nursing
PDF
NUTRITION THROUGHOUT THE LIFE CYCLE CHILDHOOD -AGEING
PPTX
PEDIATRIC OSCE, MBBS, by Dr. Sangit Chhantyal(IOM)..pptx
PDF
Selvita_Development-Strategy-2022-2025.pdf
PPTX
Medical aspects of impairment including all the domains mentioned in ICF
PDF
Dr. Jasvant Modi - Passionate About Philanthropy
PPT
Microscope is an instrument that makes an enlarged image of a small object, t...
PPTX
CBT FOR OCD TREATMENT WITHOUT MEDICATION
PDF
Megan Miller Colona Illinois - Passionate About CrossFit
PDF
A Brief Introduction About Malke Heiman
PPTX
General Pharmacology by Nandini Ratne, Nagpur College of Pharmacy, Hingna Roa...
PPTX
First Aid and Basic Life Support Training.pptx
PPTX
COMMUNICATION SKILSS IN NURSING PRACTICE
PDF
Myers’ Psychology for AP, 1st Edition David G. Myers Test Bank.pdf
PPTX
Pulmonary Circulation PPT final for easy
PPTX
NUTRITIONAL PROBLEMS, CHANGES NEEDED TO PREVENT MALNUTRITION
PPTX
First aid in common emergency conditions.pptx
PDF
MECE & SCQA FRAMEWORKS, - Adding Innovation & Influencing Hospital & Super-Sp...
PPTX
Bronchial_Asthma_in_acute_exacerbation_.pptx
Structure Composition and Mechanical Properties of Australian O.pdf
DAY-6. Summer class. Ppt. Cultural Nursing
NUTRITION THROUGHOUT THE LIFE CYCLE CHILDHOOD -AGEING
PEDIATRIC OSCE, MBBS, by Dr. Sangit Chhantyal(IOM)..pptx
Selvita_Development-Strategy-2022-2025.pdf
Medical aspects of impairment including all the domains mentioned in ICF
Dr. Jasvant Modi - Passionate About Philanthropy
Microscope is an instrument that makes an enlarged image of a small object, t...
CBT FOR OCD TREATMENT WITHOUT MEDICATION
Megan Miller Colona Illinois - Passionate About CrossFit
A Brief Introduction About Malke Heiman
General Pharmacology by Nandini Ratne, Nagpur College of Pharmacy, Hingna Roa...
First Aid and Basic Life Support Training.pptx
COMMUNICATION SKILSS IN NURSING PRACTICE
Myers’ Psychology for AP, 1st Edition David G. Myers Test Bank.pdf
Pulmonary Circulation PPT final for easy
NUTRITIONAL PROBLEMS, CHANGES NEEDED TO PREVENT MALNUTRITION
First aid in common emergency conditions.pptx
MECE & SCQA FRAMEWORKS, - Adding Innovation & Influencing Hospital & Super-Sp...
Bronchial_Asthma_in_acute_exacerbation_.pptx

Qsm guidelines

  • 1. 1 GUIDE FOR QUALITY SYSTEM MANUAL INTERNAL AUDIT MAY 1, 2006 APPROVED COPY
  • 2. 2 GUIDE FOR QUALITY SYSTEM MANUAL INTERNAL AUDITS (MAY 1, 2006) INTRODUCTION: The following is a brief guide for conducting an Internal Audit of a PCI-Certified plant’s conformance with its QSM. Included is an explanation of the planning, performing, documenting, and change implementation phases of the audit. Further, we have provided checklists, sample forms, or sample procedure outlines to aid producers in formalizing their own internal audit process. Above all, it is important to understand and keep in mind that the purpose of the QSM and the QSM audit is to make a better product. INTERNAL AUDIT OVERVIEW Auditing your plant for compliance with your company’s QSM can be a very time-consuming job. In order to keep the audit effective and timely it is recommended that the auditor not go into intense depth on every item. Rather, the auditor should do a quick overview of the operation being audited and look for procedures that do not comply with company policies that you can focus on. Another good idea is to review past audits and look for weaknesses in those audits so you can specifically review that item in your audit. Remember, an audit is a snapshot in time so no one can expect you to check and/or catch everything. Illustration A is a sample form that can be modified to reflect your plant’s information and be used to conduct and document an audit of each chapter of your QSM on an annual basis. This should be a general review of the processes covered in the chapter to see that they are still current and should provide the intended output or results. FOCUSED AUDIT To conduct a more in-depth audit of suspected problem areas, we suggest the following procedure outline, checklists, and sample forms. The targeted processes should be chosen from the general or “overview” audit or problems that have surfaced. For this, we provide an explanation of the planning, performing, documentation, and change implementation phases of the audit. 1. PLANNING  Decide who will manage the audit. Often it will be the quality manager but someone needs to handle the administrative details. Uncovering potential problems is one reason why internal auditors need to be intelligent and creative thinkers.  Define the audit objectives. One will likely be trying to comply with standards or special specifications, or in some cases, we may be looking for improvement opportunities.  Define the scope of the audit. Determine what specific activities or processes will be audited and what departments will be involved.  Define the audit criteria to be considered. This would typically include SOPs or policies defined by the QSM, such as compliance with MNL-116.  Obtain and understand the objectives.  Gather and understand product and process data and information for the area to be audited.  Prepare the work papers.  Prepare and distribute the audit plan.
  • 3. 3 2. PERFORMING THE AUDIT There is no single right way to do an audit. Auditing is about understanding requirements, looking for opportunities for improvement, looking for best practices, asking questions, gathering information, analyzing what’s seen and heard, forming opinions, and reaching conclusions. This effort requires that auditors be prepared, fair, objective, impartial, and, above all, exercise good judgment. Remember that audits are not only to find what procedures need improvement, but an auditor also should recognize outstanding efforts and practices by individuals and note them in their report. The following is a list of activities that should be considered for each audit:  Hold an opening meeting with the person in charge of the area to be audited. Things to be done at this meeting include introducing all parties and reviewing the audit objectives and scope, as well as putting the audited party at ease with the whole process. This meeting can be short and held anywhere.  Carefully observe the process and final output. Here the auditor probes to assess the degree to which the processes are operating in conformance with the requirements of the company’s QSM.  Ask questions. It is important to ask open-ended questions since the answers are rich in information about process performance and personnel competence. An open-ended question is one that requires more than a yes or no answer.  Gather objective evidence of the extent to which requirements are or are not being met. For example, a QC lab technician breaking cylinders is required to document these breaks. Ask to see this documentation to ensure that it is being done and done properly.  Keep great notes. Good notes will minimize the struggles to remember what was observed at various auditing points.  Analyze objective evidence looking for opportunities for improvement. Auditors should ask themselves questions such as, Is the process operating under controlled conditions? Is there an opportunity for improving the process? Are the requirements outlined in the company QSM being met or exceeded?  Take all aspects of the audit into account prior to reaching a conclusion. Is a failure observed to be an isolated event or is it systemic? Are there any areas that should be noted for consideration of action to improve performance, such as lowering cost, reducing rework, or improving output? Are there any individuals or crews who displayed uncommon diligence, professionalism, or attitude that merits special recognition?  Hold a closing meeting with the person in charge of the audited area. It would also be a good idea to have the plant manager at this meeting. At this closing meeting, auditors should share their overall opinion on what they have observed, outlining the negative and positive observations. Explain the process for corrective action on any significant adverse findings. To the best of their abilities, auditors at this time should also try to resolve any disagreements the person in charge may have with the auditor’s conclusions.
  • 4. 4 3. DOCUMENTATION Documentation can be the most difficult part of the audit. This is where auditors write down their findings in a clear, concise, and brief summary of facts. As it was stated before, it is important to document both the good and bad observations. Documenting positive findings can be an effective tool in reinforcing good performance. These documented facts must be truthful, objective, apply to the scope of the audit, and must be written in a way that all parties involved can understand them. The findings must simply show that they comply with the requirements of the QSM or they do not. The audit report is the official record of the audit and should contain:  Scope and criteria of audit  Listed objectives of audit  Auditor’s name and area being audited (remember not to use names except that of the auditor)  Date and location of audit  Findings and positive practices  An overall closing statement, which could include action items for area reviewed. Illustration B is a sample Internal Audit Form that can be modified to reflect your plants information and needs, and Illustration C is a sample of this form filled out. 4. CHANGE IMPLEMENTATION During the course of performing an internal audit for compliance with the Quality System Manual, non-conformances should be documented as would occur during the PCI audit. The purpose of the internal audit being both preparation for the PCI audit and self regulation for conforming to the published QSM, documented non-conformances should be handled in the same manner and with the same degree of seriousness as any found during the PCI audit. A log of non-conformances and intended corrective action should be established. The Quality Committee should be convened to hear the internal auditor’s report with each non-conforming item or area being thoroughly identified and explained. It would be a function of this committee to ascertain whether or not the noted item is, in fact, not in conformance with the QSM. Beyond that, the committee might want to consider whether the QSM accurately reflects good, standard practice with respect to the item in question and, if not, consider taking the appropriate steps to update the manual. Upon agreement that the item is non-conforming and needs correction, it would be the responsibility of the committee to assign responsibility for making the necessary changes to a specific individual or group of individuals with a target date for completion. A clear outcome of the intended correction should be available. The Quality Committee and/or the QC manager should monitor the items with respect to agreed upon completion date. Once the responsible party has so informed the committee and/or the QC manager, it will be the responsibility of the QC manager to verify that the item is now within conformance or the committee should request that the individual performing the initial audit review the item and verify conformance. The non-conformance log for the audit should be so noted that the item has been satisfactorily addressed as of that date. The report and the non-conformance log should be kept on file for future reference.
  • 5. 5 QSM AUDIT GUIDE ILLUSTRATION “A” SAMPLE FORM Company Name Address Phone & Fax Numbers MNL-116 & 117 Quality System Manual – Internal Audit Overview Date: ____________________________________________________________ Location: _________________________________________________________ Auditor: __________________________________________________________ Products Produced: ________________________________________________ __________________________________________________________________ Distribution: _______________________________________________________ __________________________________________________________________ Section of Manual Audit Information Title Page ______________________________________ Table of Contents ______________________________________ Introduction ______________________________________ 1 Management Responsibility ______________________________________ A.1 Quality Policy Statement ______________________________________ A.2 Quality System Awareness ______________________________________ ______________________________________ ______________________________________ 13 Quality Records ______________________________________ ______________________________________ 14 Internal Quality Reviews ______________________________________ ______________________________________ 15 Training ______________________________________ ______________________________________
  • 6. 6 Appendix A ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________
  • 7. 7 QSM AUDIT GUIDE ILLUSTRATION “B” INTERNAL AUDIT FORM Area for Audit Personnel for Audit = Date for Audit Plan of Action for Audit (use reverse side if necessary) Audit Notes (use reverse side if necessary) Review of Audit Results with QSM Committee (use reverse side if necessary) Action Items for Area Reviewed (use reverse side if necessary) Implementation Dates Signed By Title Date
  • 8. 8 QSM AUDIT GUIDE ILLUSTRATION “C” SAMPLE INTERNAL AUDIT FORM Area for Audit Stud Weld Shop Personnel for Audit = Date for Audit Carl Smith, Plant Drafting October 1, 2005 Plan of Action for Audit (use reverse side if necessary) 1. Be at weld shop for start of 10/1/05 shift. 2. Review WPS (Welding Procedure Specification) with Welder to confirm he has correct one and understands settings. 3. Observe welding of initial studs and testing of same. 4. Did studs pass test? 5. Did welder check length of stud and change from pre-weld? 6. Did welder correct test welds? 7. Is testing record completed for previous months? Audit Notes (use reverse side if necessary) 10/1/05 – Arrived at weld shop site. Welder sick and out for the day. Rescheduled for 10/8/05. 10/8/05 – Arrived at weld shop site and found the following: WPS for studs not on hand; first two studs tested with hammer since no pipe available for testing; second stud failed; two more welded and welds passed; weld record only recorded in September; no record in June, July, or August; stud length before and after weld not checked Review of Audit Results with QSM Committee (use reverse side if necessary) Committee Meeting 10/15/05 with Plant Manager, Chief Engineer, and QC Manager 1. WPS for stud weld needs to be developed. 2. Pipe for bend testing needs to be obtained. 3. Training session to be set up for welder. 4. Records should be checked for confirmation by QC weekly and signed off on a record sheet. Action Items for Area Reviewed (use reverse side if necessary) • Weld Shop Foreman – set up WPS, obtained pipe for testing, and set training time for welder.
  • 9. 9 • QC Manager – Attend training session and monitor weld test records. Implementation Dat e s S i g n Date Carl Smith Plant Draftsman Welder Weld Shop Foreman QC Manager