Quality in Construction WorksAn Introduction to QA/QC Concept and Quality Management System Based on ISO 9001:2008
Typical Slogan“Open ChallengeQuick Response”The BIG QUESTION is: How do we meet the challenge and achieve the benefits?
Our Only AnswerISO 9001:2008and QA/QC
ISO TC176 Update - BISThe Process Approach
1.  CUSTOMER FOCUS2.  LEADERSHIP8 MANAGEMENT PRINCIPLESISO 90013.  INVOLVEMENT OF PEOPLE4.  PROCESS APPROACH5.  SYSTEM APPROACH6.  CONTINUAL IMPROVEMENT7.  FACTUAL APPROACH 8.  MUTUAL BENEFICIAL SUPPLIER RELATIONSHIPS
6LEVEL 1 - QUALITY MANUALQuality PolicyQuality ObjectivesRequirement StandardOther Statutory and Regulatory Requirements
LEVEL 2 - QUALITY PROCEDURESControl of DocumentsControl of RecordsInternal Quality AuditsControl of Non-conforming ProductsCorrective ActionPreventive Action7
8LEVEL 3 - QUALITY PLANIncoming Inspection PlanIn-Process Inspection PlanFinal Test Report/ Inspection PlanWork Instruction
9LEVEL 4 - FORMS / FORMATS/RECORDSTesting Report formsCommissioning Report FormsInspection formsCheck Sheets/Check ListMiscellaneous Documentation Forms
Management Review		Competence, Training and Awareness Planning and Production	Review of Requirement Related to ProductDesign and Development Input			1023 MANDATORY RECORDS
1123 MANDATORY RECORDSDesign and Development OutputDesign and Development ReviewDesign and Development VerificationDesign and Development Validation	Control of Design and Development Changes
1223 MANDATORY RECORDSPurchasing ProcessAvailability of Monitoring and Measuring EquipmentPreservation of ProductCustomer PropertyControl of Monitoring and Measuring EquipmentStandards used for Calibrating Monitoring and Measuring Equipment
1323 MANDATORY RECORDSIdentify and Enable CalibrationResult of Calibration and VerificationInternal AuditMonitoring and Measurement of ProductControl of Non-conforming ProductCorrective ActionPreventive Action
Applying Quality Management System (ISO 9001) in Construction Works
QA/QC ConceptsQuality Assurance Quality Assurance (or QA) covers all activities from design, development, production, installation, servicing and documentation.
QA/QC ConceptsQuality Control Quality control refers to the process,most often implemented in manufacturing, monitoring the quality of finished products through statistical measures and an overall corporate commitment to producing defect-free products.
QA/QC ConceptsOrganizational Level. At the organizational level, QA activities ensure that the program or organization is successful by overseeing the system implementation necessary for individual projects in the program, and making sure activities have the resources they need to be successful.
QA/QC ConceptsProject Level (Design, Estimate and Initiation)At the project level, QA activities support the success of an individual project by ensuring that accurate information is channeled to the right people at the right time so that decisions can be made during project implementation.
QA/QC ConceptsTechnical Level. At the technical level, QA activities ensure that the individual technical activities that generate, process, or synthesize data (or other information) for the decision process are performing within accepted limits.
ISO 9001:2008QUALITY MANAGEMENT SYSTEM IS QUALITY ASSURANCE
Roles of QA/QC Department Verify that requirements are followed,Verify that controlling and checking an activity have been done,Ensure that approved working methods are established,Evaluate the reported principal causes of non-conformances;Evaluate the effectiveness of corrective action, andDetermine where improvements are required21
Quality Control Role of Quality Controller includes:monitoring,Inspection, reduction of variation, elimination of known causes, and22
Difference in responsibilities23
Difference in responsibilities24
Difference in responsibilities25
The OrganizationPresidentVice PresidentQA/QC ManagerEngineering ManagerQA/QC OfficerProject ManagerAuditorsQuality Controllers (Project Engineers)26
FUNCTIONSPresidentVice PresidentQuality Activities FunctionConstruction Work FunctionQA/QC OfficerProject ManagerAuditorsQuality Controllers (Project Engineers)27
CONSTRUCTION WORK FUNCTIONSPresidentVice PresidentProject ManagerQA/QC SiteProject Engineers(Site Supervision)SubcontractorsCAD28
QUALITY WORK FUNCTIONSPresidentVice PresidentQA/QC Site ManagerProject Site ManagerProject Engineers(Quality Control)SubcontractorsCAD29
As Applied to HOYA Project
As Applied to HOYA Project
As Applied to HOYA Project
Quality Management Objectiveszero defect (no defects on project hand-over)identify and solve problems before customer doesestablish true quality control by making quality“built in” and not “inspected in”.33
Why do we do this?For better efficiency,Fewer rejects, Reduce if not eliminate customer complaints,Improve customer relationImprove supplier relation.And to answer our slogan:
 Open Challenge Quick ResponseProblem 71.4%Problem 8Problem 60.6%4%Problem 58%Problem 415%Equipment /Materials Related Problem23%CUSTOMER COMPLAINTS(Est. Repair Cost: Ph P 1.7M in Laguna Area)Piping work related problem28%Ducting work related Problem20%35
BAReplacementOrder PlacedOrderABOrder MadeOrder MadeBABBBBBTo CustomerDeliveryField TestingDeliveryConformingInstallConformingFuture repercussionsRoot CauseAInvestigationNon-ConformingB & CB & CB & CRepairsSCRAPQA HOLDNon-ConformingAQA HOLDCCCCCCREPAIRQuality CheckConformingInstallTo CustomerConformingAUnload Container, Bags,STORAGETestingTrucks etcLost RevenuePaperwork/DatabaseDumping CostsTransportFuture Costs (Reclaim/Environment)ASCRAPLost RevenueDumping CostsFuture Costs (Reclaim/Environment)Cost of QualityKEY:NORMALADDEDADDEDCOSTSCOSTSCOSTS36
ReflectionPreventing mistakes is much more time and cost-effective than correcting them.37
Action Reflections“Failure to prepare is preparing to fail”“Failure to plan is planning to fail”

More Related Content

PPTX
Quality ToolBox Talk_Quality Management in Construction 101(for Senior Manage...
PDF
Quality control IN CONSTRUCTION
PPT
Quality control in construction
PDF
Quality management in construction
PPT
Quality in Construction
PPTX
Total Quality Management In Construction
PPTX
Construction contract
PPTX
Quality management
Quality ToolBox Talk_Quality Management in Construction 101(for Senior Manage...
Quality control IN CONSTRUCTION
Quality control in construction
Quality management in construction
Quality in Construction
Total Quality Management In Construction
Construction contract
Quality management

What's hot (20)

PPTX
Insepction and quality control
PPTX
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
PPTX
Qaqc in civil construction
PPTX
Quality management for civil engineering
PPT
107 quality control
PDF
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
PPT
Structural audit
PPTX
Maintenance and repair of buildings.
PPTX
total quality management in construction industry
PPTX
Rate analysis in civil engineering
PPTX
Construction Safety Management
PPTX
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
PDF
02 Construction Projects
PPTX
Specifications of buildings
PPT
Rates Analysis For Calculating Material and Labour for building works
PPTX
Construction quality management plan (Construction Productivity Analysis)
PPTX
Mivan shuttering
PPTX
The Implementation of QMS in construction industry
PDF
Specifications, reports and tenders
PPTX
Construction Project Management
Insepction and quality control
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
Qaqc in civil construction
Quality management for civil engineering
107 quality control
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Structural audit
Maintenance and repair of buildings.
total quality management in construction industry
Rate analysis in civil engineering
Construction Safety Management
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
02 Construction Projects
Specifications of buildings
Rates Analysis For Calculating Material and Labour for building works
Construction quality management plan (Construction Productivity Analysis)
Mivan shuttering
The Implementation of QMS in construction industry
Specifications, reports and tenders
Construction Project Management
Ad

Viewers also liked (20)

PPTX
Project Quality Control
PPTX
Construction safety management
PPTX
Construction safety management
PDF
Upgrade iso 9001 2000 to 2008 version
PPTX
Managerial skills required for Civil engineers
PPTX
2014 ncae test admin guidelines ms. dolly pagatpatan
PPTX
Use safety measures at construction site
PDF
3 Questions PM needs to ask for Stakeholder Management
PPTX
PMP Preparation - 06 Time Management
PPTX
PMP Preparation - 08 Quality Management
DOCX
QUALITY MANAGEMENT SYSTEM OF COCA COLA
PPTX
Quality Control
PPTX
An Overview Of Project Financing
PPT
Introduction to construction management
PPTX
Legal Aspects for Property Transactions
PPT
23 realestate laws-maha
PPT
PPTX
Construction law
PPTX
Network analysis
PPTX
Network analysis & cpm
Project Quality Control
Construction safety management
Construction safety management
Upgrade iso 9001 2000 to 2008 version
Managerial skills required for Civil engineers
2014 ncae test admin guidelines ms. dolly pagatpatan
Use safety measures at construction site
3 Questions PM needs to ask for Stakeholder Management
PMP Preparation - 06 Time Management
PMP Preparation - 08 Quality Management
QUALITY MANAGEMENT SYSTEM OF COCA COLA
Quality Control
An Overview Of Project Financing
Introduction to construction management
Legal Aspects for Property Transactions
23 realestate laws-maha
Construction law
Network analysis
Network analysis & cpm
Ad

Similar to Quality Management In Construction (20)

DOCX
Quality assurance and control quality - PMP/CAPM by PMI
PPTX
5) PQM.pptx
PPT
Episode 24 : Project Quality Management
PPT
PROJECT QUALITY KNOLEDGE AREA.ppt
PPT
Quality Assurance Vs Quality Control
PPTX
Operation management - Quality assurance in operation
PPTX
Software Quality Analyst and Software Quality Management
PPTX
Quality Management- Definitions and requirements
PPSX
Project Quality Management
PPT
Role of qa&qc in manufacturing presentation
PPTX
Quality Assurance- goodbye bye bye.pptx
PDF
QA vs QC
PPTX
presentation quality awareness draft02.pptx
PDF
ISO 27001_2022- Audit and Auditing Guidelines.pdf
PDF
Quality Control and Quality Assurance
PPTX
Session 12 4th edition PMP
PDF
PMP Key-exam-concepts-QA-QC-VS-VS
PPTX
6 project quality management (ij)
PPTX
Introduction To Qaqc
PDF
QUALITY MANAGEMENT AND ISO 9001 STANDARD
Quality assurance and control quality - PMP/CAPM by PMI
5) PQM.pptx
Episode 24 : Project Quality Management
PROJECT QUALITY KNOLEDGE AREA.ppt
Quality Assurance Vs Quality Control
Operation management - Quality assurance in operation
Software Quality Analyst and Software Quality Management
Quality Management- Definitions and requirements
Project Quality Management
Role of qa&qc in manufacturing presentation
Quality Assurance- goodbye bye bye.pptx
QA vs QC
presentation quality awareness draft02.pptx
ISO 27001_2022- Audit and Auditing Guidelines.pdf
Quality Control and Quality Assurance
Session 12 4th edition PMP
PMP Key-exam-concepts-QA-QC-VS-VS
6 project quality management (ij)
Introduction To Qaqc
QUALITY MANAGEMENT AND ISO 9001 STANDARD

More from Isidro Sid Calayag (14)

PDF
Practical auditing
PDF
Ms project training ver 01
PDF
Kick off meeting presentation
PDF
Crash course rca training rev 01
PDF
5 s – a program to improve project.ppt [compatibility mode]
PPTX
Upgrade iso 9001 2000 to 2008 version
PDF
Ms project training ver 01
PPT
5 S – A Program To Improve Project
PPTX
Basic Cleanroom Protocol
PPTX
Practical Auditing
PPTX
Typical Quality Management System Based On Iso 9001 2008
PPTX
Kick Off Meeting Presentation
PPTX
Crash Course Rca Training Rev 01
PPTX
Rca Training Rev 0
Practical auditing
Ms project training ver 01
Kick off meeting presentation
Crash course rca training rev 01
5 s – a program to improve project.ppt [compatibility mode]
Upgrade iso 9001 2000 to 2008 version
Ms project training ver 01
5 S – A Program To Improve Project
Basic Cleanroom Protocol
Practical Auditing
Typical Quality Management System Based On Iso 9001 2008
Kick Off Meeting Presentation
Crash Course Rca Training Rev 01
Rca Training Rev 0

Quality Management In Construction

  • 1. Quality in Construction WorksAn Introduction to QA/QC Concept and Quality Management System Based on ISO 9001:2008
  • 2. Typical Slogan“Open ChallengeQuick Response”The BIG QUESTION is: How do we meet the challenge and achieve the benefits?
  • 3. Our Only AnswerISO 9001:2008and QA/QC
  • 4. ISO TC176 Update - BISThe Process Approach
  • 5. 1. CUSTOMER FOCUS2. LEADERSHIP8 MANAGEMENT PRINCIPLESISO 90013. INVOLVEMENT OF PEOPLE4. PROCESS APPROACH5. SYSTEM APPROACH6. CONTINUAL IMPROVEMENT7. FACTUAL APPROACH 8. MUTUAL BENEFICIAL SUPPLIER RELATIONSHIPS
  • 6. 6LEVEL 1 - QUALITY MANUALQuality PolicyQuality ObjectivesRequirement StandardOther Statutory and Regulatory Requirements
  • 7. LEVEL 2 - QUALITY PROCEDURESControl of DocumentsControl of RecordsInternal Quality AuditsControl of Non-conforming ProductsCorrective ActionPreventive Action7
  • 8. 8LEVEL 3 - QUALITY PLANIncoming Inspection PlanIn-Process Inspection PlanFinal Test Report/ Inspection PlanWork Instruction
  • 9. 9LEVEL 4 - FORMS / FORMATS/RECORDSTesting Report formsCommissioning Report FormsInspection formsCheck Sheets/Check ListMiscellaneous Documentation Forms
  • 10. Management Review Competence, Training and Awareness Planning and Production Review of Requirement Related to ProductDesign and Development Input 1023 MANDATORY RECORDS
  • 11. 1123 MANDATORY RECORDSDesign and Development OutputDesign and Development ReviewDesign and Development VerificationDesign and Development Validation Control of Design and Development Changes
  • 12. 1223 MANDATORY RECORDSPurchasing ProcessAvailability of Monitoring and Measuring EquipmentPreservation of ProductCustomer PropertyControl of Monitoring and Measuring EquipmentStandards used for Calibrating Monitoring and Measuring Equipment
  • 13. 1323 MANDATORY RECORDSIdentify and Enable CalibrationResult of Calibration and VerificationInternal AuditMonitoring and Measurement of ProductControl of Non-conforming ProductCorrective ActionPreventive Action
  • 14. Applying Quality Management System (ISO 9001) in Construction Works
  • 15. QA/QC ConceptsQuality Assurance Quality Assurance (or QA) covers all activities from design, development, production, installation, servicing and documentation.
  • 16. QA/QC ConceptsQuality Control Quality control refers to the process,most often implemented in manufacturing, monitoring the quality of finished products through statistical measures and an overall corporate commitment to producing defect-free products.
  • 17. QA/QC ConceptsOrganizational Level. At the organizational level, QA activities ensure that the program or organization is successful by overseeing the system implementation necessary for individual projects in the program, and making sure activities have the resources they need to be successful.
  • 18. QA/QC ConceptsProject Level (Design, Estimate and Initiation)At the project level, QA activities support the success of an individual project by ensuring that accurate information is channeled to the right people at the right time so that decisions can be made during project implementation.
  • 19. QA/QC ConceptsTechnical Level. At the technical level, QA activities ensure that the individual technical activities that generate, process, or synthesize data (or other information) for the decision process are performing within accepted limits.
  • 20. ISO 9001:2008QUALITY MANAGEMENT SYSTEM IS QUALITY ASSURANCE
  • 21. Roles of QA/QC Department Verify that requirements are followed,Verify that controlling and checking an activity have been done,Ensure that approved working methods are established,Evaluate the reported principal causes of non-conformances;Evaluate the effectiveness of corrective action, andDetermine where improvements are required21
  • 22. Quality Control Role of Quality Controller includes:monitoring,Inspection, reduction of variation, elimination of known causes, and22
  • 26. The OrganizationPresidentVice PresidentQA/QC ManagerEngineering ManagerQA/QC OfficerProject ManagerAuditorsQuality Controllers (Project Engineers)26
  • 27. FUNCTIONSPresidentVice PresidentQuality Activities FunctionConstruction Work FunctionQA/QC OfficerProject ManagerAuditorsQuality Controllers (Project Engineers)27
  • 28. CONSTRUCTION WORK FUNCTIONSPresidentVice PresidentProject ManagerQA/QC SiteProject Engineers(Site Supervision)SubcontractorsCAD28
  • 29. QUALITY WORK FUNCTIONSPresidentVice PresidentQA/QC Site ManagerProject Site ManagerProject Engineers(Quality Control)SubcontractorsCAD29
  • 30. As Applied to HOYA Project
  • 31. As Applied to HOYA Project
  • 32. As Applied to HOYA Project
  • 33. Quality Management Objectiveszero defect (no defects on project hand-over)identify and solve problems before customer doesestablish true quality control by making quality“built in” and not “inspected in”.33
  • 34. Why do we do this?For better efficiency,Fewer rejects, Reduce if not eliminate customer complaints,Improve customer relationImprove supplier relation.And to answer our slogan:
  • 35. Open Challenge Quick ResponseProblem 71.4%Problem 8Problem 60.6%4%Problem 58%Problem 415%Equipment /Materials Related Problem23%CUSTOMER COMPLAINTS(Est. Repair Cost: Ph P 1.7M in Laguna Area)Piping work related problem28%Ducting work related Problem20%35
  • 36. BAReplacementOrder PlacedOrderABOrder MadeOrder MadeBABBBBBTo CustomerDeliveryField TestingDeliveryConformingInstallConformingFuture repercussionsRoot CauseAInvestigationNon-ConformingB & CB & CB & CRepairsSCRAPQA HOLDNon-ConformingAQA HOLDCCCCCCREPAIRQuality CheckConformingInstallTo CustomerConformingAUnload Container, Bags,STORAGETestingTrucks etcLost RevenuePaperwork/DatabaseDumping CostsTransportFuture Costs (Reclaim/Environment)ASCRAPLost RevenueDumping CostsFuture Costs (Reclaim/Environment)Cost of QualityKEY:NORMALADDEDADDEDCOSTSCOSTSCOSTS36
  • 37. ReflectionPreventing mistakes is much more time and cost-effective than correcting them.37
  • 38. Action Reflections“Failure to prepare is preparing to fail”“Failure to plan is planning to fail”
  • 40. Prepared by: Sid CalayagReference:Quality Management SystemISO 9001:2008

Editor's Notes

  • #6: QUALITY MANAGEMENT PRINCIPLES The quality management principles are a set of comprehensive and fundamental rules or beliefs for leading and operating an organisation. They aim at continually improving performance over long term, by focusing on customers while addressing the needs of all stakeholders.As per the ISO, the following eight quality management principles can facilitate any organisation in creating quality work culture and successful implementation of quality management.1. Customer-focused OrganisationOrganizations depend on their customers. Customer-focused organisations produce products and services that customers need and provide them satisfaction. This can be achieved by the following actions: • Identify customer needs. • Design a product that responds to customer needs. • Produce and deliver the product as per the design. • Enhance after-sales service and handle complaints quickly. • Measure customer satisfaction. • Improve quality to delight the customer.2. LeadershipSenior leaders of an organisation need to set directions and create customer orientation, clear and visible quality values and high expectations. Values, directions and expectations must address all stakeholders. The senior leaders must commit to the development of the entire workforce and should encourage participation, learning innovation and creativity by all employees. Through their personal roles in planning, communications, review or organisation performance and employee recognition, the leaders serve as role models who reinforce values and expectations and build leadership and initiative.3. Involvement of PeopleInvolvement of the people is one way of improving quality and productivity. Involving people at all levels enables their abilities to be used for the benefit of the organisation. This can be done by providing a good corporate work culture, providing an interesting work system and environment, and building the capability of people to perform assigned tasks in the organisation. 4. Process ApproachA desired result is achieved more efficiently when related resources and activities are managed as a process.5. Systems Approach to ManagementIdentifying, understanding and managing a system of interrelated processes for a given objective contributes to the effectiveness and efficiency of the organisation. 6. Continuous ImprovementA permanent objective of the organisation is that it should continuously improve performance by addressing the needs of all the interested parties. 7. Factual Approach to Decision-makingEffective decisions are based on the logical or intuitive analysis of data and information8. Mutually Beneficial Supplier RelationshipThe ability of the organisation and its suppliers to create value is enhanced by mutually beneficial relationships.The main purposes of quality management systems can be summarised as below:• Customer satisfaction/customer delight by assuring the required minimum level of consistent quality.• Satisfying 'internal customers'.• Assuring the management of doing this at minimum possible total cost of quality.• Maximising output to input ratios of processes.• 'Prevention is better than cure' strategy to be implemented.• Improve quality of communication all around.• Develop competent sub-contractors as partners.• Make continual improvement an ongoing feature of the company's culture.
  • #16: It introduced the sayings "fit for purpose" and "do it right the first time". It includes the regulation of the quality of raw materials, assemblies, products and components; services related to production; and management, production, and inspection processes.
  • #17: Quality control principles can also be utilized in service industries.
  • #22: The need for audit Once procedures are established, how can it be ensured that the procedures are being implemented and are effective? What takes the place of inspection in the old system of operation? The answer is a compliance audit.An audit is undertaken to indicate whether a procedure or job instruction is working satisfactorily. Verifying, by audit, that the quality system requirements are being followed throughout the organization and that effective procedures and job instructions are being implemented by all departments or disciplines.Verifying that those responsible for controlling and checking an activity have done so in a systematic manner and that there is objective evidence available to confirm such;Ensuring that all procedural non-conformances are resolved.Ensuring that fundamental working methods are established and that fully approved procedures are developed to cover them and that all departments and personnel are aware of, and have access to, current versions of these procedures.Verifying that all procedures are regularly reviewed and updated as necessary.Determining and reporting the principal causes of quality losses and non-conformances;Determining, with senior management, where improvements are required and, where necessary, recommending the corrective action.
  • #23: Quality control is the collective term for in-process activities and techniques intended to create specific quality characteristics. These includes monitoring, reduction of variation, elimination of known causes, and efforts to increase economic effectiveness.Quality ControlQuality control refers to the activities associated with the creation of project deliverables. It is used to verify that deliverables are of acceptable quality and that they meet the completeness and correctness criteria established in the quality planning process. Quality control is conducted continually throughout a project and is the responsibility of team members and the project manager.Quality ToolsList any quality-related tools that this project will utilize