Remote PI Planning
April 2020
Introductions
Laura Richardson
Webinar Host &
SVP Sales, CSM, SPC
lrichardson@appliedframeworks.com
John Mulligan
Principal Consultant
CSM, CSP-SM, CSPO, SPC
jmulligan@appliedframeworks.com
Kevin Rosengren,
Engagement Director
CSP-PO, CSP-SM, SPC
krosengren@appliedframeworks.com
The Challenge
● The response to COVID-19 has
prevented companies from collaborating
face-to-face
● The “show must go on” for many
companies to continue to collaborate in
the face of distributed teams
● Holding off on planning activities will
impact how businesses will recover and
maintain competitive positioning
Remote planning faces several challenges
● Planning remotely is different and should be treated differently
● An extended runway is needed for preparation
● Maintaining communications among team members is critical
Four key elements of effective remote
planning
1. Thoughtful advanced scheduling and preparation
2. Extended timeline for fully remote participation
3. Added logistics and coordinated remote facilitation
4. Collaboration tools required to facilitate remote interaction
Schedules for remote planning differ from
in-person events
• Consider scheduling and sequencing events based on dependencies
• Devote fewer hours across more days
○ Recommend 4 days; maximum 4 hours of focused, online collaboration
○ Use the 45/15 rule: 15 minutes break after 45 minutes of online collaboration
• Breakout sessions/teams require facilitators for each
• Remote presentations require effective Q&A and feedback coordination
• Expect the unexpected in extraordinary times
○ Acknowledge parents managing children at home
○ Prepare for bandwidth issues with high usage
An extended timeline for preparation is
required
• Identify portfolio
allocation across
features, R&D, defects,
tech debt, infra, etc.
• Decompose, Prioritize
and estimate backlog
• Begin narrowing down
targeted features for
the iteration
• Establish Calendar
Invites for planning
• Finalize list of targeted
features for the iteration
• Decompose features into
smallest units of value
• Refine estimation
• Prepare initial inter-team
risk and dependencies
• Identify remote
collaboration tool-set to
support planning event
4WEEKS 3WEEKS 2WEEKS 1WEEK
• Continue backlog
refinement
• Finalize business
context, vision
presentations
• Facilitation team
meet to plan logistics,
review with leadership
• Implement and
acclimate employees
to new tools
• Update risks &
dependencies
• Adjust target feature
set for iteration based
on new discoveries
• Conduct dry run of
collaboration tools
• Rehearse timing of
business and
architectural vision
presentations
An extended timeline for preparation is
required
• Identify portfolio
allocation across
features, R&D, defects,
tech debt, infra, etc.
• Decompose, Prioritize
and estimate backlog
• Begin narrowing down
targeted features for
the iteration
• Establish Calendar
Invites for planning
• Finalize list of targeted
features for the iteration
• Decompose features into
smallest units of value
• Refine estimation
• Prepare initial inter-team
risk and dependencies
• Identify remote
collaboration tool-set to
support planning event
4WEEKS 3WEEKS 2WEEKS 1WEEK
• Continue backlog
refinement
• Finalize business
context, vision
presentations
• Facilitation team
meet to plan logistics,
review with leadership
• Implement and
acclimate employees
to new tools
• Update risks &
dependencies
• Adjust target feature
set for iteration based
on new discoveries
• Conduct dry run of
collaboration tools
• Rehearse timing of
business and
architectural vision
presentations
Skilled facilitation and coordination will
be required
• Designate several roles to orchestrate people, logistics and tools
○ Planning Lead: senior, central galvanizing facilitator for planning event
○ Scrum Masters: arms and legs of Planning Lead, one for each team
○ Tool Lead: lead for collaboration and communication tools
• Set specific times for product and business leader “rotations”
○ Balance drop-ins and availability for questions
○ Schedule specific times to rotate through teams
• Actively manage timeboxes; adjust daily
○ Clearly establish time-boxes and adhere to them each day; adjust accordingly
○ Rehearse presentations to ensure presenters don’t run long
Four half-days are recommended for
remote planning
Business Context
Planning Context
Product
Solution/Vision
Architecture Vision
& Dev Practices
Final Plan Review
Mgmt Review &
Problem Solving
Draft Plan Review
Team Breakouts
Team Breakouts
Planning
Adjustments Program Risks
8:00 -
8:45
9:00 -
10:15*
10:30 -
11:15
11:30 -
12:00
8:00 -
11:00*
11:00 -
12:00
12:15 -
~~~
8:00 -
8:45
9:00 -
11:00*
11:10 -
12:00
8:00 -
8:45
9:00 -
9:15
Confidence Vote
Plan rework
Planning
Retrospective
9:15 -
10:45*
11:00 -
12:00
* Including intermittent breaks
Facilitator Inspect
& Adapt
1:00 -
1:45
Facilitator Inspect
& Adapt
2:00 -
2:45
Facilitator Inspect
& Adapt
1:00 -
1:45
Day 1 Day 2 Day 3 Day 4
Periodic synchronization with leads
throughout planning event
Synchronization checklists can help...
• Are you identifying and estimating stories?
• Did you consider whether you need to allocate capacity for maintenance in your
interactions?
• Have you begun resolving dependencies with other teams?
• Are your dependencies represented in the Program Board?
• Are you identifying team and release risks?
• On track for completing your draft plan?
• Do you have any blocking issues that are impacting planning?
• Are you discussing trade-offs and conflicting priorities with your Product team?
An investment in communication and
collaboration tools is essential
• All remote collaborations occur via video
• Virtual instant messengers will support inter/intra team communications
• Participants will need to participate in polling and voting
• Virtual Planning Board to replicate in-person experience
• Virtual collaboration tools to support retrospectives
• Virtual breakout sessions will need to be orchestrated
• Transparency of planning artifacts needs to be considered
Capabilities for good Collaboration Tools
for remote planning
• Video Tool
○ Main Sessions
○ Breakout Sessions
○ Q&A / Polling
○ Screen Sharing
○ Whiteboard
○ Recording
• Virtual Collaboration / Program Board
○ Centralized, customizable view
○ Real time updates
• Instant Messenger
○ 1:1 and 1:Many communications
○ Channels:
⇾ General Announcements
⇾ Each team channel
⇾ Escalations
⇾ Architectural
⇾ Product
⇾ “Shared Services”
⇾ Leads
• Artifact Repository
○ Real time collaborative update/edits
Virtual Collaboration Board is central to
planning
Miro
• Highly scalable with
zoom in/out
• Simple, easy templates
for planning
• “String” for connected
items
• Plugin to connect cards
to Jira
Virtual Collaboration Board is central to
planning
Weave
• Highly customizable
• Easy export of data
• Scalable for both team and
program
• Separate simultaneous team and
program views
• No license required
appliedframeworks.com
AGILE CONSULTING | ONLINE TRAINING | CLASSROOM TRAINING
You have questions, we’re here to help...

More Related Content

PDF
SAFe® PI Planning - 4 locations - but how?
PPTX
ANI | Agile Kolkata | PI Planning in Action | Anand Pandey | 19th Oct 2019
PDF
Turning Up the Magic in PI Planning
PDF
How to do effective pi planning?
PDF
Remote PI Planning Tips & Tricks - Agile en Seine 2020
PDF
Portfolio Management in an Agile World - Rick Austin
PDF
Product Backlog Refinement
PDF
Agile portfolio management
SAFe® PI Planning - 4 locations - but how?
ANI | Agile Kolkata | PI Planning in Action | Anand Pandey | 19th Oct 2019
Turning Up the Magic in PI Planning
How to do effective pi planning?
Remote PI Planning Tips & Tricks - Agile en Seine 2020
Portfolio Management in an Agile World - Rick Austin
Product Backlog Refinement
Agile portfolio management

What's hot (20)

PDF
Scrum Simulation with LEGO, Agile Game
PDF
Modern Professional Scrum using Flow and Kanban - Agile and Beyond Detroit 2019
PPTX
Scrum for Beginners
PDF
Agile transformation Explained: Agile 2017 Session
PDF
An Introduction to Scaled Agile Framework (SAFe)
PPTX
Lightning Talk: Meaningfully Reframing PI Planning
PDF
Practical Guide to Scrum
PPT
Agile effort estimation
PPTX
PDF
Agile & SCRUM basics
PDF
Agile Transformation v1.27
PPTX
Scaled Agile Framework (SAFe) Roles and Meetings
PDF
Scrum 101
PPTX
Product Owner
PDF
The Agile Adoption Roadmap (Keynote by Tim Abbott)
PDF
Scrum vs Kanban | What are the differences between Scrum and Kanban | Edureka
PDF
Agile Fundamentals
PPTX
Scrum - Product Backlog
PPTX
2017 Scrum by Picture
PPTX
Scrum In Ten Slides
Scrum Simulation with LEGO, Agile Game
Modern Professional Scrum using Flow and Kanban - Agile and Beyond Detroit 2019
Scrum for Beginners
Agile transformation Explained: Agile 2017 Session
An Introduction to Scaled Agile Framework (SAFe)
Lightning Talk: Meaningfully Reframing PI Planning
Practical Guide to Scrum
Agile effort estimation
Agile & SCRUM basics
Agile Transformation v1.27
Scaled Agile Framework (SAFe) Roles and Meetings
Scrum 101
Product Owner
The Agile Adoption Roadmap (Keynote by Tim Abbott)
Scrum vs Kanban | What are the differences between Scrum and Kanban | Edureka
Agile Fundamentals
Scrum - Product Backlog
2017 Scrum by Picture
Scrum In Ten Slides
Ad

Similar to Remote PI Planning: ScrumMaster & RTE Edition (20)

PPTX
Remote PI Planning that Works for Product Owners
PDF
Are we there yet? Rev up your productivity with project management tools
PDF
Are we there yet? Rev up your productivity with project management tools
PPSX
Directions NA Water-Agile-Fall methodology and NAV implementation
PPTX
Brief introduction to project management and project management tools
PPTX
Project Management
PPTX
Project Management Basics
PPTX
Project scheduling
PDF
PRESTO Change Management 2018
PPTX
Project management
PPTX
Agile Project Management
PPT
pmppgoav14.ppt
PDF
Change management made easy with PRESTO Digital Change Manager
PDF
Project Management Toolkit_Final v1.0
PDF
XebiCon'17 : //Tam-tams// Voici l’histoire de la disparition des dinosaures d...
PDF
Supercharge Azure DevOps with Advanced Scheduling and Robust Project Management
PDF
Process and flows of an IT Project - presentation.pdf
PDF
How to Ensure Accountability with Remote Developers?
PPTX
Scrum in Distributed Teams
PPT
Got Scope Creep Presentation by Axium
Remote PI Planning that Works for Product Owners
Are we there yet? Rev up your productivity with project management tools
Are we there yet? Rev up your productivity with project management tools
Directions NA Water-Agile-Fall methodology and NAV implementation
Brief introduction to project management and project management tools
Project Management
Project Management Basics
Project scheduling
PRESTO Change Management 2018
Project management
Agile Project Management
pmppgoav14.ppt
Change management made easy with PRESTO Digital Change Manager
Project Management Toolkit_Final v1.0
XebiCon'17 : //Tam-tams// Voici l’histoire de la disparition des dinosaures d...
Supercharge Azure DevOps with Advanced Scheduling and Robust Project Management
Process and flows of an IT Project - presentation.pdf
How to Ensure Accountability with Remote Developers?
Scrum in Distributed Teams
Got Scope Creep Presentation by Axium
Ad

More from Laura Caldie Richardson (6)

PDF
Mentoring is a Scrum Master Super Power
PDF
Scrum with Kanban
PDF
Introduction to Vertical Story Slicing
PDF
Agile Metrics: Patterns and Anti-Patterns for Enterprise Agility
PPTX
Collaborative Cost Cutting
PPTX
Product Playbook - An Essential Tool for Product Managers
Mentoring is a Scrum Master Super Power
Scrum with Kanban
Introduction to Vertical Story Slicing
Agile Metrics: Patterns and Anti-Patterns for Enterprise Agility
Collaborative Cost Cutting
Product Playbook - An Essential Tool for Product Managers

Recently uploaded (20)

PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Advanced IT Governance
PPTX
breach-and-attack-simulation-cybersecurity-india-chennai-defenderrabbit-2025....
PPTX
MYSQL Presentation for SQL database connectivity
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PPTX
Cloud computing and distributed systems.
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Electronic commerce courselecture one. Pdf
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
CIFDAQ's Market Insight: SEC Turns Pro Crypto
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Diabetes mellitus diagnosis method based random forest with bat algorithm
Dropbox Q2 2025 Financial Results & Investor Presentation
Advanced IT Governance
breach-and-attack-simulation-cybersecurity-india-chennai-defenderrabbit-2025....
MYSQL Presentation for SQL database connectivity
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Cloud computing and distributed systems.
The Rise and Fall of 3GPP – Time for a Sabbatical?
Understanding_Digital_Forensics_Presentation.pptx
Electronic commerce courselecture one. Pdf
Mobile App Security Testing_ A Comprehensive Guide.pdf
CIFDAQ's Market Insight: SEC Turns Pro Crypto
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Network Security Unit 5.pdf for BCA BBA.
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy

Remote PI Planning: ScrumMaster & RTE Edition

  • 1. appliedframeworks.com AGILE CONSULTING | ONLINE TRAINING | CLASSROOM TRAINING Remote PI Planning April 2020
  • 2. Introductions Laura Richardson Webinar Host & SVP Sales, CSM, SPC lrichardson@appliedframeworks.com John Mulligan Principal Consultant CSM, CSP-SM, CSPO, SPC jmulligan@appliedframeworks.com Kevin Rosengren, Engagement Director CSP-PO, CSP-SM, SPC krosengren@appliedframeworks.com
  • 3. The Challenge ● The response to COVID-19 has prevented companies from collaborating face-to-face ● The “show must go on” for many companies to continue to collaborate in the face of distributed teams ● Holding off on planning activities will impact how businesses will recover and maintain competitive positioning
  • 4. Remote planning faces several challenges ● Planning remotely is different and should be treated differently ● An extended runway is needed for preparation ● Maintaining communications among team members is critical
  • 5. Four key elements of effective remote planning 1. Thoughtful advanced scheduling and preparation 2. Extended timeline for fully remote participation 3. Added logistics and coordinated remote facilitation 4. Collaboration tools required to facilitate remote interaction
  • 6. Schedules for remote planning differ from in-person events • Consider scheduling and sequencing events based on dependencies • Devote fewer hours across more days ○ Recommend 4 days; maximum 4 hours of focused, online collaboration ○ Use the 45/15 rule: 15 minutes break after 45 minutes of online collaboration • Breakout sessions/teams require facilitators for each • Remote presentations require effective Q&A and feedback coordination • Expect the unexpected in extraordinary times ○ Acknowledge parents managing children at home ○ Prepare for bandwidth issues with high usage
  • 7. An extended timeline for preparation is required • Identify portfolio allocation across features, R&D, defects, tech debt, infra, etc. • Decompose, Prioritize and estimate backlog • Begin narrowing down targeted features for the iteration • Establish Calendar Invites for planning • Finalize list of targeted features for the iteration • Decompose features into smallest units of value • Refine estimation • Prepare initial inter-team risk and dependencies • Identify remote collaboration tool-set to support planning event 4WEEKS 3WEEKS 2WEEKS 1WEEK • Continue backlog refinement • Finalize business context, vision presentations • Facilitation team meet to plan logistics, review with leadership • Implement and acclimate employees to new tools • Update risks & dependencies • Adjust target feature set for iteration based on new discoveries • Conduct dry run of collaboration tools • Rehearse timing of business and architectural vision presentations
  • 8. An extended timeline for preparation is required • Identify portfolio allocation across features, R&D, defects, tech debt, infra, etc. • Decompose, Prioritize and estimate backlog • Begin narrowing down targeted features for the iteration • Establish Calendar Invites for planning • Finalize list of targeted features for the iteration • Decompose features into smallest units of value • Refine estimation • Prepare initial inter-team risk and dependencies • Identify remote collaboration tool-set to support planning event 4WEEKS 3WEEKS 2WEEKS 1WEEK • Continue backlog refinement • Finalize business context, vision presentations • Facilitation team meet to plan logistics, review with leadership • Implement and acclimate employees to new tools • Update risks & dependencies • Adjust target feature set for iteration based on new discoveries • Conduct dry run of collaboration tools • Rehearse timing of business and architectural vision presentations
  • 9. Skilled facilitation and coordination will be required • Designate several roles to orchestrate people, logistics and tools ○ Planning Lead: senior, central galvanizing facilitator for planning event ○ Scrum Masters: arms and legs of Planning Lead, one for each team ○ Tool Lead: lead for collaboration and communication tools • Set specific times for product and business leader “rotations” ○ Balance drop-ins and availability for questions ○ Schedule specific times to rotate through teams • Actively manage timeboxes; adjust daily ○ Clearly establish time-boxes and adhere to them each day; adjust accordingly ○ Rehearse presentations to ensure presenters don’t run long
  • 10. Four half-days are recommended for remote planning Business Context Planning Context Product Solution/Vision Architecture Vision & Dev Practices Final Plan Review Mgmt Review & Problem Solving Draft Plan Review Team Breakouts Team Breakouts Planning Adjustments Program Risks 8:00 - 8:45 9:00 - 10:15* 10:30 - 11:15 11:30 - 12:00 8:00 - 11:00* 11:00 - 12:00 12:15 - ~~~ 8:00 - 8:45 9:00 - 11:00* 11:10 - 12:00 8:00 - 8:45 9:00 - 9:15 Confidence Vote Plan rework Planning Retrospective 9:15 - 10:45* 11:00 - 12:00 * Including intermittent breaks Facilitator Inspect & Adapt 1:00 - 1:45 Facilitator Inspect & Adapt 2:00 - 2:45 Facilitator Inspect & Adapt 1:00 - 1:45 Day 1 Day 2 Day 3 Day 4
  • 11. Periodic synchronization with leads throughout planning event Synchronization checklists can help... • Are you identifying and estimating stories? • Did you consider whether you need to allocate capacity for maintenance in your interactions? • Have you begun resolving dependencies with other teams? • Are your dependencies represented in the Program Board? • Are you identifying team and release risks? • On track for completing your draft plan? • Do you have any blocking issues that are impacting planning? • Are you discussing trade-offs and conflicting priorities with your Product team?
  • 12. An investment in communication and collaboration tools is essential • All remote collaborations occur via video • Virtual instant messengers will support inter/intra team communications • Participants will need to participate in polling and voting • Virtual Planning Board to replicate in-person experience • Virtual collaboration tools to support retrospectives • Virtual breakout sessions will need to be orchestrated • Transparency of planning artifacts needs to be considered
  • 13. Capabilities for good Collaboration Tools for remote planning • Video Tool ○ Main Sessions ○ Breakout Sessions ○ Q&A / Polling ○ Screen Sharing ○ Whiteboard ○ Recording • Virtual Collaboration / Program Board ○ Centralized, customizable view ○ Real time updates • Instant Messenger ○ 1:1 and 1:Many communications ○ Channels: ⇾ General Announcements ⇾ Each team channel ⇾ Escalations ⇾ Architectural ⇾ Product ⇾ “Shared Services” ⇾ Leads • Artifact Repository ○ Real time collaborative update/edits
  • 14. Virtual Collaboration Board is central to planning Miro • Highly scalable with zoom in/out • Simple, easy templates for planning • “String” for connected items • Plugin to connect cards to Jira
  • 15. Virtual Collaboration Board is central to planning Weave • Highly customizable • Easy export of data • Scalable for both team and program • Separate simultaneous team and program views • No license required
  • 16. appliedframeworks.com AGILE CONSULTING | ONLINE TRAINING | CLASSROOM TRAINING You have questions, we’re here to help...