Hydraulic fracturing is a method to estimate initial stresses by pressurizing a sealed borehole section until it fractures. The fracture orientation indicates the minimum stress direction. This provides the orientation of the maximum horizontal stress for vertical boreholes. The breakdown pressure estimates the minimum principal stress, while the reopening pressure estimates the maximum principal stress. This allows estimating the 2D stress field in the horizontal plane, making it suitable for deep measurements where no underground access exists. However, it requires space for equipment and is best suited to vertical boreholes.