2
Most read
4
Most read
5
Most read
Process change Document SAP PP Module
MTO – Make To Order
In make-to-orderproduction,aproductisproducedspecificallyforanindividual salesorder.Thisplanningstrategyis
usedwhenplanningof the (parent) productisnotrequiredornotpossible.NeitherDemandManagementisinvolvedin
thisprocess,noris there an allocationmechanism.Ordersare takenastheycome.Thisstrategyrepresentsaproduction
procedure inwhicheachproductis onlyproducedonce,althoughovertime the same orsimilarproductionprocesses
are repeated.Eachproductisspecificallyproducedforanindividual customersothatthe finishedproductisrarely
placedinstock.
So that we needtosetright the masterdata to support“MTO – Make to order “scenario.
MaintainviewsinMM01  MRP Views
1. MRP1/MRP2/MRP3/MRP4 (Selectall fourviewsfordemandmanagementandProductionplanning)
2. Work schedulingview (Mandatorytocreate Productionorder)
3. Qualitymanagementview (MandatoryforQualityinspection)
4. Accountingviews
5. Costingviews
MRP Procedure:
MRP Type - PD MRP
MRP Controller -
Lot-sizingprocedure:
Lot size - EX Lot-for-lotorderquantity
Procurement
Procurementtype - E (In-house production)
Backflush - 1(Always Backflush)
Backflush Indicator: Determineswhetherthe Backflushindicatorissetinthe productionorder.
Here,a 3-level hierarchical logicisapplied:
1. In the routing,the Backflushindicatorissetinthe componentassignment.
2. In the material masterrecord,the Backflushindicatorhasthe characteristic"AlwaysBackflush".
3. In the material masterrecord,the Backflushindicatorhasthe characteristic"Workcenterdecides",the indicator
beingsetinthe work center.
Each material componentisassignedtoan operationin the production order.
If a material componentisback flushed,the systempoststhe withdrawalonlyupon confirmationof the operation.The
withdrawal isthenpostedautomatically.
SchedulingMarginKey for Floats
Keythat the systemusestodetermine the floatsrequiredforschedulinganorder.
1.In-house productiontime: Specifiesthe time inworkdaysneededtoproduce the material in-house,In-house
productiontime isindependentof the orderquantity.
2. Goods ReceiptProcessingTime inDays
3. SchedulingMarginKey
Planningstrategy group
The strategygroup groupsall the planningstrategiesthatcanbe usedfor a particularmaterial.The planningstrategy
representsthe procedure usedforplanninga material andis(technicallyspeaking)controlledbythe MRPtypes.
Strategygroup - 20(Make-to-orderproduction)
AvailabilityCheck
AvailabilityCheck - 02 Individual requirements forSFG/FG.
Work scheduling
Productionsupervisor - P72
Quality Management
Inspectiontype - Needtosetup.
Accounting1 View
Price Control - S (Standard) forSFG & FG & V (Movingaverage price forRaw materials)
Costing1 view
Material Is Costedwith Quantity Structure
If you alwayscostyour materials(includingrawmaterials) usingcostingwithquantitystructure,youshouldturnonthis
indicator.Thisimprovesperformance,because the systemdoesnotsearchunnecessarilyforexistingcostestimates
withouta quantity structure.
Regardlessof the setting,youcancost a single material withorwithoutquantitystructure.However,youshouldbearin
mindthat thissettingisalwaysusedinthe costingrunand inmixedcosting(creatingprocurementalternatives).
For everycostestimate,the systemsearchesforexistingcostestimatesthathave the materialsintheirstructure.If
withinthe periodacost estimate exists and hasbeenreleased,the systemcopiesit.
1. If thisindicatoris set,the material iscostedusingcostingwitha quantitystructure.
The systemsearchesforany existing costestimateswithquantitystructure forthe individualmaterials;itignores
existingcostestimateswithoutquantitystructure.If the systemdoesnotfindanyvalidcostingdataforthe materials, it
looksforan existingcostingbasedonthe entriesinthe transfercontrol,coststhe material,oraccessesthe price inthe
material master.
2. If thisindicatoris not set,the plannedcostsforthe material are calculated usingthe costestimate withoutquantity
structure.Inthis case,youuse unit costing to create the quantitystructure manuallybyenteringcostingitemsfor
materialsandactivitytypes,forexample.
The systemnowsearchesforany existingreleased costestimateswithoutquantitystructure.If acostestimate without
quantitystructure existsforamaterial,the resultsof thiscostestimate are includedinacostestimate withquantity
structure.If there isno cost estimate withoutquantitystructure,the costestimate withquantitystructure accessesthe
price inthe material masterrecord.The plannedcostsforthismaterial thengointothe cost estimate withquantity
structure as raw material costs.
Thisdoes not applyif the indicatorIgnore prod cost est w/o qty issetin the costingvariant.
Variance Key
Keythat controlsvariance calculation.
Variancescanonlybe calculatedforthe ordersforwhicha variance keyhas beenentered.Thiskeyisdefaultedthrough
the costingviewinthe material masterrecord.
If you have activatedvariance calculationinthe variance key,the valueof the scrapis calculatedattarget cost and
subtractedfromthe actual costs before the variancesare determined.
Material-related origin
If this indicatorisset,the material numberwillbe writtentothe costelementitemizationinthe Controllingmodule.
If you set thisindicator, the costs incurredwill be updated
•Under a primary cost element
•With reference tothe material number
NewMaster data – Decidedby ProductionDept (Kindlycheck with shareduser manuals)
1. Material (MM01 –No needif available)
2. BOM (CS01-Noneedif available)
3. Activitytypes – Will be plannedaccordingtothe Nomenclature &ActivityPrice.
4. Work center(CR01)
5. Routing(CA01)
Sap pp process change doc mto
Processflow is a Make to Order scenario (Strategy group - 20 MTO)
Internal order(KO01/KO02/KO03) Followingin Business
Create Quotation(VA21/VA22/VA23) FollowinginBusiness
1. Salesordercreationfor customer(VA01)
2. DemandManagementviaSalesorder(MD51)
3. Stock/RequirementsList(MD04)
4. ConvertcomponentplannedordertoPR(MD04) Purchase orderMIGOMIRO.
5. Convertfinishedmaterial plannedordertoproductionorder(MD04 / CO41)
6. Release of productionorder(CO02)
7. Goods issue tothe productionwithmovementtype 261(MB1A) makingby Back flush
8. Confirmationof Productionorder(CO11N-operation/CO15-ProductionOrder)
Kindlycheckthe ActivityPrice inTransactionKP26Wrt Period,Costcenter,Activitytype.
9. Goods receiptagainstProductionorderwithmovementtype 101(MIGO) (ProductionorderstatuschangedtoTECO –
Change inCO02)
10. OrdersettlementforProductionorder(KO88)
Standardcost estimation: CK11N & Simulation costinginCKUC.
Kindly checkthe Price of SFG / FG.
11. Deliveryof Finishedproductswithmovementtype 601(VL01N/VL02)
12. Billing/Invoice (VF01/VF02/VF03)
We needtosetupBOM/Routing/Workcenters,alsowe came toknow thatthe activitytypes needtobe decidedforall
above the operations
Note:Bill of materialsforSFG or FG must be maintainedbeforethe productonorderconfirmation.
Displayof multi –level BOM
CS12 - Multi-Level BOM
-----x----

More Related Content

PDF
Shelf Life Planning in SAP S/4 HANA "MRP Live"
PDF
Batch Expiration Date Management in SAP MRP/MPS
PPT
Mto end to end process demo
PDF
MRP Live on S/4 HANA
PDF
Shelf Life Planning in SAP MRP/MPS
PPTX
PDF
Sap pp-user-manual
PDF
SAP ECC Demand planning strategies
Shelf Life Planning in SAP S/4 HANA "MRP Live"
Batch Expiration Date Management in SAP MRP/MPS
Mto end to end process demo
MRP Live on S/4 HANA
Shelf Life Planning in SAP MRP/MPS
Sap pp-user-manual
SAP ECC Demand planning strategies

What's hot (20)

PDF
Sap pp tutorial
DOCX
A Guide for pi sheet
PPTX
SAP S4 HANA MM 1709 Overview (mindmap edition) Final
PDF
SAP Long Term PLANNING
PDF
Make to order document
PPTX
SAP Flexible workflows.pptx
PDF
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
PPTX
Sap pp org
PDF
sap-ps-project-systems
PDF
SAP PM Training Manual - www.sapdocs.info
PDF
BSM smart factory - Industry 4.0
DOCX
MRP views in Material Master
PDF
Guidelines for creating a qm certificate for delivery in product lifecycle ma...
PPTX
글로벌 고객 사례를 통하여 소개하는 혁신적인 데이터 웨어하우스 - 김형일 (AWS 솔루션즈 아키텍트)
DOC
Sudhir_SAP PP QM & MM resume
PDF
Sap pp shop floor control configuration
PDF
Step by-step-to-upload-new-customer-master-record-with-lsmw
PDF
SAP Document Management System(DMS)-PLM 120
PDF
Ps training mannual ( configuration )
PDF
SAP PP MRP Guide for Beginners
Sap pp tutorial
A Guide for pi sheet
SAP S4 HANA MM 1709 Overview (mindmap edition) Final
SAP Long Term PLANNING
Make to order document
SAP Flexible workflows.pptx
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
Sap pp org
sap-ps-project-systems
SAP PM Training Manual - www.sapdocs.info
BSM smart factory - Industry 4.0
MRP views in Material Master
Guidelines for creating a qm certificate for delivery in product lifecycle ma...
글로벌 고객 사례를 통하여 소개하는 혁신적인 데이터 웨어하우스 - 김형일 (AWS 솔루션즈 아키텍트)
Sudhir_SAP PP QM & MM resume
Sap pp shop floor control configuration
Step by-step-to-upload-new-customer-master-record-with-lsmw
SAP Document Management System(DMS)-PLM 120
Ps training mannual ( configuration )
SAP PP MRP Guide for Beginners
Ad

Similar to Sap pp process change doc mto (20)

PDF
Generic concept of erp
PPTX
FI - MM.pptx
PPTX
CHAPTER-28.pptx annnnnnnnnnaaaaaaaaaaann
PDF
INFOCUS16-Process Manufacturing
PPTX
Sapmmint 131118092016-phpapp02
PPTX
Inventory management
PDF
1690512145601.pdf
PDF
MicrosoftDynamicsAX2009CostManagementWhitePaper.pdf
PPTX
heizer_om12_ch014 final (1).pptx
PPTX
SAP MM Interview questions
PPTX
Mba om 09_resource_planning
PPT
ProductCosting Material Ledger.ppt
PPT
COSTING.ppt
PDF
Sample sap mm pp course material
PDF
Sample sap mm pp course material
PDF
JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016
DOCX
Product costing s4 hana
PDF
ERP Solution for MSMEs by Sumeet Mayor.pdf
PPTX
sales order type configurations details and Item category configurations deta...
PPTX
Inforln.com Baan 4 to LN Upgrade Differences Training - Enterprise Planning
Generic concept of erp
FI - MM.pptx
CHAPTER-28.pptx annnnnnnnnnaaaaaaaaaaann
INFOCUS16-Process Manufacturing
Sapmmint 131118092016-phpapp02
Inventory management
1690512145601.pdf
MicrosoftDynamicsAX2009CostManagementWhitePaper.pdf
heizer_om12_ch014 final (1).pptx
SAP MM Interview questions
Mba om 09_resource_planning
ProductCosting Material Ledger.ppt
COSTING.ppt
Sample sap mm pp course material
Sample sap mm pp course material
JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016
Product costing s4 hana
ERP Solution for MSMEs by Sumeet Mayor.pdf
sales order type configurations details and Item category configurations deta...
Inforln.com Baan 4 to LN Upgrade Differences Training - Enterprise Planning
Ad

More from Lokesh Modem (20)

DOCX
Variant configuration.docx
DOCX
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
PDF
Fiori Apps Library.pdf
DOC
Material Ledger Configuration.doc
DOCX
SAP S4 HANA.docx
DOC
What is Cost of Goods Sold.doc
DOC
FSD_Stock aging Report Based On consumption.doc
PPTX
Sap sd org
PDF
SAP Solution Manger 7.2
PDF
E invoice webinar_jan2020_v2
PDF
Gst digital compliance roadmap jan2010 v1
PPTX
SAP MM Business Scenarios
PDF
SAP Third party scenarios _automatives
DOC
Fsd for mass upload program to create and change of scheduling agreement
DOC
Pir price updation in SCHEDULLING AGREEMENT
DOC
Fsd zpriz price details from a017 & a018
DOC
Fsd for upload program for delivery completion indicator of scheduling agreem...
PDF
Guidelines for xl_filling
PDF
Gst e way bill solution from sap
PDF
Transaction code creation
Variant configuration.docx
SAP S4 HANA SOURCING AND PROCUREMENT CONTENT.docx
Fiori Apps Library.pdf
Material Ledger Configuration.doc
SAP S4 HANA.docx
What is Cost of Goods Sold.doc
FSD_Stock aging Report Based On consumption.doc
Sap sd org
SAP Solution Manger 7.2
E invoice webinar_jan2020_v2
Gst digital compliance roadmap jan2010 v1
SAP MM Business Scenarios
SAP Third party scenarios _automatives
Fsd for mass upload program to create and change of scheduling agreement
Pir price updation in SCHEDULLING AGREEMENT
Fsd zpriz price details from a017 & a018
Fsd for upload program for delivery completion indicator of scheduling agreem...
Guidelines for xl_filling
Gst e way bill solution from sap
Transaction code creation

Recently uploaded (20)

PDF
Wondershare Recoverit Full Crack New Version (Latest 2025)
PDF
Website Design Services for Small Businesses.pdf
PPTX
Advanced SystemCare Ultimate Crack + Portable (2025)
PDF
Microsoft Office 365 Crack Download Free
PDF
AI/ML Infra Meetup | Beyond S3's Basics: Architecting for AI-Native Data Access
PDF
Autodesk AutoCAD Crack Free Download 2025
DOC
UTEP毕业证学历认证,宾夕法尼亚克拉里恩大学毕业证未毕业
PDF
AI/ML Infra Meetup | LLM Agents and Implementation Challenges
PPTX
Introduction to Windows Operating System
PDF
EaseUS PDF Editor Pro 6.2.0.2 Crack with License Key 2025
PPTX
"Secure File Sharing Solutions on AWS".pptx
PDF
How Tridens DevSecOps Ensures Compliance, Security, and Agility
PDF
AI-Powered Threat Modeling: The Future of Cybersecurity by Arun Kumar Elengov...
PDF
Salesforce Agentforce AI Implementation.pdf
DOCX
Modern SharePoint Intranet Templates That Boost Employee Engagement in 2025.docx
PDF
E-Commerce Website Development Companyin india
PDF
Topaz Photo AI Crack New Download (Latest 2025)
PDF
MCP Security Tutorial - Beginner to Advanced
PDF
DNT Brochure 2025 – ISV Solutions @ D365
PPTX
Full-Stack Developer Courses That Actually Land You Jobs
Wondershare Recoverit Full Crack New Version (Latest 2025)
Website Design Services for Small Businesses.pdf
Advanced SystemCare Ultimate Crack + Portable (2025)
Microsoft Office 365 Crack Download Free
AI/ML Infra Meetup | Beyond S3's Basics: Architecting for AI-Native Data Access
Autodesk AutoCAD Crack Free Download 2025
UTEP毕业证学历认证,宾夕法尼亚克拉里恩大学毕业证未毕业
AI/ML Infra Meetup | LLM Agents and Implementation Challenges
Introduction to Windows Operating System
EaseUS PDF Editor Pro 6.2.0.2 Crack with License Key 2025
"Secure File Sharing Solutions on AWS".pptx
How Tridens DevSecOps Ensures Compliance, Security, and Agility
AI-Powered Threat Modeling: The Future of Cybersecurity by Arun Kumar Elengov...
Salesforce Agentforce AI Implementation.pdf
Modern SharePoint Intranet Templates That Boost Employee Engagement in 2025.docx
E-Commerce Website Development Companyin india
Topaz Photo AI Crack New Download (Latest 2025)
MCP Security Tutorial - Beginner to Advanced
DNT Brochure 2025 – ISV Solutions @ D365
Full-Stack Developer Courses That Actually Land You Jobs

Sap pp process change doc mto

  • 1. Process change Document SAP PP Module MTO – Make To Order In make-to-orderproduction,aproductisproducedspecificallyforanindividual salesorder.Thisplanningstrategyis usedwhenplanningof the (parent) productisnotrequiredornotpossible.NeitherDemandManagementisinvolvedin thisprocess,noris there an allocationmechanism.Ordersare takenastheycome.Thisstrategyrepresentsaproduction procedure inwhicheachproductis onlyproducedonce,althoughovertime the same orsimilarproductionprocesses are repeated.Eachproductisspecificallyproducedforanindividual customersothatthe finishedproductisrarely placedinstock. So that we needtosetright the masterdata to support“MTO – Make to order “scenario. MaintainviewsinMM01  MRP Views 1. MRP1/MRP2/MRP3/MRP4 (Selectall fourviewsfordemandmanagementandProductionplanning) 2. Work schedulingview (Mandatorytocreate Productionorder) 3. Qualitymanagementview (MandatoryforQualityinspection) 4. Accountingviews 5. Costingviews MRP Procedure: MRP Type - PD MRP MRP Controller - Lot-sizingprocedure: Lot size - EX Lot-for-lotorderquantity Procurement Procurementtype - E (In-house production) Backflush - 1(Always Backflush) Backflush Indicator: Determineswhetherthe Backflushindicatorissetinthe productionorder. Here,a 3-level hierarchical logicisapplied: 1. In the routing,the Backflushindicatorissetinthe componentassignment. 2. In the material masterrecord,the Backflushindicatorhasthe characteristic"AlwaysBackflush". 3. In the material masterrecord,the Backflushindicatorhasthe characteristic"Workcenterdecides",the indicator beingsetinthe work center. Each material componentisassignedtoan operationin the production order.
  • 2. If a material componentisback flushed,the systempoststhe withdrawalonlyupon confirmationof the operation.The withdrawal isthenpostedautomatically. SchedulingMarginKey for Floats Keythat the systemusestodetermine the floatsrequiredforschedulinganorder. 1.In-house productiontime: Specifiesthe time inworkdaysneededtoproduce the material in-house,In-house productiontime isindependentof the orderquantity. 2. Goods ReceiptProcessingTime inDays 3. SchedulingMarginKey Planningstrategy group The strategygroup groupsall the planningstrategiesthatcanbe usedfor a particularmaterial.The planningstrategy representsthe procedure usedforplanninga material andis(technicallyspeaking)controlledbythe MRPtypes. Strategygroup - 20(Make-to-orderproduction) AvailabilityCheck AvailabilityCheck - 02 Individual requirements forSFG/FG. Work scheduling Productionsupervisor - P72 Quality Management Inspectiontype - Needtosetup. Accounting1 View Price Control - S (Standard) forSFG & FG & V (Movingaverage price forRaw materials) Costing1 view Material Is Costedwith Quantity Structure If you alwayscostyour materials(includingrawmaterials) usingcostingwithquantitystructure,youshouldturnonthis indicator.Thisimprovesperformance,because the systemdoesnotsearchunnecessarilyforexistingcostestimates withouta quantity structure. Regardlessof the setting,youcancost a single material withorwithoutquantitystructure.However,youshouldbearin mindthat thissettingisalwaysusedinthe costingrunand inmixedcosting(creatingprocurementalternatives). For everycostestimate,the systemsearchesforexistingcostestimatesthathave the materialsintheirstructure.If withinthe periodacost estimate exists and hasbeenreleased,the systemcopiesit. 1. If thisindicatoris set,the material iscostedusingcostingwitha quantitystructure. The systemsearchesforany existing costestimateswithquantitystructure forthe individualmaterials;itignores existingcostestimateswithoutquantitystructure.If the systemdoesnotfindanyvalidcostingdataforthe materials, it looksforan existingcostingbasedonthe entriesinthe transfercontrol,coststhe material,oraccessesthe price inthe material master. 2. If thisindicatoris not set,the plannedcostsforthe material are calculated usingthe costestimate withoutquantity structure.Inthis case,youuse unit costing to create the quantitystructure manuallybyenteringcostingitemsfor materialsandactivitytypes,forexample.
  • 3. The systemnowsearchesforany existingreleased costestimateswithoutquantitystructure.If acostestimate without quantitystructure existsforamaterial,the resultsof thiscostestimate are includedinacostestimate withquantity structure.If there isno cost estimate withoutquantitystructure,the costestimate withquantitystructure accessesthe price inthe material masterrecord.The plannedcostsforthismaterial thengointothe cost estimate withquantity structure as raw material costs. Thisdoes not applyif the indicatorIgnore prod cost est w/o qty issetin the costingvariant. Variance Key Keythat controlsvariance calculation. Variancescanonlybe calculatedforthe ordersforwhicha variance keyhas beenentered.Thiskeyisdefaultedthrough the costingviewinthe material masterrecord. If you have activatedvariance calculationinthe variance key,the valueof the scrapis calculatedattarget cost and subtractedfromthe actual costs before the variancesare determined. Material-related origin If this indicatorisset,the material numberwillbe writtentothe costelementitemizationinthe Controllingmodule. If you set thisindicator, the costs incurredwill be updated •Under a primary cost element •With reference tothe material number NewMaster data – Decidedby ProductionDept (Kindlycheck with shareduser manuals) 1. Material (MM01 –No needif available) 2. BOM (CS01-Noneedif available) 3. Activitytypes – Will be plannedaccordingtothe Nomenclature &ActivityPrice. 4. Work center(CR01) 5. Routing(CA01)
  • 5. Processflow is a Make to Order scenario (Strategy group - 20 MTO) Internal order(KO01/KO02/KO03) Followingin Business Create Quotation(VA21/VA22/VA23) FollowinginBusiness 1. Salesordercreationfor customer(VA01) 2. DemandManagementviaSalesorder(MD51) 3. Stock/RequirementsList(MD04) 4. ConvertcomponentplannedordertoPR(MD04) Purchase orderMIGOMIRO. 5. Convertfinishedmaterial plannedordertoproductionorder(MD04 / CO41) 6. Release of productionorder(CO02) 7. Goods issue tothe productionwithmovementtype 261(MB1A) makingby Back flush 8. Confirmationof Productionorder(CO11N-operation/CO15-ProductionOrder) Kindlycheckthe ActivityPrice inTransactionKP26Wrt Period,Costcenter,Activitytype. 9. Goods receiptagainstProductionorderwithmovementtype 101(MIGO) (ProductionorderstatuschangedtoTECO – Change inCO02) 10. OrdersettlementforProductionorder(KO88) Standardcost estimation: CK11N & Simulation costinginCKUC. Kindly checkthe Price of SFG / FG. 11. Deliveryof Finishedproductswithmovementtype 601(VL01N/VL02) 12. Billing/Invoice (VF01/VF02/VF03) We needtosetupBOM/Routing/Workcenters,alsowe came toknow thatthe activitytypes needtobe decidedforall above the operations Note:Bill of materialsforSFG or FG must be maintainedbeforethe productonorderconfirmation. Displayof multi –level BOM CS12 - Multi-Level BOM -----x----