SAP Production Planning & Execution
Understanding Production Order
Time Elements
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for the
time elements for the Planned Production Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
Plan Production Order
created from the MRP
run
PIR qty is 200
Let's analyze
all these
time elements
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for
the time elements for the Planned Production
Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Scheduling Margin Key
(Material Master MRP2 view)
1) Opening period
2) Float before Production
3) Release Period
4) Float after Production
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
(Material Master MRP2
view)
10) Goods Receipt
Processing Time
Operation 10
Routing
5) Queue Time
6) Machine Time
7) Move Time
Operation 20
Routing
8) Machine Time
9) Wait Time
Material Master
MRP2 view
stores the
GR Processing Time &
Scheduling Margin Key
Scheduling Margin Key
(Material Master MRP2 view)
1) Opening period
2) Float before Production
3) Release Period
4) Float after Production
(Material Master MRP2 view)
10) Goods Receipt Processing
Time
Scheduling Margin Key
(Material Master MRP2 view)
1) Opening period
2) Float before Production
3) Release Period
4) Float after Production
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Operation 10 Operation 20
Queue
Time
MoveT
ime
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
(Material Master MRP2
view)
10) Goods Receipt
Processing Time
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
2 Work Centers in the Routing
Work Center ZWC1 and ZWC2
SAP PP Production Order Understanding Time Elements.pdf
SAP PP Production Order Understanding Time Elements.pdf
SAP PP Production Order Understanding Time Elements.pdf
SAP PP Production Order Understanding Time Elements.pdf
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
2 Work Centers in the Routing
Operation 10 Work Center ZWC1
Operation 20 Work Center ZWC2
2 Work Centers in the Routing
Operation 10 Work Center ZWC1
Operation 20 Work Center ZWC2
2 Work Centers in the Routing
Operation 10 Work Center ZWC1
Operation 20 Work Center ZWC2
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for the
time elements for the Planned Production Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
PIR qty is 200
10pcs / 60min
200/10 x 60
= 1200min
= 2.9 days for each
Operation Machine
Times
Requirement date
01.12.2021
PIR qty is 200
10pcs / 60min
200/10 x 60
= 1200min
= 2.9 days for each
Operation Machine
Times
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for the
time elements for the Planned Production Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
From Opening date 29.10.2021
to Available date 01.12.2021
the Factory calendar show
1 holiday on 01.11.2021 and all Saturday
and Sundays are non-working days
200pcs
stock available date 01.12.2021
gr processing time 2 days
basic finish date 29.11.2021
float after production 3 days
schedule finish date 23.11.2021
opr20:wait time 2 days 2 days
opr20:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days
opr10:move time 1 day 1 days
opr10:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days
opr10:queue time 1 day 1 days
schedule start date 12.11.2021
float before production 3 days
basic start date 09.11.2021
release period 2 days
release period 2 days 10.11.2021
opening period 5 days
opening date 02.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Production Times
Operation 10 Queue time + Machine time + Move time
= 1 day + 2.9 days + 1 day = 4.9 days
Operation 20 Machine time + Wait time
= 2.9 days + 2 days = 4.9 days
Total = 4.9 days + 4.9 days = 9.8 days
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for the
time elements for the Planned Production Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
Convert the
Planned Order to
Production Order
Planned Orders
Basic Start/Finish dates
Schedule Start/Finish dates
are copied to the
Production Order
Schedule Start date 12.11.2021
- 2 days (Release Period)
=
Release date 10.11.2021
Schedule Start date 12.11.2021
- 2 days (Release Period)
=
Release date 10.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Earliest Start
Time
Latest Start
Time
Earliest Finish
Time
Latest Finish
Time
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Earliest Start Time + Queue Time (1 day)
= Latest Start Times
Latest Start
Time
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Earliest Start Time + Queue Time (1 day)
= Latest Start Times
Earliest tear down time means
exclude Queue TIme
12.11.2021 09:17:08 to
17.11.2021 08:08:34
is just the Machine time of 1200min
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Earliest Start Time + Queue Time (1 day)
= Latest Start Times
Latest tear down time means
include Queue TIme
Earliest Process time
12.11.2021 09:17:08 + Machine time of 1200min + 1 day
Queue Time
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
for the Operation 20
note
Operation 10 latest teardown time + 1 day move time
= Operation 20 earliest start time
18.11.2021 08:08:34 + 1 day
= 19.11.2021 08:08:34
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Since there is no Queue Time for Operation 20
the
Earliest start time = Latest start time
Operation 10
Queue time 1 day
Move time 1 day
1. Analyzing the Production Planned Order time
elements.
2. Check the inputs that affects calculation for the
time elements for the Planned Production Order.
3. PIR requirement date and Production Machine
Time.
4. Planned Order dates verification.
5. Convert Planned Order to Production Order.
6. Summary o the Time Elements for Production
Order schedule dates.
200pcs
stock available date 01.12.2021
gr processing time 2 days
basic finish date 29.11.2021
float after production 3 days
schedule finish date 23.11.2021
opr20:wait time 2 days 2 days
opr20:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days
opr10:move time 1 day 1 days
opr10:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days
opr10:queue time 1 day 1 days
schedule start date 12.11.2021
float before production 3 days
basic start date 09.11.2021
release period 2 days
release period 2 days 10.11.2021
opening period 5 days
opening date 02.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
These are the lead times for the
Planned Production Order
and Production Order
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Opening date + Opering Period = Basic Start Date
Opening Period
is the time given to the Planner to Convert the
Planned Order to Production Order
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Basic Start Date + Float before Prod = Schedule start date
Float before Prod is
the time given to the Scheduler to prepare the Production
inclduing check materials, check jig, check drawing etc
+ the Release Period
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Schedule start date - Release Period = Release Date
Release period is
the time required for preparation of materials for picking and
material staged to the shop floor ready for Production
Release Date
10.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Queue time is
the Average time a Production Order has to
wait before it can start, due to several
Production Orders Queuing to start the JOB.
Release Date
10.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Move time is
Production finish in Operation
10 takes how long to move the
WIP from Operation 10 to
Operation 20
Release Date
10.11.2021
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Release Date
10.11.2021
Wait Time is
Operation 20 completed will have to Wait how
long before it can moved to the next Operation or
next step (example waiting for the Paint to dry)
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Release Date
10.11.2021
Schedule Start time + the Operation times
= Schedule Finish Date
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Release Date
10.11.2021
Schedule Finish Date + Float after Production
= Basic Finish date
Float after Production is
a BUFFER in case production delay
Operation 10 Operation 20
Queue
Time
Move
Time
Wait
Time
Float
After
Prod
Float
Before
Prod Release
Period
Opening
Period
5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days
10pcs / hr
or 60min
10pcs / hr
or 60min
200pcs
means
1200 min
200pcs
means
1200 min
7 hrs/day
work time
7 hrs/day
work time
= 2.9 days = 2.9 days
Goods
Receipt
Process
Time
2 Days
1 2 3 4 10
5
6
7
8
9
Stock Available Date
01.12.2021
Basic Finish Date
29.11.2021
Schedule Finish Date
23.11.2021
Schedule Start Date
12.11.2021
Basic Start Date
09.11.2021
Opening date
02.11.2021
Release Date
10.11.2021
Basic Finish Date + Goods Receipt Processing Time
= Stock Available Date
GR Processing Time is
the time required for QA and Storage to Warehouse

More Related Content

PPTX
Sap pp org
DOCX
Sap mm release Strategy
PDF
Picking 2 steps.pdf
PPTX
SAP MM_Material master dictionary.
PDF
SAP PP MRP Guide for Beginners
PPTX
Procurement for services
PDF
Lsmw step by- step
PDF
Recurring inspection in QM
Sap pp org
Sap mm release Strategy
Picking 2 steps.pdf
SAP MM_Material master dictionary.
SAP PP MRP Guide for Beginners
Procurement for services
Lsmw step by- step
Recurring inspection in QM

What's hot (20)

DOCX
Sap mrp-configuration-pp
PDF
Sap pp shop floor control configuration
PDF
Automatic batch determination based on shelf life
PPTX
WM - PP Interface
PPT
Pp batch management-presentation
DOCX
Material master views
PDF
Valuation & Split valuation in MM
PDF
SAP Demand Management
PPTX
240935187-Handling-Unit-Management-in-SAP-Packing-During-Outbound-Process.pptx
PDF
Dip profiles-documentation
PDF
SAP Automatic batch determination
DOCX
Inter company STO
DOC
Split valuation activation
DOCX
SAP EWM Pick Cancellation Process
DOCX
Revenue account determination
PDF
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
DOC
SAP - Transportation Module Study material
DOC
SAP CO Configuration Guide - Exclusive Document
PDF
Sap mm-im-goods-movements-user-manual
PDF
delivery-from-projects-sap-ps
Sap mrp-configuration-pp
Sap pp shop floor control configuration
Automatic batch determination based on shelf life
WM - PP Interface
Pp batch management-presentation
Material master views
Valuation & Split valuation in MM
SAP Demand Management
240935187-Handling-Unit-Management-in-SAP-Packing-During-Outbound-Process.pptx
Dip profiles-documentation
SAP Automatic batch determination
Inter company STO
Split valuation activation
SAP EWM Pick Cancellation Process
Revenue account determination
Multiple Work Center/Resource Selection and Classification in Master Recipe f...
SAP - Transportation Module Study material
SAP CO Configuration Guide - Exclusive Document
Sap mm-im-goods-movements-user-manual
delivery-from-projects-sap-ps
Ad

Similar to SAP PP Production Order Understanding Time Elements.pdf (20)

PPTX
Mrp ppt.
PPTX
7_production-activity-control.pptx
PDF
Programación de operaciones (GTO) Ingeniería civil industrial
PPT
PP-OVE_1.PPT
PPTX
Job Shop Scheduling.pptx
PPT
MANUFACTURING RESOURCE PLANNING Basics and concepts
PPTX
MATERIAL MANAGEMENT Job Shop Scheduling.pptx
PPT
Material requirement Process in Production
PPT
schedulingandsequencing-140424065526-phpapp02__1_.ppt
PPTX
Process selection and Facility Layout Session 3 (1).pptx
PPT
5 MRP.ppt
PPT
PPTX
SCHEDULING RULES DONE.pptx
PPTX
Unit I-min.pptx computer COMPUTER INTEGRATED MANUFACTURING
PDF
PDF
PPT
Production scheduling
PPT
Scheduling and sequencing
PPTX
Scheduling
PPTX
Scheduling
Mrp ppt.
7_production-activity-control.pptx
Programación de operaciones (GTO) Ingeniería civil industrial
PP-OVE_1.PPT
Job Shop Scheduling.pptx
MANUFACTURING RESOURCE PLANNING Basics and concepts
MATERIAL MANAGEMENT Job Shop Scheduling.pptx
Material requirement Process in Production
schedulingandsequencing-140424065526-phpapp02__1_.ppt
Process selection and Facility Layout Session 3 (1).pptx
5 MRP.ppt
SCHEDULING RULES DONE.pptx
Unit I-min.pptx computer COMPUTER INTEGRATED MANUFACTURING
Production scheduling
Scheduling and sequencing
Scheduling
Scheduling
Ad

Recently uploaded (20)

PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPT
Occupational Health and Safety Management System
PDF
737-MAX_SRG.pdf student reference guides
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PDF
PPT on Performance Review to get promotions
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
Current and future trends in Computer Vision.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
Visual Aids for Exploratory Data Analysis.pdf
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Occupational Health and Safety Management System
737-MAX_SRG.pdf student reference guides
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PPT on Performance Review to get promotions
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Exploratory_Data_Analysis_Fundamentals.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Abrasive, erosive and cavitation wear.pdf
Current and future trends in Computer Vision.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Visual Aids for Exploratory Data Analysis.pdf

SAP PP Production Order Understanding Time Elements.pdf

  • 1. SAP Production Planning & Execution Understanding Production Order Time Elements
  • 2. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 3. Plan Production Order created from the MRP run PIR qty is 200
  • 5. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 6. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9
  • 7. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Scheduling Margin Key (Material Master MRP2 view) 1) Opening period 2) Float before Production 3) Release Period 4) Float after Production Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 (Material Master MRP2 view) 10) Goods Receipt Processing Time Operation 10 Routing 5) Queue Time 6) Machine Time 7) Move Time Operation 20 Routing 8) Machine Time 9) Wait Time
  • 8. Material Master MRP2 view stores the GR Processing Time & Scheduling Margin Key Scheduling Margin Key (Material Master MRP2 view) 1) Opening period 2) Float before Production 3) Release Period 4) Float after Production (Material Master MRP2 view) 10) Goods Receipt Processing Time
  • 9. Scheduling Margin Key (Material Master MRP2 view) 1) Opening period 2) Float before Production 3) Release Period 4) Float after Production Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9
  • 10. Operation 10 Operation 20 Queue Time MoveT ime Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 (Material Master MRP2 view) 10) Goods Receipt Processing Time
  • 11. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 2 Work Centers in the Routing Work Center ZWC1 and ZWC2
  • 16. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 2 Work Centers in the Routing Operation 10 Work Center ZWC1 Operation 20 Work Center ZWC2
  • 17. 2 Work Centers in the Routing Operation 10 Work Center ZWC1 Operation 20 Work Center ZWC2
  • 18. 2 Work Centers in the Routing Operation 10 Work Center ZWC1 Operation 20 Work Center ZWC2
  • 19. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 20. PIR qty is 200 10pcs / 60min 200/10 x 60 = 1200min = 2.9 days for each Operation Machine Times
  • 21. Requirement date 01.12.2021 PIR qty is 200 10pcs / 60min 200/10 x 60 = 1200min = 2.9 days for each Operation Machine Times
  • 22. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 23. From Opening date 29.10.2021 to Available date 01.12.2021 the Factory calendar show 1 holiday on 01.11.2021 and all Saturday and Sundays are non-working days
  • 24. 200pcs stock available date 01.12.2021 gr processing time 2 days basic finish date 29.11.2021 float after production 3 days schedule finish date 23.11.2021 opr20:wait time 2 days 2 days opr20:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days opr10:move time 1 day 1 days opr10:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days opr10:queue time 1 day 1 days schedule start date 12.11.2021 float before production 3 days basic start date 09.11.2021 release period 2 days release period 2 days 10.11.2021 opening period 5 days opening date 02.11.2021
  • 25. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Production Times Operation 10 Queue time + Machine time + Move time = 1 day + 2.9 days + 1 day = 4.9 days Operation 20 Machine time + Wait time = 2.9 days + 2 days = 4.9 days Total = 4.9 days + 4.9 days = 9.8 days
  • 26. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 27. Convert the Planned Order to Production Order
  • 28. Planned Orders Basic Start/Finish dates Schedule Start/Finish dates are copied to the Production Order
  • 29. Schedule Start date 12.11.2021 - 2 days (Release Period) = Release date 10.11.2021
  • 30. Schedule Start date 12.11.2021 - 2 days (Release Period) = Release date 10.11.2021 Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9
  • 31. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Earliest Start Time Latest Start Time Earliest Finish Time Latest Finish Time
  • 32. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Earliest Start Time + Queue Time (1 day) = Latest Start Times Latest Start Time
  • 33. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Earliest Start Time + Queue Time (1 day) = Latest Start Times Earliest tear down time means exclude Queue TIme 12.11.2021 09:17:08 to 17.11.2021 08:08:34 is just the Machine time of 1200min
  • 34. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Earliest Start Time + Queue Time (1 day) = Latest Start Times Latest tear down time means include Queue TIme Earliest Process time 12.11.2021 09:17:08 + Machine time of 1200min + 1 day Queue Time
  • 35. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 for the Operation 20 note Operation 10 latest teardown time + 1 day move time = Operation 20 earliest start time 18.11.2021 08:08:34 + 1 day = 19.11.2021 08:08:34
  • 36. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Since there is no Queue Time for Operation 20 the Earliest start time = Latest start time
  • 37. Operation 10 Queue time 1 day Move time 1 day
  • 38. 1. Analyzing the Production Planned Order time elements. 2. Check the inputs that affects calculation for the time elements for the Planned Production Order. 3. PIR requirement date and Production Machine Time. 4. Planned Order dates verification. 5. Convert Planned Order to Production Order. 6. Summary o the Time Elements for Production Order schedule dates.
  • 39. 200pcs stock available date 01.12.2021 gr processing time 2 days basic finish date 29.11.2021 float after production 3 days schedule finish date 23.11.2021 opr20:wait time 2 days 2 days opr20:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days opr10:move time 1 day 1 days opr10:zwc2 (7hr) 10pcs/1hour > 20 hours 2.9 days opr10:queue time 1 day 1 days schedule start date 12.11.2021 float before production 3 days basic start date 09.11.2021 release period 2 days release period 2 days 10.11.2021 opening period 5 days opening date 02.11.2021
  • 40. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 These are the lead times for the Planned Production Order and Production Order
  • 41. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Opening date + Opering Period = Basic Start Date Opening Period is the time given to the Planner to Convert the Planned Order to Production Order
  • 42. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Basic Start Date + Float before Prod = Schedule start date Float before Prod is the time given to the Scheduler to prepare the Production inclduing check materials, check jig, check drawing etc + the Release Period
  • 43. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Schedule start date - Release Period = Release Date Release period is the time required for preparation of materials for picking and material staged to the shop floor ready for Production Release Date 10.11.2021
  • 44. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Queue time is the Average time a Production Order has to wait before it can start, due to several Production Orders Queuing to start the JOB. Release Date 10.11.2021
  • 45. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Move time is Production finish in Operation 10 takes how long to move the WIP from Operation 10 to Operation 20 Release Date 10.11.2021
  • 46. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Release Date 10.11.2021 Wait Time is Operation 20 completed will have to Wait how long before it can moved to the next Operation or next step (example waiting for the Paint to dry)
  • 47. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Release Date 10.11.2021 Schedule Start time + the Operation times = Schedule Finish Date
  • 48. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Release Date 10.11.2021 Schedule Finish Date + Float after Production = Basic Finish date Float after Production is a BUFFER in case production delay
  • 49. Operation 10 Operation 20 Queue Time Move Time Wait Time Float After Prod Float Before Prod Release Period Opening Period 5 Days 3 Days 2 Days 1 Day 1 Day 2 Days 3 Days 10pcs / hr or 60min 10pcs / hr or 60min 200pcs means 1200 min 200pcs means 1200 min 7 hrs/day work time 7 hrs/day work time = 2.9 days = 2.9 days Goods Receipt Process Time 2 Days 1 2 3 4 10 5 6 7 8 9 Stock Available Date 01.12.2021 Basic Finish Date 29.11.2021 Schedule Finish Date 23.11.2021 Schedule Start Date 12.11.2021 Basic Start Date 09.11.2021 Opening date 02.11.2021 Release Date 10.11.2021 Basic Finish Date + Goods Receipt Processing Time = Stock Available Date GR Processing Time is the time required for QA and Storage to Warehouse