SlideShare a Scribd company logo
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB 60103 - SITE SURVEYING
FIELDWORK REPORT 1
LEVELLING
NAME STUDENT ID. MARKS
LEE KAILYN 0320273
LIEW POH KA 0320424
DEONG KHAI KEAT 0320055
HUSNI NAIM BIN MOHD ZUHALI 0326126
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
TABLE OF CONTENT
CONTENT PAGES NO.
COVER PAGE 1
TABLE OF CONTENT 2
INTRODUCTION OF LEVELLING 3 - 4
APPARATUS USED 5 - 7
OBJECTIVE 8
LEVELLING FIELD WORK 9
FIELD DATA 10 - 11
ADJUSTED FIELD DATA 12 - 13
DISCUSSION 14 - 15
REFERENCES 16
2
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
INTRODUCTION OF LEVELLING
Levelling is the process of measuring, by direct or indirect methods, vertical
distances in order to determine elevations. It is defined as “an art” of determining
the relative height of different points on, above or below the surface. It is also the
measurement of geodetic height using an optical levelling instrument and a level
staff or rod having a numbered scale. Common levelling instruments include the
spirit level, the dumpy level, the digital level, and the laser level.
Level Surface
A level surface is defined as a curved surface which at each point is
perpendicular to the direction of gravity at the point. The surface of a still water is
a truly level surface. Any surface parallel to the mean spheroidal surface of the
earth is, therefore, a level surface.
Datum
A datum is an abstract coordinate system with a reference surface that provides
known locations to begin surveys. In order to relate a series of heights to each
other, they must be given a relative to common point or plane known as a datum.
There are two types of datum :
a) Ordnance Datum is a vertical datum which provides a basis for surveying and
is referred to by all heights shown on Ordnance Survey maps.
b) Assumed datum is a datum transferred to a location near to the surveyed site
when the Ordnance datum is inconvenient or impossible to relate to.
Bench-mark (B.M.)
A bench-mark is fixed point and a post of other permanent mark established at a
known elevation that is used as the basis for measuring the elevation of other
topographical points.
Temporary benchmark (T.B.M.)
A temporary benchmark (T.B.M.) is a fixed point with a known elevation used for
level control during construction works and surveys. Temporary bench-marks can
be set-up by a surveyor for his own works
3
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
Reduced Level
A reduced level is the height of a point or object stated with reference to the
selected datum for the work in hand. It is abbreviated to R.L. Provided that the
starting point of the operations is a known or assumed R.L, then the R.L.’s of the
various point of the site can be calculated from this R.L. and the staff readings
taken at the various point.
Back-sight
In levelling, the first sight or reading taken on a staff after setting up the level. A
back-sight is always taken on a point of known or assumed height. It is
abbreviated to B.S and is taken at the start of the work and at a change point.
Intermediate sight
In levelling, it is the staff reading taken on a point whose elevation is to be
determined. All staff reading between B.S. and F.S. are intermediate sight.
Foresight
In levelling, it is the last sight or reading to be taken from one setting of the
instrument. A foresight must be taken on a fixed point, which then become a
benchmark.
Change Point (Turning Point)
In levelling, it is a point at which two readings are taken on the staff, one before
moving the instrument to a new position, and one after setting the instrument on
the new position. It is often also termed a turning point and is abbreviated to C.P.
or T.P.
Line of Collimation
It is a line joining the intersection of cross hairs of diaphragm to the optical center
of object glass and continuation. It is also known as line of sight.
4
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
APPARATUS USED
a) Automatic level
An Auto Level is a Professional Leveling Tool used by Contractors, Builders,
Land Surveying Professionals, or the Engineer who demands accurate leveling
every time. The automatic level is known for providing users with consistent
leveling accuracy every time while also being fast, low cost and easy to use. The
automatic level is most commonly used in measuring, surveying, and setting
horizontal and vertical levels. The instrument is normally situated on a tripod and
then calibrated to a leveled position using leveling screws.
b) Optical Plummet
In surveying, a device used in place of a plumb bob to center transits and
theodolites over a given point, preferred for its steadiness in strong winds.
5
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
c) Adjustable Leg-tripod
A sturdy tripod in good condition is essential for obtaining accurate
measurement. They provide a level base to easily mount and securely hold your
instrument. The legs of tripod are adjustable and are made of wood, fiberglass or
aluminium are adjustable for use in different types of surveying equipment.
d) Aluminium Levelling Rod
Levelling rods can be one piece, but many are sectional and can be shortened
for storage and transport or lengthened for use. Aluminum rods may be
shortened by telescoping sections inside each other. It also a graduated rod used
in measuring the vertical distance between a point on the ground and the line of
sight of a surveyor's level.
6
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
e) Plumb bob
A plumb-bob or a plummet is a weight with a pointed tip on the bottom that is
suspended from a string and used as a vertical reference line. It may also be
used in surveying to sight a point on the ground that is not readily visible.
f) Spirit bubble
A spirit level, bubble level or simply a level is an instrument designed to indicate
whether a surface is horizontal (level) or vertical (plumb). It is used in different
types of instrument by the surveyor.
7
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
OBJECTIVE
 To find the elevation of given point with respect to some assumed
reference line called datum
 To determine the relative heights of different objects on or below the
surface of the earth
 To determine the undulation of the ground surface.
 To establish point at required elevation respect to datum
 To prepare a layout map for the water supply, sanitary and drainage
system.
 To determine the altitudes of different important points and to know the
reduce levels of different points on or below the surface of the earth.
 To prepare a map or plan to show the relative positions of the objects on
the surface of earth. The map or plan is drawn to some suitable scale. It
also shows boundaries of districts, states and countries. It also include
details of different engineering features such as buildings roads, railways,
dams, canals and many more.
8
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
LEVELLING FIELD WORK
9
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
FIELD DATA
Height of Collimation
BS IS FS Height of
Collimation
Reduced
Level
Remarks
1.290 101.290 100.000 BM101:100.000
1.520 3.280 99.530 98.010 1
1.485 1.455 99.560 98.075 2
1.478 1.520 99.518 98.040 3
1.640 1.505 99.653 98.013 4
1.305 98.348 5
1.380 1.410 99.623 98.243 6
1.475 1.435 99.663 98.188 7
1.415 98.248 8
2.200 1.395 100.468 98.268 9
1.405 0.400 101.473 100.068 10
1.455 100.018 BM101
13.873 13.855 100.018
- 13.855__ - 100.000__
0.018__ 0.018__
10
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
Rise and Fall Method
BS IS FS Rise Fall Reduced
Level
Remarks
1.290 100.000 BM101:100.00
1.520 3.280 1.990 98.010 1
1.485 1.455 0.065 98.075 2
1.478 1.520 0.035 98.040 3
1.640 1.505 0.027 98.013 4
1.305 0.335 98.348 5
1.380 1.410 0.105 98.243 6
1.475 1.435 0.055 98.188 7
1.415 0.060 98.248 8
2.200 1.395 0.020 98.268 9
1.405 0.400 1.800 100.068 10
1.455 0.050 100.018 BM101
13.873 13.855 2.280 2.262 100.018
-13.855_ - 2.262_ -100.000_
0.018_ 0.018_ 0.018_
Acceptable Misclosure: 12±/- √k ;
K = number of set-ups ;
12±/- √9 = ±/- 36mm ;
The levelling is acceptable.
11
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
ADJUSTED FIELD DATA
Height of Collimation
BS IS FS Height of
Collimation
Reduced
Level
Adjustment
Final
Reduced
Level
Remarks
1.290 101.290 100.000 100.000 BM101
1.520 3.280 99.530 98.010 - 0.0020 98.008 1
1.485 1.455 99.560 98.075 - 0.0040 98.071 2
1.478 1.520 99.518 98.040 - 0.0060 98.034 3
1.640 1.505 99.653 98.013 - 0.0080 98.005 4
1.305 98.348 5
1.380 1.410 99.623 98.243 - 0.0100 98.233 6
1.475 1.435 99.663 98.188 - 0.0120 98.176 7
1.415 98.248 8
2.200 1.395 100.468 98.268 - 0.0140 98.254 9
1.405 0.400 100.473 100.068 - 0.0160 100.052 10
1.455 100.018 -0.0180 100.000 BM101
13.873 13.855 100.018
-13.855_ - 100.000_
0.018_ 0.018_
Correction = Cumulative distance ÷ Total distance x Error
Correction per set up
= Error of misclosure ÷ Number of set up
= (100.000 – 100.018) ÷ 9
= - 0.0020 12
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
Rise and Fall Method
BS IS FS Rise Fall Reduced
Level
Adjustment Final
Reduced
Level
Remarks
1.290 100.000 100.000 BM101
1.520 3.280 1.990 98.010 - 0.0020 98.008 1
1.485 1.455 0.065 98.075 - 0.0040 98.071 2
1,478 1.520 0.035 98.040 - 0.0060 98.034 3
1.640 1.505 0.027 98.013 - 0.0080 98.005 4
1.305 0.335 98.348 5
1.380 1.410 0.105 98.243 - 0.0100 98.233 6
1.475 1.435 0.055 98.188 - 0.0120 98.176 7
1.415 0.060 98.248 8
2.200 1.395 0.020 98.268 - 0.0140 98.254 9
1.405 0.400 1.800 100.068 - 0.0160 100.052 10
1.455 0.050 100.018 - 0.0180 100.000 BM101
13.873 13.855 2.280 2.262 100.018
-13.855_ - 2.262_ - 100.000_
0.018_ 0.018_ _ 0.018_
13
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
DISCUSSION
For the first field work, we are assigned to conduct an auto-leveling in campus area. We
are given 10 locations and required to calculate the reduced level of 11 locations
included BM101 which located at the car park Taylor’s University Lakeside Campus. For
the distribution of members, one person is assigned to hold leveling rod, one person is
needed to record the data and other people are to confirm the reading from auto level
and moving the instruments. Before we start our field work, we were given a
demonstration on how to set up and read the readings of the leveling instrument to
measure the height until we get the reduced level. We are allowed to assume a R.L. of
100.00m AOD at the lamp post which labelled as BM101. We are decided to make 9 set
ups in the field work, which means we have to move the instrument for 9 times.
Firstly, the leveling instrument is set up between BM101 and Point 1. After the setup is
done, we need to confirm the reading from the leveling rod and record it down. The
instrument is then shifted to next setup location which between Point 1 and Point 2.
Steps are repeated until the last point. The leveling instrument is set up in between 2
locations to get the height of 2 or 3 points once the instrument is set. In this field work,
we have Back-sight readings, Intermediate sight readings and Foresight readings.
Based on our group’s data, we have Intermediate sight readings. This is the reason
which we have to get the readings for 3 points in 1 setup.
Once the field work is done, all readings have taken, we used two methods to calculate
the reduced level which are Height of Collimation Method and Rise and Fall Method.
After calculate the reduced level, the final reduced level is slightly more than the BM101
reduced level that given by lecturer. Therefore, we need to adjust it by using the loop
misclosure method which is taught in class. To ensure the total readings are within the
allowable error of misclosure, we are required to use the formula of Constant ×
√(Distance).
Constant × √(Distance)
= ± 12 √k
= ± 12 √9
= ± 36mm
In conclusion, the maximum acceptable error of closure is ± 36mm. If the answer is over
±36mm, we need to redo the fieldwork again. In our final result, we get the error of
closure is 18mm, therefore, it is acceptable.
In this field work, we had a great experience on leveling instrument. We are able to
measure the height by using the leveling instrument. We are also able to calculate the
reduced level by using Height of Collimation Method and Rise and Fall Method. During
the field work, we faced some problems while adjusting the spirit bubbles. Throughout
14
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
the whole field work, there are many setups and hence, we can master it. Although we
had some misclosure mistakes on calculations, we are able to adjust it by using the
method that was taught in class. This is a very great opportunity for us to handle a
surveying instrument and we enjoyed the process during the fieldwork.
15
TAYLOR’S UNIVERSITY | SABD | BQS
SITE SURVEYING | QSB 60103
REFERENCES
1) (Glossary, n.d.)
http://www.vermessungsseiten.de/englisch/vermtech/guide/glos
sary.htm
2) (Civileblog,n.d.)
http://www.civileblog.com/levelling/
3) (Dictionary of Construction, n.d.)
http://www.dictionaryofconstruction.com/definition/optical-
plummet.html
4) (Surveying Equipment and Level set-up, n.d.)
http://www.boeingconsult.com/tafe/ss&so/survey1/Module4/equi
pment-s1.htm
5) (Reference,n.d.)
https://www.reference.com/home-garden/automatic-level-
42f9ad933d1043a0#
6) (Ben Meadow’s, n.d.)
https://www.benmeadows.com/refinfo/techfacts/techpdf/survey_
equipment_1360.pdf
16

More Related Content

DOCX
Ss report 1 ----levelling eport
DOCX
Leveling report
DOCX
Site survey Fieldwork1 (levelling)
PDF
Levelling report-1
DOCX
Levelling report
PDF
Leveling final-report
DOCX
Site surveying report 1
PDF
Site surveying report (levelling)
Ss report 1 ----levelling eport
Leveling report
Site survey Fieldwork1 (levelling)
Levelling report-1
Levelling report
Leveling final-report
Site surveying report 1
Site surveying report (levelling)

What's hot (20)

DOC
Ss report 1
DOC
Site Surveying Report 1 (Levelling)
PDF
Ss report 1
DOCX
Site Surveying Report 2 (Traversing)
DOCX
Site survey report 1
DOCX
Site surveying report 2
DOC
79338922 survey-report
DOCX
Project 1- Levelling
PPTX
Levelling
DOCX
Levelling
DOCX
Site surveying report1
PDF
S2 2 leveling
PDF
Site Surveying Levelling
PPTX
Lec 1 introduction surveying by et bilal
PPTX
INTRODUCTION TO SURVEYING
PPTX
Lecture 01 introduction of surveying
DOCX
Site surveying report 1
DOCX
Theodolite report
DOCX
Site surveying-report-leveling
PPTX
2.1 surveying, levelling and mapping
Ss report 1
Site Surveying Report 1 (Levelling)
Ss report 1
Site Surveying Report 2 (Traversing)
Site survey report 1
Site surveying report 2
79338922 survey-report
Project 1- Levelling
Levelling
Levelling
Site surveying report1
S2 2 leveling
Site Surveying Levelling
Lec 1 introduction surveying by et bilal
INTRODUCTION TO SURVEYING
Lecture 01 introduction of surveying
Site surveying report 1
Theodolite report
Site surveying-report-leveling
2.1 surveying, levelling and mapping
Ad

Viewers also liked (11)

PPTX
Specifichazardsandmitigation 150527183644-lva1-app6891
PPTX
Diplomado de la tic
PDF
Mediación y seguros 2.0
PDF
Deb - newsletter 4
PDF
Artículo en Expansión, Napa Valley. Recuperado por Luis Fernando Heras Portillo
DOCX
Les citoyens charte d'eěthique et de contribution
PDF
Integrated assignment m1 ct1 and bm aug2015
PPTX
AP Biology Mitosis investigation Lab Report
PDF
La Restauración de la Iglesia San Martín de Tours de Sechura.
PDF
Arquitectura contemporánea vs Arquitectura Histórica: Confrontación o coexist...
Specifichazardsandmitigation 150527183644-lva1-app6891
Diplomado de la tic
Mediación y seguros 2.0
Deb - newsletter 4
Artículo en Expansión, Napa Valley. Recuperado por Luis Fernando Heras Portillo
Les citoyens charte d'eěthique et de contribution
Integrated assignment m1 ct1 and bm aug2015
AP Biology Mitosis investigation Lab Report
La Restauración de la Iglesia San Martín de Tours de Sechura.
Arquitectura contemporánea vs Arquitectura Histórica: Confrontación o coexist...
Ad

Similar to Ss field-data (20)

DOCX
Assignment 1 - Levelling
PDF
Ss report 1
PDF
Site Surveying Leveling
PDF
Levelling
PDF
Site surveying-almost-1
DOCX
SITE SURVEYING LEVELING
PDF
Site surveying 1 - done
PDF
Site surveying 1 - done
PDF
Ss report 1
DOCX
1 st report
DOCX
Site surveying report i
DOCX
Site surveying
DOCX
Levelling final
PPT
Types of level
DOCX
Site Surveying Report - Traversing
PPTX
levelling and contouring
PDF
Introduction to Surveying LEVELLING PROCEDURES
PPT
Basicsofsurveying 090509013902-phpapp01
PPT
Basics Of Surveying
Assignment 1 - Levelling
Ss report 1
Site Surveying Leveling
Levelling
Site surveying-almost-1
SITE SURVEYING LEVELING
Site surveying 1 - done
Site surveying 1 - done
Ss report 1
1 st report
Site surveying report i
Site surveying
Levelling final
Types of level
Site Surveying Report - Traversing
levelling and contouring
Introduction to Surveying LEVELLING PROCEDURES
Basicsofsurveying 090509013902-phpapp01
Basics Of Surveying

More from Kailyn Lee (20)

PDF
Software
PDF
Software Application report
PDF
Estimating presentation
PDF
Estimating various types of estimating
PDF
PP1 presentation
PDF
PP1 report
PDF
Eca presentation
PDF
Measurement 4 presentation
PDF
Buildingservices2 bld60503
DOCX
People's dynamic individual (autosaved)
DOC
Safety individual final
PPTX
Traffic management safety six key issues
DOCX
Bs 2 individual
PDF
Managementscienceassignment
DOCX
Ss report-2-field-data-latest
PDF
Bs1 final report_templaterecovered
DOCX
Ct bm measurement report
PPTX
Psycho video-slides
PPTX
Psycho slides-1 (1)
PDF
Psychologylor
Software
Software Application report
Estimating presentation
Estimating various types of estimating
PP1 presentation
PP1 report
Eca presentation
Measurement 4 presentation
Buildingservices2 bld60503
People's dynamic individual (autosaved)
Safety individual final
Traffic management safety six key issues
Bs 2 individual
Managementscienceassignment
Ss report-2-field-data-latest
Bs1 final report_templaterecovered
Ct bm measurement report
Psycho video-slides
Psycho slides-1 (1)
Psychologylor

Recently uploaded (20)

PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
advance database management system book.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
What if we spent less time fighting change, and more time building what’s rig...
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
advance database management system book.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
B.Sc. DS Unit 2 Software Engineering.pptx
Introduction to pro and eukaryotes and differences.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Indian roads congress 037 - 2012 Flexible pavement
Paper A Mock Exam 9_ Attempt review.pdf.
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Hazard Identification & Risk Assessment .pdf
Weekly quiz Compilation Jan -July 25.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf

Ss field-data

  • 1. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB 60103 - SITE SURVEYING FIELDWORK REPORT 1 LEVELLING NAME STUDENT ID. MARKS LEE KAILYN 0320273 LIEW POH KA 0320424 DEONG KHAI KEAT 0320055 HUSNI NAIM BIN MOHD ZUHALI 0326126
  • 2. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 TABLE OF CONTENT CONTENT PAGES NO. COVER PAGE 1 TABLE OF CONTENT 2 INTRODUCTION OF LEVELLING 3 - 4 APPARATUS USED 5 - 7 OBJECTIVE 8 LEVELLING FIELD WORK 9 FIELD DATA 10 - 11 ADJUSTED FIELD DATA 12 - 13 DISCUSSION 14 - 15 REFERENCES 16 2
  • 3. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 INTRODUCTION OF LEVELLING Levelling is the process of measuring, by direct or indirect methods, vertical distances in order to determine elevations. It is defined as “an art” of determining the relative height of different points on, above or below the surface. It is also the measurement of geodetic height using an optical levelling instrument and a level staff or rod having a numbered scale. Common levelling instruments include the spirit level, the dumpy level, the digital level, and the laser level. Level Surface A level surface is defined as a curved surface which at each point is perpendicular to the direction of gravity at the point. The surface of a still water is a truly level surface. Any surface parallel to the mean spheroidal surface of the earth is, therefore, a level surface. Datum A datum is an abstract coordinate system with a reference surface that provides known locations to begin surveys. In order to relate a series of heights to each other, they must be given a relative to common point or plane known as a datum. There are two types of datum : a) Ordnance Datum is a vertical datum which provides a basis for surveying and is referred to by all heights shown on Ordnance Survey maps. b) Assumed datum is a datum transferred to a location near to the surveyed site when the Ordnance datum is inconvenient or impossible to relate to. Bench-mark (B.M.) A bench-mark is fixed point and a post of other permanent mark established at a known elevation that is used as the basis for measuring the elevation of other topographical points. Temporary benchmark (T.B.M.) A temporary benchmark (T.B.M.) is a fixed point with a known elevation used for level control during construction works and surveys. Temporary bench-marks can be set-up by a surveyor for his own works 3
  • 4. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 Reduced Level A reduced level is the height of a point or object stated with reference to the selected datum for the work in hand. It is abbreviated to R.L. Provided that the starting point of the operations is a known or assumed R.L, then the R.L.’s of the various point of the site can be calculated from this R.L. and the staff readings taken at the various point. Back-sight In levelling, the first sight or reading taken on a staff after setting up the level. A back-sight is always taken on a point of known or assumed height. It is abbreviated to B.S and is taken at the start of the work and at a change point. Intermediate sight In levelling, it is the staff reading taken on a point whose elevation is to be determined. All staff reading between B.S. and F.S. are intermediate sight. Foresight In levelling, it is the last sight or reading to be taken from one setting of the instrument. A foresight must be taken on a fixed point, which then become a benchmark. Change Point (Turning Point) In levelling, it is a point at which two readings are taken on the staff, one before moving the instrument to a new position, and one after setting the instrument on the new position. It is often also termed a turning point and is abbreviated to C.P. or T.P. Line of Collimation It is a line joining the intersection of cross hairs of diaphragm to the optical center of object glass and continuation. It is also known as line of sight. 4
  • 5. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 APPARATUS USED a) Automatic level An Auto Level is a Professional Leveling Tool used by Contractors, Builders, Land Surveying Professionals, or the Engineer who demands accurate leveling every time. The automatic level is known for providing users with consistent leveling accuracy every time while also being fast, low cost and easy to use. The automatic level is most commonly used in measuring, surveying, and setting horizontal and vertical levels. The instrument is normally situated on a tripod and then calibrated to a leveled position using leveling screws. b) Optical Plummet In surveying, a device used in place of a plumb bob to center transits and theodolites over a given point, preferred for its steadiness in strong winds. 5
  • 6. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 c) Adjustable Leg-tripod A sturdy tripod in good condition is essential for obtaining accurate measurement. They provide a level base to easily mount and securely hold your instrument. The legs of tripod are adjustable and are made of wood, fiberglass or aluminium are adjustable for use in different types of surveying equipment. d) Aluminium Levelling Rod Levelling rods can be one piece, but many are sectional and can be shortened for storage and transport or lengthened for use. Aluminum rods may be shortened by telescoping sections inside each other. It also a graduated rod used in measuring the vertical distance between a point on the ground and the line of sight of a surveyor's level. 6
  • 7. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 e) Plumb bob A plumb-bob or a plummet is a weight with a pointed tip on the bottom that is suspended from a string and used as a vertical reference line. It may also be used in surveying to sight a point on the ground that is not readily visible. f) Spirit bubble A spirit level, bubble level or simply a level is an instrument designed to indicate whether a surface is horizontal (level) or vertical (plumb). It is used in different types of instrument by the surveyor. 7
  • 8. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 OBJECTIVE  To find the elevation of given point with respect to some assumed reference line called datum  To determine the relative heights of different objects on or below the surface of the earth  To determine the undulation of the ground surface.  To establish point at required elevation respect to datum  To prepare a layout map for the water supply, sanitary and drainage system.  To determine the altitudes of different important points and to know the reduce levels of different points on or below the surface of the earth.  To prepare a map or plan to show the relative positions of the objects on the surface of earth. The map or plan is drawn to some suitable scale. It also shows boundaries of districts, states and countries. It also include details of different engineering features such as buildings roads, railways, dams, canals and many more. 8
  • 9. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 LEVELLING FIELD WORK 9
  • 10. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 FIELD DATA Height of Collimation BS IS FS Height of Collimation Reduced Level Remarks 1.290 101.290 100.000 BM101:100.000 1.520 3.280 99.530 98.010 1 1.485 1.455 99.560 98.075 2 1.478 1.520 99.518 98.040 3 1.640 1.505 99.653 98.013 4 1.305 98.348 5 1.380 1.410 99.623 98.243 6 1.475 1.435 99.663 98.188 7 1.415 98.248 8 2.200 1.395 100.468 98.268 9 1.405 0.400 101.473 100.068 10 1.455 100.018 BM101 13.873 13.855 100.018 - 13.855__ - 100.000__ 0.018__ 0.018__ 10
  • 11. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 Rise and Fall Method BS IS FS Rise Fall Reduced Level Remarks 1.290 100.000 BM101:100.00 1.520 3.280 1.990 98.010 1 1.485 1.455 0.065 98.075 2 1.478 1.520 0.035 98.040 3 1.640 1.505 0.027 98.013 4 1.305 0.335 98.348 5 1.380 1.410 0.105 98.243 6 1.475 1.435 0.055 98.188 7 1.415 0.060 98.248 8 2.200 1.395 0.020 98.268 9 1.405 0.400 1.800 100.068 10 1.455 0.050 100.018 BM101 13.873 13.855 2.280 2.262 100.018 -13.855_ - 2.262_ -100.000_ 0.018_ 0.018_ 0.018_ Acceptable Misclosure: 12±/- √k ; K = number of set-ups ; 12±/- √9 = ±/- 36mm ; The levelling is acceptable. 11
  • 12. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 ADJUSTED FIELD DATA Height of Collimation BS IS FS Height of Collimation Reduced Level Adjustment Final Reduced Level Remarks 1.290 101.290 100.000 100.000 BM101 1.520 3.280 99.530 98.010 - 0.0020 98.008 1 1.485 1.455 99.560 98.075 - 0.0040 98.071 2 1.478 1.520 99.518 98.040 - 0.0060 98.034 3 1.640 1.505 99.653 98.013 - 0.0080 98.005 4 1.305 98.348 5 1.380 1.410 99.623 98.243 - 0.0100 98.233 6 1.475 1.435 99.663 98.188 - 0.0120 98.176 7 1.415 98.248 8 2.200 1.395 100.468 98.268 - 0.0140 98.254 9 1.405 0.400 100.473 100.068 - 0.0160 100.052 10 1.455 100.018 -0.0180 100.000 BM101 13.873 13.855 100.018 -13.855_ - 100.000_ 0.018_ 0.018_ Correction = Cumulative distance ÷ Total distance x Error Correction per set up = Error of misclosure ÷ Number of set up = (100.000 – 100.018) ÷ 9 = - 0.0020 12
  • 13. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 Rise and Fall Method BS IS FS Rise Fall Reduced Level Adjustment Final Reduced Level Remarks 1.290 100.000 100.000 BM101 1.520 3.280 1.990 98.010 - 0.0020 98.008 1 1.485 1.455 0.065 98.075 - 0.0040 98.071 2 1,478 1.520 0.035 98.040 - 0.0060 98.034 3 1.640 1.505 0.027 98.013 - 0.0080 98.005 4 1.305 0.335 98.348 5 1.380 1.410 0.105 98.243 - 0.0100 98.233 6 1.475 1.435 0.055 98.188 - 0.0120 98.176 7 1.415 0.060 98.248 8 2.200 1.395 0.020 98.268 - 0.0140 98.254 9 1.405 0.400 1.800 100.068 - 0.0160 100.052 10 1.455 0.050 100.018 - 0.0180 100.000 BM101 13.873 13.855 2.280 2.262 100.018 -13.855_ - 2.262_ - 100.000_ 0.018_ 0.018_ _ 0.018_ 13
  • 14. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 DISCUSSION For the first field work, we are assigned to conduct an auto-leveling in campus area. We are given 10 locations and required to calculate the reduced level of 11 locations included BM101 which located at the car park Taylor’s University Lakeside Campus. For the distribution of members, one person is assigned to hold leveling rod, one person is needed to record the data and other people are to confirm the reading from auto level and moving the instruments. Before we start our field work, we were given a demonstration on how to set up and read the readings of the leveling instrument to measure the height until we get the reduced level. We are allowed to assume a R.L. of 100.00m AOD at the lamp post which labelled as BM101. We are decided to make 9 set ups in the field work, which means we have to move the instrument for 9 times. Firstly, the leveling instrument is set up between BM101 and Point 1. After the setup is done, we need to confirm the reading from the leveling rod and record it down. The instrument is then shifted to next setup location which between Point 1 and Point 2. Steps are repeated until the last point. The leveling instrument is set up in between 2 locations to get the height of 2 or 3 points once the instrument is set. In this field work, we have Back-sight readings, Intermediate sight readings and Foresight readings. Based on our group’s data, we have Intermediate sight readings. This is the reason which we have to get the readings for 3 points in 1 setup. Once the field work is done, all readings have taken, we used two methods to calculate the reduced level which are Height of Collimation Method and Rise and Fall Method. After calculate the reduced level, the final reduced level is slightly more than the BM101 reduced level that given by lecturer. Therefore, we need to adjust it by using the loop misclosure method which is taught in class. To ensure the total readings are within the allowable error of misclosure, we are required to use the formula of Constant × √(Distance). Constant × √(Distance) = ± 12 √k = ± 12 √9 = ± 36mm In conclusion, the maximum acceptable error of closure is ± 36mm. If the answer is over ±36mm, we need to redo the fieldwork again. In our final result, we get the error of closure is 18mm, therefore, it is acceptable. In this field work, we had a great experience on leveling instrument. We are able to measure the height by using the leveling instrument. We are also able to calculate the reduced level by using Height of Collimation Method and Rise and Fall Method. During the field work, we faced some problems while adjusting the spirit bubbles. Throughout 14
  • 15. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 the whole field work, there are many setups and hence, we can master it. Although we had some misclosure mistakes on calculations, we are able to adjust it by using the method that was taught in class. This is a very great opportunity for us to handle a surveying instrument and we enjoyed the process during the fieldwork. 15
  • 16. TAYLOR’S UNIVERSITY | SABD | BQS SITE SURVEYING | QSB 60103 REFERENCES 1) (Glossary, n.d.) http://www.vermessungsseiten.de/englisch/vermtech/guide/glos sary.htm 2) (Civileblog,n.d.) http://www.civileblog.com/levelling/ 3) (Dictionary of Construction, n.d.) http://www.dictionaryofconstruction.com/definition/optical- plummet.html 4) (Surveying Equipment and Level set-up, n.d.) http://www.boeingconsult.com/tafe/ss&so/survey1/Module4/equi pment-s1.htm 5) (Reference,n.d.) https://www.reference.com/home-garden/automatic-level- 42f9ad933d1043a0# 6) (Ben Meadow’s, n.d.) https://www.benmeadows.com/refinfo/techfacts/techpdf/survey_ equipment_1360.pdf 16